Workshop: Building Profits on
Brownfield Sites
Workshop by Granit
June 2017
Agenda
• Introducing Granit
• Case Study 1: Project at Planning- Printworks
• Case Study 2: Project On site- Streatham Common
• Case Study 3: Completed Project- Lydden Grove
• Case Study 4: Completed Project –Townhouse
• Case Study 5: Feasibility -Peckham
• Case Study 6: Feasibility –Clapham Junction
• Discussion?
Introducing Granit
• Architects and Interior designers
• 29 years experience
• Clapham based practice, with 16 Architects and 3 Interior designers
• Integrated architecture and interior design service
• Deep knowledge and expertise of building in London / South East, including
difficult planning
• Knowledge of how to maximise ROI on brownfield sites, air rights
Case Study 1: Old Printworks
Case Study 1: Old Printworks
• Family run print work business being sold
• Brief – create a legacy / build to rent
• Current Use Class B1
Key Planning Issues
• Change of use – loss of employment
• Marketed as B1 and D1 use for 18 months
• Overlooking / privacy
• Minimum space standards / amenity space
• Pre-Planning application
Key site Issues
• Site access / vehicles and pedestrians
• Parking
• Good PTAL rating
Case Study 1: Old Printworks
Case Study 1: Old Printworks
Case Study 1: Old Printworks
Case Study 1: Old Printworks
Case Study 1: Old Printworks
• 7 houses / 2 flats
• 1-3 storeys
• 2 fully WC accessible
• Lifetimes homes compliant
• Highly energy efficient
• Offsite construction (SIPS /CLT)
• Possible phased construction
Case Study 2: Streatham Common
Case Study 2: Streatham Common
• Client – Fairway Partnership
• Redundant lock up garages
• Conservation area
• Use class – Sui Generis
• Rights of way
• 10 neighbouring properties
• No Services
• Limited access
• Overlooking / privacy / amenity
Case Study 2: Streatham Common
Planning History
• 2008 -site purchased
• 2009 -5/3 house 3-storey scheme refused
• 2010- 3 house 3-storey scheme appeal dismissed
• 2011- Pre-planning / public consultation
• 2012 - 3 house scheme refused
• 2013 -3 house scheme appeal dismissed
• 2014 – 3 house basement scheme refused
• (Rec approv)
• 2014 – Appeal for 3 house basement scheme approved
• 2015 – Planning consent for 2 larger houses
• 2016-2017 – Construction by Developers
Case Study 2: Streatham Common
Case Study 2: Streatham Common
Case Study 2: Streatham Common
Case study 2: Streatham Common
• Site Costs £700k
• Construction Value £1.9 Million
• Other costs £450k
• GDV £4M
• (House 1 £1.5M House 2 £2.5M)
• Net Profit after sales £780K
• ROI 25%
Case study 3: Wandsworth houses
Case study 3: Wandsworth houses
• Former industrial use
• Loss of employment
• 23 neighbours consulted
• Limited access
• Poor PTAL rating
• Possible flood risk
• Overlooking / privacy / amenity
• Proximity to adjoining houses
• Daylight Levels
• CSH Level 4
W101
2,363
1,500
G09
2,040
926
W103
982
2,228
W102
500
1,500
G03
1,981
836
W108
982
2,228G04
762
1,981
G04
762
1,981
G07
1,981
836
G06
714
