Overview of the Fairhill/MLK green infrastructure ambassador project taking shape in Cleveland. Includes details on project history, improvements, Project Clean Lake, traffic patterns and impacts during construction, and more.
Langley School Pump Station Community Meeting October 22, 2020Fairfax County
The community meeting was held to inform residents about the Langley School Pump Station project and to present the county's preliminary plans for the gravity sewer, pump station and force main.
Langley School Pump Station Community Meeting October 22, 2020Fairfax County
The community meeting was held to inform residents about the Langley School Pump Station project and to present the county's preliminary plans for the gravity sewer, pump station and force main.
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020Fairfax County
A virtual meeting about the project will be held on August 19, 2020 at 6:00 p.m. Please see a how to sign in on slide 2. A 2019 study evaluated several alternatives for replacement. Those alternatives will be discussed with the community at the virtual meeting.
Powerpoint - Langley School Pump Station and Force Main ProjectFairfax County
The Purpose
Inform the community about the upcoming project,
Phase 1 of the project is eminent
Gravity Sewer on Langley Lane
Force main from Langley High School to Georgetown Pike
A Closed-Circuit Television (CCTV) Camera became stuck in the sanitary sewer line located in the Old Keene Mill Shopping Center. Wastewater Design and Construction Division mobilized to the site with the on-call contractor to begin the 15-foot excavation to replace 50 feet of broken gravity sewer. Because the work was within a shopping center parking lot, the project team worked the night shift to limit disturbance to the community. After four days of work, the camera was retrieved, and the pit was backfilled. This project was substantially complete on August 27, 2021.
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Fairfax County
Restore up to 7,500 feet of stream channel and tributaries
Reduce erosion and sediment transport
Install new sanitary sewers serving over 500 single family homes
Improve watershed conditions and reduce downstream impacts
Improve and protect public infrastructure
Prevent costly emergency repairs
Reduce risk to public health and the environment
Maintain close coordination with stakeholders and community
Build partnerships with local organizations
Lakevale Sewer Improvements Community MeetingFairfax County
During the Preliminary Engineering
We are currently revising our website to match the recent revisions with the project (Same Location)
Mid-November we will have a Public Input Meeting via Zoom
Mid December we will make the Final Recommend of the Alternative available on out website
During the Detailed Design
Maintain and update the website
Public Input at the 35% design (March 2022)
Public Outreach Meeting at the 95% design summer/fall 2022
During the Construction
Install a Project Sign
Hold a Preconstruction meeting and routine status meetings as we proceed
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...Fairfax County
Restore streambed and banks, ~4,500 linear feet
Reduce sediment and nutrient inputs into stream system
Installation of grade control structures, improve/correct channel dimension and alignment
Improve floodplain connectivity and ecological processes
Reduce force and volume of water within the channel during storm and flood events
Naturally process nutrients and sediments on the floodplain and within the streambed
Improve habitat for biological community
Native landscaping
Floodplain wetlands
Streambed and flow diversity
In-stream structures
Protect Infrastructure – Sanitary Sewer Lines
Channel Relocation away from sanitary sewer lines when possible
Armoring channel banks and bottom where relocation is not an option
This project included rehabilitation of four sanitary sewer metering vaults. These meter vaults included Dukes Car Wash, Lower Holmes Run, Tod Street, and Scotts Run. The Dukes Car Wash and Lower Holmes Run Meters are in the City of Alexandria, the Tod Street Meter is in Falls Church in the Providence District, and the Scotts Run Meter is in the Scotts Run Nature Preserve in the Dranesville District. Work included removal of existing control panels, conduits and metering equipment, rehabilitation of the interior of the vaults with a cementitious coating and epoxy liner system, installation of new control panels and conduit, and reinstallation of flow metering devices. This project was substantially complete on August 30, 2021.
Lakevale Estates Collection Improvements Community MeetingFairfax County
Short-term: Install Backflow Devices
Devices installed
Regular system maintenance is ongoing
Mid-term: Temporary modifications to the Lakevale Pump Station
Updated pump operating strategy
Replaced pump impeller to reduce pump station capacity
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
Future wastewater flows in northern Fairfax County exceed existing system capacity
Treatment capacity is available in Noman M. Cole Jr. Pollution Control Plant in Lorton, VA
New pipes and pumps are needed to move future flows to treatment plant
NEXT STEPS
Field investigations / surveys
Finalize alignments and pump station layout
Use of open cut excavation
Use of trenchless methods
Easement acquisition needed
Develop traffic control plans
Celedon Lane Virtual Community Meeting Slipline Replacement August 19, 2020Fairfax County
A virtual meeting about the project will be held on August 19, 2020 at 6:00 p.m. Please see a how to sign in on slide 2. A 2019 study evaluated several alternatives for replacement. Those alternatives will be discussed with the community at the virtual meeting.
