WELCOME ABOUT
Installation, Testing & Commissioning of 800 KVA Sub-Station at
Euro Tech Bangladesh
1
PREPARED BY :
Name: Ranjan Kanti Das ID-13305011
BSEEE-BACHELOR OF SCIENCE IN ELECTRICAL AND ELECTRONICS ENGINEERING
IUBAT-INTERNATIONAL UNIVERSITY OF BUSINESS AGRICULTURE AND TECHNOLOGY
2
CONTENTS
 Introduction
 Objective
 Organizational Overview
 Sub-Station
 Single Line Diagram and Layout of 800KVA Sub-Station
 Room Lay-Out of 800 KVA Sub-Station
 Types of sub-Station
 Range of Low Voltage Sub-Station
 Equipment of 800KVA Sub-Station
 DOFC
 LA
 Different Part of a Transformer
 Technical Specification of 800KVA Sub-Station
 HT Switchgear
 LT Switchgear
 Power Factor Improvement
 Capacitor Bank of 480KVAR
 Transformer Meggar Test
 Earthing Test
 Bus-Bar
 LT Panel Bus-Bar Costing
 Recommendation
 Conclusion
 Questions
3
INTRODUCTION
• Electrical power is the key of modern civilization.
• Power should be control and transfer.
• Power products helps to control & transfer power.
• Power products organization manufacture power products.
• Power products operation.
4
OBJECTIVE
 Broad Objectives:
The Broad Objectives are mainly understand the Installation and operating of switchgear
devices for getting vast knowledge about it.
 Specific Objective:
 Collecting practical Knowledge regarding distribution substation.
 Study on Switchgear and protection in power system.
 To realize the organizational management system of Euro Tech Bangladesh.
5
ORGANIZATIONAL OVERVIEW
Name:
Euro Tech Bangladesh
Established: 2003
Chairman:
Engr. Mohammed Rejaul
Islam
Ownership: ETB Group
Location:
H: 19, R: 11, S: 10 Uttara
Dhaka
Factory Location:
Damardi, Baiddar Bazar
Sonargaon, Narayangonj
6
COUNT…….
Low Tension (LT)
Switchgear
High Tension (HT)
Switchgear
Transformer
Power Factor
Improvement (PFI)
7
A sub-station is a part of an electrical generation, transmission and distribution system.
Sub-station transforms voltage from high to low between the generating station and
consumers, electric power may flow through several substations at different voltage
levels.
SUB-STATION
8
SINGLE LINE DIAGRAM OF 800 KVA SUB-STATION
9
ROOM LAY-OUT OF 800 KVA SUB-STATION
10
TYPES OF SUB-STATION ON THE BASIS OF DESIGN
Sub-Station
Indoor Sub-Station Outdoor Sub-Station
Foundation Mounted
Sub-Station
Pole Mounted Sub-Station
11
RANGE OF LOW VOLTAGE SUB-STATION
Sub-Station Rating Protection
100 KVA
HT Not Used
150 KVA
200 KVA
250 KVA
315 KVA HT Used with LBS
(Load Break Switch)
400 KVA
500 KVA
630 KVA
HT Used with VCB
(Vacuum Circuit Breaker)
750 KVA
800 KVA
1000 KVA
1250 KVA
1500 KVA
2000 KVA
2500 KVA
3000 KVA 12
EQUIPMENT OF 800KVA, 11/0.415 KV SUB-STATION
 11 KV, Dropout Fuse Circuit (DOFC)
 11 KV, Lighting Arrester (LA)
 800 KVA Distribution Transformer
 630A, HT Switchgear
 1250A, LT Switchgear
 480 KVAr, PFI Plant
 Earthing for Sub-Station
13
 DOFC is a combination of a fuse and a switch.
 Used in primary overhead feeder lines and to
protect distribution transformers from current surges and
overloads.
Technical Specification:
Rated Voltage (Nominal) : 11KV
Rated Maximum Voltage : 15KV
Rated Frequency : 50Hz
Rated Current (RMS) : 100A
DROPOUT FUSE CIRCUIT (DOFC)
14
A lightning arrester is a protective device which conducts
