SlideShare a Scribd company logo
Unit 4- Airport Planning & Design
1
Regulating Authority
• ICAO- International Civil Aviation Organization,
an agency of UN headquartered at Montreal
Canada
It develops standards and laws for
international flights
• FAA- Federal Aviation Agency, a governmental
body of US headquartered Washington DC
• AAI & DGCA- Airport Authority of India &
Directorate General of Civil Aviation
2
Airport Authority of India
• Controls overall air navigation in India
• Came into being on 1st April, 1995 and is
headquartered at New Delhi
• Formed by merging NAA (National Airport
Authority) and IAAI (International Airport
Authority of India)
• Functions of AAI
– Control and management of the Indian airspace
extending beyond the territory limits
– Design, development and operation of domestic
and international airports
– Construction and management of facilities
3
• Factors to be considered for airport site
selection:-
Topography (less obstruction i.e proper zoning
laws, better visibility)
Analysis for wind from wind rose diagram
Grade, drainage & soil characteristics
Availability of utilities (water supply,
electricity)
Economic consideration
4
RUNWAY CONFIGURATION
• FAA includes over 20 runway layouts
• Amongst them there are 4 basic runway
patterns :
1. SIMPLE RUNWAY
2. PARALLEL RUNWAY
3. OPEN-V RUNWAYS
4. INTERSECTING RUNWAYS
Parking system for runway
5
6
SINGLE RUNWAY
PARALLEL RUNWAYS
There are 4
types of
parallel
runways
7
OPEN-V RUNWAYS
Runways diverging from different directions but do not
intersect and form an open-V shape are ‘OPEN-V runways’
8
INTERSECTING RUNWAYS
Two or more runways that cross each other are classified as
intersecting runways.
This type of runway is used when there are relatively strong
prevailing winds from more than one direction during the
year.
9
RUNWAY LIGHTING
• These lights are used to assist pilot in to
identify the runway
• GREEN THRESHOLD LIGHTS : Line the
runway edge
• RED LIGHTS : Mark the end of runway
• BLUE LIGHTS : Run alongside taxiways
• While runways have YELLOW or WHITE
lights marking their edges
10
11
RUNWAY SIGNS
• Various kinds of runway signs are also
used for facilitation
• They differ according to their purpose
and action
12
13
Aircraft components
14
15
Aircraft components
Aircraft characteristics
• Type of propulsion engine
• Size of aircraft
• Minimum turning radius
• Capacity of aircraft
• Aircraft weight and wheel configuration
• Jet blast
• noise
16
weight &wheel configuration
• Different types of weights
– Operating empty weight
• Constant weight except payload and fuel =w1
– Pay load
• Load for which revenues are generated (passengers + freight)
– Zero-fuel weight
• W1 + payload=w2
– Maximum take-off weight
• Total amount of weight when it is taking off from runway,
w3=w2+fuel
– Maximum standard landing weight
• Fuel consumed during transport will be deducted from take-off
weight i.e < w3
17
Classification of Airports
• Based on
Basic runway length- A(2100m), B, C, D,
E(600m)
Tyre pressure- 1(8.5kg/cm2), 2, 3, 4, 5, 6,
7(2.5kg/cm2)
18
Factors affecting the size of airport
– Defined by the space for operators, controlling systems,
facilities, manpower etc.
– Controlled by peak aircraft traffic, aircraft characteristics
– Elevation of airport size above MSL
• density and air pressure reduces
• Effects runway requirements, lift, drag etc.
• Aircraft performance varies altitude, air density, pressure ,
temperature
– Meteorological conditions
• Wind, temperature
• Effects runway orientation, length and no of runways reqd.
– Performance characteristics of aircraft
– Volume of air traffic (peak hour volume, size of aircraft, nature
of air traffic, runways, taxiways etc.,)
19
Elements of Runway geometric design
• Runway Length
• Runway width
• Transverse Gradients
• Longitudinal gradients
• Sight distances
20
RUNWAY ORIENTATION
Affecting factors:-
• WIND
• AIRSPACE AVAILABILITY
• ENVIRONMENTAL FACTORS
• OBSTRUCTIONS TO NAVIGATION
• AIR TRAFFIC CONTROL VISIBILITY
• WILD LIFE HAZARDS
• TERRAIN AND SOIL CONSIDERATION
21
Runway design
22
Wind-Rose
23
Windrose
24
WIND ROSE ANALYSIS
• An approach often used in determining
the runway orientation
• The method uses a wind rose template
• A transparent runway template is placed
and rotated around the center of wind
rose
• At each rotating angle, the percentage of
allowable cross winds is measured
25
WIND ROSE METHOD
26
Basic Runway Length
Assumed standard conditions
• Airport altitude is at sea level
• Temperature at airport is 15 degree Celsius
(standard temperature at any location is 15-
0.0065*elevation in metres )
• Runway is levelled in longitudinal direction
• No wind is blowing on runway
• Aircraft is loaded to its full loading capacity
27
Basic Runway Length
Determined by considering following 3 cases:-
• Normal landing case
• Normal take-off case
• Engine failure case
The case which works out the highest value for
length is finally adopted
28
29
30
31
•
32
33
•
34
35
Correction to basic runway length
36
Correction to basic runway length
37
Q
38
Q- calculate for the correct length of runway if,
basic runway length=1620m, elevation of airport
site=270m, Airport reference temperature=32.94
degrees and effective gradient=0.20%
Ans-2150m
39
Turning radius of taxiway
40
Q- calculate for the turning radius of taxiway for
an supersonic aircraft having wheel base=17.7m,
width of taxiway 22.5m, wheel tread=6.62m,
turning velocity=40kmph and f=0.13
Ans-180m
41
Airport
Airport
Airport
Airport
Airport
Airport
Airport
Airport
Airport
Airport
Airport
Airport
Airport
Airport
Airport
Airport
Airport

