Components of Sub-Station
Major Components
• Transformer
• HT Meter Unit
• LT Switchgear
• SDB
• PFI Panel
• HT Cable
• G.I Pipe for HT Cable Laying
• Cable Pit
• LT Cable
• Earthing System
• lightning Arrester
• Drop Out Fuse
Minor Components
• Earthing Boring
• Earthing Inspection pit
• Equalizer Bar
• Shock Treatment Charts
• Single Line Diagram
• First Aid Box
• Rubber hand Gloves
Transformer Selection
• Suppose total load = 80KW
• Note:
Available Transformer rating in market, 100, 200, 250, 315, 400,
500, 630, 750, 800, 1000, 1250 KVA.
• So, Our required Transformer - 100KVA
HT (High Tension) Panel & Switchgear
• HT panel is a metal enclosure fitted with HT Circuit Breakers, relays & metering
that is used to receive 11KV/33KV supply (from one or more source) & distribute
the power through its outgoing feeders. Outgoing feeder may be one or more it
depends on the load of the building.
• HT Panel & Switchgear components are –
1) Ampere meter 8) Volt meter
2) Ampere selector switch 9) Voltmeter switch
3) Circuit Breaker 10) Panel Heater
4) Solid State Programmable KWH Meter
5)Supporter / Insulator
6) Indicating Lamp
7) TP Cast Resin CT & PT
LT (Low Tension) Panel & Switchgear
• Transformer Power × 1.6 = 100KVA * 1.6 =160A
• LT Panel is an electrical distribution board that receives power from generator or
transformer and distributes the same to various electronic devices and distribution
boards.
• LT Switchgear components are –
1) Ampere meter 3) Volt meter
2) Ampere selector switch 4) Voltmeter switch
5) Circuit Breaker 6) Bus bar
7) LTCT 8)Supporter / Insulator
9) Connector 10) Cable Lux
11) Indicating Lamp 12) KT Fuse / Controller Fuse
LT(Low Tension) Panel & Switchgear (Cont.)
1) Ampere meter
Show measurement how many current flows on the loads.
Available Ampere meter Ratings , (
𝐴𝑚𝑝
5
)
30
5
,
60
5
,
100
5
,
150
5
,
200
5
,
300
5
,
400
5
,
630
5
,
800
5
,
1000
5
,
1250
5
,
1500
5
,
1600
5
,
2000
5
2500
5
,
3000
5
,
3500
5
,
4000
5
,
4500
5
,
5000
5
,
6000
5
.
2) Ampere selector switch
Show measurement, how many current flows on the Three Phase loads Like R Y B .
LT(Low Tension) Panel & Switchgear (Cont.)
3) Volt meter
It measures voltage across the loads (400V – 500V ).
4) Voltage Selector switch
It measures voltage across the every phase .
5) Circuit Breaker
SP- Single Phase Circuit Breaker
DP- Double Phase Circuit Breaker
TP- Three Phase Circuit Breaker MCB
Example – MCB, MCCB, ACB, VCB, SF6 CB, LBS.
LT(Low Tension) Panel & Switchgear (Cont.)
Ratings of Circuit Breakers :
• SP/DP : 6A, 16A, 20A, 26A, 32A, 40A, 60A, 63A. MCCB
• TP/ MCB (Miniature Circuit Breaker) : 6A, 16A, 20A,
26A, 32A, 40A, 60A, 63A.
• MCCB (Molded Case Circuit Breaker) : 25A, 32A, 40A,
60A, 63A, 75A, 80A, 100A, 125A, 150A, 160A, 200A, ACB