the high voltage surges on the power system to the ground.
Technical Specification:
Rated Voltage (RMS) : 12KV
Frequency : 50Hz
Minimum spark over voltage(RMS) : 14KV
LIGHTING ARRESTER (LA)
15
DIFFERENT PARTS OF A TRANSFORMER
Figure: Different Part of 800KVA Distribution Transformer
Conservator
Silica gel
HT Terminal
LT Terminal
Name Plate
Radiator
Tank
Earthing Point
16
SWITCHGEAR
630A, HT Switchgear 1250A, LT Switchgear 17
HT SWITCHGEAR
Line In
KV
A IDMT
Relay
Connection
CT
CT
CT
PT PT
Inner Part Upper Part
Isolator
H
a
n
d
l
e
VCB
A Selector KV Selector
3-phase Line In
3-phase Line Out
18
TECHNICAL SPECIFICATION OF HT SWITCHGEAR
1 no. 11KV, 630A, TP spring charged energy mechanism operated fixed type Vacuum
Circuit Breaker (VCB).
3 no. 11KV, Current Transformer (CT) having ratio 60/5/5A, for metering & Protection.
2 no. 11KV, Potential Transformer (PT) having ratio 11000/110V.
1 no. Triple pole IDMT relay for the Over Current, Short Circuit and Earth Fault
Protection.
3 no. Indication Lamp.
19
LT SWITCHGEAR
Line In Line In
KA V
MCCB/ACB
MCCB/ACB
Line In
MCB MCB
Line Out
CT CT CT
CT
Inner Part Upper Part
KA Selector V Selector
H
a
n
d
l
e
20
Incoming:
1 No. 1250A, TP MCCB with adjustable thermal overload & short circuit protection.
4 Nos. Current transformer having ratio 1250/5A with suitable accuracy & burden.
1 No. Ammeter having scale 0-1250A with selector switch.
1 No. Voltmeter having scale 0-500V with selector switch.
3 No. Phase indicating lamps.
Outgoing:
1 no. 800A, TP MCCB with thermal over load and magnetic short circuit releases.
2 no. 400A, TP MCCB with thermal over load and magnetic short circuit releases.
1 no. 300A, TP MCCB with thermal over load and magnetic short circuit releases.
1 no. 100A, TP MCCB with thermal over load and magnetic short circuit releases.
TECHNICAL SPECIFICATION OF LT SWITCHGEAR
21
Power Factor: The value of the cosine (cosθ) between the voltage and the current is called the power
factor.
POWER FACTOR IMPROVEMENT
Voltage
Current
Improving power factor means reducing the phase difference
between voltage and current. Since majority of loads are of
inductive nature, they require some amount of
reactive power for them to function. This reactive power is
provided by the bank of capacitors installed parallel to the load.
22
Line In Line In
Power Factor
Regulator
Power Capacitor
Magnetic Contactor
HRC Fuse
PC
HRC Fuse
HRC Fuse
M.C.
HRC fuse
Inner Part Upper Part
PFI PANEL
H
a
n
d
l
e
23
480 KVAR CAPACITOR BANK
24
1 no. 12 stages automatic power factor correction relay with auto/manual selector switch,
indication lamp & digital P.F. meter.
08 No. 50KVAr, 415V, TP dry type power capacitor bank with built in discharge resistor.
02 No. 25KVAr, 415 V, TP dry type Power capacitor bank with built in discharge resistor.
01 No. 15KVAr, 415V, TP dry type Power capacitor bank with built in discharge resistor.
01 No. 5KVAr, 415 V, TP dry type Power capacitor bank with built in discharge resistor (Fixed )
12 No. TP, 415V Magnetic contractor of adequate rating.
39 No. HRC fuses with base of adequate rating.
12 No. Indication Lamps.
TECHNICAL SPECIFICATION OF PFI PANEL
25
MAGNETIC CONTACTOR AND FUSE SELECTION DEPENDING
ON KVAR
Sl Capacitor Stage of Controller
