1.T5S Activity (Overview)
Basically refers to overall 5S activities in a field. This activity is to improve
and maintain not only the existing 5S activity but also 3R and visual control
parts.
This activity shall satisfy the followings in comfortable circumstances:
① To create an exciting company atmosphere,
② To make a business easy based upon above conditions, and
③ To increase productivity and quality.
Also,
The most important points are improvement and maintenance which not
returned to the original condition.
2. 5S Activity (Concept)
This refers to a basic activity for creating an exciting and
comfortable atmosphere for the production activity, and means
a breathing movement of a factory as a basic stage for an
improvement, and a movement carried out by “3 I & 3 C” principle.
Shitsuke
▣ Environmental improvement
in factory, improvement of
production and quality
1. Quality Obtainment
2. Reduction of cost
3. Improvement of
productivity
4. Increase of Innovation Mind
Seiri
Seiton
Seisoh
Seiketsu
2. 5S Activity (Concept)
1. Be sure to maintain Seiri and Seiton
to allow everyone to identify easily
necessary things.
2. Propel 5S through participation in of
all Members.
3. 5S is a foundation for discovering
trouble or loss.
Be sure to unify 5S with improvement
Activity.
One of the most basic tools for living of field quality innovation
Seiri
Seiton
Seisoh
Seiketsu
Shitsuke
To dispose unnecessary things immediately by
classifying necessary and unnecessary things.
To show necessary things in designated
place for allowing that to be identified and
used easily by everyone.
To make a work field clear by removing dust,
contamination, foreign materials, etc.
To maintain and improve 3S activities of Seiri,
Seiton and Seisoh.
To make oneself familiar with an attitude to
obey learned matters and designated matters.
Improvement PointImprovement Point
Yes! This is the
first step for obeying
the basis.
Material
Environment/
Product Quality
Work
Method of Work
Office Division
Office
Conference table,passage,conference
room,scrubbing things,Window,wall,ceiling,
lighting, dressing room,toilet,welding room
Office Supplies
Office machine, desk, drawer, chair, telephone,
cabinet, clock, blackboard, waste basket
Document
File,drawings,regulation,standard,
various standards, various forms
Field Division
Field
Work table,passage,desk,cabinet,
lighting,Window,entrance,wall,pillar,
scrubbing things,dressing room,toilet
Equipment
Jig and Fixture
Conveyor,machinery,mold,equipment,
jig and fixture,tool box,truck,forklift
Material Parts,
Document
Material,part,product,document,drawings,
work standard,file
Etiquette,
Observance of
Regulation, Rule
Bow,costume,designation marking,
telephone response,vending machine
use,Document preparation,
factory guide for visitor
Observance of
Safety & Work
Standards
Safety rule,putting on safety device,work
Standard,work instruction observance,
smoking place observance
Punctuality
Attending and leaving the office,
conference time,break time,
time of opening and closing of office
2. 5S (Object of Activity)
2. 5S (Activity Order)
Seiri
Seiton
Seisoh
Classification of necessary and
unnecessary materials
Removal of unnecessary material
Exclusion of surplus holding
material
Designation of depot for
nonconforming product
Arrangement of processing tools
(Mold included)
Arrangement of cutting tool
Arrangement of measuring
instrument and measuring jig
Arrangement of work in-process
Arrangement of raw material
and part
Arrangement of lubricant
Cleaning
Isolation of dust cause
Cleaning and Inspection of
equipment
Clean
Maintenance
Improvement
Shitsuke Settlement
5S
Object
Scope
2. 5S (Requirements for Success of Activity
Total Participation
Seek control, leadership of
supervisor and total participation
bottom-up for importance of 5S.
Autonomous Performance
Attempt the complete performance
for planned things by means
of role play clarification and
formalization.
Creativity
Create the creativity of workshop
such as QC, IE, VE, etc. based on
5S.
Shitsuke
Seek settlement of 5S by making a
point of observing the regulated
things.
Responsibility
Seek an increase of workshop
control level by acting with overall
responsibility.
2. 5S (Role (Manager / Supervisor)
Behavior
Instructions
Behavior
Instructions
Take the initiative and set an example for others.
If others failed to observe the rule, take corrective action to have them
observe it for them on the spot. - It is important to make them observe
the rule on the spot even though the subsequent work stops.
Expose problems by going around every corner of a work field everyday.
Determination for 5S propelling
Establishment of 5S propelling plan
Obtainment and determination of time of 5S activity
Obtainment and determination of space required to a minimum
for 5S propelling
Preparation of overall rules and check list related to 5S
Preparation and determination of classification standards for acceptable
product, not-required product, unacceptable product by going around
Carrying out 5S related training and guidance to worker
Coordination of department concerned(Role Play)
Key RolesKey Roles
2. 5S Role (Worker)
Be sure to observe the regulated rule.
Understand, in connection with waste of production,
why do that should be observed.
If required, immediately report to a superior official to take
suitable actions.
Carrying out of 5S activity in a district(facility) assigned
Recommendation of practical problems improvement
Field improvement for 5S can not be achieved so easily.
Important thing is a top’s strong will of “must do it” and certain
practice ability in a field of “let’s do it in advance”.
For this, a company must propel it in a body.
Thus, improvement(team) activity is required.
Discovery of problems and improvement review for that
Improvement review and performance
Behavior
Instructions
Behavior
Instructions
Key RolesKey Roles
2. 5S (Necessity of 5S and Its Effect)
eral, a factory of higher level has good conditions of arrangement, cleaning and order.
a means to make comfortable factory.
his is a technique to isolate sources generating a lot of troubles caused by unnecessary,
niform and unreasonable matters in a factory.
Trouble occurs to accuracy control.
30 minutes to find anything are not important for wait time taking several hours of the day, but
3 minutes can be fatal for production of supplied product .