250A, 300A, 320A, 400A, 500A, 630A, 800A, 1000A,
1250A, 1600A.
• ACB (Air Circuit Breaker) : 800A, 1000A, 1250A,
2000A, 2500A. VCB
• VCB (Vacuum Circuit Breaker) : 630A, 800A, 1250A.
LT(Low Tension) Panel & Switchgear (Cont.)
LTCT (Low Tension Current Transformer)
• It depends on secondary current or LT switchgear ratio.
• LTCT and LT switchgear have same Amp.
Ratings:
30
5
,
60
5
,
100
5
,
150
5
,
200
5
,
300
5
,
400
5
,
630
5
,
800
5
,
1000
5
,
1250
5
,
1500
5
,
1600
5
,
2000
5
,
2500
5
,
3000
5
,
3500
5
,
4000
5
,
4500
5
,
5000
5
,
6000
5
.
• Supporter / Insulator
We can use supporter or Insulator till 600A.
More than 600A we need to use Fibre.
PFI Selection
• PFI Rating/ Capacity = Transformer Capacity × 0.6
=100 × 0.6 = 60KVAR
• Capacitor Bank Value =
KVAR ∗10^9
2π ∗f ∗V^2
uf
=
160 ∗10^9
2π ∗50 ∗440^2
uf
= 2630.65 uf, total
= 2630.65 / 3 uf, per phase of Three Phase
= 876.88 uf
Bus bar Selection
• For Copper 1Sqmm = 1.5A ~ 2A
• For Aluminium 1Sqmm = 0.5A~ 1.5A
• Suppose total load current = 196 A + 25% = 246 A
• So, Bus bar Size = 246 / 1.6 = 154 Sqmm
If thickness of bar is 7 mm , then high = 154 / 7 = 22 m
Cable Selection
• Cable selection depends on three factors.
1 . Load Current
2. Temperature or Correction Factor
3. Voltage Drop
Always we take 20% extra load with total load. Let total load 80KW.
So Total load + 20% of load = 80 + 16 = 96 KW
1. Load Current Calculation
For Single Phase Connection , IL = Power / Voltage × cosƟ
For three Phase Connection, IL = Power / √3 Voltage × cosƟ
Cable Selection (Cont.)
2. Correction Factor 0r Temperature or Current Carrying Capacity (C.C.C.)
In our House hold and many industrial wiring is conduit wiring .
There is no air inside of the conduit wiring that’s why Temperature of Cable Increase.
So, Current Carrying Capacity is changing.
Let Our Load Current is 50A.
From Chart , we can choose 16Sqmm wire which carries 61A.
But C.C.C of this Wire is (61A*0.71) = 43.31 A, Which is Less than IL .
If we Choose 25Sqmm wire which carries 80A.
CCC of this wire =( 80*0.71)= 56.8A .
So, we can choose this wire (25Sqmm wire which carries 80A).
Cable Selection (Cont.)
3. Voltage Drop
There is no voltage Drop within 10m to 15m. If we use 100m wire than we
definitely get voltage drop.
Voltage drop of this wire 1.80 mV/A/m .
So, the total voltage Drop of this Wire = (1.80 *56.8*100)/1000 =10.224
Note:
There is no problem If the voltage drop will be 3% to 5% of nominal voltage.
3% of 220V = 6.6V
For 25Sqmm wire we get more than 6.6V voltage drop.
So, We use 35Sqmm wire for system.
Other Equipment of Sub-Station
Lightning Arrester & Drop Out Fuse
We always use same rating for lightning arrester and Drop Out Fuse as
DESCO input Connection Rating.
Drop out Fuse Lightning Arrester

