SlideShare a Scribd company logo
EGLINTON
CROSSTOWN LRT
Forest Hill Station Open House
October 20, 2016
INFORMATION IS CURRENT AS OF
October 20, 2016
AND SUBJECT TO CHANGE
Safety First – Our #1 Priority
• Always have a site specific safety plan and site specific emergency plan.
• Ensure pre-work hazard assessments are complete and understood.
• Ensure job hazards analyses are complete and understood.
• Identify and report unsafe behaviour and coach each other to make improvements.
• Do everything possible to protect themselves, co-workers and members of the
public
• Stop work if the safety of themselves, co-workers and members of the public
cannot be assured
• Be prepared and equipped to work safely.
We train and direct staff to:
Construction of the
Eglinton Crosstown LRT Line
Background
• In September 2008, Metrolinx
launched a regional transportation
plan – a 25-year, $50 billion plan -- to
coordinate and integrate transportation
and transit in the Greater Toronto Area
• In 2010, City of Toronto approved the
project to build the Eglinton Crosstown
from Weston Road in the west to
Kennedy Station in the east.
• Following a competitive process,
Crosslinx Transit Solutions (CTS) was
awarded a contract in July 2015 to
design, build, finance, and maintain
the Eglinton Crosstown Light Rail
Transit (LRT).
Benefits of P3s:
• The Crosstown is being delivered using a public
private partnership model called Alternative
Financing and Procurement (AFP).
• It was procured as one design-build-finance-
maintain project to minimize integration risk –
historically, a factor for project cost overruns
under traditional models.
• Under the AFP model, CTS assumes most
project risks, including:
 design, project management and sub-
contractor coordination
 increases in construction material prices
and labour costs
 schedule and project completion delays
 maintenance and lifecycle replacement of
materials within the stations and stops,
rails, control systems, and vehicles
Project Players Roles
What are we building – a new modern LRT
• 15 underground stations and 10 surface stops
• A maintenance and storage facility
• A 19-kilometre route separated from regular traffic
• Communications system
• Links to 54 bus routes, three subway stations, GO Transit, and a new UP Express station
14
Design Excellence Principles & Objectives
Design Approach: Design from City to Object
15
S i m p l i c i t y
I conog ra phy
Transparency
Ur b a n i t y
Simplicity and elegance of the design solution at all scales,
from the city to the object;
Iconography of the architectural elements to create a unique
and highly recognizable signature on Eglinton Avenue, from
the slanted portal celebrating kinetic movement, to the
profiled wing delineating shelters and waiting areas;
Transparency of the entrances and through the station to magnify
the presence of natural light, to enact as a way-finding strategy
and to uplift the passenger’s experience;
Urbanity of the signature layers from landscape to architecture,
to underline the genius loci and contextualize the stations and
stops within the civic scale of the avenue.
Design Concepts
• Passenger First
Passenger First Light-filled Stations
Simplicity of Circulation
17
Clarity and Simplicity of Architectural
Expression
Street Level – Contextual &
Inviting
An International Signature
for Toronto
Entrance – Bright & Secure
Concourse – Simple &
Pristine
Concourse – Transparent &
Open
Platform – Spacious &
Animated
Crosstown Design Approach
Features
• About half of the 19 km line is
tunneled
• Stations and stops are about 0.6 km
apart
• Features will include:
• time arrival information
• safe access for people walking
and biking to the station
• clear route maps, seating, bike
parking
Design Approach
Comply with nine design principles developed
by City of Toronto and Metrolinx.
• Provide a legacy for generations to come.
• Have natural lighting during the day and well-lit
entrances at night.
• Have safe, clean, intuitive wayfinding at
all the stations and stops.
• Put passengers first.
• Provide visible entrances, bicycle facilities and
sustainable practices to ensure all stations
comply with Toronto Green Standard Tier.
• Landscaped entrances, including planters with
trees and ornamental grasses.
• Public plazas and retail components at some
stations.
• Clean and minimalist space at platform level.
• Accessible to passengers with disabilities,
strollers, and bicycles.
Accessibility for All
Station and stops are designed to support ease of access and use by persons with
differing levels of mobility, sight, hearing, sensory and cognitive abilities. The project site
and facilities are designed to be universally accessible including satisfying the
requirements of Accessibility for Ontarians with Disabilities Act (AODA) and applicable
City of Toronto Guidelines, Ontario Building Code (OBC) and Canadian Standards
Association (CSA) Standards. Some of these features include:
• Barrier‐free path from the entrance level to the station platform level
• Tactile warning strips and tactile walking surface indicators
• Signage system with tactile indicators
• Passenger Assistance Intercom (PAI)
• Low floor Light Rail Vehicle (LRV) with designated wheelchair locations
• Nominal gap from platform edge to LRV entry
• Automated visual and audible stop announcements
• On-street and off-street paratransit passenger pick-up/drop-off
• The underground stations run
between Weston Road in the west to
Laird Street in the east.
• Construction began at Keelesdale
station, located at Keele Street /
Trethewey Drive and Eglinton Avenue
in March 2016.
• Installing support of excavation is the first step in
constructing an underground station.
• All underground stations will be brand
new, including the three LRT
interchange stations connecting to
other transit modes.
• Most of the underground stations will be
in construction by the end of 2016.
What to expect in 2016
– Start of Stations Construction
How we’re building: Cut-and-Cover Stations
Forest Hill
Locations: Keelesdale (Keele), Caledonia, Fairbank (Dufferin), Forest Hill
(Bathurst), Chaplin, Mount Pleasant, Leaside (Bayview), Science Centre
How we’re building: Mined Stations
