The document provides information about construction of the Forest Hill station for the Eglinton Crosstown LRT project in Toronto. Safety is the top priority during construction. The station will be built using a cut-and-cover method, requiring excavation below the road that will later be reinstated. Construction will occur in stages from 2016-2017, with traffic and pedestrian changes implemented to accommodate work zones. The station design includes entrances, a bike parking area, and potential retail space. Nearby roads will be used as haul routes during excavation and shoring stages.