1,981
W107
2,400
2,358
G11
815
2,400
W106
2,400
2,049
G11
836
2,400
G12
836
1,981
G08
836
1,981
W105
2,372
2,400
G11
815
2,400
W104
2,400
497
G11
836
2,400
G05
2,040
926
H
E
E
North Elevation
North Elevation1
4,359
3,025
4,359
3,025
4,359
4,168
660
694
695
1,394
763
3,953
763
3,953
3,959
975
4,038
2,238
4,222
3,472
1,954
1,154
818
2,693
79
982
2,846
892
156
1,600
2,469
130
1,489
1,112
2,670
1,784
100
892
750648
930
3,183
892
230
797
3,674
1,513
1,666
3,441
69
982
3,133
892
120
3,441
452
3,147
2,587
3,747
3,019
130
1,092
130
1,706
1,784
1,035
892
2,442
810
533
1,484
1,375
3,441
69
982
3,133
892
150
695
466
1,249
3,106
4,474
2,878
1,096
2,857
3,375
3,258
2,675
6,587
1,206
2,907
2,134
2,956
3,268
900
905
1,170
3,259
2,301
1,405
969
2,341
1,920
1,606
2,450
2,840
11,536
7,344
2,086
3,501
900
5,913
3,701
2,919
3,855
1,308
1,197
1,287
3,745
380
1,293
744
2,796
892
380
2,845
466
694
223
466
682
818
100
3,449
1,600
1,614
3,025
3,025
4,168
3,179
+1.500
+1.500
+0.780
+1.000
+1.500
+0.400
C
C
B
B
A
D
D
B1
B1
E
E
D/509
D/509
2NO 178 x 102 x 19 UB
440 x 100 x 215 Padstone
in Concrete
660 x 100 x 330
Padstone in concrete
under post
660 x 100 x 330
Padstone in concrete
under post
Wall 2600 High
Wall 1800 High
BATHROOM
BEDROOM
BEDROOM
LOBBY
CBD
BATHROOM
COURTYARD
LOBBY
BATHROOM
COURTYARD
BEDROOM
Rise 280mm 1.14 over 2450mm
Rise 160 1.12 over 1900mm
Rise 160 1.12 over
1900mm
EXISTING SINGLE STOREY
OUTBUILDING
SERVICE YARD
FJ
FJ
FJ
FJ
FJ
FJ
FJ
FJ
L1
L1
L1
L1
L1
L4
L4
L4
FJ
47 x 22
@400 C
=
L1 = Catnic CG 110 / 100
L2 = 2NO 50 x 100 C24 Timbers
152 UB
152UB
140 x 140 x 10.0 SHS
152 UB
152UB
2xFJ
L1
L1 C'BD
6rises@183mm/
going250mm
500
1,500
Wall 2600 High
15 rises @218mm
/ going 250mm
15 rises @218mm
/ going 250mm
1
8
10
11
12
13
14
8
9
7
10
11
12
13
14
2
3
4
5
1
11
12
13
8
5
2
1
8rises@220mm/going250mm
8
5
1
10
5
1
2
MMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevation
150 x 90 PFC
150x90PFC
90 x 90 x 5.0 SHS
6
15
1
2
3
4
10
Unit 1 UG-1
13 rises @204mm12 going @250mm
1
2
3
4
5
6
FJ
203 x 60 UC
254UCx89UC
203 x 60 UC
254x89UC
203 x 60 UC
FJ
203 x 60 UC
203 x 60 UC
203 x 60 UC
254x89UC
1
2
3
4
15
9
440 x 100 x 215 PCC Lintel padsto
beams
150 x 150 x 10.0 SHS
150 x 150 x 10.0 SHS
140 x 140 x 10.0 SHS
South Elevation
A
B
C
D
E
F
G
G
1
1
2
2
3
3
5
5
4
4
G01
2,040
926
G11
1,981
836
G11
1,981
836
1,019
3,147
1,634
D/500
D/500
D/508
D/508
WestElevation
Eas
100 x 220 C24
or
125 x 65 x 15 PFC
Under screen
*Steel to be galvanized
Supported by engineering bricks
550 x 100 x 215
Padstone in concrete
100 x 220 C24
or
125 x 65 x 15 PFC
Under screen
*Steel to be galvanized
Supported by engineering bricks
Rise300mm1.14over4200mm
Rise 200mm 1.14 over 3800mm
Rise 200mm over 3500mm
Rise300mm1.14over4200mm
L1
W109Bins
Com
post
Bins
Bins
Bins
Box out corner to
form service riser
Ramp to suit access
Galvansied steel frame with timber finish
Slatted Timber Privacy Scr een
Slatted Timber Privacy Scr een
Dwarf wall built from top of
retaining wall 200mm above FGL.