Avenue
tLocations: Oakwood, Avenue, Leaside (part), Laird
• There are three
interchange stations.
• Interchange stations
will allow transit
riders to connect to
other transit modes,
such as TTC, GO
and the UP Express.
• The three
interchange stations
will be built with the
‘Cut and Cover’
method.
How we’re building – Interchange Stations
Subway Station Longitudinal Section
Locations: Cedarvale (Allen), Eglinton (Yonge), Kennedy
How we’re building Forest Hill Station -
Construction Overview
Distinct phases of construction:
• Preparatory works
• Utility relocations
• Support of excavation (shoring)
• Road restoration
• Deep excavation
• Underground station construction
• Track work and systems installation
• Station structure construction
• Traction power system
• Signalling system
• Testing and commissioning
• A modified version of the cut-and-cover method,
whereby following support of excavation, a large
concrete roof slab is constructed and placed over
top of the excavated area, the roadway is restored
and work continues safely below ground
• The roof slab is used to support utilities and the
roadway
• Benefits include reduction in road disruption
(compared to tradition method), increased utility
stability and improved safety and working
conditions
How we’re building Forest Hill Station –
Station Construction
Reinstate Roadway
• A concrete roof slab will be
constructed over top of the
excavated area, utilities will be
buried, and the roadway will be
reinstated above the roof slab.
Excavation
• Once the roadway is reinstated,
crews will work safely beneath the
roadway to construct the station box,
build the platform and install rail
infrastructure.
Architectural & Building Work
• Construction of the station entrance
structures will begin in 2018.
How we’re building Forest Hill Station –
Station Construction (cont’d)
Forest Hill Station Map
Main
Entrance
Secondary
Entrance
Station Box
Forest Hill Station Main Entrance
Forest Hill Station Secondary Entrance
Forest Hill Station Aerial View
Forest Hill Station Unique Design Concepts
• Fully glazed glass main station entrance
• Solid cool roofs with high albedo surfaces,
designed to reduce heat island effect and
contribute to energy efficiency
• Outdoor bike canopy with 60 bike parking
spots
• On-street connections to TTC bus routes
• Retail space
Forest Hill Station Tunnel Ventilation System (TVS)
• Designed to extract and control smoke from tunnels and stations in
the event of a fire.
• Controls excessive air velocities and air pressure transients.
• Removes heat and controls air temperature during operations.
• Supplies outdoor air ventilation and facilitates contaminant removal.
• Forest Hill Station TVS is comprised of axial fans, dampers,
electrical equipment, tunnel ventilation panels, supervisory control
and data acquisition (SCADA) interface, and Tunnel Ventilation Fire
Command Post.
• Vents are located on top of the secondary station entrance.
Forest Hill Station Construction Lookahead
(2016 – 2017)
Fall 2016
• Continue Bell utilities relocation
• Continue installation of geotechnical monitoring instrumentation
• Continue traffic signal relocation and reconfiguration
• Backfilling and compaction of the secondary entrance
• Relocation of overhead hydro utilities and poles
• Relocation of overhead Rogers utilities to an underground duct bank
• Site mobilization and drill rig/crane pad construction
• Support of excavation (shoring) beginning on the south side of Eglinton Avenue West
Winter 2016
• Continue shoring on the south side of Eglinton Avenue West
• Watermain services
Traffic and Pedestrian Changes
• To accommodate the utilities relocation and shoring
construction stages, temporary traffic changes, such as road
closures, lane reductions, turn restrictions, pedestrian
rerouting and bus stop relocations may be in effect
• Additionally, changes to existing traffic conditions, such as
relaxation of turn prohibitions or additional restrictions, may be
enacted in development with local elected officials, traffic
engineers and the local community to accommodate station
construction
Forest Hill Station Construction Stages
Stage Activity Duration Start Date
Shoring
Stage 1
Utilities Relocation,
Shoring and Roof Slab
5 months Fall 2016
Shoring
Stage 2
Utilities Relocation,
Shoring and Roof Slab
3 months Winter 2017
Shoring
Stage 3
Shoring and Roof Slab 3 months
Summer
2017
Shoring
Stage 4
Shoring and Roof Slab 3.5 months Fall 2017
Utilities Relocation – Current Staging Plan
Began July 2016
Forest Hill Station – Shoring Stage 1
Beginning as early as Fall 2016 (20 weeks)
Forest Hill Station – Shoring Stage 2
Beginning as early as Winter 2017 (12 weeks)
Forest Hill Station – Shoring Stage 3
Beginning as early as Summer 2017 (12 weeks)
Forest Hill Station – Shoring Stage 4
Beginning as early as Fall 2017 (14 weeks)
Summary of Proposed Traffic Changes for Forest
Hill Station
Stage Traffic Changes
Construction
Activities
Approx.
Start Date
Approx.
Duration
1
• Close Peveril Hill N at Eglinton Ave W
• Restrict all turns at the intersection of Bathurst St and
Eglinton Ave W
• Reduce traffic to one lane in each direction on Bathurst St
and Eglinton Ave W
Utilities
Relocation &
shoring
Fall 2016 20 weeks
2 Continue Stage 1 configuration
Utilities
Relocation &
shoring
Winter
2017
12 weeks
3
Continue Stage 2 configuration, plus:
• Restore northbound right turn onto Eglinton Ave W
• Restore eastbound right turn onto Bathurst St
Shoring
Summer
2017
12 weeks
4 Continue Stage 3 configuration Shoring Fall 2017 14 weeks
Summary of Proposed Pedestrian Changes for
Forest Hill Station
Stage Pedestrian Changes
Construction
Activities
Approx.
Start Date
Approx.
Duration
1
• Restrict the east crosswalk
• Reroute pedestrians south on Peveril Hill N and east to
Bathurst St
Utilities
Relocation and
shoring
Fall 2016 20 weeks
2
Continue Stage 1 configuration, plus:
• Restore east crosswalk
• Restrict west crosswalk
Utilities
Relocation and
shoring
Winter
2017
12 weeks
3
Continue Stage 2 configuration, plus:
• Restore west crosswalk
• Restrict east crosswalk
Shoring
Summer
2017
12 weeks
4
Continue Stage 3 configuration, plus:
• Restore east crosswalk
• Restrict west crosswalk