Powerpoint - Langley School Pump Station and Force Main ProjectFairfax County
The Purpose
Inform the community about the upcoming project,
Phase 1 of the project is eminent
Gravity Sewer on Langley Lane
Force main from Langley High School to Georgetown Pike
A Closed-Circuit Television (CCTV) Camera became stuck in the sanitary sewer line located in the Old Keene Mill Shopping Center. Wastewater Design and Construction Division mobilized to the site with the on-call contractor to begin the 15-foot excavation to replace 50 feet of broken gravity sewer. Because the work was within a shopping center parking lot, the project team worked the night shift to limit disturbance to the community. After four days of work, the camera was retrieved, and the pit was backfilled. This project was substantially complete on August 27, 2021.
Little Pimmit Run at Chesterbrook Stream Restoration Project and Little Pimmi...Fairfax County
Restore up to 7,500 feet of stream channel and tributaries
Reduce erosion and sediment transport
Install new sanitary sewers serving over 500 single family homes
Improve watershed conditions and reduce downstream impacts
Improve and protect public infrastructure
Prevent costly emergency repairs
Reduce risk to public health and the environment
Maintain close coordination with stakeholders and community
Build partnerships with local organizations
Lakevale Sewer Improvements Community MeetingFairfax County
During the Preliminary Engineering
We are currently revising our website to match the recent revisions with the project (Same Location)
Mid-November we will have a Public Input Meeting via Zoom
Mid December we will make the Final Recommend of the Alternative available on out website
During the Detailed Design
Maintain and update the website
Public Input at the 35% design (March 2022)
Public Outreach Meeting at the 95% design summer/fall 2022
During the Construction
Install a Project Sign
Hold a Preconstruction meeting and routine status meetings as we proceed
Long Branch at Arlington Boulevard and Robin Ridge Court - Concept Design and...Fairfax County
Restore streambed and banks, ~4,500 linear feet
Reduce sediment and nutrient inputs into stream system
Installation of grade control structures, improve/correct channel dimension and alignment
Improve floodplain connectivity and ecological processes
Reduce force and volume of water within the channel during storm and flood events
Naturally process nutrients and sediments on the floodplain and within the streambed
Improve habitat for biological community
Native landscaping
Floodplain wetlands
Streambed and flow diversity
In-stream structures
Protect Infrastructure – Sanitary Sewer Lines
Channel Relocation away from sanitary sewer lines when possible
Armoring channel banks and bottom where relocation is not an option
This project included rehabilitation of four sanitary sewer metering vaults. These meter vaults included Dukes Car Wash, Lower Holmes Run, Tod Street, and Scotts Run. The Dukes Car Wash and Lower Holmes Run Meters are in the City of Alexandria, the Tod Street Meter is in Falls Church in the Providence District, and the Scotts Run Meter is in the Scotts Run Nature Preserve in the Dranesville District. Work included removal of existing control panels, conduits and metering equipment, rehabilitation of the interior of the vaults with a cementitious coating and epoxy liner system, installation of new control panels and conduit, and reinstallation of flow metering devices. This project was substantially complete on August 30, 2021.
Lakevale Estates Collection Improvements Community MeetingFairfax County
Short-term: Install Backflow Devices
Devices installed
Regular system maintenance is ongoing
Mid-term: Temporary modifications to the Lakevale Pump Station
Updated pump operating strategy
Replaced pump impeller to reduce pump station capacity
Tysons West Wastewater Conveyance Systems Modifications Project 05-22.pptxFairfax County
Future wastewater flows in northern Fairfax County exceed existing system capacity
Treatment capacity is available in Noman M. Cole Jr. Pollution Control Plant in Lorton, VA
New pipes and pumps are needed to move future flows to treatment plant
NEXT STEPS
Field investigations / surveys
Finalize alignments and pump station layout
Use of open cut excavation
Use of trenchless methods
Easement acquisition needed
Develop traffic control plans
Okeechobee Road (US 27/SR 25) from Krome Avenue (SR 997) to NW 79 Avenue PD&E Study presentation to the Citizens Transportation Advisory Committee (CTAC), July 23, 2014.