More Related Content

What's hot

Airport Engineering
Airport Engineering Airport Engineering
Airport Engineering Abhishek Pandey
 
Aircraft characteristics
Aircraft characteristicsAircraft characteristics
Aircraft characteristicsAbhishek Kumar
 
Runway orientation
Runway orientationRunway orientation
Runway orientationrehan5c
 
Design and planning of airport
Design and planning of airportDesign and planning of airport
Design and planning of airportHarshit P Jain
 
Classification of airport
Classification of airportClassification of airport
Classification of airportIsmailQubaisMotiya
 
Airport planning
Airport planning Airport planning
Airport planning Sonali99999
 
Layout of Airport Planning
Layout of Airport PlanningLayout of Airport Planning
Layout of Airport PlanningManoharanM12
 
Airport engineering PART-1
Airport engineering PART-1 Airport engineering PART-1
Airport engineering PART-1 RAMPRASAD KUMAWAT
 
Airport aprons & holding bays
Airport  aprons & holding baysAirport  aprons & holding bays
Airport aprons & holding bayskhans666
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport EngineeringArbaz Kazi
 
Air Transportation Basic Elements
Air Transportation Basic ElementsAir Transportation Basic Elements
Air Transportation Basic ElementsBathla Tuition Centre
 
Air transport details
Air transport detailsAir transport details
Air transport detailsChirag Agrawal
 
Speed study analysis
Speed study analysisSpeed study analysis
Speed study analysisARJUN RAJAN KAUL
 
AIR LAW PPT
AIR LAW PPTAIR LAW PPT
AIR LAW PPTShripad J
 
Airport Planning and Design
Airport Planning and DesignAirport Planning and Design
Airport Planning and DesignMohsen, S Ab
 

What's hot (20)

Airport Engineering
Airport Engineering Airport Engineering
Airport Engineering
 
Terminal area
Terminal areaTerminal area
Terminal area
 
Aircraft characteristics
Aircraft characteristicsAircraft characteristics
Aircraft characteristics
 
