INTRODUCTION
5S is the name of a workplace organisation method that uses a list of FIVE Japanese words:
seiri, seiton, seiso, seiketsu, and shitsuke.
Transliterated or translated into English, they all start with the letter “S”.
The 5S’s describes how to organise a work space for efficiency and effectiveness by identifying and storing the
items used, maintaining the area and items, and sustaining the new order.
5S was developed in Japan. It was first heard of as one of the techniques that
enabled what was then termed 'Just in Time Manufacturing'.
5S was developed by Hiroyuki Hirano within his overall approach to
production systems.
Many Western managers coming across the approach for the first time found
the experience one of enlightenment. They had perhaps always known the
role of housekeeping within optimised manufacturing performance and had
always known the elements of best practice.
However, Hirano provided a structure for improvement programs. He pointed
out a series of identifiable steps, each building on its predecessor. Western
managers, for example, had always recognised the need to decide upon
locations for materials and tools and upon the flow of work through a work area; central to this (but perhaps
implicit) is the principle that items not essential to the process should be removed – stored elsewhere or
eliminated completely. By differentiating between Seiri and Seiton, Hirano made the distinction explicit. He
taught his audience that any effort to consider layout and flow before the removal of the unnecessary items was
likely to lead to a sub-optimal solution.
BUY 5S Training Posters and Signs at Fabufacture
BENEFITS OF 5S
In order to participate in the global economy and compete against companies that are advantaged by overseas
production, businesses are looking to find ways to identify and reduce production wastes.
By implementing the 5S methodology correctly numerous benefits can be realised, including:
 Reduced production costs and improved production efficiencies.
 Improvements in Quality, leading to a reduction in Customer Return costs, liabilities costs, etc.
 Reduced Inventory levels and warehousing costs.
 Adaptability to new products improved, leading to increased production capability.
 Employee safety improved, reducing loss time incident costs and compensation pay outs.
 Employee moral improved, leading to increased productivity and reduced staff turnover / re-training costs.
 Increased (reclaimed) floor space providing the company with huge savings and scope for new products.
For the above reasons and more, businesses are implementing 5S, allowing for significant improvements with
minimal amounts of resource.
SORT
Sort means that you remove all items from the work place that are not needed for current production (or
clerical) operations. Surprisingly, this simple concept is easily misunderstood. At first, it may be difficult to
distinguish between what is needed and what is not.
Common Issues:
- People tend to hold onto parts, thinking that they may be needed for the next order (sometimes holding
on to obsolete or ‘out of issue’ parts without realising).
- They see an inappropriate machine and think they will use it someday or somehow.
This leads to inventory and equipment tending to build up over time and start getting in the way of everyday
production activities. This leads to a massive build-up of waste factory wide. This factory waste leads to
numerous problems including the reduction of floor space, creation of trip hazards and damage to employee
morale due to a messy work environment.
During the SORT stage of the 5S methodology, a RED TAG HOLDING AREA is set up in order to allow an
evaluation of unwanted items. RED TAGs are used to identify unwanted items before placing the ‘tagged items’
in the RED TAG HOLDING AREA.
BUY 5S Red Tag Holding Areas at Fabufacture
12 STEPS TO SORT SUCCESS
The list of SORT steps below, assume Management have bought into implementing 5S at your facility.
Step 1 - Employee Awareness and Training – Getting your colleagues on board with 5S is vital, as they will be
the people making it work and ripping most of the day to day benefits. Your facility should immersed in
5S visuals and training materials. >more info and related products
Step 2 - Identify the 5S Area and Team Members – Start with one part of your facility and use this as the Pilot
area. Decide on a location that is seen / walked pass by most of the people working at your facility and
clearly identify the boundaries of that area. The team should be made up of people from the area, as
well as a 5S (adding a Manager to the team will demonstrate that the company is serious about 5S).
>more info and related products
Step 3 - Gather Event Supplies – These are the things you will require for the event (See Event Kits)
Step 4 - Set Red Tag Event Date and Time – Initially, 5S sorting should be ran as ‘SORT Events’ until the other 5S
pillars have been completed on the area and then daily SORT sustainment becomes the future. >more
info and related products
Step 5 - Set up a Local Holding Area – Without a local holding area, items will not leave the work area and SORT
will fail. Set up a holding area, but don’t locate it too close (items will find their way back ‘overnight’) or