Shoring Fall 2017 14 weeks
Proposed Closure of Peveril Hill N
Why?
• To provide a truck entry and egress route
from the work zone during shoring stages 1
and 2
Proposed Mitigation
• Temporary relaxation of the left turn
prohibition from northbound Bathurst Street
onto Dewbourne Avenue (in place)
• Temporary relaxation of the right turn
prohibition from eastbound Eglinton Avenue
West onto Chiltern Hill Road
Duration
• Approximately eight (8) months beginning
in fall 2016
RELAX
EXISITING
RIGHT TURN
RESTRICTION
RELAX
EXISITING
LEFT TURN
RESTRICTION
Proposed Restriction of Turns at Eglinton
Avenue West and Bathurst Street
Why?
• Insufficient turn radius due to location of station box
• To prevent traffic congestion during construction stages
1 through 4
Mitigation
• Temporary relaxation of turn prohibitions on nearby
streets to provide alternative travel routes for local traffic
Duration
• For approximately 15 months
Summary of Turn Prohibitions to be
considered for Temporary Relaxation
Prohibited
Movement
From To
Prohibited
Time
Right turn Eglinton Ave W (WB) Vesta Dr (NB) 7 AM – 6 PM
Right turn Eglinton Ave W (EB) Gardiner Rd (SB) 7 AM – 7 PM
Right turn Eglinton Ave W (EB) Old Forest Hill Rd (SB) 7 AM – 7 PM
(everyday)
Left turn Eglinton Ave W (WB) Old Forest Hill Rd (SB) 7 AM – 9 AM
Through traffic Old Forest Hill Rd (SB) @ Eglinton Ave W Peak Hours
Through traffic Old Forest Hill Rd (NB) @ Eglinton Ave W Peak Hours
Left turn Old Forest Hill Rd (NB) Eglinton Ave W (WB) Peak Hours
Left turn Bathurst St (SB) Burton St (EB) All Times
Right turn Ava Rd (WB) Bathurst St (NB) 4 PM – 6 PM
Left turn Bathurst St (NB) Avenal Dr (WB) Peak Hours
Left turn Bathurst St (NB) Dewbourne Ave (WB) Peak Hours
Summary of Turn Prohibitions to be considered for
Temporary Relaxation (cont’d)
Prohibited
Movement
From To
Prohibited
Time
Right turn Rosemary Ln (WB) Bathurst St (NB) 4 PM – 6 PM
Right turn Eglinton Ave W (EB) Chiltern Hill Rd (SB) Peak Hours
Right turn Eglinton Ave W (EB) Rostrevor Rd (SB) Peak Hours
Left turn Glen Cedar Rd (NB) Eglinton Ave W (WB) Peak Hours
Left turn Bathurst St (NB) Wembley Rd (WB) Peak Hours
Right turn Bathurst St (SB) Wembley Rd (WB) 7 AM – 9 AM
Left turn Bathurst St (SB) Shallmar Blvd (EB) 7 AM – 9 AM
Left turn Bathurst St (SB) Rosemary Ln (EB) 7 AM – 9 AM
Left turn Bathurst St (SB) Ava Rd (EB) 7 AM – 9 AM
Haul Routes
• During the shoring and deep excavation stages of construction,
approximately 30 trucks will haul more than 80 loads of construction
material, such as soil and concrete, to-and-from Forest Hill Station per day
• To minimize traffic congestion along Eglinton Avenue, construction vehicles
will use a combination of arterial, minor arterial, collector and local roads on
a rotating basis to haul loads
• The following roads will be used as haul routes for Forest Hill Station:
• Bathurst Street
• Eglinton Avenue West
• Spadina Road
• Old Forest Hill Road
• Ava Road
• Chadwick Avenue
• Dewbourne Avenue
• Gardiner Road
• Hilltop Road
• Peveril Hill North
• Rosemary Lane
• Vesta Drive
• Wembley Road
Summary of Streets to be used as Haul Routes for
Forest Hill Station
Street Name From To
Vesta Drive Ava Rd Bathurst St
Ava Rd Bathurst St Rosemary Ln
Rosemary Ln Bathurst St Dewbourne Ave
Dewbourne Ave Rosemary Ln Bathurst St
Chadwick Ave Spadina Rd Vesta Dr
Gardiner Rd Eglinton Ave W Old Forest Hill Rd
Peveril Hill N Eglinton Ave W Dewbourne Ave
Advanced Signage
• Advanced signage will be placed
along Eglinton Ave W and cross
streets to inform motorists and
pedestrians of traffic changes at the
intersection
• At Forest Hill Station, advanced
signage will be placed as far north
as Wembley Rd, as far south as
Dewbourne Ave, as far east as Old
Forest Hill Rd and as far west as
Chiltern Hill Rd
Bus Stop Relocations
Four (4) TTC bus stops at the four corners of Eglinton Avenue West and Bathurst
Street will be relocated throughout various stages of utilities relocation and shoring.
• The TTC bus stop on the southwest corner has been relocated approximately
140 meters to the east.
• The TTC bus stop on the southeast corner will be relocated approximately 90
meters to the north
• The TTC bus stop on the northwest corner will be relocated approximately 70
meters to the north
• The TTC bus stop on the northeast corner will be relocated approximately 50
meters to the east to the next available stop
The stops service the following TTC bus routes:
• 7/307 Bathurst North
• 310 Bathurst South
• 32/332 Eglinton West
Please look for signage informing passengers of the new temporary stop locations.
TTC Bus Stop Relocation Map
Relocate 50m
east to next
stop
Relocated
140m east
Relocate 90m
northRelocate 70m
north
TTC Bus Route 33 Detour
• To accommodate construction staging
at Forest Hill Station, TTC bus route #
33 will be detour north on Mayfair
Avenue and west on Shallmar
Boulevard to Bathurst Street
• The approximate duration of the
detour is 15 months, beginning as
early as October 2016
• Changes to traffic calming conditions
on Mayfair Avenue and Shallmar
Boulevard will be implemented
Experience Eglinton
Advertising and marketing initiatives, ranging
from subway and local newspapers advertisements,
to postcards, coupon booklets and flyers all focused
on encouraging residents in the neighbourhood
to shop locally.
Support for Businesses – Shop Local
Community Benefits
Commit to Social Procurement and Local Investment
to maximize business opportunities along the project corridor.
Visit CTS’ website www.crosslinxtransit.ca for updated postings.
The Eglinton Crosstown LRT is the first time a Community Benefits Framework
has been included as part of a major infrastructure project in Ontario.
Partner with Local Workforce Agencies
to recruit candidates from the project corridor and from
historically disadvantaged communities.
Work with Subcontractors
to maximize opportunities for apprentices.
Stay in touch
416-782-8118
www.thecrosstown.ca
crosstown@metrolinx.com
facebook.com/thecrosstown
twitter.com/crosstownTO
instagram.com/eglinton_crosstown
Crosstown West Office
1848 Eglinton Ave W (at Dufferin)
Crosstown East Office
660 Eglinton Ave E (at Bayview)
Forest hill station open house

