This document provides an overview of the drilled shaft and bored pile installation for the foundations of a new fitness and wellness plaza development project in New Brunswick, NJ. It discusses that Moretrench was contracted to install 77 drilled shafts ranging from 3-6 feet in diameter and averaging 30 feet in depth, as well as 246 18-inch diameter bored piles averaging 20 feet in depth. The document describes the equipment, materials, and procedures used for the installation, including dealing with logistical challenges of existing infrastructure and scheduling issues during construction.