The document provides details about the construction of a parking garage at the Horseshoe Casino in Cincinnati, OH using prefabricated forming tables. Some key points: 1) Excavation for the project went down over 50 feet in some locations due to levels below grade. Forming tables were fabricated off-site in a controlled environment and delivered just-in-time to be installed. 2) Tables are set into place one by one using steel beam forms for access. I-joists support the deck forms and allow for cantilevering. 3) Once forming and rebar installation is complete, concrete is poured to form the deck slabs and beams together. Curing, stripping, and res