too far away from the work area (items will never leave the area i.e get stuffed into draws and
cupboards). >more info and related products
Step 6 - Set Red Tag Event Targets – Post specific and measurable targets for the red tagging activity. You may
also consider - ‘only items required for next 48 hours’ >more info and related products
Step 7- Take lots of BEFORE Photos – These photos are important, as they demonstrate to the Management
that improvement process has been made - use your Before / After Board. The photos will also be used
for the Recognition Board. >more info and related products
Step 8- Hold Red Tagging Event – When you are happy that the Team understands the red tagging criteria, go
ahead and tag unneeded items. This should be a quick event. Set a minimum target for each team
member. As soon as the item is tagged, move it to the holding area. >more info and related products
Step 9 - Evaluate Tagged Items - As a team, evaluate each tagged item to decide on the most appropriate
disposition action (Scrap, Return to Vendor, Send for calibration, Sell / Auction, etc). Invite a person
from outside of the area to challenge the team on the tagged items. >more info and related products
Step 10 - Assign Disposition Actions – Decide on who (name of person) will carried out the disposition action on
an item. Make this information visible for everyone to see. >more info and related products
Step 11 - Take AFTER photos – With all the unneeded items removed from the area, take some photos to
demonstrate to the Management that improvement process has been made (use your Before / After
Board) and the photos will also be used for the Recognition Board later. >more info and related
products
Step 12 - Update your Recognition Board and congratulate the team – Congratulating your team for their
efforts is a vital part of the sustainment activity of 5S SORT. Your colleagues won’t continue to support
5S if they cannot see progress or are not being recognised for the work they have carried out. >more
info and related products
Then……5S SORT Sustainment – TED
SORT TIPS:
- Don’t tag people, they want be happy.
- Be clear on the red tag criteria and make sure the team understands what they should be tagging.
- Ensure that the local holding area is close enough to the work area, but not too close, as items will make
their way back. Assign a holding area manager. You may need to make it a restricted / quarantine area
depending on what your company produces. Don’t locate the holding area too far away, as team
members may not be inclined to remove unneeded items.
- Set a target for the number of red tags per person.
- Keep a record of tags raised. If you have removed excess inventory or raw materials someone may be
looking for items for production so you need to keep track.
Hi! I’m TED. I can help you to keep
your facility clean and organised
forever with my SORT system!
PRODUCT SPOT LIGHT
PRODUCT SPOT LIGHT
SET IN ORDER
Set In Order is all about the old adage “A place for everything and everything in its place”.
Set In Order can be defined as arranging needed items so that they are easy to use and labelling them so that
they are easy to find and put away.
Step 1 - Identify the frequency of items are used - The first step (as a Team) is to review the job (process or
product) that is performed in the area and identify the frequency in which the tools and equipment are
used.
- Store items together if they are used together
- Store them in the sequence you use them in
- Store items according to their function so if they do similar things store them together
- Eliminate multiple items that do the same thing and use a single one that does multiple function
- Make storage places larger than items stored there so it’s easy to remove and put them back
- Make storage places accessible and comfortable to use
Step 2 - Identify designated locations - The most frequently used items should be placed closest to were the job
is being performed and within easy reach.
- Store items together if they are used together
- Store them in the sequence you use them in
- Store items according to their function so if they do similar things store them together
- Eliminate multiple items that do the same thing and use a single one that does multiple function
- Make storage places larger than items stored there so it’s easy to remove and put them back
- Make storage places accessible and comfortable to use
Step 3 - Think Ergonomics - Make sure to consider the principles of ergonomics when determining where to
locate equipment and supplies.
- Maintain comfortable posture and position
- Minimise lifting and motion.
- Use principle of gravity instead of muscle.
Having designated locations for everything needed in the work area enables employees to exert visual control
over their operations. At a glance, employees are able to see if things are in-place or out-of-place and if more
materials, supplies or tools need to be ordered.
Step 4 - Visual Controls - Create visual cues to reinforce location of supplies and equipment by using techniques
such as:
- Labels on shelves
- Tapped off sections of floor for positioning of items
- Shadow boards outlining placement of key equipment