Detail of balustrade TBC
Existing brick wall
to edge of site
Separating
wall between
properties
Retaining Wall Type A
Separating
wall between
properties
Existing Wall to
edge of site
retained
Vertical shuttered
timber privacy
screens on
galvanized steel
support
Vertical shuttered
timber privacy
screens on
galvanized steel
support
B (Above Ground):
y fixed with skim finish to both sides
Unit 2 Garden
Void over
Lightwell
Unit 3 Garden
Void over
Lightwell
Void over
Lightwell
pe A
Case study 3: Wandsworth houses
Case study 3: Wandsworth houses
Case study 3: Wandsworth houses
Case study 4: Townhouse Studios
Case study 4: Townhouse Studios
• Client – Perpetuum Developments
• Old recording studios turned into 10
mews houses, 1 apartment and 1
commercial unit.
Key site Issues
• Deep plan
• Complicated existing structure
Key Planning Issues
• Parking restrictions
• London plan space standards
• Amenity space requirements
• 21 planning conditions to discharge
• Retention of commercial space
Case study 4: Townhouse Studios
Case study 4: Townhouse Studios
Case study 4: Townhouse Studios
Case study 4: Townhouse Studios
Case study 4: Townhouse Studios
Case study 4: Townhouse Studios
Case study 4: Townhouse Studios
Case study 4: Townhouse Studios
Case study 4: Townhouse Studios
Case study 5: Car Park
• Council owned carpark
• Possible JV with council
• Central location close to
Peckham Rye
• Underused site
• Some parking needs to be
retained
• 1 of 65 identified sites across
Southwark as potential sites
for development
Case study 5: Car Park
• News story Jan 2017
Case study 5: Car Park
• Existing site
• Street entrance and rear
vehicular access
Case study 5: Car Park
Case study 5: Car Park
Case study 5: Car Park
Case study 5: Car Park
Case study 5: Car Park
Case study 5: Car Park - Summary
• RESIDENTIAL
• 7 no 2-3 bed flats
• 5 no 3-bed houses
• Construction Value £5M
• Fees, CIL, etc. £1.5M
• GDV £10M (excluding
Commercial)
• ROI £3.5M
• 54% return
• COMMERCIAL
• 80 flexible work space
• Construction Value £1.5M
• Fees, CIL, etc. £0.5M
• Rental income £150K per
annum
• Net Yield 7.5%
Case study 6: Supermarket Site
Case study 6: Supermarket Site
Case study 6: Supermarket Site
Case study 6: Supermarket Site
• RESIDENTIAL
• 172 no 2-3 bed flats
• Construction Value £18-22M
• Fees, CIL, etc. £4M
• GDV £64M (excluding
Commercial)
• ROI £38M
• 135% return
• Assuming a site value of £30M,
ROI would be 35%.
• COMMERCIAL
• 3000sqm commercial space
• Construction Value £6-8M
• Fees, CIL, etc. £1M
• Rental income £600K per
annum
• Net Yield 8.5%
Case study 6: Supermarket Site
Summary
• Brownfield sites offer profitable opportunities
• Often significant planning and site constraints
• Focused strategy for getting a change of use and planning consent
• Clever design solutions required to overcome these constraints
• A planning refusal may be of benefit (lower sale price and a planning steer)
• Presumption in favour of housing in many areas
• New rules on permitted development for change of use
• Tap into long term council and infrastructure plans
Contact us
Granit Architects
Studios 18-19
16 Porteus Place
Clapham
London
SW4 0AS
Telephone: +44 (0)20 7924 4555
Email: James@granit.co.uk
@LondonArchitect

Building Profits on Brownfield Sites

  • 1.
    Workshop: Building Profitson Brownfield Sites Workshop by Granit June 2017
  • 2.