Runway orientation
Runway orientationRunway orientation
Runway orientation
 
Airports
AirportsAirports
Airports
 
Design and planning of airport
Design and planning of airportDesign and planning of airport
Design and planning of airport
 
Classification of airport
Classification of airportClassification of airport
Classification of airport
 
Airport planning
Airport planning Airport planning
Airport planning
 
Layout of Airport Planning
Layout of Airport PlanningLayout of Airport Planning
Layout of Airport Planning
 
Airport
AirportAirport
Airport
 
Airport engineering PART-1
Airport engineering PART-1 Airport engineering PART-1
Airport engineering PART-1
 
Basic runway length
Basic runway lengthBasic runway length
Basic runway length
 
Airport aprons & holding bays
Airport  aprons & holding baysAirport  aprons & holding bays
Airport aprons & holding bays
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport Engineering
 
Air Transportation Basic Elements
Air Transportation Basic ElementsAir Transportation Basic Elements
Air Transportation Basic Elements
 
Air transport details
Air transport detailsAir transport details
Air transport details
 
Airports presentation
Airports presentationAirports presentation
Airports presentation
 
Speed study analysis
Speed study analysisSpeed study analysis
Speed study analysis
 
AIR LAW PPT
AIR LAW PPTAIR LAW PPT
AIR LAW PPT
 
Airport Planning and Design
Airport Planning and DesignAirport Planning and Design
Airport Planning and Design
 

Similar to Airport

Airport engineering
Airport engineering Airport engineering
Airport engineering Jaspreet singh
 
1.introduction
1.introduction1.introduction
1.introductionMani Vel
 
Airport &amp; railways engineering ce467 pdf
Airport &amp; railways engineering   ce467 pdfAirport &amp; railways engineering   ce467 pdf
Airport &amp; railways engineering ce467 pdfSaqib Imran
 
airports-140217060642-phpapp01 .pptx
airports-140217060642-phpapp01     .pptxairports-140217060642-phpapp01     .pptx
airports-140217060642-phpapp01 .pptxcuhp21rdtt12
 
airports-140217060642-phpapp01.pptx
airports-140217060642-phpapp01.pptxairports-140217060642-phpapp01.pptx
airports-140217060642-phpapp01.pptxNeha Kajulkar
 
EIA repot for Airport
EIA repot for AirportEIA repot for Airport
EIA repot for AirportMuhammad Adnan
 
AIRPORT PAVEMENT - CONSTRUCTION & REPAIR.pptx
AIRPORT PAVEMENT -  CONSTRUCTION & REPAIR.pptxAIRPORT PAVEMENT -  CONSTRUCTION & REPAIR.pptx
AIRPORT PAVEMENT - CONSTRUCTION & REPAIR.pptxAnujyadav514462
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport EngineeringBecky Gilbert
 
Airport engineering
Airport engineeringAirport engineering
Airport engineeringsaibabu48
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport EngineeringFirasath Ali
 
airport customer services class1_ basics of ACS
airport customer services class1_ basics of ACSairport customer services class1_ basics of ACS
airport customer services class1_ basics of ACSBHARATANKURDOGRA
 
Airport study by ashwin
Airport study by ashwinAirport study by ashwin
Airport study by ashwinAshwin Samarouthu
 
Airport presentation 5th unit
Airport presentation 5th unitAirport presentation 5th unit
Airport presentation 5th unitT.Naga Anusha
 
AIRPORT AIR TRANSPORT CHARASTERSTICS.pptx
AIRPORT AIR TRANSPORT CHARASTERSTICS.pptxAIRPORT AIR TRANSPORT CHARASTERSTICS.pptx
AIRPORT AIR TRANSPORT CHARASTERSTICS.pptxRishi Nath
 
Airport layout
Airport layoutAirport layout
Airport layoutArmanAnsari37
 
Compartive study of surface heliport and elevated heliport
Compartive study of surface heliport and elevated heliportCompartive study of surface heliport and elevated heliport
Compartive study of surface heliport and elevated heliportJayakrishnan Jayarajan
 