It is impossible to take concurrent operating multi processes if a lot of troubles occurs to
equipment.
Surplus tenement still exists in a place where can not be seen.
Various wastes (stock, quality deterioration, efficiency deterioration, cost rising) can not be seen in
factory where does not carry out 5S activity well.
◈ Necessity of 5S
◈ Improvement in Quality
◈ Reduction of Ready Time
◈ Equipment Protection
◈ Minimization of Inventory
◈ Increase of Waste
2. 5S (Necessity of 5S and Its Effect)
fect of 5S
kes much time to carry out 5S activity. It is required to take preventive actions
preventing comparatively relative large waste or loss. Various effects such as
ovement in quality and productivity, removal of waste, stock control, safety
rol, etc. can be taken by carrying out 5S activity in cases that it takes much time
nd out product or part caused that 1 minute was saved to arrange the product and
part, and product gets rusty caused that anti-corrosion process was not be taken,
so forth. Also, clean and comfortable work circumstances can give effects as
ows:
① To die down unrest caused by even small defects and minor failures,
② To ensure good feeling, low fatigue and increased efficiency by means of clean
and comfortable workshop where you spend most of the time of the day in,
③ To form high reliability between customers and job seekers, and
④ To assure company development and personnel growth.
2. 5S ( What is our changed figures? )
ShitsukeShitsuke
SeiriSeiri SeitonSeiton
SeiketsuSeiketsu SeisohSeisoh
Classify clearly
necessary and
unnecessary things
and throw away
unnecessary
things.
Store the necessary
things properly to
be used and seen easily
by everyone.
Keep 3S activity of
Seiri, Seiton and
Seisoh.
Always keep work
circumstances clean.
Accustom yourself
to observe the specified
things at all times.
Development
In Quality
Reduction
Of Cost
Delivery
Date
Observance
Development
In
Safety
Batch
Production
Development
In
Operating
Rate
3. 3R
This refers to a tool to ensure that Right amounts can be stored in Right container in
Right location at all times.
Right
Location
Right
Container
Right
Amounts
Allocation of
Location
Signboard
Attachment
Size Classification
by Parts
Classification by
Part Features
Box
Standardization
Packaging Form
Classification by
Container
Determination of
Max/Min
• Allocation by classification forms (part, product)
• Allocation by using interval (store,depot)
• Subsequent process information share
(Visual Stock Control)
• Presentation of Classification Move
(First-in First-out)
• Iron Basket,Plastic,Adhesive Pallet
• Large, Medium, Small parts
• Carrier Box
• Logistics moving amounts
• Worker Usability
• Box: Indication of quantity by Bundle and bag,
and total quantities of boxes
• Carrier: Indication of piece quantity
• Large Part: Quantity required for 10~30 min.
• Small Part: Quantity required for 2~4 hr.
• Time required for minimum movement
considered
• Quantity allocation by area unit
4. Visual Control
This is to allow trouble to be identified visually by everyone.
Tool for
Visual
Control
Indication of Location and Goods Depot
(Place to go to take goods)
T/Time Indication
Productivity Control Table Per Time
(Status of Production and Input)
Notice of Standard Work Instruction
(Work Order, Inspection Contents, Standard Quantity
In-Process)
Signboard(Right Position Signboard, Part Table)
Alarm Lamp for Abnormal Conditions
Identification Marking
4. Visual Control
① Are there any tools to identify the troubles as seen by naked eyes
in your field?
② Are those tools structured to be identified easily by everyone(including
personnel who is not concerned in the matter).
③ Can everyone visually identify the production status if approaching to the
production line right now?
④ Is a system structured so that the contents and corrective actions for
quality defectives can be identified by everyone if the quality defectives
are occurred?
⑤ Can personnel in charge of clean-up be identified if it fails to clean
every corner in a factory?
⑥ Is a monthly improvement plan established and operated, and also is the
progressive status controlled with a method of color marking, etc.?
5S - Image by step
Image
Ⅰ Step Ⅱ Step Ⅲ Step Ⅳ Step Ⅴ Step
Sequence
conditions
5 S 3 C Visual management
Seiri Seiton Seisoh Seiketsu Shitsuke
Correct
position
Correct
container
Correct
volume
Remove partition,
In a straight Line
Current production
state board
Error
alarm
Organizing of
needed items is
performed
- Cleaning rules
(objection to be
cleaned, a person in
charge, time, cycle,
check points) are
regulated, and
autonomous check and
evaluation are
performed
- Public facilities (toilet,
lounge, dressing room)
are kept in clean state
- Floor and outer of
factory are kept/
managed in clean state
- Cleaning tools are
provided
- Cleaning is
performed with
cleaning cycle and
object not clear
- Jig & Fixture kit is
open and arranged
in place easier to use
- Needed items and
unneeded items
divided and the latter
is removed
- Ceiling or steam pipe
of wall face is
preserved in clean
state
- Even hidden places
are being cleaned
- Workplace Image is
smart, continuous
environmental
improvement activities
Are performed
- Cover is transparent
enough to see the
inside, and cleaned
- The results of actions,
associated with
improvement activities
are appeared
gradually
- Events are held
regularly to promote
attitude of activities
- The whole employees
are satisfied with work
environment, and have
self-confidence
- There is long term
environment plan, and it
is carried out as
scheduled
Person in charge of
cleaning is designated
and individual autonomy
management is
performed
Periodical management
is performed,
even though hidden place
The entire of factory is
maintained cleanly by
habituation of all
employees
3C – Image by step
Organized so that
Workers can
handle easily
Passage/Depot
are divided
Organized to be able
to see what is in
where
Organized to allow
first-in first-out
Image
Ⅰ Step Ⅱ Step Ⅲ Step Ⅳ Step Ⅴ Step
Order
Conditions
Operated according to
3C operation basis;
- continuous version up is
performed
- There is operation basis
so that 3 C can be
obeyed
- There are Correct
position markings of
workbench or parts
mounts by line process
- Being marked in order to
be able to things (parts)
that is under the control
within district
- Basis of division per
district is set up
- Places for lay
parts(things) on are
set and divided
- Basis that controls the
