DRILLED SHAFT / BORED IN PILE INSTALLATION
New Brunswick Fitness & Wellness Plaza
New Brunswick, NJ
Presentation to:
ADSC Northeast Chapter
Holiday Inn, Clark, NJ
November 30th, 2012
Presentation by:
Jeffrey B. Ayres
Moretrench American Corporation
PROJECT OVERVIEW
• Proposed Construction:
• Fitness Center
• Supermarket
• Parking Garage
• Owner
• City of New Brunswick
• General Contractor
• Joseph Jingoli & Sons,
Inc.
• Structural Engineer
• PS&S
• Foundation Contractor
• Moretrench
PROJECT OVERVIEW
• Scheduling / Coordination
• Difficult Schedule
• No relief in schedule
when schedule slid
• Additional subs added
when schedule slid
MTAC CONTRACT WORK – DRILLED SHAFTS
• 77 Total Drilled Shafts
• Provide support for new
column loads
• 39 @ 3’ diameter
• Reinforcing dowels
• 38 @ 6’ diameter
• Reinforcing dowels
• Anchor bolts (precast
connection)
• Average drill length: 30’
DRILL RIG (DRILLED SHAFTS)
• Soilmec SR-65
• Hydraulic Rotary Rig
• 22,500 mm (~74’) mast
• Equipped with:
• Self Handling Counterweight
• Kelly Drilling System
• Drilling Mate System
• Actively monitor drill depth,
crowd pressure, mast
verticality, pump pressures,
and more
DRILL RIG (DRILLED SHAFTS)
• Bottom of Mast Clearance
• Cable system feed on back of mast
• Enough clearance for casing “spinner”
WHY SOILMEC?
MTAC CONTRACT WORK – BIP’s
• 246 Bored In Piles (BIP’s)
• Provide support for new slab
• 18” Diameter
• 6 x #6 reinforcing cage
substituted with #18 grade 75
threadbar
• Average drill length: 20’
DRILLING EQUIPMENT (BIP)
• Bauer RTG RG 19 T
• Universal Piling Rig
• Up to 78’ Mast Height
• Equipped with:
• PIR (Pile Installation Recorder)
• Actively monitor drill depth,
grout volume per 5’
increment, and more
MATERIAL / EQUIPMENT SUPPLIERS
• Soilmec SR-65
• American Equipment & Fabrication, East
Providence, RI
• Bauer RTG RG 19T
• Moretrench owned, purchased from
Posillico, Inc.
• Temporary Casing
• Favor Steel & Fabricating, Bessemer, AL
• Drill Tooling
• Jeffrey Machine, Birmingham, AL
• Concrete
• Clayton Concrete, Edison, NJ
• Rebar
• Barker Steel, Avenel, NJ
LOGISTICS
LOGISTICAL ISSUES
• Existing Overhead Powerlines
• Existing Robert Wood Johnson (RWJ) Building
• Existing Utilities
• Northeast Regional Amtrak Line
EXISTING OVERHEAD POWERLINES
EXISTING OVERHEAD POWERLINES
EXISTING OVERHEAD POWERLINES
EXISTING OVERHEAD POWERLINES
RWJ BUILDING DEMOLITION
Existing RWJ Building
RWJ BUILDING DEMOLITION
RWJ BUILDING DEMOLITION
 Mobilized prior to
demolition
 22 caissons
unavailable during
demolition
 Obstructions /
Utilities encountered
beneath building
footprint while drilling
RWJ BUILDING DEMOLITION
EXISTING / NEW UTILITIES
AMTRAK PROXIMITY
• Required to be 15’ minimum between
mast & edge of Amtrak line
DRILLED SHAFTS
DRILLING PROCEDURE (3’ DRILLED SHAFTS)
• 48” diameter starter
can for top 5’
• 42” diameter “inner”
can to top of rock
• Socketed into
weathered shale
• Visual inspection
performed by PS&S
DRILLING PROCEDURE (6’ DRILLED SHAFTS)
• 87” diameter starter
can for top 5’
• 78” diameter “inner”
can to top of rock
• Socketed into
weathered shale
• Visual inspection
performed by PS&S
6’ DRILL TOOLING
3’ DRILL TOOLING
Soilmec equipped to switch between both 3’
and 6’ diameter tooling easily
REINFORCING CAGE / CONCRETE
• 26 x #11 bars per 6’ caisson
• 10 x #9 bars per 3’ caisson
• Cage placed with drill rig or crane
REINFORCING CAGE / CONCRETE
• Top of reinforcing cage @ 3” below top of caisson (minimum coverage of
reinforcement)
• Water removal (hydraulic pump) & shallow depth permitted end dumping of
concrete
DOWELS
• Issues Faced:
• All 77 caissons received either dowels or anchor bolts
• Connection to grade beam, column, etc.
• Drilling grade consistent at ~ elevation 47
• Top of caisson elevation varied from elevation 47 to elevation 40
• Drilling / epoxying dowels into 6’ shafts was not permitted
• Solutions:
• “Wet-Set” dowels for 6’ shafts using premade wooden templates
• Drill / epoxy any remaining dowels once top of caisson is exposed
DOWELS
• More than a dozen different dowel patterns
• Up to 7’ depth below drilling grade (worst case scenario)
DOWELS
ANCHOR BOLTS
• Issues Faced:
• Anchor Bolt location and embedment in top of drilled shafts were critical,
with nearly negligible tolerances
• Solution:
• Per the engineer, pour shaft concrete 3’ below top of caisson (cold joint).
• Place 6’ corrugated pipe around top of shaft
• Set template at correct elevation and plan location
• Pour remainder of concrete
• Monitor location of template before, during, and after pour
ANCHOR BOLTS
• Left: 6’ Diameter Caisson with Concrete 2’-3’ low
• Right: 6’ Diameter Corrugated Pipe
ANCHOR BOLTS
• Left: Typical Anchor Bolt Template
• Right: Placement of Anchor Bolt Template at exact elevation prior to pour
ANCHOR BOLTS
ANCHOR BOLTS
ANCHOR BOLTS
ANCHOR BOLTS
• Left: Finished Anchor Bolt Shaft
• Right: Precast Column @ Anchor Bolt Shaft
BORED IN PILES (BIP’s)
DRILLING PROCEDURE (BORED IN PILES)
• 18” Diameter Continuous Flight Hollow Stem Auger
• Advanced 5’ below top of first rock encountered or to auger refusal
• <1’ / minute
• Once tip reached, sand-cement grout pumped through auger
• 115% of theoretical volume (measured by PIR & stroke count)
• Slow positive rotation maintained during withdrawal
DRILLING PROCEDURE (BORED IN PILES)
• Upon grouting completion, pile top protector placed into hole (left picture)
• Top of Pile (grout) elevation reached by removing excess grout from top
• #18 Grade 75 Threadbar installed full length (right) along with 4 x #4 bars with
90 degree bends
• Average Production – 15 to 20 / DAY
BEFORE
AFTER
NEW BRUNSWICK WELLNESS PLAZA
QUESTIONS?