More Related Content

What's hot

Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
Crosstown TO
 
Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017
Crosstown TO
 
Caledonia station open house
Caledonia station open houseCaledonia station open house
Caledonia station open house
Crosstown TO
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017
Crosstown TO
 
Chaplin station open house
Chaplin station open houseChaplin station open house
Chaplin station open house
Crosstown TO
 
Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017
Crosstown TO
 
Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open House
Crosstown TO
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Crosstown TO
 
Mount pleasant station open house
Mount pleasant station open house  Mount pleasant station open house
Mount pleasant station open house
Crosstown TO
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Crosstown TO
 
Fairbank and Oakwood stations open house
Fairbank and Oakwood stations open house  Fairbank and Oakwood stations open house
Fairbank and Oakwood stations open house
Crosstown TO
 
Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house
Crosstown TO
 
Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017
Crosstown TO
 
Forest Hill station open house
Forest Hill station open houseForest Hill station open house
Forest Hill station open house
Crosstown TO
 
Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...
Crosstown TO
 
Western Works - Construction Liaison Committee Meeting - May 2017
Western Works - Construction Liaison Committee Meeting - May 2017Western Works - Construction Liaison Committee Meeting - May 2017
Western Works - Construction Liaison Committee Meeting - May 2017
Crosstown TO
 
Leaside - Laird Construction Liaison Committee Meeting - July 2017
Leaside - Laird Construction Liaison Committee Meeting  - July 2017Leaside - Laird Construction Liaison Committee Meeting  - July 2017
Leaside - Laird Construction Liaison Committee Meeting - July 2017
Crosstown TO
 

What's hot (20)

Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
Chaplin - Avenue Construction Liaison Committee Meeting - June 2017
 
Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017Leaside - Laird Construction Liaison Committee Meeting - June 2017
Leaside - Laird Construction Liaison Committee Meeting - June 2017
 
Caledonia station open house
Caledonia station open houseCaledonia station open house
Caledonia station open house
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017
 
Chaplin station open house
Chaplin station open houseChaplin station open house
Chaplin station open house
 
Laird Station Open House
Laird Station Open HouseLaird Station Open House
Laird Station Open House
 
Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017Cedarvale Station Open House - March 2017
Cedarvale Station Open House - March 2017
 
Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open House
 
Stations Presentation - Corridor Wide
Stations Presentation - Corridor WideStations Presentation - Corridor Wide
Stations Presentation - Corridor Wide
 
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
Pharmacy - Kennedy Construction Liaison Committee Meeting - May 2017
 
Mount pleasant station open house
Mount pleasant station open house  Mount pleasant station open house
Mount pleasant station open house
 
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
Brentcliffe - Victoria Park Construction Liaison Committee Meeting - June 2017
 
Fairbank and Oakwood stations open house
Fairbank and Oakwood stations open house  Fairbank and Oakwood stations open house
Fairbank and Oakwood stations open house
 
Chaplin slide deck final
Chaplin slide deck finalChaplin slide deck final
Chaplin slide deck final
 
Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house
 
Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017Eglinton Station Open House - March 2017
Eglinton Station Open House - March 2017
 
Forest Hill station open house
Forest Hill station open houseForest Hill station open house
Forest Hill station open house
 
Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...Science Centre Station and West At-Grade Surface Stops Open House - November ...
Science Centre Station and West At-Grade Surface Stops Open House - November ...
 
Western Works - Construction Liaison Committee Meeting - May 2017
Western Works - Construction Liaison Committee Meeting - May 2017Western Works - Construction Liaison Committee Meeting - May 2017
Western Works - Construction Liaison Committee Meeting - May 2017
 
Leaside - Laird Construction Liaison Committee Meeting - July 2017
Leaside - Laird Construction Liaison Committee Meeting  - July 2017Leaside - Laird Construction Liaison Committee Meeting  - July 2017
Leaside - Laird Construction Liaison Committee Meeting - July 2017
 

Viewers also liked

Chaplin - Avenue Construction Liaison Committee Meeting - March 28, 2017
Chaplin - Avenue Construction Liaison Committee Meeting - March 28, 2017Chaplin - Avenue Construction Liaison Committee Meeting - March 28, 2017
Chaplin - Avenue Construction Liaison Committee Meeting - March 28, 2017
Crosstown TO
 
Western Works Construction Liaison Committee Meeting - September 2017
Western Works Construction Liaison Committee Meeting - September 2017Western Works Construction Liaison Committee Meeting - September 2017
Western Works Construction Liaison Committee Meeting - September 2017
Crosstown TO
 
Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017
Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017
Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017
Crosstown TO
 
Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017
Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017
Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017
Crosstown TO
 
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Crosstown TO
 
Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017
Crosstown TO
 
Cedarvale - Forest Hill Construction Liaison Committee Meeting - June 2017
Cedarvale - Forest Hill Construction Liaison Committee Meeting - June 2017Cedarvale - Forest Hill Construction Liaison Committee Meeting - June 2017
Cedarvale - Forest Hill Construction Liaison Committee Meeting - June 2017
Crosstown TO
 
Brentcliffe-Victoria Park Construction Liaison Committee Meeting - July 2017
Brentcliffe-Victoria Park Construction Liaison Committee Meeting - July 2017Brentcliffe-Victoria Park Construction Liaison Committee Meeting - July 2017
Brentcliffe-Victoria Park Construction Liaison Committee Meeting - July 2017
Crosstown TO
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017
Crosstown TO
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017
Crosstown TO
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017
Crosstown TO
 

Viewers also liked (11)

Chaplin - Avenue Construction Liaison Committee Meeting - March 28, 2017
Chaplin - Avenue Construction Liaison Committee Meeting - March 28, 2017Chaplin - Avenue Construction Liaison Committee Meeting - March 28, 2017
Chaplin - Avenue Construction Liaison Committee Meeting - March 28, 2017
 
Western Works Construction Liaison Committee Meeting - September 2017
Western Works Construction Liaison Committee Meeting - September 2017Western Works Construction Liaison Committee Meeting - September 2017
Western Works Construction Liaison Committee Meeting - September 2017
 
Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017
Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017
Cedarvale - Forest Hill Construction Liaison Committee Meeting - May 2017
 
Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017
Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017
Fairbank & Oakwood Stations Construction Liaison Committee Meeting - Aug 2017
 
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
Chaplin & Avenue Construction Liaison Committee Meeting - July 2017
 
Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017Science Centre Station Open House - June 2017
Science Centre Station Open House - June 2017
 
Cedarvale - Forest Hill Construction Liaison Committee Meeting - June 2017
Cedarvale - Forest Hill Construction Liaison Committee Meeting - June 2017Cedarvale - Forest Hill Construction Liaison Committee Meeting - June 2017
Cedarvale - Forest Hill Construction Liaison Committee Meeting - June 2017
 
Brentcliffe-Victoria Park Construction Liaison Committee Meeting - July 2017
Brentcliffe-Victoria Park Construction Liaison Committee Meeting - July 2017Brentcliffe-Victoria Park Construction Liaison Committee Meeting - July 2017
Brentcliffe-Victoria Park Construction Liaison Committee Meeting - July 2017
 
Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017Forest Hill Station Open House - June 2017
Forest Hill Station Open House - June 2017
 
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017
Cedarvale & Forest Hill Construction Liaison Committee Meeting - July 2017
 
Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017Chaplin and Avenue Stations Open House - October 2017
Chaplin and Avenue Stations Open House - October 2017
 

Similar to Forest hill station open house

Science centre station open house
Science centre station open houseScience centre station open house
Science centre station open house
Crosstown TO
 
Eglinton Station Open House
Eglinton Station Open HouseEglinton Station Open House
Eglinton Station Open House
Crosstown TO
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
Crosstown TO
 
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
Crosstown TO
 
Central Open House (Chaplin Station to Leaside Station) - spring 2018
Central Open House (Chaplin Station to Leaside Station) - spring 2018Central Open House (Chaplin Station to Leaside Station) - spring 2018
Central Open House (Chaplin Station to Leaside Station) - spring 2018
Crosstown TO
 
Community Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank StationCommunity Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank Station
Crosstown TO
 
Central- West Open House - April 2018
Central- West Open House - April 2018Central- West Open House - April 2018
Central- West Open House - April 2018
Crosstown TO
 
Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017
Crosstown TO
 
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Crosstown TO
 
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Crosstown TO
 
Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017
Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017
Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017
Crosstown TO
 

Similar to Forest hill station open house (16)

Science centre station open house
Science centre station open houseScience centre station open house
Science centre station open house
 
Avenue station open house
Avenue station open house Avenue station open house
Avenue station open house
 
Keelesdale station open house
Keelesdale station open houseKeelesdale station open house
Keelesdale station open house
 
Eglinton Station Open House
Eglinton Station Open HouseEglinton Station Open House
Eglinton Station Open House
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
 
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
East Open House - East At-Grade (Pharmacy - Ionview Stops) to Kennedy Station...
 