AIR TRANSPORT CHARASTERSTICS.pptx
AIR TRANSPORT CHARASTERSTICS.pptxAIR TRANSPORT CHARASTERSTICS.pptx
AIR TRANSPORT CHARASTERSTICS.pptxRishi Nath
 
Airport introduction
Airport introductionAirport introduction
Airport introductionjagadish108
 
Airport planning and design
Airport planning and designAirport planning and design
Airport planning and designRAMPRASAD KUMAWAT
 

Similar to Airport (20)

Airport engineering
Airport engineering Airport engineering
Airport engineering
 
1.introduction
1.introduction1.introduction
1.introduction
 
Airport &amp; railways engineering ce467 pdf
Airport &amp; railways engineering   ce467 pdfAirport &amp; railways engineering   ce467 pdf
Airport &amp; railways engineering ce467 pdf
 
airports-140217060642-phpapp01 .pptx
airports-140217060642-phpapp01     .pptxairports-140217060642-phpapp01     .pptx
airports-140217060642-phpapp01 .pptx
 
airports-140217060642-phpapp01.pptx
airports-140217060642-phpapp01.pptxairports-140217060642-phpapp01.pptx
airports-140217060642-phpapp01.pptx
 
EIA repot for Airport
EIA repot for AirportEIA repot for Airport
EIA repot for Airport
 
AIRPORT PAVEMENT - CONSTRUCTION & REPAIR.pptx
AIRPORT PAVEMENT -  CONSTRUCTION & REPAIR.pptxAIRPORT PAVEMENT -  CONSTRUCTION & REPAIR.pptx
AIRPORT PAVEMENT - CONSTRUCTION & REPAIR.pptx
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport Engineering
 
Airport engineering
Airport engineeringAirport engineering
Airport engineering
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport Engineering
 
airport customer services class1_ basics of ACS
airport customer services class1_ basics of ACSairport customer services class1_ basics of ACS
airport customer services class1_ basics of ACS
 
Airport study by ashwin
Airport study by ashwinAirport study by ashwin
Airport study by ashwin
 
Airport presentation 5th unit
Airport presentation 5th unitAirport presentation 5th unit
Airport presentation 5th unit
 
AIRPORT AIR TRANSPORT CHARASTERSTICS.pptx
AIRPORT AIR TRANSPORT CHARASTERSTICS.pptxAIRPORT AIR TRANSPORT CHARASTERSTICS.pptx
AIRPORT AIR TRANSPORT CHARASTERSTICS.pptx
 
Airport layout
Airport layoutAirport layout
Airport layout
 
Compartive study of surface heliport and elevated heliport
Compartive study of surface heliport and elevated heliportCompartive study of surface heliport and elevated heliport
Compartive study of surface heliport and elevated heliport
 
AIR TRANSPORT CHARASTERSTICS.pptx
AIR TRANSPORT CHARASTERSTICS.pptxAIR TRANSPORT CHARASTERSTICS.pptx
AIR TRANSPORT CHARASTERSTICS.pptx
 
Airport introduction
Airport introductionAirport introduction
Airport introduction
 
Airport planning and design
Airport planning and designAirport planning and design
Airport planning and design
 
AIRPORT.pptx
AIRPORT.pptxAIRPORT.pptx
AIRPORT.pptx
 

More from Umar Karimi

NISHANT PPT TWCHNIQUES nanoparticles techniques
NISHANT PPT TWCHNIQUES nanoparticles techniquesNISHANT PPT TWCHNIQUES nanoparticles techniques
NISHANT PPT TWCHNIQUES nanoparticles techniquesUmar Karimi
 
Term Paper -19PHDCE026.pptx
Term Paper -19PHDCE026.pptxTerm Paper -19PHDCE026.pptx
Term Paper -19PHDCE026.pptxUmar Karimi
 
Railway Geometric Design
Railway Geometric DesignRailway Geometric Design
Railway Geometric DesignUmar Karimi
 