More Related Content

What's hot

Formwork
FormworkFormwork
Formwork
Jitesh Dhule
 
Slip formwork for chimney
Slip formwork for chimneySlip formwork for chimney
Slip formwork for chimney
Axay Sharma
 
Slipform construction
Slipform constructionSlipform construction
Slipform construction
ErankajKumar
 
FORM WORK & SLIPFORM
FORM WORK & SLIPFORMFORM WORK & SLIPFORM
FORM WORK & SLIPFORM
VISHNU VIJAYAN
 
presentation on slip formwork
presentation on slip formworkpresentation on slip formwork
presentation on slip formwork
nemilgandhi
 
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Communications Branding
 
Pre caste Concrete
Pre caste ConcretePre caste Concrete
Pre caste Concrete
University of Tikrit
 
Peace Bridge Pres
Peace Bridge PresPeace Bridge Pres
Peace Bridge Pres
Jordan Penney
 
Design of Kinked Steel Girders Presentation for the IBC
Design of Kinked Steel Girders Presentation for the IBCDesign of Kinked Steel Girders Presentation for the IBC
Design of Kinked Steel Girders Presentation for the IBC
Joe Krajewski
 
Building Economics
Building EconomicsBuilding Economics
Building Economics
Sultan M Muzahir
 
A study on the construction process (Precast concrete, In-situ cast concrete,...
A study on the construction process (Precast concrete, In-situ cast concrete,...A study on the construction process (Precast concrete, In-situ cast concrete,...
A study on the construction process (Precast concrete, In-situ cast concrete,...
Bhaddin Al-Naqshabandi
 