Tucker Avenue Neighborhood Community Meeting, 03-15-2022Fairfax County
Identify and evaluate house flooding and public safety concerns
Improve drainage conditions to convey 100-year storm if feasible
Reduce and treat stormwater runoff at the source
Improve water quality and stream protection
Use resilient & functional designs
Make improvements compatible with characteristics of neighborhood
Partner with community to develop sound, cost effective solutions that can be collaboratively implemented and maintained
Build on lessons learned to help improve site development process for infill development
I-75 / University Drive: An Interchange Under Pressure Becomes a DiamondOHM Advisors
John Katers, PE and Pat Wingate, PE present I-75 / University Drive: An Interchange Under Pressure Becomes a Diamond at the 2016 Ohio Transportation Engineering Conference.
This presentation shows the results of a class project analyzing transportation alternatives to ease congestion at a Ohio major intersection. My group was assigned the roundabout alternative, and our analysis included site analysis using GIS, stakeholder concerns, environmental issues, feasibility of a roundabout, and final recommendations.
Tucker Avenue Neighborhood Stormwater Improvement Preliminary Design ReviewFairfax County
Identify and evaluate house flooding and public safety concerns
Improve drainage conditions to convey 100-year storm if feasible
Reduce and treat stormwater runoff at the source
Improve water quality and stream protection
Use innovative & functional designs
Make improvements compatible with characteristics of neighborhood
Partner with community to develop sound, cost effective solutions that can be collaboratively implemented and maintained
Build on lessons learned to help improve site development process for infill development
Fairgrounds Roadway Widening Public Hearing (March 17, 2015)City of Midland
The purpose of this hearing was to present the planned improvements to Fairgrounds Road from State Loop (SL) 250 to Pecan Avenue in the City of Midland, Midland County, Texas, and to receive public comment. Displays will be available for viewing at 6:00 p.m. with the formal hearing commencing at 7:00 p.m.
The existing facility consists of one 12-foot travel lane in each direction with no shoulders. The existing right-of-way (ROW) width varies from approximately 62 feet south of Wadley Avenue to 77 feet historically used for the roadway north of Wadley Avenue.
The proposed project would widen Fairgrounds Road from two lanes to five lanes. South of Wadley Avenue, Fairgrounds Road would consist of one 11-foot lane and one 14-foot shared use lane in each direction and an 11-foot continuous center left-turn lane. There would be five-foot wide sidewalks on each side of the roadway. North of Wadley Avenue, Fairgrounds Road would consist of two 12-foot lanes in each direction with a 12-foot continuous center left-turn lane. An eight-foot bike/pedestrian trail would be constructed on the west side of the roadway. The length of the proposed project is approximately 1.5 miles. The proposed typical ROW width would vary from approximately 80 feet south of Wadley Avenue to approximately 129.5 feet north of Wadley Avenue. The proposed improvements would require approximately 11.4 acres of additional ROW, of which, 10.9 acres are already owned by the City of Midland. The proposed project would not result in any residential relocations or commercial displacements. Information about the tentative schedule for ROW acquisition and construction may be obtained from the City of Midland.
As part of this project, the City of Midland is considering a Section 4(f) de minimis impact determination for impacts to F.T. Hogan Park (Hogan Park). An approximate 10.9 acre strip of land generally located east of Hogan Park Golf Course from Wadley Avenue to Loop 250 would be required for permanent incorporation into the proposed transportation facility. A Section 4(f) de minimis finding means that the proposed project would not adversely affect the activities, features, or attributes that qualify Hogan Park for protection under Section 4(f). The City of Midland and TxDOT will consider comments received during this Public Hearing before making a final Section 4(f) de minimis determination.
This report describes the methods applied to develop co-benefits information and analysis results representing a range of anticipated community, environmental and
financial co-benefits. These co-benefits are examined at the site and neighborhood scales. The report also discusses the impact of certain co-benefits collectively across the District’s Appendix 3 GI Projects and refers to this cumulative impact at the program-wide scale.
Does "personality" matter to public-agencies' social media? We think so. In this slide deck, we examine how personality can help us as utilities engage, educate and entertain our followers.
As presented to NEORSD Trustees May 15, these photographs were taken by NEORSD crews inspecting stream locations impacted by high flows and flooding following a significant storm May 12, 2014.
When a new Marriott Hotel was going to go up in University Circle, we saw a great opportunity to manage stormwater and reduce contributions to the combined sewer system. Here's what it looks like. The hotel is scheduled to open this month.
How and why is the Northeast Ohio Regional Sewer District using social media? This overview gives you the past, present and future of social media’s role in @neorsd’s communication, outreach, and education efforts, as well as tips to keep in mind in when using your own social networks.