Magnetic
Contactor(Amp)
Fuse (Amp)
1 5 KVAR Fixed/Direct 12A 14 A
2 10 KVAR 1 25A 30 A
3 15 KVAR 2 32A 40 A
4 25 KVAR 3 40A 63 A
5 25 KVAR 4 40A 63 A
6 50 KVAR 5 85A 125 A
7 50 KVAR 6 85A 125 A
8 50 KVAR 7 85A 125 A
9 50 KVAR 8 85A 125 A
10 50 KVAR 9 85A 125 A
11 50 KVAR 10 85A 125 A
12 50 KVAR 11 85A 125 A
13 50 KVAR 12 85A 125 A 26
Here the insulation resistance varies the different condition. Mainly in transformer have
three special part LT winding, HT winding, and Transformer body. That should be like
that value
• HT- LT: 2000MΩ
• HT- Body: 2000MΩ
• LT- Body: 2000MΩ
TRANSFORMER MEGGAR TEST
27
EARTHING TEST
Earthing Metarials:
 Earthing conductor size should be 2-4 SWG
 Earthing result will be less than 1 ohm
 LA and X-F neutral grounding should be separated from the main mesh
 Depth of LA & X-F neutral grounding boring point at least 25 M
 X-F body will be grounded at least 2 points
Earthing Test (Earth Tester No: 26180204)
 Earthing resistance in Electrode-1 = 0.93 Ohm
 Earthing resistance in Electrode-2 = 0.88 Ohm
 Earthing resistance in Electrode-3 = 0.86 Ohm
 Earthing resistance in Electrode-4 = 0.92 Ohm
28
BUS-BAR
Bus-Bar is a type of electrical junction in which all the incoming and outgoing electrical
current meets. Thus, the electrical bus bar collects the electrical energy at one location.
LT Panel Bus-Bar Selection:
We will multiply incoming breaker capacity 1250A by 1.25.
1250 × 1.25 = 1562.5 A
We know that,
2 Amp = 1 mm2
1562.5 A = 781.25 mm2
So according to 781.25 mm2 we need (65 ×12) mm2 Bus bar but this is not available in
market so we will take (70×12) mm2.
N.B: A little or more increasing is good for Bus bar but not decreasing from rated value.
29
LT PANEL BUS-BAR COSTING
We need 1 m length bus bar then
N.B.: Here we choose (70×12) mm2 Bus bar
L = 1 m = 1000 mm
W = 70 mm
H = 12 mm
So,
V = L x W x H
V = (1000× 70× 12) mm3
V = 840000 mm3
V = 0.00084 m3
Now we know that the density of
cupper is,
ρ = 8960 kg/m3
So Mass,
m = ρ v
m = 8960 kg/m3 × 0.00084 m3
m = (7.5) kg
Let,
1 kg = 800 Tk.
7.5 kg = 6000 Tk.
30
RECOMMENDATION
 To avoid fault in Substation, ELB should take care of overall test on substation like, Transformer
magger test, Dimension of substation equipment, Earth test etc.
 Transformer oil and silica gel should be checked after one month or any type of fault. Oil should be
changed if it is decomposed.
 Need separation between Transformer and LT switchgear for their safety purpose.
 Depends on ambient temperature we should manufactured transformer for in terms of area, to
minimize cost.
 The direct capacitor which used in PFI, it should be used low rating capacitor to avoid assess by
DESCO, BREB, DPDC etc.
31
CONCLUSION
For a technical service provider plant I&C activities are very important as its service
mostly depends on the availability of its equipment. By using proper I&C schedule of
substation cost can be reduced and supply can be increased. I&C are traditionally
classified as a part of output that comes from the system. During my internship, I could
learn about Substation on, its Installation, Testing and Commissioning. During this study,
it has been observed from the organizational point of view where it has been
implemented.
32
33
34