- Colour coding
- KANBAN bins to show inventory levels
- Directional signage
- Floor tape or paint indicating pedestrian paths, off limits or hazardous areas.
- Parts dividers
Gauge Highlighting:
 Red - Failure mode
 Yellow – Warning/execute control plan
 Green - Normal
BUY Tool Shadow at Fabufacture
Step 5 - Lighting - Whilst you are improving your visual controls you may also want to think about improving the
lighting in the area.
Proper workplace lighting is essential to any good business as it:
- allows employees to comfortably see what they’re doing, without straining their eyes or bodies
- makes work easier and more productive
- draws attention to hazardous operations and equipment
- helps prevent costly errors and accidents
Step 6 - Evaluate the work area space – Review the job being performed and ask the question “ Does the
operator need that much space? ” Often the answer to this question is NO. Two objectives can often be
achieved here:
1) Freeing up floor space
2) Reducing the amount of work surface used
Floor Space – is an expensive asset and freeing up floor space is considered as one of the major financial
quick hits that can be gained from 5S. Calculate the cost per sqm or sqft in your facility and present the
financial cost saving to your management. It could even result a decision to be made to bring more work
into the facility or prevent the facility from relocating in some circumstances.
Reduction in work surface (Work benches and tables) – This ideology works in any office or production
environment. By considering the minimum (comfortable) level of work surface required, you can
minimise the likely hood of people collecting ‘stuff’. If there’s nowhere to collect and hoard, then the
benches and tables should stay tidy and SORT should be sustained.
In some instances, it’s even possible to eliminate traditional work bench surfaces all together.
Sloping surface to prevent storing items
Eliminate accidental shelving – When
redesigning work areas, be careful not to
accidentally create additional flat surfaces
that people can store items on.
Can the surface be angled / sloped?
Step 7 - Set a Visual Standard - Once the Set In Order has been completed, take photos to show the standard in
the area. Display this standard in the area so everyone can see it.
SHINE
Shine means sweeping floors, wiping off machinery, and generally making sure everything in the factory or
workplace stays clean. In a manufacturing company, Shine is closely related to the ability to turn out quality
products. Shine also includes saving labour by finding ways to prevent dirt, dust and debris from piling up in the
workshop.
Shine should be integrated into daily maintenance tasks to combine cleaning checkpoints with maintenance
checkpoints. There are three aspects of Shine: getting the work area clean, maintaining its appearance, and
using preventive measures to keep it clean
Step 1 - Clean your work area completely – Clean the area from top to bottom. Treat the initial clean as a kind
of spring clean. Ensure that all work benches, tables, equipment and all other items are cleaned
thoroughly.
Step 2 - Maintaining its appearance - Once the cleaning has been completed, take photos to show the new
standard for cleanliness in the area. Display this standard in the area so everyone can see it.
Step 3 - Preventive measures – Use a cleaning (Shine) schedule with specific owners to ensure that the area is
kept clean. Nominate an independent person to audit the area and give it a score.
Painting the work area in light grey floor paint really
enhances the work area, making the environment much more
pleasant to work in. It also makes it easier to see what items
are out of place and it’s easier to keep the floor clean.
BUY Floor Tapes at Fabufacture
STANDARDISE
The three steps to making SORT, SET IN ORDER and SHINE activities (the three pillars or 3S) a habit are:
Step 1 – Decide who is responsible for which activities with regard to maintaining 3S conditions.
Step 2 – To prevent back sliding, integrate 3S maintenance duties into regular work activities.
Step 3 – Check on how well 3S conditions are being maintained.
SUSTAIN
Within the context of the five pillars, Sustain means making a habit of properly maintaining correct procedures.
The implementation of the sustain pillar is different from that of the Sort, Set In Order, Shine and Standardise
pillars in the sense that the results are not visible and cannot be easily measured.
Commitment to it exists in people’s hearts and minds and their behaviour shows its presence.
Steps you can take:
Step 1 - Create a 5S poster with in-house examples.
Step 2 - Develop a practical 5S auditing tool.
Step 3 - Display 5S metrics.
Step 4 - Develop a storyboard to display good results “a picture is worth a thousand words”.
Step 5- 5S newsletter can be centred around in-house improvements and to communicate new 5S
conditions.
Step 6 - Setup a 5S communication board with 5S map to involve all employees.
Step 7 - Develop in-house 5S manual that to explain examples for each of the 5S steps.
Step 8 - If areas have been improving maybe take 10 minutes and arrange for in-house tours to show off to
others great examples of 5S.