    Agenda • Introducing Granit •Case Study 1: Project at Planning- Printworks • Case Study 2: Project On site- Streatham Common • Case Study 3: Completed Project- Lydden Grove • Case Study 4: Completed Project –Townhouse • Case Study 5: Feasibility -Peckham • Case Study 6: Feasibility –Clapham Junction • Discussion?
  • 3.
    Introducing Granit • Architectsand Interior designers • 29 years experience • Clapham based practice, with 16 Architects and 3 Interior designers • Integrated architecture and interior design service • Deep knowledge and expertise of building in London / South East, including difficult planning • Knowledge of how to maximise ROI on brownfield sites, air rights
  • 4.
    Case Study 1:Old Printworks
  • 5.
    Case Study 1:Old Printworks • Family run print work business being sold • Brief – create a legacy / build to rent • Current Use Class B1 Key Planning Issues • Change of use – loss of employment • Marketed as B1 and D1 use for 18 months • Overlooking / privacy • Minimum space standards / amenity space • Pre-Planning application Key site Issues • Site access / vehicles and pedestrians • Parking • Good PTAL rating
  • 6.
    Case Study 1:Old Printworks
  • 7.
    Case Study 1:Old Printworks
  • 8.
    Case Study 1:Old Printworks
  • 9.
    Case Study 1:Old Printworks
  • 10.
    Case Study 1:Old Printworks • 7 houses / 2 flats • 1-3 storeys • 2 fully WC accessible • Lifetimes homes compliant • Highly energy efficient • Offsite construction (SIPS /CLT) • Possible phased construction
  • 11.
    Case Study 2:Streatham Common
  • 12.
    Case Study 2:Streatham Common • Client – Fairway Partnership • Redundant lock up garages • Conservation area • Use class – Sui Generis • Rights of way • 10 neighbouring properties • No Services • Limited access • Overlooking / privacy / amenity
  • 13.
    Case Study 2:Streatham Common Planning History • 2008 -site purchased • 2009 -5/3 house 3-storey scheme refused • 2010- 3 house 3-storey scheme appeal dismissed • 2011- Pre-planning / public consultation • 2012 - 3 house scheme refused • 2013 -3 house scheme appeal dismissed • 2014 – 3 house basement scheme refused • (Rec approv) • 2014 – Appeal for 3 house basement scheme approved • 2015 – Planning consent for 2 larger houses • 2016-2017 – Construction by Developers
  • 14.
    Case Study 2:Streatham Common
  • 15.
    Case Study 2:Streatham Common
  • 16.
    Case Study 2:Streatham Common
  • 17.
    Case study 2:Streatham Common • Site Costs £700k • Construction Value £1.9 Million • Other costs £450k • GDV £4M • (House 1 £1.5M House 2 £2.5M) • Net Profit after sales £780K • ROI 25%
  • 18.
    Case study 3:Wandsworth houses
  • 19.
    Case study 3:Wandsworth houses • Former industrial use • Loss of employment • 23 neighbours consulted • Limited access • Poor PTAL rating • Possible flood risk • Overlooking / privacy / amenity • Proximity to adjoining houses • Daylight Levels • CSH Level 4
  • 20.