More Related Content

What's hot

Current transformers
Current transformersCurrent transformers
Current transformers
Bhairav Joshi
 
Wide Vin DC/DC Converters: Reliable Power for Demanding Applications
		 Wide Vin DC/DC Converters: Reliable Power for Demanding Applications		 Wide Vin DC/DC Converters: Reliable Power for Demanding Applications
Wide Vin DC/DC Converters: Reliable Power for Demanding ApplicationsDesign World
 
CSI Manual
CSI ManualCSI Manual
CSI Manual
Corporate Services
 
Power Transformers regulations - MEPS
Power Transformers regulations - MEPSPower Transformers regulations - MEPS
Power Transformers regulations - MEPS
Leonardo ENERGY
 
Ref protn ct sample calculation
Ref protn ct   sample calculationRef protn ct   sample calculation
Ref protn ct sample calculation
LANOGWA RODGERS
 
EEP301: Transducer and instrumentation
EEP301: Transducer and instrumentationEEP301: Transducer and instrumentation
EEP301: Transducer and instrumentation
Umang Gupta
 
EEP303: Cycle ii exp 4
EEP303: Cycle ii   exp 4EEP303: Cycle ii   exp 4
EEP303: Cycle ii exp 4
Umang Gupta
 
TI’s Next Great Leap: Introducing the NexFET™ 100V Power MOSFETs!
TI’s Next Great Leap: Introducing the NexFET™ 100V Power MOSFETs!TI’s Next Great Leap: Introducing the NexFET™ 100V Power MOSFETs!
TI’s Next Great Leap: Introducing the NexFET™ 100V Power MOSFETs!Design World
 
EEP303: Cycle ii exp 2
EEP303: Cycle ii   exp 2EEP303: Cycle ii   exp 2
EEP303: Cycle ii exp 2
Umang Gupta
 
Protection settings calculation
Protection settings calculationProtection settings calculation
Protection settings calculation
LANOGWA RODGERS
 
Main cost of coverpage1
Main cost of coverpage1Main cost of coverpage1
Main cost of coverpage1Narendra Reddy
 
EEP301: Exp5
EEP301: Exp5EEP301: Exp5
EEP301: Exp5
Umang Gupta
 
Per unit systems in power systems
Per unit systems in power systemsPer unit systems in power systems
Per unit systems in power systems
anoopeluvathingal
 
40 MVA TX
40 MVA TX40 MVA TX
40 MVA TX
LANOGWA RODGERS
 
Transformer Fundamentals
Transformer FundamentalsTransformer Fundamentals
Transformer Fundamentals
michaeljmack
 
Design of DC-DC Converter for SMPS with Multiple isolated outputs.
Design of DC-DC Converter for SMPS with Multiple isolated outputs.Design of DC-DC Converter for SMPS with Multiple isolated outputs.
Design of DC-DC Converter for SMPS with Multiple isolated outputs.
Prajwal M B Raj
 
EEP303 Cycle ii exp-1
EEP303 Cycle ii exp-1EEP303 Cycle ii exp-1
EEP303 Cycle ii exp-1
Umang Gupta
 
Electric power calculations
Electric power calculationsElectric power calculations
Electric power calculations
michaeljmack
 
Dual Converter using Thyristors
Dual Converter using ThyristorsDual Converter using Thyristors
Dual Converter using Thyristors
Edgefxkits & Solutions
 
Power systems symmetrical components
Power systems symmetrical componentsPower systems symmetrical components
Power systems symmetrical components
anoopeluvathingal
 

What's hot (20)

Current transformers
Current transformersCurrent transformers
Current transformers
 
Wide Vin DC/DC Converters: Reliable Power for Demanding Applications
		 Wide Vin DC/DC Converters: Reliable Power for Demanding Applications		 Wide Vin DC/DC Converters: Reliable Power for Demanding Applications
Wide Vin DC/DC Converters: Reliable Power for Demanding Applications
 
CSI Manual
CSI ManualCSI Manual
CSI Manual
 
Power Transformers regulations - MEPS
Power Transformers regulations - MEPSPower Transformers regulations - MEPS
Power Transformers regulations - MEPS
 
Ref protn ct sample calculation
Ref protn ct   sample calculationRef protn ct   sample calculation
Ref protn ct sample calculation
 
EEP301: Transducer and instrumentation
EEP301: Transducer and instrumentationEEP301: Transducer and instrumentation
EEP301: Transducer and instrumentation
 
EEP303: Cycle ii exp 4
EEP303: Cycle ii   exp 4EEP303: Cycle ii   exp 4
EEP303: Cycle ii exp 4
 
TI’s Next Great Leap: Introducing the NexFET™ 100V Power MOSFETs!
TI’s Next Great Leap: Introducing the NexFET™ 100V Power MOSFETs!TI’s Next Great Leap: Introducing the NexFET™ 100V Power MOSFETs!
TI’s Next Great Leap: Introducing the NexFET™ 100V Power MOSFETs!
 