More Related Content

What's hot

5 S
5 S5 S
implementation of 5s
implementation of 5simplementation of 5s
implementation of 5s
Abhishek Goyal
 
Examples of 5-S Projects
Examples of 5-S ProjectsExamples of 5-S Projects
Examples of 5-S Projects
Dan Olson
 
5S AWARNESS TRAINING PROGRAM
5S AWARNESS  TRAINING  PROGRAM5S AWARNESS  TRAINING  PROGRAM
5S AWARNESS TRAINING PROGRAM
DEEPAK SAHOO
 
5s training slides_432
5s training slides_4325s training slides_432
5s training slides_432
Mahesh Kumar
 
5 S Manual
5 S Manual5 S Manual
5S basic training ppt
5S basic training ppt5S basic training ppt
5S basic training ppt
beskidek
 
Presentation - introduction to 5S
Presentation - introduction to 5SPresentation - introduction to 5S
Presentation - introduction to 5S
Jan Sabat
 
5S training manual
5S training manual5S training manual
5S training manual
Hasan319365
 
5s
5s5s
Lean 5S Visual Workplace Organization Training Module
Lean 5S Visual Workplace Organization Training ModuleLean 5S Visual Workplace Organization Training Module
Lean 5S Visual Workplace Organization Training Module
Frank-G. Adler
 
Visual Management by Operational Excellence Consulting
Visual Management by Operational Excellence ConsultingVisual Management by Operational Excellence Consulting
Visual Management by Operational Excellence Consulting
Operational Excellence Consulting
 
Visual Management
Visual Management Visual Management
Visual Management
Mohamed Effat
 
The Amazing, Incredible, Powerful 5S
The Amazing, Incredible, Powerful 5SThe Amazing, Incredible, Powerful 5S
The Amazing, Incredible, Powerful 5S
Lisa Machos
 
5s system PDF from Floor Tape to visual Labels
5s system PDF from Floor Tape to visual Labels5s system PDF from Floor Tape to visual Labels
5s system PDF from Floor Tape to visual Labels
Ben Geck
 
5s and Safety Tips in Workplace.pptx
5s and Safety Tips in Workplace.pptx5s and Safety Tips in Workplace.pptx
5s and Safety Tips in Workplace.pptx
NathanielRondina1
 
5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement
Adrian Oprea
 
5s
5s5s
5 S
5 S5 S
5S Workshop &Visual management - Krishna Heda
5S Workshop &Visual management - Krishna Heda5S Workshop &Visual management - Krishna Heda
5S Workshop &Visual management - Krishna Heda
krishnaheda
 

What's hot (20)

5 S
5 S5 S
5 S
 
implementation of 5s
implementation of 5simplementation of 5s
implementation of 5s
 
Examples of 5-S Projects
Examples of 5-S ProjectsExamples of 5-S Projects
Examples of 5-S Projects
 
5S AWARNESS TRAINING PROGRAM
5S AWARNESS  TRAINING  PROGRAM5S AWARNESS  TRAINING  PROGRAM
5S AWARNESS TRAINING PROGRAM
 
5s training slides_432
5s training slides_4325s training slides_432
5s training slides_432
 
5 S Manual
5 S Manual5 S Manual
5 S Manual
 
5S basic training ppt
5S basic training ppt5S basic training ppt
5S basic training ppt
 
Presentation - introduction to 5S
Presentation - introduction to 5SPresentation - introduction to 5S
Presentation - introduction to 5S
 
5S training manual
5S training manual5S training manual
5S training manual
 
5s
5s5s
5s
 
Lean 5S Visual Workplace Organization Training Module
Lean 5S Visual Workplace Organization Training ModuleLean 5S Visual Workplace Organization Training Module
Lean 5S Visual Workplace Organization Training Module
 
Visual Management by Operational Excellence Consulting
Visual Management by Operational Excellence ConsultingVisual Management by Operational Excellence Consulting
Visual Management by Operational Excellence Consulting
 
Visual Management
Visual Management Visual Management
Visual Management
 
The Amazing, Incredible, Powerful 5S
The Amazing, Incredible, Powerful 5SThe Amazing, Incredible, Powerful 5S
The Amazing, Incredible, Powerful 5S
 
5s system PDF from Floor Tape to visual Labels
5s system PDF from Floor Tape to visual Labels5s system PDF from Floor Tape to visual Labels
5s system PDF from Floor Tape to visual Labels
 
5s and Safety Tips in Workplace.pptx
5s and Safety Tips in Workplace.pptx5s and Safety Tips in Workplace.pptx
5s and Safety Tips in Workplace.pptx
 
5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement5S Implementation - The first step to continuous improvement
5S Implementation - The first step to continuous improvement
 
5s
5s5s
5s
 
5 S
5 S5 S
5 S
 
5S Workshop &Visual management - Krishna Heda
5S Workshop &Visual management - Krishna Heda5S Workshop &Visual management - Krishna Heda
5S Workshop &Visual management - Krishna Heda
 

Similar to 5S Step by Step Guide.pdf

Training program on 5 S
Training program on 5 STraining program on 5 S
Training program on 5 S
RANDY FERRESE
 
Brady 5S_HandBook - Project Sales Corp
 Brady 5S_HandBook - Project Sales Corp Brady 5S_HandBook - Project Sales Corp
Brady 5S_HandBook - Project Sales Corp
Project Sales Corp
 
Guide 6 s
Guide 6 sGuide 6 s
Guide 6 s
Rizwan Aslam
 
5 s handbook
5 s handbook5 s handbook
5 s handbook
Mario Charlin
 
5s handbook
5s handbook5s handbook
5s handbook
Khaled Tarawneh
 
5s Philosophy
5s Philosophy5s Philosophy
Introduction to 6S
Introduction to 6SIntroduction to 6S
Introduction to 6S
Tim McMahon
 