height of storage
presents
- Be organized to be
able to use parts in the
order of their
warehousing
- L/No is specified and
organized to be able to
handle easily
- Correct part/ defective
part/ remains are
classified and
controlled
- Organized to be able to
store Jig/tools as open
type
- 3C has habituated and
maintained
- Continuous improvement
Activities, connected with
material handling
Improvement proceeded,
and effect of improvement
realized
- Standardization/ using
in common of
container are
proceeded
- Be managed to be able
to see the change of
inventory
- Container becomes
Standardization/
common in use and is
made of usable
structure
5 S 3 C Visual management
Seiri Seiton Seisoh Seiketsu Shitsuke
Correct
position
Correct
container
Correct
volume
Remove partition,
In a straight Line
Current production
state board
Error
alarm
Visual management - Image by step
Visual marking is made
to parts/equipment/
districts
Attachments such as
Current state board is
replaced and
controlled regularly
Organized to be able to
see the abnormal
conditions
Organized to be able to
share production/ quality
situation
Image
Ⅰstep Ⅱstep Ⅲstep Ⅳstep Ⅴstep
- Current state board is
controlled regularly
- Attachments are
replaced regularly,
and shared by
employees
- Able to see work
guide, sequential
inspection, and
production plan by
time zone to actual
result loss
- There is marker that
allows visual
management
- Nameplate
recorded/controlled
regularly.
Power Distribution
panel, S/W/
equipment name
CTQ process, Time
Check
- Alarm lamp is
installed and used
- Be operated so that
upon changing 4M,
anyone can know it
(Process signboard
etc.)
- Rules about 4M
change are
managed, especially
changed process is
managed
preponderantly
- Production/quality
situation shared, and
current Mfg. state
board is operated
- Rreconsideration
meeting
reconsideration
meeting is held
regularly, and
situation of abnormal
symptoms is shared
- RTY system is
established, and data
upgraded regularly
Order
Conditions
R/time of information on
abnormal conditions
is shared and processed
quickly
- R/time on Error is shared
and linked to
Improvement Activities
- Be systematized so that,
upon abnormal conditions
occurring, anyone can
realize it and it shall be
not reoccurred
5 S 3 C Visual management
Seiri Seiton Seisoh Seiketsu Shitsuke
Correct
position
Correct
container
Correct
volume
Remove partition,
In a straight Line
Current production
state board
Error
alarm
1 5 S Seiri
:To dispose unnecessary
things immediately by
classifying necessary and
unnecessary things.
1) Objects :
① JIG and molded mount Tool kit,cleaning tool kit②
③ Indoor and floor
④ Original/subsidiary materials warehouse
⑤ Factory outer office⑥
2) Progress activities according to a management basis by
section → Division/item name/department/reason should be
specified
- Red Card
(division, item name,
department, attachment
reason, attachment date)
Seiton
:To show necessary things in
designated place for
allowing that to be identified
and used easily by
everyone.
1) Organizes needed things
2) Checks storage place
3) Determines storage place: using easier method to follow
4) Marks storage place: position, item name
5) Maintains/checks: marking visibly
(marks in thing itself or classifying using color)
- Designates storage place
for defective products
- Performs 3C
Seisoh
:To make a work field clear
by removing dust,
contamination, foreign
materials, etc.
1) Uses a broom(prepare cleaning tools)
2) Arranges section line: passages, floor lines of correct position
① Passages: straight lines,passing direction marking
② Entrance:dotted lines Position lines:place designation③
④ Designation of line thickness and color
3) Remove and improve the causes of dust or dirt: oil leaks, piping
leaks, particle blowing
4) Thorough cleaning: cleaning of oil soaked into floor, painting,
wall, stepped area
- 5S MAP
- Signboard to divide 5S area
- Cleaning rules :
Designating a person in
charge of cleaning,
method, tool, location,
period (time)
Seiketsu
:To maintain and improve
3S activities of Seiri,
Seiton and Seisoh.
1) Periodic check and evaluation of clearing-up, organizing or
cleaning status
2) Selects and executes continuously a month key theme ex) floor
cleaning
3) Checks the causes of dilapidation : is it too complicated ?
Is it too distant?
Does not it move back against work action?
4) Filming of the pictures or VTR of dilapidated place.
- 5S evaluation
Shitsuke
:To make oneself familiar
with an attitude to
obey learned matters and
designated matters.
1) Leader’s leadership
2) Proceeds activity on a principle that total personnel attend
NO. Purposes Remarks
T5S methods
Items Contents
2 3 C Standardization of how
to place things
Where … Correct
position
What … Correct thing
(Correct container)
How much … Correct
volume
1) Uses signboard so as to be able to know place and amount of
parts correctly
2) Regulates amount of stock: marking of load height, amount
(max,min)
3) Attaches item name and ID card to each part and thing
4) Standardization of used container (size,amount etc)
5) Clears up of JIG tool – Piling table open/drawer-in
arrangement
6) Storage place is marked with line, positioned so as to be able
to search easily like supermarket
- Signboard
- Standardization of
container
- Connected with material
handling improvement
activity
To perceive abnormal
conditions of working field
quickly, to restore in normal
conditions and to minimize
loss
1) Indication light
①Call indication : Demand of parts
②Abnormality indication : Indicates situation of assembly
line, abnormal assembly state etc.
③running indication : Indicates production situation/
machine running
④Progress indication : Indicates work progress
2) Signboard : Attaches and manages signboard periodically in
order to be able to know 4M change etc.
3) Defects indication : Attaches/positions markers in a such way
that positive/negative distribution within process is definite
4) Production management : Indicates productive situation of line
①Plan/result management
5) Attaches and manages the signboard about how to work
equipment
- Error Alarm
- Current state board
- Work guide/new process/
sequential inspection card
etc.
- OS&D Table,TAG
District division indication
- Current state board of
Production management
- Plant check table (lubrication
record table etc.)
3 Visual
management
NO Purposes RemarksItems Contents
T5S methods