Central Open House (Chaplin Station to Leaside Station) - spring 2018
Central Open House (Chaplin Station to Leaside Station) - spring 2018Central Open House (Chaplin Station to Leaside Station) - spring 2018
Central Open House (Chaplin Station to Leaside Station) - spring 2018
 
Community Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank StationCommunity Information Meeting of parkette design plan at Fairbank Station
Community Information Meeting of parkette design plan at Fairbank Station
 
Central- West Open House - April 2018
Central- West Open House - April 2018Central- West Open House - April 2018
Central- West Open House - April 2018
 
Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017Kennedy Station and East At-Grade Section Open House - December 2017
Kennedy Station and East At-Grade Section Open House - December 2017
 
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
Central-East Open House - Laird Station to West At-Grade (Sunnybrook - O'Conn...
 
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
Open House Meeting: Mount Dennis Station, Railway Corridor and Eglinton Maint...
 
Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021Central Virtual Open House 28Apr2021
Central Virtual Open House 28Apr2021
 
SmartTrack Public Meeting Presentation
SmartTrack Public Meeting PresentationSmartTrack Public Meeting Presentation
SmartTrack Public Meeting Presentation
 
Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017
Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017
Keelesdale Station, West Portal and Elevated Guideway Open House - October 2017
 
OPDC revised draft Local Plan presentation - Transport
OPDC revised draft Local Plan presentation - TransportOPDC revised draft Local Plan presentation - Transport
OPDC revised draft Local Plan presentation - Transport
 

More from Crosstown TO

More from Crosstown TO (20)

Western Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdfWestern Works CLC - January 17, 2023.pdf
Western Works CLC - January 17, 2023.pdf
 
Western Works CLC - May 16, 2023
 Western Works CLC - May 16, 2023 Western Works CLC - May 16, 2023
Western Works CLC - May 16, 2023
 
Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023 Western Works CLC - March, 21 2023
Western Works CLC - March, 21 2023
 
Leaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdfLeaside-Laird CLC - May 8, 2023.pdf
Leaside-Laird CLC - May 8, 2023.pdf
 
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdfEglinton - Mt Pleasant CLC - May 10, 2023.pdf
Eglinton - Mt Pleasant CLC - May 10, 2023.pdf
 
Chaplin-Avenue CLC - May 3 2023 Updated.pptx
Chaplin-Avenue CLC - May 3 2023 Updated.pptxChaplin-Avenue CLC - May 3 2023 Updated.pptx
Chaplin-Avenue CLC - May 3 2023 Updated.pptx
 
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - May 4 2023 - Compressed.pptx
 
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptxPharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
Pharmacy to Kennedy CLC presentation deck - Janaury 31, 2023.pptx
 
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptxCLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
CLC Pharmacy to Kennedy - March 28, 2023 - Compressed.pptx
 
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
 
Chaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptxChaplin-Avenue CLC - March 1, 2023.pptx
Chaplin-Avenue CLC - March 1, 2023.pptx
 
Leaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdfLeaside-Laird CLC - March 13, 2023.pdf
Leaside-Laird CLC - March 13, 2023.pdf
 
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - March 2, 2023 - Compressed.pptx
 
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdfEglinton - Mount Pleasant CLC - March 8, 2023.pdf
Eglinton - Mount Pleasant CLC - March 8, 2023.pdf
 
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptxChaplin-Avenue CLC - November 2 2022 compressed.pptx
Chaplin-Avenue CLC - November 2 2022 compressed.pptx
 
Chaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptxChaplin-Avenue CLC - January 11 2023 (002).pptx
Chaplin-Avenue CLC - January 11 2023 (002).pptx
 
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptxCLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
CLC Deck - Brentcliffe to Victoria Park - January 12, 2023 - Compressed.pptx
 
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdfEglinton - Mt Pleasant CLC - January 11, 2023.pdf
Eglinton - Mt Pleasant CLC - January 11, 2023.pdf
 
Leaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdfLeaside-Laird CLC - January 9, 2023.pdf
Leaside-Laird CLC - January 9, 2023.pdf
 
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdfCLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
CLC Deck - Brentcliffe to Victoria Park - November 3 2022.pdf
 

Recently uploaded

一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
ehbuaw
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
ehbuaw
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
ukyewh
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
ehbuaw
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
evkovas
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
ehbuaw
 
CCS-Joining-Time-Rules-1979-20210405120021.ppt
CCS-Joining-Time-Rules-1979-20210405120021.pptCCS-Joining-Time-Rules-1979-20210405120021.ppt
CCS-Joining-Time-Rules-1979-20210405120021.ppt
Asashukla6
 

Recently uploaded (20)

一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
 
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
一比一原版(ANU毕业证)澳大利亚国立大学毕业证成绩单
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
 
Understanding the Challenges of Street Children
Understanding the Challenges of Street ChildrenUnderstanding the Challenges of Street Children
Understanding the Challenges of Street Children
 
Counting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptxCounting Class for Micro Observers 2024.pptx
Counting Class for Micro Observers 2024.pptx
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
 
“Educate an African fit for the 21st Century: Building resilient education sy...
“Educate an African fit for the 21st Century: Building resilient education sy...“Educate an African fit for the 21st Century: Building resilient education sy...
“Educate an African fit for the 21st Century: Building resilient education sy...
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 
Canadian Immigration Tracker March 2024 - Key Slides
Canadian Immigration Tracker March 2024 - Key SlidesCanadian Immigration Tracker March 2024 - Key Slides
Canadian Immigration Tracker March 2024 - Key Slides
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
 
2024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 362024: The FAR - Federal Acquisition Regulations, Part 36
2024: The FAR - Federal Acquisition Regulations, Part 36
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
 
Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...
Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...
Writing Sample-Title: Pioneering Urban Transformation: The Collective Power o...
 