Box Pushing Technique
Box Pushing TechniqueBox Pushing Technique
Box Pushing Technique
Seminar Links
 
Construction portfolio (manvi)
Construction portfolio (manvi)Construction portfolio (manvi)
Construction portfolio (manvi)
ManviVarshney2
 
Underpinning
UnderpinningUnderpinning
Underpinning
Khuzema Olia
 
Earth quack resisting system in a building
Earth quack resisting system in a buildingEarth quack resisting system in a building
Earth quack resisting system in a building
symun66
 
Significance of utilizing a slipform machine for all the development needs
Significance of utilizing a slipform machine for all the development needsSignificance of utilizing a slipform machine for all the development needs
Significance of utilizing a slipform machine for all the development needs
Curb Fox Equipment
 
Alternative Structural System - Session 10
Alternative Structural System - Session 10Alternative Structural System - Session 10
Alternative Structural System - Session 10
Ajit Sabnis
 
Post-Tensioning Developments in Texas
Post-Tensioning Developments in TexasPost-Tensioning Developments in Texas
Post-Tensioning Developments in Texas
Center for Transportation Research - UT Austin
 
Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...
Ramin Vaghei
 
Anchored Secant Pile Wall Presentation
Anchored Secant Pile Wall PresentationAnchored Secant Pile Wall Presentation
Anchored Secant Pile Wall Presentation
Kyle Beaudry, P.Eng
 

What's hot (20)

Formwork
FormworkFormwork
Formwork
 
Slip formwork for chimney
Slip formwork for chimneySlip formwork for chimney
Slip formwork for chimney
 
Slipform construction
Slipform constructionSlipform construction
Slipform construction
 
FORM WORK & SLIPFORM
FORM WORK & SLIPFORMFORM WORK & SLIPFORM
FORM WORK & SLIPFORM
 
presentation on slip formwork
presentation on slip formworkpresentation on slip formwork
presentation on slip formwork
 
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.Precast Concrete Steps Construction Tutorial by Armtec Ltd.
Precast Concrete Steps Construction Tutorial by Armtec Ltd.
 
Pre caste Concrete
Pre caste ConcretePre caste Concrete
Pre caste Concrete
 
Peace Bridge Pres
Peace Bridge PresPeace Bridge Pres
Peace Bridge Pres
 
Design of Kinked Steel Girders Presentation for the IBC
Design of Kinked Steel Girders Presentation for the IBCDesign of Kinked Steel Girders Presentation for the IBC
Design of Kinked Steel Girders Presentation for the IBC
 
Building Economics
Building EconomicsBuilding Economics
Building Economics
 
A study on the construction process (Precast concrete, In-situ cast concrete,...
A study on the construction process (Precast concrete, In-situ cast concrete,...A study on the construction process (Precast concrete, In-situ cast concrete,...
A study on the construction process (Precast concrete, In-situ cast concrete,...
 
Box Pushing Technique
Box Pushing TechniqueBox Pushing Technique
Box Pushing Technique
 
Construction portfolio (manvi)
Construction portfolio (manvi)Construction portfolio (manvi)
Construction portfolio (manvi)
 
Underpinning
UnderpinningUnderpinning
Underpinning
 
Earth quack resisting system in a building
Earth quack resisting system in a buildingEarth quack resisting system in a building
Earth quack resisting system in a building
 
Significance of utilizing a slipform machine for all the development needs
Significance of utilizing a slipform machine for all the development needsSignificance of utilizing a slipform machine for all the development needs
Significance of utilizing a slipform machine for all the development needs
 
Alternative Structural System - Session 10
Alternative Structural System - Session 10Alternative Structural System - Session 10
Alternative Structural System - Session 10
 
Post-Tensioning Developments in Texas
Post-Tensioning Developments in TexasPost-Tensioning Developments in Texas
Post-Tensioning Developments in Texas
 
Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...Performance of ibs precast concrete beam column connections under earthquake ...
Performance of ibs precast concrete beam column connections under earthquake ...
 