    W101 2,363 1,500 G09 2,040 926 W103 982 2,228 W102 500 1,500 G03 1,981 836 W108 982 2,228G04 762 1,981 G04 762 1,981 G07 1,981 836 G06 714 1,981 W107 2,400 2,358 G11 815 2,400 W106 2,400 2,049 G11 836 2,400 G12 836 1,981 G08 836 1,981 W105 2,372 2,400 G11 815 2,400 W104 2,400 497 G11 836 2,400 G05 2,040 926 H E E North Elevation North Elevation1 4,359 3,025 4,359 3,025 4,359 4,168 660 694 695 1,394 763 3,953 763 3,953 3,959 975 4,038 2,238 4,222 3,472 1,954 1,154 818 2,693 79 982 2,846 892 156 1,600 2,469 130 1,489 1,112 2,670 1,784 100 892 750648 930 3,183 892 230 797 3,674 1,513 1,666 3,441 69 982 3,133 892 120 3,441 452 3,147 2,587 3,747 3,019 130 1,092 130 1,706 1,784 1,035 892 2,442 810 533 1,484 1,375 3,441 69 982 3,133 892 150 695 466 1,249 3,106 4,474 2,878 1,096 2,857 3,375 3,258 2,675 6,587 1,206 2,907 2,134 2,956 3,268 900 905 1,170 3,259 2,301 1,405 969 2,341 1,920 1,606 2,450 2,840 11,536 7,344 2,086 3,501 900 5,913 3,701 2,919 3,855 1,308 1,197 1,287 3,745 380 1,293 744 2,796 892 380 2,845 466 694 223 466 682 818 100 3,449 1,600 1,614 3,025 3,025 4,168 3,179 +1.500 +1.500 +0.780 +1.000 +1.500 +0.400 C C B B A D D B1 B1 E E D/509 D/509 2NO178 x 102 x 19 UB 440 x 100 x 215 Padstone in Concrete 660 x 100 x 330 Padstone in concrete under post 660 x 100 x 330 Padstone in concrete under post Wall 2600 High Wall 1800 High BATHROOM BEDROOM BEDROOM LOBBY CBD BATHROOM COURTYARD LOBBY BATHROOM COURTYARD BEDROOM Rise 280mm 1.14 over 2450mm Rise 160 1.12 over 1900mm Rise 160 1.12 over 1900mm EXISTING SINGLE STOREY OUTBUILDING SERVICE YARD FJ FJ FJ FJ FJ FJ FJ FJ L1 L1 L1 L1 L1 L4 L4 L4 FJ 47 x 22 @400 C = L1 = Catnic CG 110 / 100 L2 = 2NO 50 x 100 C24 Timbers 152 UB 152UB 140 x 140 x 10.0 SHS 152 UB 152UB 2xFJ L1 L1 C'BD 6rises@183mm/ going250mm 500 1,500 Wall 2600 High 15 rises @218mm / going 250mm 15 rises @218mm / going 250mm 1 8 10 11 12 13 14 8 9 7 10 11 12 13 14 2 3 4 5 1 11 12 13 8 5 2 1 8rises@220mm/going250mm 8 5 1 10 5 1 2 MMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevationMMANorthElevation 150 x 90 PFC 150x90PFC 90 x 90 x 5.0 SHS 6 15 1 2 3 4 10 Unit 1 UG-1 13 rises @204mm12 going @250mm 1 2 3 4 5 6 FJ 203 x 60 UC 254UCx89UC 203 x 60 UC 254x89UC 203 x 60 UC FJ 203 x 60 UC 203 x 60 UC 203 x 60 UC 254x89UC 1 2 3 4 15 9 440 x 100 x 215 PCC Lintel padsto beams 150 x 150 x 10.0 SHS 150 x 150 x 10.0 SHS 140 x 140 x 10.0 SHS South Elevation A B C D E F G G 1 1 2 2 3 3 5 5 4 4 G01 2,040 926 G11 1,981 836 G11 1,981 836 1,019 3,147 1,634 D/500 D/500 D/508 D/508 WestElevation Eas 100 x 220 C24 or 125 x 65 x 15 PFC Under screen *Steel to be galvanized Supported by engineering bricks 550 x 100 x 215 Padstone in concrete 100 x 220 C24 or 125 x 65 x 15 PFC Under screen *Steel to be galvanized Supported by engineering bricks Rise300mm1.14over4200mm Rise 200mm 1.14 over 3800mm Rise 200mm over 3500mm Rise300mm1.14over4200mm L1 W109Bins Com post Bins Bins Bins Box out corner to form service riser Ramp to suit access Galvansied steel frame with timber finish Slatted Timber Privacy Scr een Slatted Timber Privacy Scr een Dwarf wall built from top of retaining wall 200mm above FGL. Detail of balustrade TBC Existing brick wall to edge of site Separating wall between properties Retaining Wall Type A Separating wall between properties Existing Wall to edge of site retained Vertical shuttered timber privacy screens on galvanized steel support Vertical shuttered timber privacy screens on galvanized steel support B (Above Ground): y fixed with skim finish to both sides Unit 2 Garden Void over Lightwell Unit 3 Garden Void over Lightwell Void over Lightwell pe A Case study 3: Wandsworth houses
  • 21.