CCS-Joining-Time-Rules-1979-20210405120021.ppt
CCS-Joining-Time-Rules-1979-20210405120021.pptCCS-Joining-Time-Rules-1979-20210405120021.ppt
CCS-Joining-Time-Rules-1979-20210405120021.ppt
 
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
 

Forest hill station open house

  • 1. EGLINTON CROSSTOWN LRT Forest Hill Station Open House October 20, 2016
  • 2. INFORMATION IS CURRENT AS OF October 20, 2016 AND SUBJECT TO CHANGE
  • 3.
  • 4.
  • 5.
  • 6.
  • 7.
  • 8.
  • 9.
  • 10. Safety First – Our #1 Priority • Always have a site specific safety plan and site specific emergency plan. • Ensure pre-work hazard assessments are complete and understood. • Ensure job hazards analyses are complete and understood. • Identify and report unsafe behaviour and coach each other to make improvements. • Do everything possible to protect themselves, co-workers and members of the public • Stop work if the safety of themselves, co-workers and members of the public cannot be assured • Be prepared and equipped to work safely. We train and direct staff to:
  • 11. Construction of the Eglinton Crosstown LRT Line Background • In September 2008, Metrolinx launched a regional transportation plan – a 25-year, $50 billion plan -- to coordinate and integrate transportation and transit in the Greater Toronto Area • In 2010, City of Toronto approved the project to build the Eglinton Crosstown from Weston Road in the west to Kennedy Station in the east. • Following a competitive process, Crosslinx Transit Solutions (CTS) was awarded a contract in July 2015 to design, build, finance, and maintain the Eglinton Crosstown Light Rail Transit (LRT). Benefits of P3s: • The Crosstown is being delivered using a public private partnership model called Alternative Financing and Procurement (AFP). • It was procured as one design-build-finance- maintain project to minimize integration risk – historically, a factor for project cost overruns under traditional models. • Under the AFP model, CTS assumes most project risks, including:  design, project management and sub- contractor coordination  increases in construction material prices and labour costs  schedule and project completion delays  maintenance and lifecycle replacement of materials within the stations and stops, rails, control systems, and vehicles
  • 13. What are we building – a new modern LRT • 15 underground stations and 10 surface stops • A maintenance and storage facility • A 19-kilometre route separated from regular traffic • Communications system • Links to 54 bus routes, three subway stations, GO Transit, and a new UP Express station
  • 15. Design Approach: Design from City to Object 15 S i m p l i c i t y I conog ra phy Transparency Ur b a n i t y Simplicity and elegance of the design solution at all scales, from the city to the object; Iconography of the architectural elements to create a unique and highly recognizable signature on Eglinton Avenue, from the slanted portal celebrating kinetic movement, to the profiled wing delineating shelters and waiting areas; Transparency of the entrances and through the station to magnify the presence of natural light, to enact as a way-finding strategy and to uplift the passenger’s experience; Urbanity of the signature layers from landscape to architecture, to underline the genius loci and contextualize the stations and stops within the civic scale of the avenue.
  • 16. Design Concepts • Passenger First Passenger First Light-filled Stations Simplicity of Circulation
  • 17. 17 Clarity and Simplicity of Architectural Expression Street Level – Contextual & Inviting An International Signature for Toronto Entrance – Bright & Secure Concourse – Simple & Pristine Concourse – Transparent & Open Platform – Spacious & Animated
  • 18. Crosstown Design Approach Features • About half of the 19 km line is tunneled • Stations and stops are about 0.6 km apart • Features will include: • time arrival information • safe access for people walking and biking to the station • clear route maps, seating, bike parking Design Approach Comply with nine design principles developed by City of Toronto and Metrolinx. • Provide a legacy for generations to come. • Have natural lighting during the day and well-lit entrances at night. • Have safe, clean, intuitive wayfinding at all the stations and stops. • Put passengers first. • Provide visible entrances, bicycle facilities and sustainable practices to ensure all stations comply with Toronto Green Standard Tier. • Landscaped entrances, including planters with trees and ornamental grasses. • Public plazas and retail components at some stations. • Clean and minimalist space at platform level. • Accessible to passengers with disabilities, strollers, and bicycles.
  • 19. Accessibility for All Station and stops are designed to support ease of access and use by persons with differing levels of mobility, sight, hearing, sensory and cognitive abilities. The project site and facilities are designed to be universally accessible including satisfying the requirements of Accessibility for Ontarians with Disabilities Act (AODA) and applicable City of Toronto Guidelines, Ontario Building Code (OBC) and Canadian Standards Association (CSA) Standards. Some of these features include: • Barrier‐free path from the entrance level to the station platform level • Tactile warning strips and tactile walking surface indicators • Signage system with tactile indicators • Passenger Assistance Intercom (PAI) • Low floor Light Rail Vehicle (LRV) with designated wheelchair locations • Nominal gap from platform edge to LRV entry • Automated visual and audible stop announcements • On-street and off-street paratransit passenger pick-up/drop-off
  • 20. • The underground stations run between Weston Road in the west to Laird Street in the east. • Construction began at Keelesdale station, located at Keele Street / Trethewey Drive and Eglinton Avenue in March 2016. • Installing support of excavation is the first step in constructing an underground station. • All underground stations will be brand new, including the three LRT interchange stations connecting to other transit modes. • Most of the underground stations will be in construction by the end of 2016. What to expect in 2016 – Start of Stations Construction
  • 21. How we’re building: Cut-and-Cover Stations Forest Hill Locations: Keelesdale (Keele), Caledonia, Fairbank (Dufferin), Forest Hill (Bathurst), Chaplin, Mount Pleasant, Leaside (Bayview), Science Centre
  • 22. How we’re building: Mined Stations Avenue tLocations: Oakwood, Avenue, Leaside (part), Laird
  • 23. • There are three interchange stations. • Interchange stations will allow transit riders to connect to other transit modes, such as TTC, GO and the UP Express. • The three interchange stations will be built with the ‘Cut and Cover’ method. How we’re building – Interchange Stations Subway Station Longitudinal Section Locations: Cedarvale (Allen), Eglinton (Yonge), Kennedy
  • 24. How we’re building Forest Hill Station - Construction Overview Distinct phases of construction: • Preparatory works • Utility relocations • Support of excavation (shoring) • Road restoration • Deep excavation • Underground station construction • Track work and systems installation • Station structure construction • Traction power system • Signalling system • Testing and commissioning
  • 25. • A modified version of the cut-and-cover method, whereby following support of excavation, a large concrete roof slab is constructed and placed over top of the excavated area, the roadway is restored and work continues safely below ground • The roof slab is used to support utilities and the roadway • Benefits include reduction in road disruption (compared to tradition method), increased utility stability and improved safety and working conditions How we’re building Forest Hill Station – Station Construction
  • 26. Reinstate Roadway • A concrete roof slab will be constructed over top of the excavated area, utilities will be buried, and the roadway will be reinstated above the roof slab. Excavation • Once the roadway is reinstated, crews will work safely beneath the roadway to construct the station box, build the platform and install rail infrastructure. Architectural & Building Work • Construction of the station entrance structures will begin in 2018. How we’re building Forest Hill Station – Station Construction (cont’d)
  • 27. Forest Hill Station Map Main Entrance Secondary Entrance Station Box
  • 28. Forest Hill Station Main Entrance
  • 29. Forest Hill Station Secondary Entrance
  • 30. Forest Hill Station Aerial View
  • 31. Forest Hill Station Unique Design Concepts • Fully glazed glass main station entrance • Solid cool roofs with high albedo surfaces, designed to reduce heat island effect and contribute to energy efficiency • Outdoor bike canopy with 60 bike parking spots • On-street connections to TTC bus routes • Retail space
  • 32. Forest Hill Station Tunnel Ventilation System (TVS) • Designed to extract and control smoke from tunnels and stations in the event of a fire. • Controls excessive air velocities and air pressure transients. • Removes heat and controls air temperature during operations. • Supplies outdoor air ventilation and facilitates contaminant removal. • Forest Hill Station TVS is comprised of axial fans, dampers, electrical equipment, tunnel ventilation panels, supervisory control and data acquisition (SCADA) interface, and Tunnel Ventilation Fire Command Post. • Vents are located on top of the secondary station entrance.