Anchored Secant Pile Wall Presentation
Anchored Secant Pile Wall PresentationAnchored Secant Pile Wall Presentation
Anchored Secant Pile Wall Presentation
 

Viewers also liked

Verticality
VerticalityVerticality
Verticality
ref2
 
Cmh bp profile 2013
Cmh bp profile 2013Cmh bp profile 2013
Cmh bp profile 2013
Jose Castillo
 
Mining Survey 2012-2013
Mining Survey 2012-2013Mining Survey 2012-2013
Mining Survey 2012-2013
No to mining in Palawan
 
Microtunel Construction / Secant Pile
Microtunel Construction / Secant PileMicrotunel Construction / Secant Pile
Microtunel Construction / Secant Pile
Togrul Mukhtarov, MSc. MICE, Aff.M.ASCE
 
Design and construction of auger cast piles by Dr. Malek Smadi of GEOTILL
Design and construction of auger cast piles by Dr. Malek Smadi of GEOTILLDesign and construction of auger cast piles by Dr. Malek Smadi of GEOTILL
Design and construction of auger cast piles by Dr. Malek Smadi of GEOTILL
Dr. Malek Smadi
 
Code of practice for mine surveyors
Code of practice for mine surveyorsCode of practice for mine surveyors
Code of practice for mine surveyors
Krishna Deo Prasad
 
Temeltas Bored Piling 25.06
Temeltas Bored Piling 25.06Temeltas Bored Piling 25.06
Temeltas Bored Piling 25.06
Can Cihan Cankat
 
Underground mine
Underground mineUnderground mine
Underground mine
Saurabh Jain
 
Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Triangulation and trilateration pdf...
Triangulation and trilateration pdf...
Gokul Saud
 
Triangulation
Triangulation Triangulation
Design of openpit mining
Design of openpit miningDesign of openpit mining
Design of openpit mining
SATYANARAYANA I
 
Gothic architecture
Gothic architectureGothic architecture
Gothic architecture
Mudra Vyas
 
Caissons
CaissonsCaissons
Driven & Bored Piles
Driven & Bored PilesDriven & Bored Piles
Driven & Bored Piles
Ahmed Zanaty
 
Triangulation
TriangulationTriangulation
Triangulation
Sheila Shamuganathan
 
Pile Foundation presentation
Pile Foundation presentationPile Foundation presentation
Pile Foundation presentation
Sevar Dilkhaz
 
Surface mining planning and design of open pit mining
Surface mining planning and design of open pit miningSurface mining planning and design of open pit mining
Surface mining planning and design of open pit mining
Geology Department, Faculty of Science, Tanta University
 
Design of shafts couplings ppt
Design of shafts couplings  pptDesign of shafts couplings  ppt
Design of shafts couplings ppt
nsvnhanu
 
Mining ppt 2014
Mining ppt 2014Mining ppt 2014
Mining ppt 2014
Ajoy Raj Saikia
 
PILE FOUNDATION-INDIA
PILE FOUNDATION-INDIAPILE FOUNDATION-INDIA
PILE FOUNDATION-INDIA
aditya singh
 

Viewers also liked (20)

Verticality
VerticalityVerticality
Verticality
 
Cmh bp profile 2013
Cmh bp profile 2013Cmh bp profile 2013
Cmh bp profile 2013
 
Mining Survey 2012-2013
Mining Survey 2012-2013Mining Survey 2012-2013
Mining Survey 2012-2013
 
Microtunel Construction / Secant Pile
Microtunel Construction / Secant PileMicrotunel Construction / Secant Pile
Microtunel Construction / Secant Pile
 
Design and construction of auger cast piles by Dr. Malek Smadi of GEOTILL
Design and construction of auger cast piles by Dr. Malek Smadi of GEOTILLDesign and construction of auger cast piles by Dr. Malek Smadi of GEOTILL
Design and construction of auger cast piles by Dr. Malek Smadi of GEOTILL
 
Code of practice for mine surveyors
Code of practice for mine surveyorsCode of practice for mine surveyors
Code of practice for mine surveyors
 
Temeltas Bored Piling 25.06
Temeltas Bored Piling 25.06Temeltas Bored Piling 25.06
Temeltas Bored Piling 25.06
 
Underground mine
Underground mineUnderground mine
Underground mine
 
Triangulation and trilateration pdf...
Triangulation and trilateration pdf...Triangulation and trilateration pdf...
Triangulation and trilateration pdf...
 