More Related Content

What's hot

EE452_Flyback Convert
EE452_Flyback ConvertEE452_Flyback Convert
EE452_Flyback Convertki hei chan
 
Seminor on resonant and soft switching converter
Seminor on resonant and soft switching converterSeminor on resonant and soft switching converter
Seminor on resonant and soft switching converterAnup Kumar
 
Operational Amplifier (OpAmp)
Operational Amplifier (OpAmp)Operational Amplifier (OpAmp)
Operational Amplifier (OpAmp)Mohammed Bamatraf
 
Double tail comparator
Double tail comparatorDouble tail comparator
Double tail comparatorMdLogic Mdls
 
High Speed, Low Offset, Low Power, Fully Dynamic Cmos Latched Comparator
High Speed, Low Offset, Low Power, Fully Dynamic Cmos Latched ComparatorHigh Speed, Low Offset, Low Power, Fully Dynamic Cmos Latched Comparator
High Speed, Low Offset, Low Power, Fully Dynamic Cmos Latched Comparatoriosrjce
 
Unit-V Special ICs
Unit-V Special ICsUnit-V Special ICs
Unit-V Special ICsDr.Raja R
 
H2PToday1201_design_IR
H2PToday1201_design_IRH2PToday1201_design_IR
H2PToday1201_design_IRParviz Parto
 
1182 apec2011
1182 apec20111182 apec2011
1182 apec2011dunisha
 
Linear Integrated Circuits and Its Applications Unit-V Special ICs
Linear Integrated Circuits and Its Applications Unit-V Special ICsLinear Integrated Circuits and Its Applications Unit-V Special ICs
Linear Integrated Circuits and Its Applications Unit-V Special ICsSatheeshCS2
 
Sample calculation-for-differential-relays
Sample calculation-for-differential-relaysSample calculation-for-differential-relays
Sample calculation-for-differential-relaysRoberto Costa
 
Power transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines rPower transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines rAshish Patel
 
Modular Multilevel Inverter
Modular Multilevel InverterModular Multilevel Inverter
Modular Multilevel InverterAjay Kumar
 
ANALYSIS, DESIGN AND IMPLEMENTATION OF ZERO-CURRENT-SWITCHING RESONANT CONVER...
ANALYSIS, DESIGN AND IMPLEMENTATION OF ZERO-CURRENT-SWITCHING RESONANT CONVER...ANALYSIS, DESIGN AND IMPLEMENTATION OF ZERO-CURRENT-SWITCHING RESONANT CONVER...
ANALYSIS, DESIGN AND IMPLEMENTATION OF ZERO-CURRENT-SWITCHING RESONANT CONVER...hunypink
 

What's hot (20)

sensro Ie bab3 scc
sensro Ie bab3 sccsensro Ie bab3 scc
sensro Ie bab3 scc
 
Comparator
ComparatorComparator
Comparator
 
ECNG 6503 #2
ECNG 6503  #2ECNG 6503  #2
ECNG 6503 #2
 
EE452_Flyback Convert
EE452_Flyback ConvertEE452_Flyback Convert
EE452_Flyback Convert
 
Seminor on resonant and soft switching converter
Seminor on resonant and soft switching converterSeminor on resonant and soft switching converter
Seminor on resonant and soft switching converter
 
Operational Amplifier (OpAmp)
Operational Amplifier (OpAmp)Operational Amplifier (OpAmp)
Operational Amplifier (OpAmp)
 
Double tail comparator
Double tail comparatorDouble tail comparator
Double tail comparator
 
High Speed, Low Offset, Low Power, Fully Dynamic Cmos Latched Comparator
High Speed, Low Offset, Low Power, Fully Dynamic Cmos Latched ComparatorHigh Speed, Low Offset, Low Power, Fully Dynamic Cmos Latched Comparator
High Speed, Low Offset, Low Power, Fully Dynamic Cmos Latched Comparator
 
Unit-V Special ICs
Unit-V Special ICsUnit-V Special ICs
Unit-V Special ICs
 
Op amp basics
Op amp basicsOp amp basics
Op amp basics
 
Smh presentación jmsc depc
Smh presentación  jmsc depcSmh presentación  jmsc depc
Smh presentación jmsc depc
 
H2PToday1201_design_IR
H2PToday1201_design_IRH2PToday1201_design_IR
H2PToday1201_design_IR
 
1182 apec2011
1182 apec20111182 apec2011
1182 apec2011
 
Linear Integrated Circuits and Its Applications Unit-V Special ICs
Linear Integrated Circuits and Its Applications Unit-V Special ICsLinear Integrated Circuits and Its Applications Unit-V Special ICs
Linear Integrated Circuits and Its Applications Unit-V Special ICs
 
Aec manual2017 imp
Aec manual2017 impAec manual2017 imp
Aec manual2017 imp
 
Sample calculation-for-differential-relays
Sample calculation-for-differential-relaysSample calculation-for-differential-relays
Sample calculation-for-differential-relays
 
Power transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines rPower transformer testing and commissioning guidelines r
Power transformer testing and commissioning guidelines r
 
Ee6503(r 13) qb-2013_regulation
Ee6503(r 13) qb-2013_regulationEe6503(r 13) qb-2013_regulation
Ee6503(r 13) qb-2013_regulation
 