  • 33. Forest Hill Station Construction Lookahead (2016 – 2017) Fall 2016 • Continue Bell utilities relocation • Continue installation of geotechnical monitoring instrumentation • Continue traffic signal relocation and reconfiguration • Backfilling and compaction of the secondary entrance • Relocation of overhead hydro utilities and poles • Relocation of overhead Rogers utilities to an underground duct bank • Site mobilization and drill rig/crane pad construction • Support of excavation (shoring) beginning on the south side of Eglinton Avenue West Winter 2016 • Continue shoring on the south side of Eglinton Avenue West • Watermain services
  • 34. Traffic and Pedestrian Changes • To accommodate the utilities relocation and shoring construction stages, temporary traffic changes, such as road closures, lane reductions, turn restrictions, pedestrian rerouting and bus stop relocations may be in effect • Additionally, changes to existing traffic conditions, such as relaxation of turn prohibitions or additional restrictions, may be enacted in development with local elected officials, traffic engineers and the local community to accommodate station construction
  • 35. Forest Hill Station Construction Stages Stage Activity Duration Start Date Shoring Stage 1 Utilities Relocation, Shoring and Roof Slab 5 months Fall 2016 Shoring Stage 2 Utilities Relocation, Shoring and Roof Slab 3 months Winter 2017 Shoring Stage 3 Shoring and Roof Slab 3 months Summer 2017 Shoring Stage 4 Shoring and Roof Slab 3.5 months Fall 2017
  • 36. Utilities Relocation – Current Staging Plan Began July 2016
  • 37. Forest Hill Station – Shoring Stage 1 Beginning as early as Fall 2016 (20 weeks)
  • 38. Forest Hill Station – Shoring Stage 2 Beginning as early as Winter 2017 (12 weeks)
  • 39. Forest Hill Station – Shoring Stage 3 Beginning as early as Summer 2017 (12 weeks)
  • 40. Forest Hill Station – Shoring Stage 4 Beginning as early as Fall 2017 (14 weeks)
  • 41. Summary of Proposed Traffic Changes for Forest Hill Station Stage Traffic Changes Construction Activities Approx. Start Date Approx. Duration 1 • Close Peveril Hill N at Eglinton Ave W • Restrict all turns at the intersection of Bathurst St and Eglinton Ave W • Reduce traffic to one lane in each direction on Bathurst St and Eglinton Ave W Utilities Relocation & shoring Fall 2016 20 weeks 2 Continue Stage 1 configuration Utilities Relocation & shoring Winter 2017 12 weeks 3 Continue Stage 2 configuration, plus: • Restore northbound right turn onto Eglinton Ave W • Restore eastbound right turn onto Bathurst St Shoring Summer 2017 12 weeks 4 Continue Stage 3 configuration Shoring Fall 2017 14 weeks
  • 42. Summary of Proposed Pedestrian Changes for Forest Hill Station Stage Pedestrian Changes Construction Activities Approx. Start Date Approx. Duration 1 • Restrict the east crosswalk • Reroute pedestrians south on Peveril Hill N and east to Bathurst St Utilities Relocation and shoring Fall 2016 20 weeks 2 Continue Stage 1 configuration, plus: • Restore east crosswalk • Restrict west crosswalk Utilities Relocation and shoring Winter 2017 12 weeks 3 Continue Stage 2 configuration, plus: • Restore west crosswalk • Restrict east crosswalk Shoring Summer 2017 12 weeks 4 Continue Stage 3 configuration, plus: • Restore east crosswalk • Restrict west crosswalk Shoring Fall 2017 14 weeks
  • 43. Proposed Closure of Peveril Hill N Why? • To provide a truck entry and egress route from the work zone during shoring stages 1 and 2 Proposed Mitigation • Temporary relaxation of the left turn prohibition from northbound Bathurst Street onto Dewbourne Avenue (in place) • Temporary relaxation of the right turn prohibition from eastbound Eglinton Avenue West onto Chiltern Hill Road Duration • Approximately eight (8) months beginning in fall 2016 RELAX EXISITING RIGHT TURN RESTRICTION RELAX EXISITING LEFT TURN RESTRICTION
  • 44. Proposed Restriction of Turns at Eglinton Avenue West and Bathurst Street Why? • Insufficient turn radius due to location of station box • To prevent traffic congestion during construction stages 1 through 4 Mitigation • Temporary relaxation of turn prohibitions on nearby streets to provide alternative travel routes for local traffic Duration • For approximately 15 months
  • 45. Summary of Turn Prohibitions to be considered for Temporary Relaxation Prohibited Movement From To Prohibited Time Right turn Eglinton Ave W (WB) Vesta Dr (NB) 7 AM – 6 PM Right turn Eglinton Ave W (EB) Gardiner Rd (SB) 7 AM – 7 PM Right turn Eglinton Ave W (EB) Old Forest Hill Rd (SB) 7 AM – 7 PM (everyday) Left turn Eglinton Ave W (WB) Old Forest Hill Rd (SB) 7 AM – 9 AM Through traffic Old Forest Hill Rd (SB) @ Eglinton Ave W Peak Hours Through traffic Old Forest Hill Rd (NB) @ Eglinton Ave W Peak Hours Left turn Old Forest Hill Rd (NB) Eglinton Ave W (WB) Peak Hours Left turn Bathurst St (SB) Burton St (EB) All Times Right turn Ava Rd (WB) Bathurst St (NB) 4 PM – 6 PM Left turn Bathurst St (NB) Avenal Dr (WB) Peak Hours Left turn Bathurst St (NB) Dewbourne Ave (WB) Peak Hours
  • 46. Summary of Turn Prohibitions to be considered for Temporary Relaxation (cont’d) Prohibited Movement From To Prohibited Time Right turn Rosemary Ln (WB) Bathurst St (NB) 4 PM – 6 PM Right turn Eglinton Ave W (EB) Chiltern Hill Rd (SB) Peak Hours Right turn Eglinton Ave W (EB) Rostrevor Rd (SB) Peak Hours Left turn Glen Cedar Rd (NB) Eglinton Ave W (WB) Peak Hours Left turn Bathurst St (NB) Wembley Rd (WB) Peak Hours Right turn Bathurst St (SB) Wembley Rd (WB) 7 AM – 9 AM Left turn Bathurst St (SB) Shallmar Blvd (EB) 7 AM – 9 AM Left turn Bathurst St (SB) Rosemary Ln (EB) 7 AM – 9 AM Left turn Bathurst St (SB) Ava Rd (EB) 7 AM – 9 AM
  • 47. Haul Routes • During the shoring and deep excavation stages of construction, approximately 30 trucks will haul more than 80 loads of construction material, such as soil and concrete, to-and-from Forest Hill Station per day • To minimize traffic congestion along Eglinton Avenue, construction vehicles will use a combination of arterial, minor arterial, collector and local roads on a rotating basis to haul loads • The following roads will be used as haul routes for Forest Hill Station: • Bathurst Street • Eglinton Avenue West • Spadina Road • Old Forest Hill Road • Ava Road • Chadwick Avenue • Dewbourne Avenue • Gardiner Road • Hilltop Road • Peveril Hill North • Rosemary Lane • Vesta Drive • Wembley Road
  • 48. Summary of Streets to be used as Haul Routes for Forest Hill Station Street Name From To Vesta Drive Ava Rd Bathurst St Ava Rd Bathurst St Rosemary Ln Rosemary Ln Bathurst St Dewbourne Ave Dewbourne Ave Rosemary Ln Bathurst St Chadwick Ave Spadina Rd Vesta Dr Gardiner Rd Eglinton Ave W Old Forest Hill Rd Peveril Hill N Eglinton Ave W Dewbourne Ave
  • 49. Advanced Signage • Advanced signage will be placed along Eglinton Ave W and cross streets to inform motorists and pedestrians of traffic changes at the intersection • At Forest Hill Station, advanced signage will be placed as far north as Wembley Rd, as far south as Dewbourne Ave, as far east as Old Forest Hill Rd and as far west as Chiltern Hill Rd
  • 50. Bus Stop Relocations Four (4) TTC bus stops at the four corners of Eglinton Avenue West and Bathurst Street will be relocated throughout various stages of utilities relocation and shoring. • The TTC bus stop on the southwest corner has been relocated approximately 140 meters to the east. • The TTC bus stop on the southeast corner will be relocated approximately 90 meters to the north • The TTC bus stop on the northwest corner will be relocated approximately 70 meters to the north • The TTC bus stop on the northeast corner will be relocated approximately 50 meters to the east to the next available stop The stops service the following TTC bus routes: • 7/307 Bathurst North • 310 Bathurst South • 32/332 Eglinton West Please look for signage informing passengers of the new temporary stop locations.
  • 51. TTC Bus Stop Relocation Map Relocate 50m east to next stop Relocated 140m east Relocate 90m northRelocate 70m north
  • 52. TTC Bus Route 33 Detour • To accommodate construction staging at Forest Hill Station, TTC bus route # 33 will be detour north on Mayfair Avenue and west on Shallmar Boulevard to Bathurst Street • The approximate duration of the detour is 15 months, beginning as early as October 2016 • Changes to traffic calming conditions on Mayfair Avenue and Shallmar Boulevard will be implemented
  • 53. Experience Eglinton Advertising and marketing initiatives, ranging from subway and local newspapers advertisements, to postcards, coupon booklets and flyers all focused on encouraging residents in the neighbourhood to shop locally. Support for Businesses – Shop Local
  • 54. Community Benefits Commit to Social Procurement and Local Investment to maximize business opportunities along the project corridor. Visit CTS’ website www.crosslinxtransit.ca for updated postings. The Eglinton Crosstown LRT is the first time a Community Benefits Framework has been included as part of a major infrastructure project in Ontario. Partner with Local Workforce Agencies to recruit candidates from the project corridor and from historically disadvantaged communities. Work with Subcontractors to maximize opportunities for apprentices.