EEP303: Cycle ii exp 2
EEP303: Cycle ii   exp 2EEP303: Cycle ii   exp 2
EEP303: Cycle ii exp 2
 
Protection settings calculation
Protection settings calculationProtection settings calculation
Protection settings calculation
 
Main cost of coverpage1
Main cost of coverpage1Main cost of coverpage1
Main cost of coverpage1
 
EEP301: Exp5
EEP301: Exp5EEP301: Exp5
EEP301: Exp5
 
Per unit systems in power systems
Per unit systems in power systemsPer unit systems in power systems
Per unit systems in power systems
 
40 MVA TX
40 MVA TX40 MVA TX
40 MVA TX
 
Transformer Fundamentals
Transformer FundamentalsTransformer Fundamentals
Transformer Fundamentals
 
Design of DC-DC Converter for SMPS with Multiple isolated outputs.
Design of DC-DC Converter for SMPS with Multiple isolated outputs.Design of DC-DC Converter for SMPS with Multiple isolated outputs.
Design of DC-DC Converter for SMPS with Multiple isolated outputs.
 
EEP303 Cycle ii exp-1
EEP303 Cycle ii exp-1EEP303 Cycle ii exp-1
EEP303 Cycle ii exp-1
 
Electric power calculations
Electric power calculationsElectric power calculations
Electric power calculations
 
Dual Converter using Thyristors
Dual Converter using ThyristorsDual Converter using Thyristors
Dual Converter using Thyristors
 
Power systems symmetrical components
Power systems symmetrical componentsPower systems symmetrical components
Power systems symmetrical components
 

Similar to Sub station design

Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)
FunExplode
 
Power Distribution Report of THE NEOTIA UNIVERSITY CAMPUS
Power Distribution Report of  THE NEOTIA UNIVERSITY CAMPUSPower Distribution Report of  THE NEOTIA UNIVERSITY CAMPUS
Power Distribution Report of THE NEOTIA UNIVERSITY CAMPUS
Saikat Bhandari
 
Sub station training
Sub station trainingSub station training
Sub station training
Durga Prasad, IES
 
220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx
ssuser1b3e431
 
Substation design guideliness
Substation design guidelinessSubstation design guideliness
Substation design guideliness
michaeljmack
 
Substation7😇😙😚😙😙 Designing Guide.pdf
Substation7😇😙😚😙😙 Designing Guide.pdfSubstation7😇😙😚😙😙 Designing Guide.pdf
Substation7😇😙😚😙😙 Designing Guide.pdf
abdeialiji1975
 
Substation design-guideliness
Substation design-guidelinessSubstation design-guideliness
Substation design-guideliness
OSMAN SAYGIN AKKAYA
 
Substation-Design-Guideliness
Substation-Design-GuidelinessSubstation-Design-Guideliness
Substation-Design-GuidelinessMircea Tomescu
 
Power transformers rating
Power transformers ratingPower transformers rating
Power transformers rating
Leonardo ENERGY
 
Panel designing
Panel designingPanel designing
Panel designing
AKANSHA GURELE
 
Visit to 400 kV substation, Hadala
Visit to 400 kV substation, HadalaVisit to 400 kV substation, Hadala
Visit to 400 kV substation, Hadala
Nandan Desai
 
SMC LET Primary Injection Test Sets
SMC LET Primary Injection Test SetsSMC LET Primary Injection Test Sets
SMC LET Primary Injection Test Sets
Erika Herbozo
 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Gensol Engineering Limited
 
Track 2 session 6 - st dev con 2016 - wireless charging technologies
Track 2   session 6 - st dev con 2016 - wireless charging technologies Track 2   session 6 - st dev con 2016 - wireless charging technologies
Track 2 session 6 - st dev con 2016 - wireless charging technologies
ST_World
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptx
AkshaiSai2
 