Modular Multilevel Inverter
Modular Multilevel InverterModular Multilevel Inverter
Modular Multilevel Inverter
 
ANALYSIS, DESIGN AND IMPLEMENTATION OF ZERO-CURRENT-SWITCHING RESONANT CONVER...
ANALYSIS, DESIGN AND IMPLEMENTATION OF ZERO-CURRENT-SWITCHING RESONANT CONVER...ANALYSIS, DESIGN AND IMPLEMENTATION OF ZERO-CURRENT-SWITCHING RESONANT CONVER...
ANALYSIS, DESIGN AND IMPLEMENTATION OF ZERO-CURRENT-SWITCHING RESONANT CONVER...
 

Similar to Installation testing and_commissioning_o (1)

Power Distribution Report of THE NEOTIA UNIVERSITY CAMPUS
Power Distribution Report of  THE NEOTIA UNIVERSITY CAMPUSPower Distribution Report of  THE NEOTIA UNIVERSITY CAMPUS
Power Distribution Report of THE NEOTIA UNIVERSITY CAMPUSSaikat Bhandari
 
Substation-Design-Guideliness
Substation-Design-GuidelinessSubstation-Design-Guideliness
Substation-Design-GuidelinessMircea Tomescu
 
Substation design guideliness
Substation design guidelinessSubstation design guideliness
Substation design guidelinessmichaeljmack
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxAkshaiSai2
 
C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)saurabhVEC
 
RELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdfRELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdfJayWin2
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPURsahid raja khan
 
Multi-KilowattFlybackConverters.pptx
Multi-KilowattFlybackConverters.pptxMulti-KilowattFlybackConverters.pptx
Multi-KilowattFlybackConverters.pptxRickMaity
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & MaintenanceHimansu Pradhan
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substationpk130992
 
INDUSTRIAL SEMINAR PRESENTATION
INDUSTRIAL SEMINAR PRESENTATIONINDUSTRIAL SEMINAR PRESENTATION
INDUSTRIAL SEMINAR PRESENTATIONArgha Dutta
 
Power transformers rating
Power transformers ratingPower transformers rating
Power transformers ratingLeonardo ENERGY
 
Insulation co cordination design
Insulation co cordination designInsulation co cordination design
Insulation co cordination designNaresh Surisetti
 
industrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLindustrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLsurendra rawat
 
Cooper Power Connectors - MV-HV Specifiers Guide 5kV-35kV
Cooper Power Connectors - MV-HV Specifiers Guide 5kV-35kVCooper Power Connectors - MV-HV Specifiers Guide 5kV-35kV
Cooper Power Connectors - MV-HV Specifiers Guide 5kV-35kVThorne & Derrick International
 

Similar to Installation testing and_commissioning_o (1) (20)

Power Distribution Report of THE NEOTIA UNIVERSITY CAMPUS
Power Distribution Report of  THE NEOTIA UNIVERSITY CAMPUSPower Distribution Report of  THE NEOTIA UNIVERSITY CAMPUS
Power Distribution Report of THE NEOTIA UNIVERSITY CAMPUS
 
Substation design-guideliness
Substation design-guidelinessSubstation design-guideliness
Substation design-guideliness
 
Substation-Design-Guideliness
Substation-Design-GuidelinessSubstation-Design-Guideliness
Substation-Design-Guideliness
 
Substation design guideliness
Substation design guidelinessSubstation design guideliness
Substation design guideliness
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptx
 
C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)C.S.P.D.C.L.AMBIKAPUR (TOWN)
C.S.P.D.C.L.AMBIKAPUR (TOWN)
 
ABB Price List of Capacitors 008
ABB Price List of Capacitors 008ABB Price List of Capacitors 008
ABB Price List of Capacitors 008
 
RELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdfRELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdf
 
Sub station design
Sub station designSub station design
Sub station design
 
400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR400 KV GSS HEERAPURA, JAIPUR
400 KV GSS HEERAPURA, JAIPUR
 
Multi-KilowattFlybackConverters.pptx
Multi-KilowattFlybackConverters.pptxMulti-KilowattFlybackConverters.pptx
Multi-KilowattFlybackConverters.pptx
 