Editor's Notes

  1.   Laird Station will be an underground station located at the intersection of Laird Drive and Eglinton Avenue East. The station will also be a turnback station and will have special trackwork for LRT operations.  A turnback station allows trains to change directions. The special trackwork allows a train to be stored between the tracks. For example, a disabled train could be stored there so it does not disrupt service.  The main, fully accessible entrance will be located at the southwest corner of Eglinton Avenue and Laird Drive. This entrance will also include a station plaza and retail spaces at street level. The secondary entrance will be located south of Eglinton Avenue East, just east of Laird Drive. There will be on-street connections to TTC buses, and 60 outdoor bicycle parking spaces.
  2.   Laird Station will be an underground station located at the intersection of Laird Drive and Eglinton Avenue East. The station will also be a turnback station and will have special trackwork for LRT operations.  A turnback station allows trains to change directions. The special trackwork allows a train to be stored between the tracks. For example, a disabled train could be stored there so it does not disrupt service.  The main, fully accessible entrance will be located at the southwest corner of Eglinton Avenue and Laird Drive. This entrance will also include a station plaza and retail spaces at street level. The secondary entrance will be located south of Eglinton Avenue East, just east of Laird Drive. There will be on-street connections to TTC buses, and 60 outdoor bicycle parking spaces.
  3. June 1, 2016 Utilities relocation Removal of one hydro pole on south west corner Relocation of light poles along Laird Drive and on the south side of Eglinton Avenue East
  4. Two long-term one lane closures anticipated, one at the main shaft and another at the secondary shaft. Four sidewalk closures are anticipated; all other sidewalks will be maintained along with business accesses. One bus stop relocations as per Stage 1 will continue to be maintained.
  5. Two long-term one lane closures anticipated, one at the main shaft and another at the secondary shaft. Four sidewalk closures are anticipated; all other sidewalks will be maintained along with business accesses. One bus stop relocations as per Stage 1 will continue to be maintained.