5 s
5 s5 s
5 s 2
5 s 25 s 2
What is 5S.docx
What is 5S.docxWhat is 5S.docx
What is 5S.docx
ErPatz1
 
Basics Of Lean
Basics Of LeanBasics Of Lean
Basics Of Lean
guest399e73
 
5 s training -recap
5 s  training -recap5 s  training -recap
5 s training -recap
MANOJ ARORA
 
TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT
Nahar spinning mills bhopal
 
5 S Intro
5 S Intro5 S Intro
5 S Intro
Harold Philbrick
 
Phuong phap trien khai 5S trong doanh nghiep
Phuong phap trien khai 5S trong doanh nghiepPhuong phap trien khai 5S trong doanh nghiep
Phuong phap trien khai 5S trong doanh nghiep
nguyenanvuong2007
 
5 s users guide
5 s users guide5 s users guide
5 s users guide
Komarul Fausiyah
 
Chapter-Two-Lean.pdf
Chapter-Two-Lean.pdfChapter-Two-Lean.pdf
Chapter-Two-Lean.pdf
mengist4
 
5 s modul
5 s modul5 s modul
5 s modul
edibayu
 
KAIZEN Updated 030507
KAIZEN Updated 030507KAIZEN Updated 030507
KAIZEN Updated 030507
Krishna Thobhani
 
5 S Laboratory.pptx
5 S Laboratory.pptx5 S Laboratory.pptx
5 S Laboratory.pptx
VaibhavUnhale1
 

Similar to 5S Step by Step Guide.pdf (20)

Training program on 5 S
Training program on 5 STraining program on 5 S
Training program on 5 S
 
Brady 5S_HandBook - Project Sales Corp
 Brady 5S_HandBook - Project Sales Corp Brady 5S_HandBook - Project Sales Corp
Brady 5S_HandBook - Project Sales Corp
 
Guide 6 s
Guide 6 sGuide 6 s
Guide 6 s
 
5 s handbook
5 s handbook5 s handbook
5 s handbook
 
5s handbook
5s handbook5s handbook
5s handbook
 
5s Philosophy
5s Philosophy5s Philosophy
5s Philosophy
 
Introduction to 6S
Introduction to 6SIntroduction to 6S
Introduction to 6S
 
5 s
5 s5 s
5 s
 
5 s 2
5 s 25 s 2
5 s 2
 
What is 5S.docx
What is 5S.docxWhat is 5S.docx
What is 5S.docx
 
Basics Of Lean
Basics Of LeanBasics Of Lean
Basics Of Lean
 
5 s training -recap
5 s  training -recap5 s  training -recap
5 s training -recap
 
TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT
 
5 S Intro
5 S Intro5 S Intro
5 S Intro
 
Phuong phap trien khai 5S trong doanh nghiep
Phuong phap trien khai 5S trong doanh nghiepPhuong phap trien khai 5S trong doanh nghiep
Phuong phap trien khai 5S trong doanh nghiep
 
5 s users guide
5 s users guide5 s users guide
5 s users guide
 
Chapter-Two-Lean.pdf
Chapter-Two-Lean.pdfChapter-Two-Lean.pdf
Chapter-Two-Lean.pdf
 
5 s modul
5 s modul5 s modul
5 s modul
 
KAIZEN Updated 030507
KAIZEN Updated 030507KAIZEN Updated 030507
KAIZEN Updated 030507
 
5 S Laboratory.pptx
5 S Laboratory.pptx5 S Laboratory.pptx
5 S Laboratory.pptx
 

Recently uploaded

Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
RadiNasr
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
Divyam548318
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
gerogepatton
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
yokeleetan1
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
IJECEIAES
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
Victor Morales
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Christina Lin
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
MDSABBIROJJAMANPAYEL
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
drwaing
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
ssuser36d3051
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
mahammadsalmanmech
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
rpskprasana
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
heavyhaig
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
mamunhossenbd75
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
Dr Ramhari Poudyal
 

Recently uploaded (20)

Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdfIron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
Iron and Steel Technology Roadmap - Towards more sustainable steelmaking.pdf
 
bank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdfbank management system in java and mysql report1.pdf
bank management system in java and mysql report1.pdf
 
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODELDEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
DEEP LEARNING FOR SMART GRID INTRUSION DETECTION: A HYBRID CNN-LSTM-BASED MODEL
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Swimming pool mechanical components design.pptx
Swimming pool  mechanical components design.pptxSwimming pool  mechanical components design.pptx
Swimming pool mechanical components design.pptx
 
Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...Advanced control scheme of doubly fed induction generator for wind turbine us...
Advanced control scheme of doubly fed induction generator for wind turbine us...
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressionsKuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
KuberTENes Birthday Bash Guadalajara - K8sGPT first impressions
 
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming PipelinesHarnessing WebAssembly for Real-time Stateless Streaming Pipelines
Harnessing WebAssembly for Real-time Stateless Streaming Pipelines
 
Properties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptxProperties Railway Sleepers and Test.pptx
Properties Railway Sleepers and Test.pptx
 
digital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdfdigital fundamental by Thomas L.floydl.pdf
digital fundamental by Thomas L.floydl.pdf
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
sieving analysis and results interpretation
sieving analysis and results interpretationsieving analysis and results interpretation
sieving analysis and results interpretation
 
Question paper of renewable energy sources
Question paper of renewable energy sourcesQuestion paper of renewable energy sources
Question paper of renewable energy sources
 
CSM Cloud Service Management Presentarion
CSM Cloud Service Management PresentarionCSM Cloud Service Management Presentarion
CSM Cloud Service Management Presentarion
 
Technical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prismsTechnical Drawings introduction to drawing of prisms
Technical Drawings introduction to drawing of prisms
 
Heat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation pptHeat Resistant Concrete Presentation ppt
Heat Resistant Concrete Presentation ppt
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Literature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptxLiterature Review Basics and Understanding Reference Management.pptx
Literature Review Basics and Understanding Reference Management.pptx
 