220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance220 KV Substation Operation & Maintenance
220 KV Substation Operation & Maintenance
 
industrial training on 132 kv substation
industrial training on 132 kv substationindustrial training on 132 kv substation
industrial training on 132 kv substation
 
INDUSTRIAL SEMINAR PRESENTATION
INDUSTRIAL SEMINAR PRESENTATIONINDUSTRIAL SEMINAR PRESENTATION
INDUSTRIAL SEMINAR PRESENTATION
 
Power transformers rating
Power transformers ratingPower transformers rating
Power transformers rating
 
Mcbelcb
McbelcbMcbelcb
Mcbelcb
 
Insulation co cordination design
Insulation co cordination designInsulation co cordination design
Insulation co cordination design
 
industrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCLindustrial training ppt from 33 kv substation UPCL
industrial training ppt from 33 kv substation UPCL
 
havells ppt
havells ppthavells ppt
havells ppt
 
Cooper Power Connectors - MV-HV Specifiers Guide 5kV-35kV
Cooper Power Connectors - MV-HV Specifiers Guide 5kV-35kVCooper Power Connectors - MV-HV Specifiers Guide 5kV-35kV
Cooper Power Connectors - MV-HV Specifiers Guide 5kV-35kV
 

Recently uploaded

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Installation testing and_commissioning_o (1)