More Related Content

What's hot

Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance DEEPAK SAHOO
 
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentIRJET Journal
 
Autonomous maintenance Jishu Hozen
Autonomous maintenance Jishu HozenAutonomous maintenance Jishu Hozen
Autonomous maintenance Jishu HozenChetanMehta39
 
IRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in CompanyIRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in CompanyIRJET Journal
 
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...
TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...博行 門眞
 
All about housekeeping
All about housekeepingAll about housekeeping
All about housekeepingeta star group
 
Lean Manufacturing and Principles
Lean Manufacturing and PrinciplesLean Manufacturing and Principles
Lean Manufacturing and PrinciplesAzmir Latif Beg
 
16 big losses for manufacturing and services
16 big losses for manufacturing and services16 big losses for manufacturing and services
16 big losses for manufacturing and servicesVishy Chandra
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...Karina Islam
 
KAIZEN: A Lean Manufacturing Technique
KAIZEN: A Lean Manufacturing TechniqueKAIZEN: A Lean Manufacturing Technique
KAIZEN: A Lean Manufacturing Techniquevivatechijri
 
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRYMPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRYSharif Mrh
 
Ergonomics in apparel manufacturing
Ergonomics in apparel manufacturingErgonomics in apparel manufacturing
Ergonomics in apparel manufacturingShubham Singh
 

What's hot (20)

Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance Jishu Hozen or Autonomous Maintenance
Jishu Hozen or Autonomous Maintenance
 
Application of Lean Concepts in Molding Department
Application of Lean Concepts in Molding DepartmentApplication of Lean Concepts in Molding Department
Application of Lean Concepts in Molding Department
 
Autonomous maintenance Jishu Hozen
Autonomous maintenance Jishu HozenAutonomous maintenance Jishu Hozen
Autonomous maintenance Jishu Hozen
 
5s
5s5s
5s
 
Jishu hozen1
Jishu hozen1Jishu hozen1
Jishu hozen1
 
IRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in CompanyIRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in Company
 
13 smed methodology_v2
13 smed methodology_v213 smed methodology_v2
13 smed methodology_v2
 
16 major losses tng
16 major losses tng16 major losses tng
16 major losses tng
 
Standard operations preview
Standard operations previewStandard operations preview
Standard operations preview
 
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...
TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...TPM For lean manufacturing  chp3 |   kobetsu kaizen for production efficiency...
TPM For lean manufacturing chp3 | kobetsu kaizen for production efficiency...
 
5 s workplace organization
5 s workplace organization 5 s workplace organization
5 s workplace organization
 
All about housekeeping
All about housekeepingAll about housekeeping
All about housekeeping
 
Lean Manufacturing and Principles
Lean Manufacturing and PrinciplesLean Manufacturing and Principles
Lean Manufacturing and Principles
 
16 big losses for manufacturing and services
16 big losses for manufacturing and services16 big losses for manufacturing and services
16 big losses for manufacturing and services
 
Knowledge management
Knowledge managementKnowledge management
Knowledge management
 
5%20 s%20training%20first
5%20 s%20training%20first5%20 s%20training%20first
5%20 s%20training%20first
 
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY  IMPLEMENTING LEAN TOOLS AN...
IMPROVING OSH & PRODUCTIVITY OF RMG INDUSTRIES BY IMPLEMENTING LEAN TOOLS AN...
 
KAIZEN: A Lean Manufacturing Technique
KAIZEN: A Lean Manufacturing TechniqueKAIZEN: A Lean Manufacturing Technique
KAIZEN: A Lean Manufacturing Technique
 
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRYMPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
MPROVING WORKING ENVIRONMENT AND PRODUCTIVITY OF A SEWING FLOOR IN RMG INDUSTRY
 
Ergonomics in apparel manufacturing
Ergonomics in apparel manufacturingErgonomics in apparel manufacturing
Ergonomics in apparel manufacturing
 

Viewers also liked

Safety-Australia-Group-Brochure-2016
Safety-Australia-Group-Brochure-2016Safety-Australia-Group-Brochure-2016
Safety-Australia-Group-Brochure-2016Kathryn York
 
Certificate (2)
Certificate (2)Certificate (2)
Certificate (2)John Horn
 
Natalie Floering Resume General
Natalie Floering Resume GeneralNatalie Floering Resume General
Natalie Floering Resume GeneralNatalie Floering
 
TYTE JEANS BY KARLA VIDAL
TYTE JEANS BY KARLA VIDALTYTE JEANS BY KARLA VIDAL
TYTE JEANS BY KARLA VIDALKarla Andres
 
Nabil Ebrhimgeel Portfolio
Nabil Ebrhimgeel PortfolioNabil Ebrhimgeel Portfolio
Nabil Ebrhimgeel PortfolioNabil Ebrhimgeel
 
5 KICKSTARTER PROJECTS WORTH BACKING - MansWorld
5 KICKSTARTER PROJECTS WORTH BACKING - MansWorld5 KICKSTARTER PROJECTS WORTH BACKING - MansWorld
5 KICKSTARTER PROJECTS WORTH BACKING - MansWorldJason Fernandes
 
Payment Terminal Fulfillment Process
Payment Terminal Fulfillment ProcessPayment Terminal Fulfillment Process
Payment Terminal Fulfillment ProcessUnitedThinkers
 
Особенности ФГОС основного общего образования
Особенности ФГОС основного общего образованияОсобенности ФГОС основного общего образования
Особенности ФГОС основного общего образованияRainbox
 
Understanding the Role of Hardware Data Encryption in EMV and P2PE
Understanding the Role of Hardware Data Encryption in EMV and P2PEUnderstanding the Role of Hardware Data Encryption in EMV and P2PE
Understanding the Role of Hardware Data Encryption in EMV and P2PEGreg Stone
 
15-YEAR-OLD LAUNCHES WORLD-CLASS WEBSITE TO HELP OTHERS
15-YEAR-OLD LAUNCHES WORLD-CLASS WEBSITE TO HELP OTHERS15-YEAR-OLD LAUNCHES WORLD-CLASS WEBSITE TO HELP OTHERS
15-YEAR-OLD LAUNCHES WORLD-CLASS WEBSITE TO HELP OTHERSJason Fernandes
 
La coordination zonale des "crises" routières en zone sud, par Francis Mené
La coordination zonale des "crises" routières en zone sud, par Francis MenéLa coordination zonale des "crises" routières en zone sud, par Francis Mené
La coordination zonale des "crises" routières en zone sud, par Francis MenéFrancis Mené
 