Cooper Power Connectors - MV-HV Specifiers Guide 5kV-35kV
Cooper Power Connectors - MV-HV Specifiers Guide 5kV-35kVCooper Power Connectors - MV-HV Specifiers Guide 5kV-35kV
Cooper Power Connectors - MV-HV Specifiers Guide 5kV-35kV
Thorne & Derrick International
 
General condition-relating-to-electricity new
General condition-relating-to-electricity newGeneral condition-relating-to-electricity new
General condition-relating-to-electricity newDineshsenthil
 
A PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITYA PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITY
Rohitashav Goyal
 
Switch yard & Protection
Switch yard & ProtectionSwitch yard & Protection
Switch yard & Protection
MANOJ KUMAR MAHARANA
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
imkanhaiyalal
 

Similar to Sub station design (20)

Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)Installation testing and_commissioning_o (1)
Installation testing and_commissioning_o (1)
 
Power Distribution Report of THE NEOTIA UNIVERSITY CAMPUS
Power Distribution Report of  THE NEOTIA UNIVERSITY CAMPUSPower Distribution Report of  THE NEOTIA UNIVERSITY CAMPUS
Power Distribution Report of THE NEOTIA UNIVERSITY CAMPUS
 
Sub station training
Sub station trainingSub station training
Sub station training
 
220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx220kv-switch-yard-ppt.pptx
220kv-switch-yard-ppt.pptx
 
Substation design guideliness
Substation design guidelinessSubstation design guideliness
Substation design guideliness
 
Substation7😇😙😚😙😙 Designing Guide.pdf
Substation7😇😙😚😙😙 Designing Guide.pdfSubstation7😇😙😚😙😙 Designing Guide.pdf
Substation7😇😙😚😙😙 Designing Guide.pdf
 
Substation design-guideliness
Substation design-guidelinessSubstation design-guideliness
Substation design-guideliness
 
Substation-Design-Guideliness
Substation-Design-GuidelinessSubstation-Design-Guideliness
Substation-Design-Guideliness
 
Power transformers rating
Power transformers ratingPower transformers rating
Power transformers rating
 
Panel designing
Panel designingPanel designing
Panel designing
 
Visit to 400 kV substation, Hadala
Visit to 400 kV substation, HadalaVisit to 400 kV substation, Hadala
Visit to 400 kV substation, Hadala
 
SMC LET Primary Injection Test Sets
SMC LET Primary Injection Test SetsSMC LET Primary Injection Test Sets
SMC LET Primary Injection Test Sets
 
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
Bill of Material of 132/33 KV 15 MVA Pooling Substation (15-07-2019)
 
Track 2 session 6 - st dev con 2016 - wireless charging technologies
Track 2   session 6 - st dev con 2016 - wireless charging technologies Track 2   session 6 - st dev con 2016 - wireless charging technologies
Track 2 session 6 - st dev con 2016 - wireless charging technologies
 
fdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptxfdocuments.in_presentation-on-substation-220-kv.pptx
fdocuments.in_presentation-on-substation-220-kv.pptx
 
Cooper Power Connectors - MV-HV Specifiers Guide 5kV-35kV
Cooper Power Connectors - MV-HV Specifiers Guide 5kV-35kVCooper Power Connectors - MV-HV Specifiers Guide 5kV-35kV
Cooper Power Connectors - MV-HV Specifiers Guide 5kV-35kV
 
General condition-relating-to-electricity new
General condition-relating-to-electricity newGeneral condition-relating-to-electricity new
General condition-relating-to-electricity new
 
A PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITYA PPT ON 220 KV GSS HINDAUN CITY
A PPT ON 220 KV GSS HINDAUN CITY
 
Switch yard & Protection
Switch yard & ProtectionSwitch yard & Protection
Switch yard & Protection
 