  • 1. WELCOME ABOUT Installation, Testing & Commissioning of 800 KVA Sub-Station at Euro Tech Bangladesh 1
  • 2. PREPARED BY : Name: Ranjan Kanti Das ID-13305011 BSEEE-BACHELOR OF SCIENCE IN ELECTRICAL AND ELECTRONICS ENGINEERING IUBAT-INTERNATIONAL UNIVERSITY OF BUSINESS AGRICULTURE AND TECHNOLOGY 2
  • 3. CONTENTS  Introduction  Objective  Organizational Overview  Sub-Station  Single Line Diagram and Layout of 800KVA Sub-Station  Room Lay-Out of 800 KVA Sub-Station  Types of sub-Station  Range of Low Voltage Sub-Station  Equipment of 800KVA Sub-Station  DOFC  LA  Different Part of a Transformer  Technical Specification of 800KVA Sub-Station  HT Switchgear  LT Switchgear  Power Factor Improvement  Capacitor Bank of 480KVAR  Transformer Meggar Test  Earthing Test  Bus-Bar  LT Panel Bus-Bar Costing  Recommendation  Conclusion  Questions 3
  • 4. INTRODUCTION • Electrical power is the key of modern civilization. • Power should be control and transfer. • Power products helps to control & transfer power. • Power products organization manufacture power products. • Power products operation. 4
  • 5. OBJECTIVE  Broad Objectives: The Broad Objectives are mainly understand the Installation and operating of switchgear devices for getting vast knowledge about it.  Specific Objective:  Collecting practical Knowledge regarding distribution substation.  Study on Switchgear and protection in power system.  To realize the organizational management system of Euro Tech Bangladesh. 5
  • 6. ORGANIZATIONAL OVERVIEW Name: Euro Tech Bangladesh Established: 2003 Chairman: Engr. Mohammed Rejaul Islam Ownership: ETB Group Location: H: 19, R: 11, S: 10 Uttara Dhaka Factory Location: Damardi, Baiddar Bazar Sonargaon, Narayangonj 6
  • 7. COUNT……. Low Tension (LT) Switchgear High Tension (HT) Switchgear Transformer Power Factor Improvement (PFI) 7
  • 8. A sub-station is a part of an electrical generation, transmission and distribution system. Sub-station transforms voltage from high to low between the generating station and consumers, electric power may flow through several substations at different voltage levels. SUB-STATION 8
  • 9. SINGLE LINE DIAGRAM OF 800 KVA SUB-STATION 9
  • 10. ROOM LAY-OUT OF 800 KVA SUB-STATION 10
  • 11. TYPES OF SUB-STATION ON THE BASIS OF DESIGN Sub-Station Indoor Sub-Station Outdoor Sub-Station Foundation Mounted Sub-Station Pole Mounted Sub-Station 11
  • 12. RANGE OF LOW VOLTAGE SUB-STATION Sub-Station Rating Protection 100 KVA HT Not Used 150 KVA 200 KVA 250 KVA 315 KVA HT Used with LBS (Load Break Switch) 400 KVA 500 KVA 630 KVA HT Used with VCB (Vacuum Circuit Breaker) 750 KVA 800 KVA 1000 KVA 1250 KVA 1500 KVA 2000 KVA 2500 KVA 3000 KVA 12
  • 13. EQUIPMENT OF 800KVA, 11/0.415 KV SUB-STATION  11 KV, Dropout Fuse Circuit (DOFC)  11 KV, Lighting Arrester (LA)  800 KVA Distribution Transformer  630A, HT Switchgear  1250A, LT Switchgear  480 KVAr, PFI Plant  Earthing for Sub-Station 13
  • 14.  DOFC is a combination of a fuse and a switch.  Used in primary overhead feeder lines and to protect distribution transformers from current surges and overloads. Technical Specification: Rated Voltage (Nominal) : 11KV Rated Maximum Voltage : 15KV Rated Frequency : 50Hz Rated Current (RMS) : 100A DROPOUT FUSE CIRCUIT (DOFC) 14
  • 15. A lightning arrester is a protective device which conducts the high voltage surges on the power system to the ground. Technical Specification: Rated Voltage (RMS) : 12KV Frequency : 50Hz Minimum spark over voltage(RMS) : 14KV LIGHTING ARRESTER (LA) 15
  • 16. DIFFERENT PARTS OF A TRANSFORMER Figure: Different Part of 800KVA Distribution Transformer Conservator Silica gel HT Terminal LT Terminal Name Plate Radiator Tank Earthing Point 16
  • 17. SWITCHGEAR 630A, HT Switchgear 1250A, LT Switchgear 17
  • 18. HT SWITCHGEAR Line In KV A IDMT Relay Connection CT CT CT PT PT Inner Part Upper Part Isolator H a n d l e VCB A Selector KV Selector 3-phase Line In 3-phase Line Out 18
  • 19. TECHNICAL SPECIFICATION OF HT SWITCHGEAR 1 no. 11KV, 630A, TP spring charged energy mechanism operated fixed type Vacuum Circuit Breaker (VCB). 3 no. 11KV, Current Transformer (CT) having ratio 60/5/5A, for metering & Protection. 2 no. 11KV, Potential Transformer (PT) having ratio 11000/110V. 1 no. Triple pole IDMT relay for the Over Current, Short Circuit and Earth Fault Protection. 3 no. Indication Lamp. 19
  • 20. LT SWITCHGEAR Line In Line In KA V MCCB/ACB MCCB/ACB Line In MCB MCB Line Out CT CT CT CT Inner Part Upper Part KA Selector V Selector H a n d l e 20
  • 21. Incoming: 1 No. 1250A, TP MCCB with adjustable thermal overload & short circuit protection. 4 Nos. Current transformer having ratio 1250/5A with suitable accuracy & burden. 1 No. Ammeter having scale 0-1250A with selector switch. 1 No. Voltmeter having scale 0-500V with selector switch. 3 No. Phase indicating lamps. Outgoing: 1 no. 800A, TP MCCB with thermal over load and magnetic short circuit releases. 2 no. 400A, TP MCCB with thermal over load and magnetic short circuit releases. 1 no. 300A, TP MCCB with thermal over load and magnetic short circuit releases. 1 no. 100A, TP MCCB with thermal over load and magnetic short circuit releases. TECHNICAL SPECIFICATION OF LT SWITCHGEAR 21