5S Step by Step Guide.pdf

  • 1. Step by Step Guide
  • 2. INTRODUCTION 5S is the name of a workplace organisation method that uses a list of FIVE Japanese words: seiri, seiton, seiso, seiketsu, and shitsuke. Transliterated or translated into English, they all start with the letter “S”. The 5S’s describes how to organise a work space for efficiency and effectiveness by identifying and storing the items used, maintaining the area and items, and sustaining the new order. 5S was developed in Japan. It was first heard of as one of the techniques that enabled what was then termed 'Just in Time Manufacturing'. 5S was developed by Hiroyuki Hirano within his overall approach to production systems. Many Western managers coming across the approach for the first time found the experience one of enlightenment. They had perhaps always known the role of housekeeping within optimised manufacturing performance and had always known the elements of best practice. However, Hirano provided a structure for improvement programs. He pointed out a series of identifiable steps, each building on its predecessor. Western managers, for example, had always recognised the need to decide upon locations for materials and tools and upon the flow of work through a work area; central to this (but perhaps implicit) is the principle that items not essential to the process should be removed – stored elsewhere or eliminated completely. By differentiating between Seiri and Seiton, Hirano made the distinction explicit. He taught his audience that any effort to consider layout and flow before the removal of the unnecessary items was likely to lead to a sub-optimal solution. BUY 5S Training Posters and Signs at Fabufacture
  • 3. BENEFITS OF 5S In order to participate in the global economy and compete against companies that are advantaged by overseas production, businesses are looking to find ways to identify and reduce production wastes. By implementing the 5S methodology correctly numerous benefits can be realised, including:  Reduced production costs and improved production efficiencies.  Improvements in Quality, leading to a reduction in Customer Return costs, liabilities costs, etc.  Reduced Inventory levels and warehousing costs.  Adaptability to new products improved, leading to increased production capability.  Employee safety improved, reducing loss time incident costs and compensation pay outs.  Employee moral improved, leading to increased productivity and reduced staff turnover / re-training costs.  Increased (reclaimed) floor space providing the company with huge savings and scope for new products. For the above reasons and more, businesses are implementing 5S, allowing for significant improvements with minimal amounts of resource.
  • 4. SORT Sort means that you remove all items from the work place that are not needed for current production (or clerical) operations. Surprisingly, this simple concept is easily misunderstood. At first, it may be difficult to distinguish between what is needed and what is not. Common Issues: - People tend to hold onto parts, thinking that they may be needed for the next order (sometimes holding on to obsolete or ‘out of issue’ parts without realising). - They see an inappropriate machine and think they will use it someday or somehow. This leads to inventory and equipment tending to build up over time and start getting in the way of everyday production activities. This leads to a massive build-up of waste factory wide. This factory waste leads to numerous problems including the reduction of floor space, creation of trip hazards and damage to employee morale due to a messy work environment. During the SORT stage of the 5S methodology, a RED TAG HOLDING AREA is set up in order to allow an evaluation of unwanted items. RED TAGs are used to identify unwanted items before placing the ‘tagged items’ in the RED TAG HOLDING AREA. BUY 5S Red Tag Holding Areas at Fabufacture
  • 5. 12 STEPS TO SORT SUCCESS The list of SORT steps below, assume Management have bought into implementing 5S at your facility. Step 1 - Employee Awareness and Training – Getting your colleagues on board with 5S is vital, as they will be the people making it work and ripping most of the day to day benefits. Your facility should immersed in 5S visuals and training materials. >more info and related products Step 2 - Identify the 5S Area and Team Members – Start with one part of your facility and use this as the Pilot area. Decide on a location that is seen / walked pass by most of the people working at your facility and clearly identify the boundaries of that area. The team should be made up of people from the area, as well as a 5S (adding a Manager to the team will demonstrate that the company is serious about 5S). >more info and related products Step 3 - Gather Event Supplies – These are the things you will require for the event (See Event Kits) Step 4 - Set Red Tag Event Date and Time – Initially, 5S sorting should be ran as ‘SORT Events’ until the other 5S pillars have been completed on the area and then daily SORT sustainment becomes the future. >more info and related products Step 5 - Set up a Local Holding Area – Without a local holding area, items will not leave the work area and SORT will fail. Set up a holding area, but don’t locate it too close (items will find their way back ‘overnight’) or too far away from the work area (items will never leave the area i.e get stuffed into draws and cupboards). >more info and related products Step 6 - Set Red Tag Event Targets – Post specific and measurable targets for the red tagging activity. You may also consider - ‘only items required for next 48 hours’ >more info and related products Step 7- Take lots of BEFORE Photos – These photos are important, as they demonstrate to the Management that improvement process has been made - use your Before / After Board. The photos will also be used for the Recognition Board. >more info and related products Step 8- Hold Red Tagging Event – When you are happy that the Team understands the red tagging criteria, go ahead and tag unneeded items. This should be a quick event. Set a minimum target for each team member. As soon as the item is tagged, move it to the holding area. >more info and related products Step 9 - Evaluate Tagged Items - As a team, evaluate each tagged item to decide on the most appropriate disposition action (Scrap, Return to Vendor, Send for calibration, Sell / Auction, etc). Invite a person from outside of the area to challenge the team on the tagged items. >more info and related products Step 10 - Assign Disposition Actions – Decide on who (name of person) will carried out the disposition action on an item. Make this information visible for everyone to see. >more info and related products Step 11 - Take AFTER photos – With all the unneeded items removed from the area, take some photos to demonstrate to the Management that improvement process has been made (use your Before / After Board) and the photos will also be used for the Recognition Board later. >more info and related products
  • 6. Step 12 - Update your Recognition Board and congratulate the team – Congratulating your team for their efforts is a vital part of the sustainment activity of 5S SORT. Your colleagues won’t continue to support 5S if they cannot see progress or are not being recognised for the work they have carried out. >more info and related products Then……5S SORT Sustainment – TED SORT TIPS: - Don’t tag people, they want be happy. - Be clear on the red tag criteria and make sure the team understands what they should be tagging. - Ensure that the local holding area is close enough to the work area, but not too close, as items will make their way back. Assign a holding area manager. You may need to make it a restricted / quarantine area depending on what your company produces. Don’t locate the holding area too far away, as team members may not be inclined to remove unneeded items. - Set a target for the number of red tags per person. - Keep a record of tags raised. If you have removed excess inventory or raw materials someone may be looking for items for production so you need to keep track. Hi! I’m TED. I can help you to keep your facility clean and organised forever with my SORT system!