    Case study 3:Wandsworth houses
  • 22.
    Case study 3:Wandsworth houses
  • 23.
    Case study 4:Townhouse Studios
  • 24.
    Case study 4:Townhouse Studios • Client – Perpetuum Developments • Old recording studios turned into 10 mews houses, 1 apartment and 1 commercial unit. Key site Issues • Deep plan • Complicated existing structure Key Planning Issues • Parking restrictions • London plan space standards • Amenity space requirements • 21 planning conditions to discharge • Retention of commercial space
  • 25.
    Case study 4:Townhouse Studios
  • 26.
    Case study 4:Townhouse Studios
  • 27.
    Case study 4:Townhouse Studios
  • 28.
    Case study 4:Townhouse Studios
  • 29.
    Case study 4:Townhouse Studios
  • 30.
    Case study 4:Townhouse Studios
  • 31.
    Case study 4:Townhouse Studios
  • 32.
    Case study 4:Townhouse Studios
  • 33.
    Case study 4:Townhouse Studios
  • 34.
    Case study 5:Car Park • Council owned carpark • Possible JV with council • Central location close to Peckham Rye • Underused site • Some parking needs to be retained • 1 of 65 identified sites across Southwark as potential sites for development
  • 35.
    Case study 5:Car Park • News story Jan 2017
  • 36.
    Case study 5:Car Park • Existing site • Street entrance and rear vehicular access
  • 37.
    Case study 5:Car Park
  • 38.
    Case study 5:Car Park
  • 39.
    Case study 5:Car Park
  • 40.
    Case study 5:Car Park
  • 41.
    Case study 5:Car Park
  • 42.
    Case study 5:Car Park - Summary • RESIDENTIAL • 7 no 2-3 bed flats • 5 no 3-bed houses • Construction Value £5M • Fees, CIL, etc. £1.5M • GDV £10M (excluding Commercial) • ROI £3.5M • 54% return • COMMERCIAL • 80 flexible work space • Construction Value £1.5M • Fees, CIL, etc. £0.5M • Rental income £150K per annum • Net Yield 7.5%
  • 43.
    Case study 6:Supermarket Site
  • 44.
    Case study 6:Supermarket Site
  • 45.
    Case study 6:Supermarket Site
  • 46.
    Case study 6:Supermarket Site
  • 47.
    • RESIDENTIAL • 172no 2-3 bed flats • Construction Value £18-22M • Fees, CIL, etc. £4M • GDV £64M (excluding Commercial) • ROI £38M • 135% return • Assuming a site value of £30M, ROI would be 35%. • COMMERCIAL • 3000sqm commercial space • Construction Value £6-8M • Fees, CIL, etc. £1M • Rental income £600K per annum • Net Yield 8.5% Case study 6: Supermarket Site
  • 48.
    Summary • Brownfield sitesoffer profitable opportunities • Often significant planning and site constraints • Focused strategy for getting a change of use and planning consent • Clever design solutions required to overcome these constraints • A planning refusal may be of benefit (lower sale price and a planning steer) • Presumption in favour of housing in many areas • New rules on permitted development for change of use • Tap into long term council and infrastructure plans
  • 49.
    Contact us Granit Architects Studios18-19 16 Porteus Place Clapham London SW4 0AS Telephone: +44 (0)20 7924 4555 Email: James@granit.co.uk @LondonArchitect