Railway Signals
Railway SignalsRailway Signals
Railway SignalsUmar Karimi
 
Unit 1.pptx
Unit 1.pptxUnit 1.pptx
Unit 1.pptxUmar Karimi
 
Projection of Points.pptx
Projection of Points.pptxProjection of Points.pptx
Projection of Points.pptxUmar Karimi
 
Projection of Lines.pptx
Projection of Lines.pptxProjection of Lines.pptx
Projection of Lines.pptxUmar Karimi
 
Pojection of Planes.pptx
Pojection of Planes.pptxPojection of Planes.pptx
Pojection of Planes.pptxUmar Karimi
 
Lecture 13 Projection of Points.pptx
Lecture 13 Projection of Points.pptxLecture 13 Projection of Points.pptx
Lecture 13 Projection of Points.pptxUmar Karimi
 
Social Security.pptx
Social Security.pptxSocial Security.pptx
Social Security.pptxUmar Karimi
 
presentation_ecological_pyramids_1445500393_136286.ppt
presentation_ecological_pyramids_1445500393_136286.pptpresentation_ecological_pyramids_1445500393_136286.ppt
presentation_ecological_pyramids_1445500393_136286.pptUmar Karimi
 
EARTH RETAINING STRUCTURES.ppt
EARTH RETAINING STRUCTURES.pptEARTH RETAINING STRUCTURES.ppt
EARTH RETAINING STRUCTURES.pptUmar Karimi
 
ECOLOGY.ppt
ECOLOGY.pptECOLOGY.ppt
ECOLOGY.pptUmar Karimi
 

More from Umar Karimi (14)

NISHANT PPT TWCHNIQUES nanoparticles techniques
NISHANT PPT TWCHNIQUES nanoparticles techniquesNISHANT PPT TWCHNIQUES nanoparticles techniques
NISHANT PPT TWCHNIQUES nanoparticles techniques
 
Term Paper -19PHDCE026.pptx
Term Paper -19PHDCE026.pptxTerm Paper -19PHDCE026.pptx
Term Paper -19PHDCE026.pptx
 
Railway Geometric Design
Railway Geometric DesignRailway Geometric Design
Railway Geometric Design
 
Railway Signals
Railway SignalsRailway Signals
Railway Signals
 
Waterways
WaterwaysWaterways
Waterways
 
Unit 1.pptx
Unit 1.pptxUnit 1.pptx
Unit 1.pptx
 
Projection of Points.pptx
Projection of Points.pptxProjection of Points.pptx
Projection of Points.pptx
 
Projection of Lines.pptx
Projection of Lines.pptxProjection of Lines.pptx
Projection of Lines.pptx
 
Pojection of Planes.pptx
Pojection of Planes.pptxPojection of Planes.pptx
Pojection of Planes.pptx
 
Lecture 13 Projection of Points.pptx
Lecture 13 Projection of Points.pptxLecture 13 Projection of Points.pptx
Lecture 13 Projection of Points.pptx
 
Social Security.pptx
Social Security.pptxSocial Security.pptx
Social Security.pptx
 
presentation_ecological_pyramids_1445500393_136286.ppt
presentation_ecological_pyramids_1445500393_136286.pptpresentation_ecological_pyramids_1445500393_136286.ppt
presentation_ecological_pyramids_1445500393_136286.ppt
 
EARTH RETAINING STRUCTURES.ppt
EARTH RETAINING STRUCTURES.pptEARTH RETAINING STRUCTURES.ppt
EARTH RETAINING STRUCTURES.ppt
 
ECOLOGY.ppt
ECOLOGY.pptECOLOGY.ppt
ECOLOGY.ppt
 

Recently uploaded

Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdfKamal Acharya
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdfKamal Acharya
 
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdfDanfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdfNurvisNavarroSanchez
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.PrashantGoswami42
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxMd. Shahidul Islam Prodhan
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientistgettygaming1
 