  • 9.
  • 10. SET IN ORDER Set In Order is all about the old adage “A place for everything and everything in its place”. Set In Order can be defined as arranging needed items so that they are easy to use and labelling them so that they are easy to find and put away. Step 1 - Identify the frequency of items are used - The first step (as a Team) is to review the job (process or product) that is performed in the area and identify the frequency in which the tools and equipment are used. - Store items together if they are used together - Store them in the sequence you use them in - Store items according to their function so if they do similar things store them together - Eliminate multiple items that do the same thing and use a single one that does multiple function - Make storage places larger than items stored there so it’s easy to remove and put them back - Make storage places accessible and comfortable to use Step 2 - Identify designated locations - The most frequently used items should be placed closest to were the job is being performed and within easy reach. - Store items together if they are used together - Store them in the sequence you use them in - Store items according to their function so if they do similar things store them together - Eliminate multiple items that do the same thing and use a single one that does multiple function - Make storage places larger than items stored there so it’s easy to remove and put them back - Make storage places accessible and comfortable to use Step 3 - Think Ergonomics - Make sure to consider the principles of ergonomics when determining where to locate equipment and supplies. - Maintain comfortable posture and position - Minimise lifting and motion. - Use principle of gravity instead of muscle. Having designated locations for everything needed in the work area enables employees to exert visual control over their operations. At a glance, employees are able to see if things are in-place or out-of-place and if more materials, supplies or tools need to be ordered.
  • 11. Step 4 - Visual Controls - Create visual cues to reinforce location of supplies and equipment by using techniques such as: - Labels on shelves - Tapped off sections of floor for positioning of items - Shadow boards outlining placement of key equipment - Colour coding - KANBAN bins to show inventory levels - Directional signage - Floor tape or paint indicating pedestrian paths, off limits or hazardous areas. - Parts dividers Gauge Highlighting:  Red - Failure mode  Yellow – Warning/execute control plan  Green - Normal BUY Tool Shadow at Fabufacture
  • 12. Step 5 - Lighting - Whilst you are improving your visual controls you may also want to think about improving the lighting in the area. Proper workplace lighting is essential to any good business as it: - allows employees to comfortably see what they’re doing, without straining their eyes or bodies - makes work easier and more productive - draws attention to hazardous operations and equipment - helps prevent costly errors and accidents
  • 13. Step 6 - Evaluate the work area space – Review the job being performed and ask the question “ Does the operator need that much space? ” Often the answer to this question is NO. Two objectives can often be achieved here: 1) Freeing up floor space 2) Reducing the amount of work surface used Floor Space – is an expensive asset and freeing up floor space is considered as one of the major financial quick hits that can be gained from 5S. Calculate the cost per sqm or sqft in your facility and present the financial cost saving to your management. It could even result a decision to be made to bring more work into the facility or prevent the facility from relocating in some circumstances. Reduction in work surface (Work benches and tables) – This ideology works in any office or production environment. By considering the minimum (comfortable) level of work surface required, you can minimise the likely hood of people collecting ‘stuff’. If there’s nowhere to collect and hoard, then the benches and tables should stay tidy and SORT should be sustained. In some instances, it’s even possible to eliminate traditional work bench surfaces all together. Sloping surface to prevent storing items Eliminate accidental shelving – When redesigning work areas, be careful not to accidentally create additional flat surfaces that people can store items on. Can the surface be angled / sloped?
  • 14. Step 7 - Set a Visual Standard - Once the Set In Order has been completed, take photos to show the standard in the area. Display this standard in the area so everyone can see it.
  • 15. SHINE Shine means sweeping floors, wiping off machinery, and generally making sure everything in the factory or workplace stays clean. In a manufacturing company, Shine is closely related to the ability to turn out quality products. Shine also includes saving labour by finding ways to prevent dirt, dust and debris from piling up in the workshop. Shine should be integrated into daily maintenance tasks to combine cleaning checkpoints with maintenance checkpoints. There are three aspects of Shine: getting the work area clean, maintaining its appearance, and using preventive measures to keep it clean Step 1 - Clean your work area completely – Clean the area from top to bottom. Treat the initial clean as a kind of spring clean. Ensure that all work benches, tables, equipment and all other items are cleaned thoroughly. Step 2 - Maintaining its appearance - Once the cleaning has been completed, take photos to show the new standard for cleanliness in the area. Display this standard in the area so everyone can see it. Step 3 - Preventive measures – Use a cleaning (Shine) schedule with specific owners to ensure that the area is kept clean. Nominate an independent person to audit the area and give it a score. Painting the work area in light grey floor paint really enhances the work area, making the environment much more pleasant to work in. It also makes it easier to see what items are out of place and it’s easier to keep the floor clean. BUY Floor Tapes at Fabufacture
  • 16. STANDARDISE The three steps to making SORT, SET IN ORDER and SHINE activities (the three pillars or 3S) a habit are: Step 1 – Decide who is responsible for which activities with regard to maintaining 3S conditions. Step 2 – To prevent back sliding, integrate 3S maintenance duties into regular work activities. Step 3 – Check on how well 3S conditions are being maintained.
  • 17. SUSTAIN Within the context of the five pillars, Sustain means making a habit of properly maintaining correct procedures. The implementation of the sustain pillar is different from that of the Sort, Set In Order, Shine and Standardise pillars in the sense that the results are not visible and cannot be easily measured. Commitment to it exists in people’s hearts and minds and their behaviour shows its presence. Steps you can take: Step 1 - Create a 5S poster with in-house examples. Step 2 - Develop a practical 5S auditing tool. Step 3 - Display 5S metrics. Step 4 - Develop a storyboard to display good results “a picture is worth a thousand words”. Step 5- 5S newsletter can be centred around in-house improvements and to communicate new 5S conditions. Step 6 - Setup a 5S communication board with 5S map to involve all employees. Step 7 - Develop in-house 5S manual that to explain examples for each of the 5S steps. Step 8 - If areas have been improving maybe take 10 minutes and arrange for in-house tours to show off to others great examples of 5S.