Gss ppt by kanhaiya
Gss ppt  by kanhaiyaGss ppt  by kanhaiya
Gss ppt by kanhaiya
 

Recently uploaded

Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
gdsczhcet
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
Kamal Acharya
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
Kamal Acharya
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Teleport Manpower Consultant
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 

Recently uploaded (20)

Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
Gen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdfGen AI Study Jams _ For the GDSC Leads in India.pdf
Gen AI Study Jams _ For the GDSC Leads in India.pdf
 
Vaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdfVaccine management system project report documentation..pdf
Vaccine management system project report documentation..pdf
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
Courier management system project report.pdf
Courier management system project report.pdfCourier management system project report.pdf
Courier management system project report.pdf
 
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdfTop 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
Top 10 Oil and Gas Projects in Saudi Arabia 2024.pdf
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 

Sub station design

  • 2. Components of Sub-Station Major Components • Transformer • HT Meter Unit • LT Switchgear • SDB • PFI Panel • HT Cable • G.I Pipe for HT Cable Laying • Cable Pit • LT Cable • Earthing System • lightning Arrester • Drop Out Fuse Minor Components • Earthing Boring • Earthing Inspection pit • Equalizer Bar • Shock Treatment Charts • Single Line Diagram • First Aid Box • Rubber hand Gloves
  • 3. Transformer Selection • Suppose total load = 80KW • Note: Available Transformer rating in market, 100, 200, 250, 315, 400, 500, 630, 750, 800, 1000, 1250 KVA. • So, Our required Transformer - 100KVA
  • 4. HT (High Tension) Panel & Switchgear • HT panel is a metal enclosure fitted with HT Circuit Breakers, relays & metering that is used to receive 11KV/33KV supply (from one or more source) & distribute the power through its outgoing feeders. Outgoing feeder may be one or more it depends on the load of the building. • HT Panel & Switchgear components are – 1) Ampere meter 8) Volt meter 2) Ampere selector switch 9) Voltmeter switch 3) Circuit Breaker 10) Panel Heater 4) Solid State Programmable KWH Meter 5)Supporter / Insulator 6) Indicating Lamp 7) TP Cast Resin CT & PT
  • 5. LT (Low Tension) Panel & Switchgear • Transformer Power × 1.6 = 100KVA * 1.6 =160A • LT Panel is an electrical distribution board that receives power from generator or transformer and distributes the same to various electronic devices and distribution boards. • LT Switchgear components are – 1) Ampere meter 3) Volt meter 2) Ampere selector switch 4) Voltmeter switch 5) Circuit Breaker 6) Bus bar 7) LTCT 8)Supporter / Insulator 9) Connector 10) Cable Lux 11) Indicating Lamp 12) KT Fuse / Controller Fuse
  • 6. LT(Low Tension) Panel & Switchgear (Cont.) 1) Ampere meter Show measurement how many current flows on the loads. Available Ampere meter Ratings , ( 𝐴𝑚𝑝 5 ) 30 5 , 60 5 , 100 5 , 150 5 , 200 5 , 300 5 , 400 5 , 630 5 , 800 5 , 1000 5 , 1250 5 , 1500 5 , 1600 5 , 2000 5 2500 5 , 3000 5 , 3500 5 , 4000 5 , 4500 5 , 5000 5 , 6000 5 . 2) Ampere selector switch Show measurement, how many current flows on the Three Phase loads Like R Y B .