Viewers also liked (15)

Safety-Australia-Group-Brochure-2016
Safety-Australia-Group-Brochure-2016Safety-Australia-Group-Brochure-2016
Safety-Australia-Group-Brochure-2016
 
Phan mem snapchat
Phan mem snapchatPhan mem snapchat
Phan mem snapchat
 
Certificate (2)
Certificate (2)Certificate (2)
Certificate (2)
 
Natalie Floering Resume General
Natalie Floering Resume GeneralNatalie Floering Resume General
Natalie Floering Resume General
 
TYTE JEANS BY KARLA VIDAL
TYTE JEANS BY KARLA VIDALTYTE JEANS BY KARLA VIDAL
TYTE JEANS BY KARLA VIDAL
 
Nabil Ebrhimgeel Portfolio
Nabil Ebrhimgeel PortfolioNabil Ebrhimgeel Portfolio
Nabil Ebrhimgeel Portfolio
 
5 KICKSTARTER PROJECTS WORTH BACKING - MansWorld
5 KICKSTARTER PROJECTS WORTH BACKING - MansWorld5 KICKSTARTER PROJECTS WORTH BACKING - MansWorld
5 KICKSTARTER PROJECTS WORTH BACKING - MansWorld
 
01
0101
01
 
Payment Terminal Fulfillment Process
Payment Terminal Fulfillment ProcessPayment Terminal Fulfillment Process
Payment Terminal Fulfillment Process
 
Особенности ФГОС основного общего образования
Особенности ФГОС основного общего образованияОсобенности ФГОС основного общего образования
Особенности ФГОС основного общего образования
 
Understanding the Role of Hardware Data Encryption in EMV and P2PE
Understanding the Role of Hardware Data Encryption in EMV and P2PEUnderstanding the Role of Hardware Data Encryption in EMV and P2PE
Understanding the Role of Hardware Data Encryption in EMV and P2PE
 
Busques finançament 2015 - ACC10
Busques finançament 2015 - ACC10Busques finançament 2015 - ACC10
Busques finançament 2015 - ACC10
 
Key Account Management Seminar | DIM
Key Account Management Seminar | DIMKey Account Management Seminar | DIM
Key Account Management Seminar | DIM
 
15-YEAR-OLD LAUNCHES WORLD-CLASS WEBSITE TO HELP OTHERS
15-YEAR-OLD LAUNCHES WORLD-CLASS WEBSITE TO HELP OTHERS15-YEAR-OLD LAUNCHES WORLD-CLASS WEBSITE TO HELP OTHERS
15-YEAR-OLD LAUNCHES WORLD-CLASS WEBSITE TO HELP OTHERS
 
La coordination zonale des "crises" routières en zone sud, par Francis Mené
La coordination zonale des "crises" routières en zone sud, par Francis MenéLa coordination zonale des "crises" routières en zone sud, par Francis Mené
La coordination zonale des "crises" routières en zone sud, par Francis Mené
 

Similar to 5 s modul

20 Tools of Six Sigma.pptx
20 Tools of Six Sigma.pptx20 Tools of Six Sigma.pptx
20 Tools of Six Sigma.pptxminhajulislam90
 
Chapter-Two-Lean.pdf
Chapter-Two-Lean.pdfChapter-Two-Lean.pdf
Chapter-Two-Lean.pdfmengist4
 
5S for Enhancing Productivity, Quality, and Safety at the Workplace
5S for Enhancing Productivity, Quality, and Safety at the Workplace5S for Enhancing Productivity, Quality, and Safety at the Workplace
5S for Enhancing Productivity, Quality, and Safety at the WorkplaceAnsar Lawi
 
1603960041059_20 Six Sigma Good Tools.pptx
1603960041059_20 Six Sigma Good Tools.pptx1603960041059_20 Six Sigma Good Tools.pptx
1603960041059_20 Six Sigma Good Tools.pptxMimmaafrin1
 
5S: Definition and Benefits
5S: Definition and Benefits5S: Definition and Benefits
5S: Definition and BenefitsAbdullah Saif
 
5S Concept- bnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn...
5S Concept- bnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn...5S Concept- bnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn...
5S Concept- bnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn...MithilaWeligalla
 
k10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th semk10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th semGuddu Ali
 
5 s in public dealing service industry
5 s in public dealing service industry5 s in public dealing service industry
5 s in public dealing service industryN P Singh
 
Introduction to 6S
Introduction to 6SIntroduction to 6S
Introduction to 6STim McMahon
 
Effective shop floor oranization
Effective shop floor oranizationEffective shop floor oranization
Effective shop floor oranizationColin Porter
 
Quality management ( 6SIGMA,5S,KAIZEN)
Quality management ( 6SIGMA,5S,KAIZEN)Quality management ( 6SIGMA,5S,KAIZEN)
Quality management ( 6SIGMA,5S,KAIZEN)STAY CURIOUS
 
5S Step by Step Guide.pdf
5S Step by Step Guide.pdf5S Step by Step Guide.pdf
5S Step by Step Guide.pdfOlivierNgono
 

Similar to 5 s modul (20)

20 Tools of Six Sigma.pptx
20 Tools of Six Sigma.pptx20 Tools of Six Sigma.pptx
20 Tools of Six Sigma.pptx
 
Chapter-Two-Lean.pdf
Chapter-Two-Lean.pdfChapter-Two-Lean.pdf
Chapter-Two-Lean.pdf
 
5S for Enhancing Productivity, Quality, and Safety at the Workplace
5S for Enhancing Productivity, Quality, and Safety at the Workplace5S for Enhancing Productivity, Quality, and Safety at the Workplace
5S for Enhancing Productivity, Quality, and Safety at the Workplace
 
1603960041059_20 Six Sigma Good Tools.pptx
1603960041059_20 Six Sigma Good Tools.pptx1603960041059_20 Six Sigma Good Tools.pptx
1603960041059_20 Six Sigma Good Tools.pptx
 
5s training
5s training5s training
5s training
 
TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT TOTAL QUALITY MANAGEMENT
TOTAL QUALITY MANAGEMENT
 
Kaizen
KaizenKaizen
Kaizen
 
5S: Definition and Benefits
5S: Definition and Benefits5S: Definition and Benefits
5S: Definition and Benefits
 
5S Concept- bnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn...
5S Concept- bnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn...5S Concept- bnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn...
5S Concept- bnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn...
 