The Roman Empire A Historical Colossus.pdfkaushalkr1407
The Roman Empire, a vast and enduring power, stands as one of history's most remarkable civilizations, leaving an indelible imprint on the world. It emerged from the Roman Republic, transitioning into an imperial powerhouse under the leadership of Augustus Caesar in 27 BCE. This transformation marked the beginning of an era defined by unprecedented territorial expansion, architectural marvels, and profound cultural influence.
The empire's roots lie in the city of Rome, founded, according to legend, by Romulus in 753 BCE. Over centuries, Rome evolved from a small settlement to a formidable republic, characterized by a complex political system with elected officials and checks on power. However, internal strife, class conflicts, and military ambitions paved the way for the end of the Republic. Julius Caesar’s dictatorship and subsequent assassination in 44 BCE created a power vacuum, leading to a civil war. Octavian, later Augustus, emerged victorious, heralding the Roman Empire’s birth.
Under Augustus, the empire experienced the Pax Romana, a 200-year period of relative peace and stability. Augustus reformed the military, established efficient administrative systems, and initiated grand construction projects. The empire's borders expanded, encompassing territories from Britain to Egypt and from Spain to the Euphrates. Roman legions, renowned for their discipline and engineering prowess, secured and maintained these vast territories, building roads, fortifications, and cities that facilitated control and integration.
The Roman Empire’s society was hierarchical, with a rigid class system. At the top were the patricians, wealthy elites who held significant political power. Below them were the plebeians, free citizens with limited political influence, and the vast numbers of slaves who formed the backbone of the economy. The family unit was central, governed by the paterfamilias, the male head who held absolute authority.
Culturally, the Romans were eclectic, absorbing and adapting elements from the civilizations they encountered, particularly the Greeks. Roman art, literature, and philosophy reflected this synthesis, creating a rich cultural tapestry. Latin, the Roman language, became the lingua franca of the Western world, influencing numerous modern languages.
Roman architecture and engineering achievements were monumental. They perfected the arch, vault, and dome, constructing enduring structures like the Colosseum, Pantheon, and aqueducts. These engineering marvels not only showcased Roman ingenuity but also served practical purposes, from public entertainment to water supply.
Unit 8 - Information and Communication Technology (Paper I).pdfThiyagu K
This slides describes the basic concepts of ICT, basics of Email, Emerging Technology and Digital Initiatives in Education. This presentations aligns with the UGC Paper I syllabus.
Instructions for Submissions thorugh G- Classroom.pptxJheel Barad
This presentation provides a briefing on how to upload submissions and documents in Google Classroom. It was prepared as part of an orientation for new Sainik School in-service teacher trainees. As a training officer, my goal is to ensure that you are comfortable and proficient with this essential tool for managing assignments and fostering student engagement.
Honest Reviews of Tim Han LMA Course Program.pptxtimhan337
Personal development courses are widely available today, with each one promising life-changing outcomes. Tim Han’s Life Mastery Achievers (LMA) Course has drawn a lot of interest. In addition to offering my frank assessment of Success Insider’s LMA Course, this piece examines the course’s effects via a variety of Tim Han LMA course reviews and Success Insider comments.
2024.06.01 Introducing a competency framework for languag learning materials ...Sandy Millin
http://sandymillin.wordpress.com/iateflwebinar2024
Published classroom materials form the basis of syllabuses, drive teacher professional development, and have a potentially huge influence on learners, teachers and education systems. All teachers also create their own materials, whether a few sentences on a blackboard, a highly-structured fully-realised online course, or anything in between. Despite this, the knowledge and skills needed to create effective language learning materials are rarely part of teacher training, and are mostly learnt by trial and error.
Knowledge and skills frameworks, generally called competency frameworks, for ELT teachers, trainers and managers have existed for a few years now. However, until I created one for my MA dissertation, there wasn’t one drawing together what we need to know and do to be able to effectively produce language learning materials.
This webinar will introduce you to my framework, highlighting the key competencies I identified from my research. It will also show how anybody involved in language teaching (any language, not just English!), teacher training, managing schools or developing language learning materials can benefit from using the framework.
Introduction to AI for Nonprofits with Tapp NetworkTechSoup
Dive into the world of AI! Experts Jon Hill and Tareq Monaur will guide you through AI's role in enhancing nonprofit websites and basic marketing strategies, making it easy to understand and apply.
Model Attribute Check Company Auto PropertyCeline George
In Odoo, the multi-company feature allows you to manage multiple companies within a single Odoo database instance. Each company can have its own configurations while still sharing common resources such as products, customers, and suppliers.