Antenna efficency lecture course chapter 3.pdf
Antenna  efficency lecture course chapter 3.pdfAntenna  efficency lecture course chapter 3.pdf
Antenna efficency lecture course chapter 3.pdfAbrahamGadissa
 
Natalia Rutkowska - BIM School Course in KrakĂłw
Natalia Rutkowska - BIM School Course in KrakĂłwNatalia Rutkowska - BIM School Course in KrakĂłw
Natalia Rutkowska - BIM School Course in KrakĂłwbim.edu.pl
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdfAhmedHussein950959
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationRobbie Edward Sayers
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopEmre Günaydın
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdfKamal Acharya
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxViniHema
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdfKamal Acharya
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdfKamal Acharya
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Electivekarthi keyan
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industriesMuhammadTufail242431
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdfKamal Acharya
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionjeevanprasad8
 

Recently uploaded (20)

Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Fruit shop management system project report.pdf
Fruit shop management system project report.pdfFruit shop management system project report.pdf
Fruit shop management system project report.pdf
 
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdfDanfoss NeoCharge Technology -A Revolution in 2024.pdf
Danfoss NeoCharge Technology -A Revolution in 2024.pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptxCloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
Cloud-Computing_CSE311_Computer-Networking CSE GUB BD - Shahidul.pptx
 
Top 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering ScientistTop 13 Famous Civil Engineering Scientist
Top 13 Famous Civil Engineering Scientist
 
Antenna efficency lecture course chapter 3.pdf
Antenna  efficency lecture course chapter 3.pdfAntenna  efficency lecture course chapter 3.pdf
Antenna efficency lecture course chapter 3.pdf
 
Natalia Rutkowska - BIM School Course in KrakĂłw
Natalia Rutkowska - BIM School Course in KrakĂłwNatalia Rutkowska - BIM School Course in KrakĂłw
Natalia Rutkowska - BIM School Course in KrakĂłw
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
İTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering WorkshopİTÜ CAD and Reverse Engineering Workshop
İTÜ CAD and Reverse Engineering Workshop
 
Laundry management system project report.pdf
Laundry management system project report.pdfLaundry management system project report.pdf
Laundry management system project report.pdf
 
power quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptxpower quality voltage fluctuation UNIT - I.pptx
power quality voltage fluctuation UNIT - I.pptx
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Online blood donation management system project.pdf
Online blood donation management system project.pdfOnline blood donation management system project.pdf
Online blood donation management system project.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
fundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projectionfundamentals of drawing and isometric and orthographic projection
fundamentals of drawing and isometric and orthographic projection
 