Triangulation
Triangulation Triangulation
Triangulation
 
Design of openpit mining
Design of openpit miningDesign of openpit mining
Design of openpit mining
 
Gothic architecture
Gothic architectureGothic architecture
Gothic architecture
 
Caissons
CaissonsCaissons
Caissons
 
Driven & Bored Piles
Driven & Bored PilesDriven & Bored Piles
Driven & Bored Piles
 
Triangulation
TriangulationTriangulation
Triangulation
 
Pile Foundation presentation
Pile Foundation presentationPile Foundation presentation
Pile Foundation presentation
 
Surface mining planning and design of open pit mining
Surface mining planning and design of open pit miningSurface mining planning and design of open pit mining
Surface mining planning and design of open pit mining
 
Design of shafts couplings ppt
Design of shafts couplings  pptDesign of shafts couplings  ppt
Design of shafts couplings ppt
 
Mining ppt 2014
Mining ppt 2014Mining ppt 2014
Mining ppt 2014
 
PILE FOUNDATION-INDIA
PILE FOUNDATION-INDIAPILE FOUNDATION-INDIA
PILE FOUNDATION-INDIA
 

Similar to ADSC Presentation - 11.30.12

Rohleder_presentation.pdf
Rohleder_presentation.pdfRohleder_presentation.pdf
Rohleder_presentation.pdf
walid691760
 
Portageville Presentation
Portageville PresentationPortageville Presentation
Portageville Presentation
Jordan Penney
 
Newport Marina Presentation March 2015
Newport Marina Presentation March 2015Newport Marina Presentation March 2015
Newport Marina Presentation March 2015
American Society of Civil Engineers, Orange County Branch
 
well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...
Arman Hashmi
 
Cantilever bridge construction
Cantilever bridge constructionCantilever bridge construction
Cantilever bridge construction
Kundan Sanap
 
ABC in Nebraska
ABC in NebraskaABC in Nebraska
ABC in Nebraska
Jill Reeves
 
RUDDER TRUNK MISMATCH
RUDDER TRUNK MISMATCHRUDDER TRUNK MISMATCH
RUDDER TRUNK MISMATCH
Apoorv Dhawan
 
Tony
TonyTony
Tony
TONY ROSE
 
Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...
mecocca5
 
Construction of well foundation
Construction of well foundation Construction of well foundation
Construction of well foundation
dilip patidar
 
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...
Specialized Carriers & Rigging Association
 
Deep Foundation (Construction Engineering)
Deep Foundation (Construction Engineering)Deep Foundation (Construction Engineering)
Deep Foundation (Construction Engineering)
S M Rahat Rahman
 
Slab column and stair case
Slab column and stair caseSlab column and stair case
Slab column and stair case
Vikas Mehta
 
Suspension bridges
Suspension bridgesSuspension bridges
Suspension bridges
Rana Ibrahim
 
SMAW OF PIPE.pptx
SMAW OF PIPE.pptxSMAW OF PIPE.pptx
SMAW OF PIPE.pptx
IndustrialEducationL
 
2022-07-13.pptx
2022-07-13.pptx2022-07-13.pptx
2022-07-13.pptx
AshrafulHaqueTushar1
 
Ballasted Ground Mount Presentation 2014_optimized
Ballasted Ground Mount Presentation 2014_optimizedBallasted Ground Mount Presentation 2014_optimized
Ballasted Ground Mount Presentation 2014_optimized
David Lewenz
 
1926 concrete safety 2018
1926 concrete safety 20181926 concrete safety 2018
1926 concrete safety 2018
John Newquist
 
Intro to offshore drilling
Intro to offshore drilling Intro to offshore drilling
Intro to offshore drilling
amrhaggag
 
UMAID IQBAL SEMINAR.pptx
UMAID IQBAL SEMINAR.pptxUMAID IQBAL SEMINAR.pptx
UMAID IQBAL SEMINAR.pptx
Praveendubey82
 

Similar to ADSC Presentation - 11.30.12 (20)

Rohleder_presentation.pdf
Rohleder_presentation.pdfRohleder_presentation.pdf
Rohleder_presentation.pdf
 
Portageville Presentation
Portageville PresentationPortageville Presentation
Portageville Presentation
 
Newport Marina Presentation March 2015
Newport Marina Presentation March 2015Newport Marina Presentation March 2015
Newport Marina Presentation March 2015
 
well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...well foundation of six lane new ganga bridge near kacchi dargah in district P...
well foundation of six lane new ganga bridge near kacchi dargah in district P...
 