5 s
5 s5 s
5 s
 
Tpm by drh.
Tpm by drh.Tpm by drh.
Tpm by drh.
 
The 5 s system
The 5 s systemThe 5 s system
The 5 s system
 
5S_DMSC
5S_DMSC5S_DMSC
5S_DMSC
 
k10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th semk10798 aaftab alam opc me 6th sem
k10798 aaftab alam opc me 6th sem
 
5 s in public dealing service industry
5 s in public dealing service industry5 s in public dealing service industry
5 s in public dealing service industry
 
Introduction to 6S
Introduction to 6SIntroduction to 6S
Introduction to 6S
 
Toyota 5 s system
Toyota 5 s systemToyota 5 s system
Toyota 5 s system
 
Effective shop floor oranization
Effective shop floor oranizationEffective shop floor oranization
Effective shop floor oranization
 
Quality management ( 6SIGMA,5S,KAIZEN)
Quality management ( 6SIGMA,5S,KAIZEN)Quality management ( 6SIGMA,5S,KAIZEN)
Quality management ( 6SIGMA,5S,KAIZEN)
 
5S Step by Step Guide.pdf
5S Step by Step Guide.pdf5S Step by Step Guide.pdf
5S Step by Step Guide.pdf
 

5 s modul

  • 1.
  • 2. 1.T5S Activity (Overview) Basically refers to overall 5S activities in a field. This activity is to improve and maintain not only the existing 5S activity but also 3R and visual control parts. This activity shall satisfy the followings in comfortable circumstances: ① To create an exciting company atmosphere, ② To make a business easy based upon above conditions, and ③ To increase productivity and quality. Also, The most important points are improvement and maintenance which not returned to the original condition.
  • 3. 2. 5S Activity (Concept) This refers to a basic activity for creating an exciting and comfortable atmosphere for the production activity, and means a breathing movement of a factory as a basic stage for an improvement, and a movement carried out by “3 I & 3 C” principle. Shitsuke ▣ Environmental improvement in factory, improvement of production and quality 1. Quality Obtainment 2. Reduction of cost 3. Improvement of productivity 4. Increase of Innovation Mind Seiri Seiton Seisoh Seiketsu
  • 4. 2. 5S Activity (Concept) 1. Be sure to maintain Seiri and Seiton to allow everyone to identify easily necessary things. 2. Propel 5S through participation in of all Members. 3. 5S is a foundation for discovering trouble or loss. Be sure to unify 5S with improvement Activity. One of the most basic tools for living of field quality innovation Seiri Seiton Seisoh Seiketsu Shitsuke To dispose unnecessary things immediately by classifying necessary and unnecessary things. To show necessary things in designated place for allowing that to be identified and used easily by everyone. To make a work field clear by removing dust, contamination, foreign materials, etc. To maintain and improve 3S activities of Seiri, Seiton and Seisoh. To make oneself familiar with an attitude to obey learned matters and designated matters. Improvement PointImprovement Point Yes! This is the first step for obeying the basis.
  • 5. Material Environment/ Product Quality Work Method of Work Office Division Office Conference table,passage,conference room,scrubbing things,Window,wall,ceiling, lighting, dressing room,toilet,welding room Office Supplies Office machine, desk, drawer, chair, telephone, cabinet, clock, blackboard, waste basket Document File,drawings,regulation,standard, various standards, various forms Field Division Field Work table,passage,desk,cabinet, lighting,Window,entrance,wall,pillar, scrubbing things,dressing room,toilet Equipment Jig and Fixture Conveyor,machinery,mold,equipment, jig and fixture,tool box,truck,forklift Material Parts, Document Material,part,product,document,drawings, work standard,file Etiquette, Observance of Regulation, Rule Bow,costume,designation marking, telephone response,vending machine use,Document preparation, factory guide for visitor Observance of Safety & Work Standards Safety rule,putting on safety device,work Standard,work instruction observance, smoking place observance Punctuality Attending and leaving the office, conference time,break time, time of opening and closing of office 2. 5S (Object of Activity)
  • 6. 2. 5S (Activity Order) Seiri Seiton Seisoh Classification of necessary and unnecessary materials Removal of unnecessary material Exclusion of surplus holding material Designation of depot for nonconforming product Arrangement of processing tools (Mold included) Arrangement of cutting tool Arrangement of measuring instrument and measuring jig Arrangement of work in-process Arrangement of raw material and part Arrangement of lubricant Cleaning Isolation of dust cause Cleaning and Inspection of equipment Clean Maintenance Improvement Shitsuke Settlement 5S Object Scope
  • 7. 2. 5S (Requirements for Success of Activity Total Participation Seek control, leadership of supervisor and total participation bottom-up for importance of 5S. Autonomous Performance Attempt the complete performance for planned things by means of role play clarification and formalization. Creativity Create the creativity of workshop such as QC, IE, VE, etc. based on 5S. Shitsuke Seek settlement of 5S by making a point of observing the regulated things. Responsibility Seek an increase of workshop control level by acting with overall responsibility.
  • 8. 2. 5S (Role (Manager / Supervisor) Behavior Instructions Behavior Instructions Take the initiative and set an example for others. If others failed to observe the rule, take corrective action to have them observe it for them on the spot. - It is important to make them observe the rule on the spot even though the subsequent work stops. Expose problems by going around every corner of a work field everyday. Determination for 5S propelling Establishment of 5S propelling plan Obtainment and determination of time of 5S activity Obtainment and determination of space required to a minimum for 5S propelling Preparation of overall rules and check list related to 5S Preparation and determination of classification standards for acceptable product, not-required product, unacceptable product by going around Carrying out 5S related training and guidance to worker Coordination of department concerned(Role Play) Key RolesKey Roles
  • 9. 2. 5S Role (Worker) Be sure to observe the regulated rule. Understand, in connection with waste of production, why do that should be observed. If required, immediately report to a superior official to take suitable actions. Carrying out of 5S activity in a district(facility) assigned Recommendation of practical problems improvement Field improvement for 5S can not be achieved so easily. Important thing is a top’s strong will of “must do it” and certain practice ability in a field of “let’s do it in advance”. For this, a company must propel it in a body. Thus, improvement(team) activity is required. Discovery of problems and improvement review for that Improvement review and performance Behavior Instructions Behavior Instructions Key RolesKey Roles