  • 22. Power Factor: The value of the cosine (cosθ) between the voltage and the current is called the power factor. POWER FACTOR IMPROVEMENT Voltage Current Improving power factor means reducing the phase difference between voltage and current. Since majority of loads are of inductive nature, they require some amount of reactive power for them to function. This reactive power is provided by the bank of capacitors installed parallel to the load. 22
  • 23. Line In Line In Power Factor Regulator Power Capacitor Magnetic Contactor HRC Fuse PC HRC Fuse HRC Fuse M.C. HRC fuse Inner Part Upper Part PFI PANEL H a n d l e 23
  • 25. 1 no. 12 stages automatic power factor correction relay with auto/manual selector switch, indication lamp & digital P.F. meter. 08 No. 50KVAr, 415V, TP dry type power capacitor bank with built in discharge resistor. 02 No. 25KVAr, 415 V, TP dry type Power capacitor bank with built in discharge resistor. 01 No. 15KVAr, 415V, TP dry type Power capacitor bank with built in discharge resistor. 01 No. 5KVAr, 415 V, TP dry type Power capacitor bank with built in discharge resistor (Fixed ) 12 No. TP, 415V Magnetic contractor of adequate rating. 39 No. HRC fuses with base of adequate rating. 12 No. Indication Lamps. TECHNICAL SPECIFICATION OF PFI PANEL 25
  • 26. MAGNETIC CONTACTOR AND FUSE SELECTION DEPENDING ON KVAR Sl Capacitor Stage of Controller Magnetic Contactor(Amp) Fuse (Amp) 1 5 KVAR Fixed/Direct 12A 14 A 2 10 KVAR 1 25A 30 A 3 15 KVAR 2 32A 40 A 4 25 KVAR 3 40A 63 A 5 25 KVAR 4 40A 63 A 6 50 KVAR 5 85A 125 A 7 50 KVAR 6 85A 125 A 8 50 KVAR 7 85A 125 A 9 50 KVAR 8 85A 125 A 10 50 KVAR 9 85A 125 A 11 50 KVAR 10 85A 125 A 12 50 KVAR 11 85A 125 A 13 50 KVAR 12 85A 125 A 26
  • 27. Here the insulation resistance varies the different condition. Mainly in transformer have three special part LT winding, HT winding, and Transformer body. That should be like that value • HT- LT: 2000MΩ • HT- Body: 2000MΩ • LT- Body: 2000MΩ TRANSFORMER MEGGAR TEST 27
  • 28. EARTHING TEST Earthing Metarials:  Earthing conductor size should be 2-4 SWG  Earthing result will be less than 1 ohm  LA and X-F neutral grounding should be separated from the main mesh  Depth of LA & X-F neutral grounding boring point at least 25 M  X-F body will be grounded at least 2 points Earthing Test (Earth Tester No: 26180204)  Earthing resistance in Electrode-1 = 0.93 Ohm  Earthing resistance in Electrode-2 = 0.88 Ohm  Earthing resistance in Electrode-3 = 0.86 Ohm  Earthing resistance in Electrode-4 = 0.92 Ohm 28
  • 29. BUS-BAR Bus-Bar is a type of electrical junction in which all the incoming and outgoing electrical current meets. Thus, the electrical bus bar collects the electrical energy at one location. LT Panel Bus-Bar Selection: We will multiply incoming breaker capacity 1250A by 1.25. 1250 × 1.25 = 1562.5 A We know that, 2 Amp = 1 mm2 1562.5 A = 781.25 mm2 So according to 781.25 mm2 we need (65 ×12) mm2 Bus bar but this is not available in market so we will take (70×12) mm2. N.B: A little or more increasing is good for Bus bar but not decreasing from rated value. 29
  • 30. LT PANEL BUS-BAR COSTING We need 1 m length bus bar then N.B.: Here we choose (70×12) mm2 Bus bar L = 1 m = 1000 mm W = 70 mm H = 12 mm So, V = L x W x H V = (1000× 70× 12) mm3 V = 840000 mm3 V = 0.00084 m3 Now we know that the density of cupper is, ρ = 8960 kg/m3 So Mass, m = ρ v m = 8960 kg/m3 × 0.00084 m3 m = (7.5) kg Let, 1 kg = 800 Tk. 7.5 kg = 6000 Tk. 30
  • 31. RECOMMENDATION  To avoid fault in Substation, ELB should take care of overall test on substation like, Transformer magger test, Dimension of substation equipment, Earth test etc.  Transformer oil and silica gel should be checked after one month or any type of fault. Oil should be changed if it is decomposed.  Need separation between Transformer and LT switchgear for their safety purpose.  Depends on ambient temperature we should manufactured transformer for in terms of area, to minimize cost.  The direct capacitor which used in PFI, it should be used low rating capacitor to avoid assess by DESCO, BREB, DPDC etc. 31
  • 32. CONCLUSION For a technical service provider plant I&C activities are very important as its service mostly depends on the availability of its equipment. By using proper I&C schedule of substation cost can be reduced and supply can be increased. I&C are traditionally classified as a part of output that comes from the system. During my internship, I could learn about Substation on, its Installation, Testing and Commissioning. During this study, it has been observed from the organizational point of view where it has been implemented. 32
  • 33. 33