Cantilever bridge construction
Cantilever bridge constructionCantilever bridge construction
Cantilever bridge construction
 
ABC in Nebraska
ABC in NebraskaABC in Nebraska
ABC in Nebraska
 
RUDDER TRUNK MISMATCH
RUDDER TRUNK MISMATCHRUDDER TRUNK MISMATCH
RUDDER TRUNK MISMATCH
 
Tony
TonyTony
Tony
 
Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...Assessing and constructing a cost effective bridge replacement christopher si...
Assessing and constructing a cost effective bridge replacement christopher si...
 
Construction of well foundation
Construction of well foundation Construction of well foundation
Construction of well foundation
 
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...
2019 CRW - esign, Fabrication and Testing of Cantilever Beams and Triangle Pl...
 
Deep Foundation (Construction Engineering)
Deep Foundation (Construction Engineering)Deep Foundation (Construction Engineering)
Deep Foundation (Construction Engineering)
 
Slab column and stair case
Slab column and stair caseSlab column and stair case
Slab column and stair case
 
Suspension bridges
Suspension bridgesSuspension bridges
Suspension bridges
 
SMAW OF PIPE.pptx
SMAW OF PIPE.pptxSMAW OF PIPE.pptx
SMAW OF PIPE.pptx
 
2022-07-13.pptx
2022-07-13.pptx2022-07-13.pptx
2022-07-13.pptx
 
Ballasted Ground Mount Presentation 2014_optimized
Ballasted Ground Mount Presentation 2014_optimizedBallasted Ground Mount Presentation 2014_optimized
Ballasted Ground Mount Presentation 2014_optimized
 
1926 concrete safety 2018
1926 concrete safety 20181926 concrete safety 2018
1926 concrete safety 2018
 
Intro to offshore drilling
Intro to offshore drilling Intro to offshore drilling
Intro to offshore drilling
 