  • 10. 2. 5S (Necessity of 5S and Its Effect) eral, a factory of higher level has good conditions of arrangement, cleaning and order. a means to make comfortable factory. his is a technique to isolate sources generating a lot of troubles caused by unnecessary, niform and unreasonable matters in a factory. Trouble occurs to accuracy control. 30 minutes to find anything are not important for wait time taking several hours of the day, but 3 minutes can be fatal for production of supplied product . It is impossible to take concurrent operating multi processes if a lot of troubles occurs to equipment. Surplus tenement still exists in a place where can not be seen. Various wastes (stock, quality deterioration, efficiency deterioration, cost rising) can not be seen in factory where does not carry out 5S activity well. ◈ Necessity of 5S ◈ Improvement in Quality ◈ Reduction of Ready Time ◈ Equipment Protection ◈ Minimization of Inventory ◈ Increase of Waste
  • 11. 2. 5S (Necessity of 5S and Its Effect) fect of 5S kes much time to carry out 5S activity. It is required to take preventive actions preventing comparatively relative large waste or loss. Various effects such as ovement in quality and productivity, removal of waste, stock control, safety rol, etc. can be taken by carrying out 5S activity in cases that it takes much time nd out product or part caused that 1 minute was saved to arrange the product and part, and product gets rusty caused that anti-corrosion process was not be taken, so forth. Also, clean and comfortable work circumstances can give effects as ows: ① To die down unrest caused by even small defects and minor failures, ② To ensure good feeling, low fatigue and increased efficiency by means of clean and comfortable workshop where you spend most of the time of the day in, ③ To form high reliability between customers and job seekers, and ④ To assure company development and personnel growth.
  • 12. 2. 5S ( What is our changed figures? ) ShitsukeShitsuke SeiriSeiri SeitonSeiton SeiketsuSeiketsu SeisohSeisoh Classify clearly necessary and unnecessary things and throw away unnecessary things. Store the necessary things properly to be used and seen easily by everyone. Keep 3S activity of Seiri, Seiton and Seisoh. Always keep work circumstances clean. Accustom yourself to observe the specified things at all times. Development In Quality Reduction Of Cost Delivery Date Observance Development In Safety Batch Production Development In Operating Rate
  • 13. 3. 3R This refers to a tool to ensure that Right amounts can be stored in Right container in Right location at all times. Right Location Right Container Right Amounts Allocation of Location Signboard Attachment Size Classification by Parts Classification by Part Features Box Standardization Packaging Form Classification by Container Determination of Max/Min • Allocation by classification forms (part, product) • Allocation by using interval (store,depot) • Subsequent process information share (Visual Stock Control) • Presentation of Classification Move (First-in First-out) • Iron Basket,Plastic,Adhesive Pallet • Large, Medium, Small parts • Carrier Box • Logistics moving amounts • Worker Usability • Box: Indication of quantity by Bundle and bag, and total quantities of boxes • Carrier: Indication of piece quantity • Large Part: Quantity required for 10~30 min. • Small Part: Quantity required for 2~4 hr. • Time required for minimum movement considered • Quantity allocation by area unit
  • 14. 4. Visual Control This is to allow trouble to be identified visually by everyone. Tool for Visual Control Indication of Location and Goods Depot (Place to go to take goods) T/Time Indication Productivity Control Table Per Time (Status of Production and Input) Notice of Standard Work Instruction (Work Order, Inspection Contents, Standard Quantity In-Process) Signboard(Right Position Signboard, Part Table) Alarm Lamp for Abnormal Conditions Identification Marking
  • 15. 4. Visual Control ① Are there any tools to identify the troubles as seen by naked eyes in your field? ② Are those tools structured to be identified easily by everyone(including personnel who is not concerned in the matter). ③ Can everyone visually identify the production status if approaching to the production line right now? ④ Is a system structured so that the contents and corrective actions for quality defectives can be identified by everyone if the quality defectives are occurred? ⑤ Can personnel in charge of clean-up be identified if it fails to clean every corner in a factory? ⑥ Is a monthly improvement plan established and operated, and also is the progressive status controlled with a method of color marking, etc.?
  • 16. 5S - Image by step Image Ⅰ Step Ⅱ Step Ⅲ Step Ⅳ Step Ⅴ Step Sequence conditions 5 S 3 C Visual management Seiri Seiton Seisoh Seiketsu Shitsuke Correct position Correct container Correct volume Remove partition, In a straight Line Current production state board Error alarm Organizing of needed items is performed - Cleaning rules (objection to be cleaned, a person in charge, time, cycle, check points) are regulated, and autonomous check and evaluation are performed - Public facilities (toilet, lounge, dressing room) are kept in clean state - Floor and outer of factory are kept/ managed in clean state - Cleaning tools are provided - Cleaning is performed with cleaning cycle and object not clear - Jig & Fixture kit is open and arranged in place easier to use - Needed items and unneeded items divided and the latter is removed - Ceiling or steam pipe of wall face is preserved in clean state - Even hidden places are being cleaned - Workplace Image is smart, continuous environmental improvement activities Are performed - Cover is transparent enough to see the inside, and cleaned - The results of actions, associated with improvement activities are appeared gradually - Events are held regularly to promote attitude of activities - The whole employees are satisfied with work environment, and have self-confidence - There is long term environment plan, and it is carried out as scheduled Person in charge of cleaning is designated and individual autonomy management is performed Periodical management is performed, even though hidden place The entire of factory is maintained cleanly by habituation of all employees