Airport

  • 1. Unit 4- Airport Planning & Design 1
  • 2. Regulating Authority • ICAO- International Civil Aviation Organization, an agency of UN headquartered at Montreal Canada It develops standards and laws for international flights • FAA- Federal Aviation Agency, a governmental body of US headquartered Washington DC • AAI & DGCA- Airport Authority of India & Directorate General of Civil Aviation 2
  • 3. Airport Authority of India • Controls overall air navigation in India • Came into being on 1st April, 1995 and is headquartered at New Delhi • Formed by merging NAA (National Airport Authority) and IAAI (International Airport Authority of India) • Functions of AAI – Control and management of the Indian airspace extending beyond the territory limits – Design, development and operation of domestic and international airports – Construction and management of facilities 3
  • 4. • Factors to be considered for airport site selection:- Topography (less obstruction i.e proper zoning laws, better visibility) Analysis for wind from wind rose diagram Grade, drainage & soil characteristics Availability of utilities (water supply, electricity) Economic consideration 4
  • 5. RUNWAY CONFIGURATION • FAA includes over 20 runway layouts • Amongst them there are 4 basic runway patterns : 1. SIMPLE RUNWAY 2. PARALLEL RUNWAY 3. OPEN-V RUNWAYS 4. INTERSECTING RUNWAYS Parking system for runway 5
  • 7. PARALLEL RUNWAYS There are 4 types of parallel runways 7
  • 8. OPEN-V RUNWAYS Runways diverging from different directions but do not intersect and form an open-V shape are ‘OPEN-V runways’ 8
  • 9. INTERSECTING RUNWAYS Two or more runways that cross each other are classified as intersecting runways. This type of runway is used when there are relatively strong prevailing winds from more than one direction during the year. 9
  • 10. RUNWAY LIGHTING • These lights are used to assist pilot in to identify the runway • GREEN THRESHOLD LIGHTS : Line the runway edge • RED LIGHTS : Mark the end of runway • BLUE LIGHTS : Run alongside taxiways • While runways have YELLOW or WHITE lights marking their edges 10
  • 11. 11
  • 12. RUNWAY SIGNS • Various kinds of runway signs are also used for facilitation • They differ according to their purpose and action 12
  • 13. 13
  • 16. Aircraft characteristics • Type of propulsion engine • Size of aircraft • Minimum turning radius • Capacity of aircraft • Aircraft weight and wheel configuration • Jet blast • noise 16
  • 17. weight &wheel configuration • Different types of weights – Operating empty weight • Constant weight except payload and fuel =w1 – Pay load • Load for which revenues are generated (passengers + freight) – Zero-fuel weight • W1 + payload=w2 – Maximum take-off weight • Total amount of weight when it is taking off from runway, w3=w2+fuel – Maximum standard landing weight • Fuel consumed during transport will be deducted from take-off weight i.e < w3 17
  • 18. Classification of Airports • Based on Basic runway length- A(2100m), B, C, D, E(600m) Tyre pressure- 1(8.5kg/cm2), 2, 3, 4, 5, 6, 7(2.5kg/cm2) 18
  • 19. Factors affecting the size of airport – Defined by the space for operators, controlling systems, facilities, manpower etc. – Controlled by peak aircraft traffic, aircraft characteristics – Elevation of airport size above MSL • density and air pressure reduces • Effects runway requirements, lift, drag etc. • Aircraft performance varies altitude, air density, pressure , temperature – Meteorological conditions • Wind, temperature • Effects runway orientation, length and no of runways reqd. – Performance characteristics of aircraft – Volume of air traffic (peak hour volume, size of aircraft, nature of air traffic, runways, taxiways etc.,) 19
  • 20. Elements of Runway geometric design • Runway Length • Runway width • Transverse Gradients • Longitudinal gradients • Sight distances 20
  • 21. RUNWAY ORIENTATION Affecting factors:- • WIND • AIRSPACE AVAILABILITY • ENVIRONMENTAL FACTORS • OBSTRUCTIONS TO NAVIGATION • AIR TRAFFIC CONTROL VISIBILITY • WILD LIFE HAZARDS • TERRAIN AND SOIL CONSIDERATION 21
  • 25. WIND ROSE ANALYSIS • An approach often used in determining the runway orientation • The method uses a wind rose template • A transparent runway template is placed and rotated around the center of wind rose • At each rotating angle, the percentage of allowable cross winds is measured 25
  • 27. Basic Runway Length Assumed standard conditions • Airport altitude is at sea level • Temperature at airport is 15 degree Celsius (standard temperature at any location is 15- 0.0065*elevation in metres ) • Runway is levelled in longitudinal direction • No wind is blowing on runway • Aircraft is loaded to its full loading capacity 27
  • 28. Basic Runway Length Determined by considering following 3 cases:- • Normal landing case • Normal take-off case • Engine failure case The case which works out the highest value for length is finally adopted 28
  • 29. 29
  • 30. 30
  • 32. 32
  • 34. 34
  • 35. 35
  • 36. Correction to basic runway length 36
  • 37. Correction to basic runway length 37
  • 38. Q 38
  • 39. Q- calculate for the correct length of runway if, basic runway length=1620m, elevation of airport site=270m, Airport reference temperature=32.94 degrees and effective gradient=0.20% Ans-2150m 39
  • 40. Turning radius of taxiway 40