UMAID IQBAL SEMINAR.pptx
UMAID IQBAL SEMINAR.pptxUMAID IQBAL SEMINAR.pptx
UMAID IQBAL SEMINAR.pptx
 

ADSC Presentation - 11.30.12

  • 1. DRILLED SHAFT / BORED IN PILE INSTALLATION New Brunswick Fitness & Wellness Plaza New Brunswick, NJ Presentation to: ADSC Northeast Chapter Holiday Inn, Clark, NJ November 30th, 2012 Presentation by: Jeffrey B. Ayres Moretrench American Corporation
  • 2. PROJECT OVERVIEW • Proposed Construction: • Fitness Center • Supermarket • Parking Garage • Owner • City of New Brunswick • General Contractor • Joseph Jingoli & Sons, Inc. • Structural Engineer • PS&S • Foundation Contractor • Moretrench
  • 3. PROJECT OVERVIEW • Scheduling / Coordination • Difficult Schedule • No relief in schedule when schedule slid • Additional subs added when schedule slid
  • 4. MTAC CONTRACT WORK – DRILLED SHAFTS • 77 Total Drilled Shafts • Provide support for new column loads • 39 @ 3’ diameter • Reinforcing dowels • 38 @ 6’ diameter • Reinforcing dowels • Anchor bolts (precast connection) • Average drill length: 30’
  • 5. DRILL RIG (DRILLED SHAFTS) • Soilmec SR-65 • Hydraulic Rotary Rig • 22,500 mm (~74’) mast • Equipped with: • Self Handling Counterweight • Kelly Drilling System • Drilling Mate System • Actively monitor drill depth, crowd pressure, mast verticality, pump pressures, and more
  • 6. DRILL RIG (DRILLED SHAFTS) • Bottom of Mast Clearance • Cable system feed on back of mast • Enough clearance for casing “spinner” WHY SOILMEC?
  • 7. MTAC CONTRACT WORK – BIP’s • 246 Bored In Piles (BIP’s) • Provide support for new slab • 18” Diameter • 6 x #6 reinforcing cage substituted with #18 grade 75 threadbar • Average drill length: 20’
  • 8. DRILLING EQUIPMENT (BIP) • Bauer RTG RG 19 T • Universal Piling Rig • Up to 78’ Mast Height • Equipped with: • PIR (Pile Installation Recorder) • Actively monitor drill depth, grout volume per 5’ increment, and more
  • 9. MATERIAL / EQUIPMENT SUPPLIERS • Soilmec SR-65 • American Equipment & Fabrication, East Providence, RI • Bauer RTG RG 19T • Moretrench owned, purchased from Posillico, Inc. • Temporary Casing • Favor Steel & Fabricating, Bessemer, AL • Drill Tooling • Jeffrey Machine, Birmingham, AL • Concrete • Clayton Concrete, Edison, NJ • Rebar • Barker Steel, Avenel, NJ
  • 11. LOGISTICAL ISSUES • Existing Overhead Powerlines • Existing Robert Wood Johnson (RWJ) Building • Existing Utilities • Northeast Regional Amtrak Line
  • 18. RWJ BUILDING DEMOLITION  Mobilized prior to demolition  22 caissons unavailable during demolition  Obstructions / Utilities encountered beneath building footprint while drilling
  • 20. EXISTING / NEW UTILITIES
  • 21. AMTRAK PROXIMITY • Required to be 15’ minimum between mast & edge of Amtrak line
  • 23. DRILLING PROCEDURE (3’ DRILLED SHAFTS) • 48” diameter starter can for top 5’ • 42” diameter “inner” can to top of rock • Socketed into weathered shale • Visual inspection performed by PS&S
  • 24. DRILLING PROCEDURE (6’ DRILLED SHAFTS) • 87” diameter starter can for top 5’ • 78” diameter “inner” can to top of rock • Socketed into weathered shale • Visual inspection performed by PS&S
  • 26. 3’ DRILL TOOLING Soilmec equipped to switch between both 3’ and 6’ diameter tooling easily
  • 27. REINFORCING CAGE / CONCRETE • 26 x #11 bars per 6’ caisson • 10 x #9 bars per 3’ caisson • Cage placed with drill rig or crane
  • 28. REINFORCING CAGE / CONCRETE • Top of reinforcing cage @ 3” below top of caisson (minimum coverage of reinforcement) • Water removal (hydraulic pump) & shallow depth permitted end dumping of concrete
  • 29. DOWELS • Issues Faced: • All 77 caissons received either dowels or anchor bolts • Connection to grade beam, column, etc. • Drilling grade consistent at ~ elevation 47 • Top of caisson elevation varied from elevation 47 to elevation 40 • Drilling / epoxying dowels into 6’ shafts was not permitted • Solutions: • “Wet-Set” dowels for 6’ shafts using premade wooden templates • Drill / epoxy any remaining dowels once top of caisson is exposed
  • 30. DOWELS • More than a dozen different dowel patterns • Up to 7’ depth below drilling grade (worst case scenario)
  • 32. ANCHOR BOLTS • Issues Faced: • Anchor Bolt location and embedment in top of drilled shafts were critical, with nearly negligible tolerances • Solution: • Per the engineer, pour shaft concrete 3’ below top of caisson (cold joint). • Place 6’ corrugated pipe around top of shaft • Set template at correct elevation and plan location • Pour remainder of concrete • Monitor location of template before, during, and after pour
  • 33. ANCHOR BOLTS • Left: 6’ Diameter Caisson with Concrete 2’-3’ low • Right: 6’ Diameter Corrugated Pipe
  • 34. ANCHOR BOLTS • Left: Typical Anchor Bolt Template • Right: Placement of Anchor Bolt Template at exact elevation prior to pour
  • 38. ANCHOR BOLTS • Left: Finished Anchor Bolt Shaft • Right: Precast Column @ Anchor Bolt Shaft
  • 39. BORED IN PILES (BIP’s)
  • 40. DRILLING PROCEDURE (BORED IN PILES) • 18” Diameter Continuous Flight Hollow Stem Auger • Advanced 5’ below top of first rock encountered or to auger refusal • <1’ / minute • Once tip reached, sand-cement grout pumped through auger • 115% of theoretical volume (measured by PIR & stroke count) • Slow positive rotation maintained during withdrawal
  • 41. DRILLING PROCEDURE (BORED IN PILES) • Upon grouting completion, pile top protector placed into hole (left picture) • Top of Pile (grout) elevation reached by removing excess grout from top • #18 Grade 75 Threadbar installed full length (right) along with 4 x #4 bars with 90 degree bends • Average Production – 15 to 20 / DAY
  • 43. AFTER
  • 44. NEW BRUNSWICK WELLNESS PLAZA QUESTIONS?