Macroeconomics- Movie Location
This will be used as part of your Personal Professional Portfolio once graded.
Objective:
Prepare a presentation or a paper using research, basic comparative analysis, data organization and application of economic information. You will make an informed assessment of an economic climate outside of the United States to accomplish an entertainment industry objective.
4. • Political subdivision of Ohio
• Created in 1972 by Court Order
– Code of Regulations
– Governed by seven Trustees
• Separate and distinct from the City of
Cleveland and Cuyahoga County
Who We Are…
5. • Sanitary & regional stormwater services to
Cleveland and 61 member communities
– 1 million customers
– 90+ billion gallons treated each year
• Water quality monitoring
• Lake Erie beach monitoring and
maintenance
What We Do…
6. We Own and Operate 3 Wastewater
Treatment Plants
Westerly
Southerly
Easterly
6
7. Northeast Ohio Regional Sewer District
Responsibility
• $3 billion in 25 years
• Combined Sewer
Overflow (CSO) control
• Sewer fees
• Regional flooding
and erosion issues
• Impervious
surface fee
8. Northeast Ohio Regional Sewer District
Responsibility
• Regional flooding
and erosion issues
• Impervious
surface fee
• $3 billion in 25 years
• Combined Sewer
Overflow (CSO) control
• Sewer fees
10. 10 10
Dry Weather Flow
to treatment plant
Additional Conveyance
Capacity Available for
wet-weather
Combined Sewer
Overflow Discharge to
Stream/Lake
What is a Combined Sewer?
16. Consent Decree Requires Northeast
Ohio’s CSO Problem Reduced in 25
Years
98%
Capture
0
1
2
3
4
5
6
7
8
9
Baseline (1970s) Current (2011) Target (2036)
9
4.5
0.494
TypicalYear
CSOVolumeRemaining
(BG)
0 to 4 overflows
in typical year
0 to 80+
overflows in
typical year
17. CSO Consent Decree
25 years of Tunnel Construction
Seven Tunnel Systems
– 21 Miles
– 17’ to 24’ in Diameter
– 100’ to 200’ in Depth
42. Outlet Pipe to
Bioretention Area
Maximum Height
14 feet
Large Stones to Slow
Down Stormwater
Bioretention
Area
Exposed Aggregate
Concrete
Stamped & Stained
Concrete
Standard Concrete Stained Concrete
43. NEORSD will maintain the following:
Maintenance Responsibilities
• New storm sewers and new street inlets
• Bioretention basins (includes storm sewer infrastructure
within the bioretention basins)
• Public plaza (includes facility maintenance, litter control, etc.)
46. Pre Construction Coordination
• Pre Construction Inspection/Photographs
• Coordination with residents for access to property (typically
exterior of the home photographed)
• Residential Notification
• 72-hour notification prior to commencement of work
• Access To Property
• Contractor to coordinate & maintain access to drives, if
crossing is to occur
• Maintained with steel road plate
• Issues and Complaints
• NEORSD Customer Service (216)881-8247 8AM-5PM
47. Maintenance of Traffic
• Tentative Plan (Subject to Change)
based on approval/schedule
• Major Components:
– West bound lane Fairhill Road closed. Detour to be
established around Larchmere Blvd. to MLK Drive.
– No left turn from E. 124th, E. 127th, Kemper Road
and North Moreland Road
– Intersection of MLK and Fairhill channelized to
eastbound Fairhill, left turn only lane, to North MLK
– Pedestrian sidewalk closed along north Fairhill Road
– No street parking allowed
48.
49.
50. Open Cut Construction
• Noise and dust limited to working hours.
Contractor is responsible for maintaining
work zone.
• Partial restoration of road cuts when sewer
work completed.
56. Questions & Answers
Question: Where will bus route #48/#48A go?
How will the public be notified of RTA bus route
and/or bus stop location changes?
RTA service alerts are posted at
http://www.riderta.com
RTA Answerline (216) 621-9500 is also available
to help answer RTA related questions.
57. Questions & Answers
Question: Who do I contact if I have a
question or concern?
NEORSD Customer Service Department
(216) 881-8247 8AM – 5PM
58. Questions & Answers
Question: What impacts should I expect
from construction of the new storm sewers
within the public right-of-way?
Temporary on-street parking limitations.
Temporary lane closures, detours and limits
to left turns onto Fairhill Road westbound.
Temporary driveway access closures.
Pedestrian sidewalk closures/detours.
Construction dust & noise.
59. For more information:
• NEORSD Customer Service (216) 881-8247
• Project Clean Lake official homepage:
www.neorsd.org/cso.php