  • 7. LT(Low Tension) Panel & Switchgear (Cont.) 3) Volt meter It measures voltage across the loads (400V – 500V ). 4) Voltage Selector switch It measures voltage across the every phase . 5) Circuit Breaker SP- Single Phase Circuit Breaker DP- Double Phase Circuit Breaker TP- Three Phase Circuit Breaker MCB Example – MCB, MCCB, ACB, VCB, SF6 CB, LBS.
  • 8. LT(Low Tension) Panel & Switchgear (Cont.) Ratings of Circuit Breakers : • SP/DP : 6A, 16A, 20A, 26A, 32A, 40A, 60A, 63A. MCCB • TP/ MCB (Miniature Circuit Breaker) : 6A, 16A, 20A, 26A, 32A, 40A, 60A, 63A. • MCCB (Molded Case Circuit Breaker) : 25A, 32A, 40A, 60A, 63A, 75A, 80A, 100A, 125A, 150A, 160A, 200A, ACB 250A, 300A, 320A, 400A, 500A, 630A, 800A, 1000A, 1250A, 1600A. • ACB (Air Circuit Breaker) : 800A, 1000A, 1250A, 2000A, 2500A. VCB • VCB (Vacuum Circuit Breaker) : 630A, 800A, 1250A.
  • 9. LT(Low Tension) Panel & Switchgear (Cont.) LTCT (Low Tension Current Transformer) • It depends on secondary current or LT switchgear ratio. • LTCT and LT switchgear have same Amp. Ratings: 30 5 , 60 5 , 100 5 , 150 5 , 200 5 , 300 5 , 400 5 , 630 5 , 800 5 , 1000 5 , 1250 5 , 1500 5 , 1600 5 , 2000 5 , 2500 5 , 3000 5 , 3500 5 , 4000 5 , 4500 5 , 5000 5 , 6000 5 . • Supporter / Insulator We can use supporter or Insulator till 600A. More than 600A we need to use Fibre.
  • 10. PFI Selection • PFI Rating/ Capacity = Transformer Capacity × 0.6 =100 × 0.6 = 60KVAR • Capacitor Bank Value = KVAR ∗10^9 2π ∗f ∗V^2 uf = 160 ∗10^9 2π ∗50 ∗440^2 uf = 2630.65 uf, total = 2630.65 / 3 uf, per phase of Three Phase = 876.88 uf
  • 11. Bus bar Selection • For Copper 1Sqmm = 1.5A ~ 2A • For Aluminium 1Sqmm = 0.5A~ 1.5A • Suppose total load current = 196 A + 25% = 246 A • So, Bus bar Size = 246 / 1.6 = 154 Sqmm If thickness of bar is 7 mm , then high = 154 / 7 = 22 m
  • 12. Cable Selection • Cable selection depends on three factors. 1 . Load Current 2. Temperature or Correction Factor 3. Voltage Drop Always we take 20% extra load with total load. Let total load 80KW. So Total load + 20% of load = 80 + 16 = 96 KW 1. Load Current Calculation For Single Phase Connection , IL = Power / Voltage × cosƟ For three Phase Connection, IL = Power / √3 Voltage × cosƟ
  • 13.
  • 14. Cable Selection (Cont.) 2. Correction Factor 0r Temperature or Current Carrying Capacity (C.C.C.) In our House hold and many industrial wiring is conduit wiring . There is no air inside of the conduit wiring that’s why Temperature of Cable Increase. So, Current Carrying Capacity is changing. Let Our Load Current is 50A. From Chart , we can choose 16Sqmm wire which carries 61A. But C.C.C of this Wire is (61A*0.71) = 43.31 A, Which is Less than IL . If we Choose 25Sqmm wire which carries 80A. CCC of this wire =( 80*0.71)= 56.8A . So, we can choose this wire (25Sqmm wire which carries 80A).
  • 15. Cable Selection (Cont.) 3. Voltage Drop There is no voltage Drop within 10m to 15m. If we use 100m wire than we definitely get voltage drop. Voltage drop of this wire 1.80 mV/A/m . So, the total voltage Drop of this Wire = (1.80 *56.8*100)/1000 =10.224 Note: There is no problem If the voltage drop will be 3% to 5% of nominal voltage. 3% of 220V = 6.6V For 25Sqmm wire we get more than 6.6V voltage drop. So, We use 35Sqmm wire for system.
  • 16. Other Equipment of Sub-Station Lightning Arrester & Drop Out Fuse We always use same rating for lightning arrester and Drop Out Fuse as DESCO input Connection Rating. Drop out Fuse Lightning Arrester