  • 17. 3C – Image by step Organized so that Workers can handle easily Passage/Depot are divided Organized to be able to see what is in where Organized to allow first-in first-out Image Ⅰ Step Ⅱ Step Ⅲ Step Ⅳ Step Ⅴ Step Order Conditions Operated according to 3C operation basis; - continuous version up is performed - There is operation basis so that 3 C can be obeyed - There are Correct position markings of workbench or parts mounts by line process - Being marked in order to be able to things (parts) that is under the control within district - Basis of division per district is set up - Places for lay parts(things) on are set and divided - Basis that controls the height of storage presents - Be organized to be able to use parts in the order of their warehousing - L/No is specified and organized to be able to handle easily - Correct part/ defective part/ remains are classified and controlled - Organized to be able to store Jig/tools as open type - 3C has habituated and maintained - Continuous improvement Activities, connected with material handling Improvement proceeded, and effect of improvement realized - Standardization/ using in common of container are proceeded - Be managed to be able to see the change of inventory - Container becomes Standardization/ common in use and is made of usable structure 5 S 3 C Visual management Seiri Seiton Seisoh Seiketsu Shitsuke Correct position Correct container Correct volume Remove partition, In a straight Line Current production state board Error alarm
  • 18. Visual management - Image by step Visual marking is made to parts/equipment/ districts Attachments such as Current state board is replaced and controlled regularly Organized to be able to see the abnormal conditions Organized to be able to share production/ quality situation Image Ⅰstep Ⅱstep Ⅲstep Ⅳstep Ⅴstep - Current state board is controlled regularly - Attachments are replaced regularly, and shared by employees - Able to see work guide, sequential inspection, and production plan by time zone to actual result loss - There is marker that allows visual management - Nameplate recorded/controlled regularly. Power Distribution panel, S/W/ equipment name CTQ process, Time Check - Alarm lamp is installed and used - Be operated so that upon changing 4M, anyone can know it (Process signboard etc.) - Rules about 4M change are managed, especially changed process is managed preponderantly - Production/quality situation shared, and current Mfg. state board is operated - Rreconsideration meeting reconsideration meeting is held regularly, and situation of abnormal symptoms is shared - RTY system is established, and data upgraded regularly Order Conditions R/time of information on abnormal conditions is shared and processed quickly - R/time on Error is shared and linked to Improvement Activities - Be systematized so that, upon abnormal conditions occurring, anyone can realize it and it shall be not reoccurred 5 S 3 C Visual management Seiri Seiton Seisoh Seiketsu Shitsuke Correct position Correct container Correct volume Remove partition, In a straight Line Current production state board Error alarm
  • 19. 1 5 S Seiri :To dispose unnecessary things immediately by classifying necessary and unnecessary things. 1) Objects : ① JIG and molded mount Tool kit,cleaning tool kit② ③ Indoor and floor ④ Original/subsidiary materials warehouse ⑤ Factory outer office⑥ 2) Progress activities according to a management basis by section → Division/item name/department/reason should be specified - Red Card (division, item name, department, attachment reason, attachment date) Seiton :To show necessary things in designated place for allowing that to be identified and used easily by everyone. 1) Organizes needed things 2) Checks storage place 3) Determines storage place: using easier method to follow 4) Marks storage place: position, item name 5) Maintains/checks: marking visibly (marks in thing itself or classifying using color) - Designates storage place for defective products - Performs 3C Seisoh :To make a work field clear by removing dust, contamination, foreign materials, etc. 1) Uses a broom(prepare cleaning tools) 2) Arranges section line: passages, floor lines of correct position ① Passages: straight lines,passing direction marking ② Entrance:dotted lines Position lines:place designation③ ④ Designation of line thickness and color 3) Remove and improve the causes of dust or dirt: oil leaks, piping leaks, particle blowing 4) Thorough cleaning: cleaning of oil soaked into floor, painting, wall, stepped area - 5S MAP - Signboard to divide 5S area - Cleaning rules : Designating a person in charge of cleaning, method, tool, location, period (time) Seiketsu :To maintain and improve 3S activities of Seiri, Seiton and Seisoh. 1) Periodic check and evaluation of clearing-up, organizing or cleaning status 2) Selects and executes continuously a month key theme ex) floor cleaning 3) Checks the causes of dilapidation : is it too complicated ? Is it too distant? Does not it move back against work action? 4) Filming of the pictures or VTR of dilapidated place. - 5S evaluation Shitsuke :To make oneself familiar with an attitude to obey learned matters and designated matters. 1) Leader’s leadership 2) Proceeds activity on a principle that total personnel attend NO. Purposes Remarks T5S methods Items Contents
  • 20. 2 3 C Standardization of how to place things Where … Correct position What … Correct thing (Correct container) How much … Correct volume 1) Uses signboard so as to be able to know place and amount of parts correctly 2) Regulates amount of stock: marking of load height, amount (max,min) 3) Attaches item name and ID card to each part and thing 4) Standardization of used container (size,amount etc) 5) Clears up of JIG tool – Piling table open/drawer-in arrangement 6) Storage place is marked with line, positioned so as to be able to search easily like supermarket - Signboard - Standardization of container - Connected with material handling improvement activity To perceive abnormal conditions of working field quickly, to restore in normal conditions and to minimize loss 1) Indication light ①Call indication : Demand of parts ②Abnormality indication : Indicates situation of assembly line, abnormal assembly state etc. ③running indication : Indicates production situation/ machine running ④Progress indication : Indicates work progress 2) Signboard : Attaches and manages signboard periodically in order to be able to know 4M change etc. 3) Defects indication : Attaches/positions markers in a such way that positive/negative distribution within process is definite 4) Production management : Indicates productive situation of line ①Plan/result management 5) Attaches and manages the signboard about how to work equipment - Error Alarm - Current state board - Work guide/new process/ sequential inspection card etc. - OS&D Table,TAG District division indication - Current state board of Production management - Plant check table (lubrication record table etc.) 3 Visual management NO Purposes RemarksItems Contents T5S methods