SlideShare a Scribd company logo
FIRE MAIN SYSTEM
TYPE OF INSTALLATION
• SINGLE MAIN LINE SYSTEM
 Economical (cost)
• LOOPED MAIN LINE SYSTEM
 More comprehensive coverage.
 Uninterruptible supply even though one
section may be isolated for maintenance,
breakdown etc.
ADVANTAGE
• ABUNDANTLY AVAILABLE
• GREAT COOLING EFFECT
– SPECIFIC HEAT OF WATER = 4.2 kJ/kg°K
– LATENT HEAT OF EVAPORATION = 2256.7 kJ/kg
• SMOTHERING ACTION OF WATER
AND STEAM
• EASILY HANDLED & TRANSPORT TO
THE SCENE OF FIRE.
DISADVANTAGE
• WATER DAMAGE – CARGO
• ENDANGERING STABILITY – WHEN
LARGE QUANTITY BEING USED
• DANGER TO ELECTRICAL SYSTEM
• DANGER TO SOME CARGOES
• DANGEROUS TO USE WATER AS A
JET ON DEEP SEATED BURNING OIL /
FAT – FIRE SPREAD DUE TO VIOLENT
BOILING WATER.
HOW FIRE IS PUT OFF?
• PRIMARILY AS A COOLING AGENT.
• ABSORBS HEAT MORE EFFICIENTLY.
• MOST EFFICIENT WHEN IT ABSORBS HEAT
TILL IT REACHES 100ºC AND TURN INTO
STEAM.
• REMOVES THE HEAT AWAY FROM THE
SEAT OF FIRE.
• STEAM ALSO SMOTHERS AND THUS
DEPRIVES FIRE OF OXYGEN.
ISOLATING VALVE
• ENABLE TO SEPARATE SECTION WHICH IS
REQD ATTENTION.
• THE 1ST ONE SHALL BE LOCATED OUTSIDE
ENGINE ROOM.
• EASILY ACCESSIBLE
• WHEN IN USE, WATER SUPPLY CAN BE
MAINTAINED BY OTHER FIRE PUMP.
• ADMINISTRATION MAY PERMIT SHORT
LENGTHS OF EMERGENCY FIRE PP
CONNECTION TO ER IF IMPRACTICLE TO
ROUTE EXTERNALLY, PROVIDED
INTEGRITY OF FIRE PP MAINTAINED BY
PIPING ENCLOSURE.
QUANTITY OF FIRE PUMP REQD:
• PASSENGER SHIP > 4000 TON
– AT LEAST 3 PUMPS
• PASSENGER SHIP < 4000 TON & CARGO
SHIP > 1000 TON
– AT LEAST 2 PUMPS
• CARGO SHIP < 1000 TON
– ADMINISTRATION DISCRETION
• SANITARY, BALLAST, BILGE OR GS PUMP
MAY ACCEPTED AS FIRE PP PROVIDED:
– NOT NORMALLY USED FOR PUMPING OIL.
– IF OCCASIONAL DUTY PUMPING OIL,
SUITABLE C/O ARRANGEMENTS ARE FITTED.
FIRE PUMP CAPACITY
• PASSENGER SHIP - > 2/3 OF BILGE PUMPS
CAPACITY WHEN PUMPING BILGES.
• CARGO SHIP - > 4/3 OF BILGE PUMP
CAPACITY PROVIDED TOTAL CAPACITY
OF FIRE PUMPS > 180M³/HR (EXCLUDING
EMERGENCY FIRE PP)
• EACH PUMP CAPACITY > 80% OF TOTAL
REQD CAPACITY ÷ MIN NO. OF REQD FIRE
PP & IN ANY CASES > 25M³/HR.
• CAPABLE OF DELIVERING > 2 JETS OF
WATER.
REQUIREMENTS FOR EMERGENCY
FIRE PUMP
• MUST NOT LOCATED SAME
COMPARTMENT WITH MAIN FIRE PUMPS.
• DRIVEN BY SELF CONTAINED POWER
SOURCE – (ICE, ELECTRICAL OR HYDRAULIC)
• ITS SEA SUCTION, PRIMING UNIT, POWER
SOURCE SWBD, CABLES ETC MUST NOT
SAME LOCATION WITH MAIN FIRE PUMP.
• SUCTION LINE TO BE POSITIONED WHERE
PP RUNNING EFFICIENTLY AT LIGHTEST
DRAFT.
• PRIMING UNIT MUST BE FITTED IF PP
LOCATION > 2 MTR ABOVE LIGHTEST
DRAFT.
• ARRANGEMENT SHOULD PERMIT THE
ISOLATION OF FIRE MAIN FROM
MACHINERY SPACES.
• STARTING ARRANGEMENT MUST BE
OUTSIDE, INDEPENDENT FROM MAIN FIRE
PP SPACE.
• DIESEL DRIVEN – CAPABLE TO START AT
0ºC MANUALLY, IF NOT, HEATING SHALL
BE APPLY TOGETHER WITH
MAINTENANCE. (COMPRESSION RATIO 20:1)
• IF UNABLE, OTHER MEANS BY > 6 TIMES
WITHIN 30 MIN, > 2 TIMES WITHIN 10 MIN.
• SUFFICIENT FUEL SUPPLY FOR > 3 HRS &
RESERVE SUPPLY FOR 15 HRS.
• TOTAL SUCTION HEAD < 4.5 MTR UNDER
ALL CONDITIONS OF LIST & TRIM –
SUCTION LINE TO BE DESIGNED TO
MINIMISE SUCTION LOSSES.
• BOUNDARIES FOR PP SPACE INSULATED
SIMILAR TO CONTROL STATION
PROTECTION (REG 44)
EMERGENCY FIRE PUMP
LOCATION
• STEERING GEAR FLAT
• SHAFT TUNNEL
• FWD OF SHIP (AFT OF COLLISION
BULKHEAD)
EMERGENCY FIRE PUMP
CAPACITY
• NOT LESS THAN 40% OF TOTAL
CAPACITY OF MAIN FIRE PUMPS
REQD.
• IN ANY CASES, NOT LESS THAN
25M³/HR.
• POSSIBLE TO MAINTAIN 2.5 BAR
WHILE SUPPLYING 2 HYDRANT
USING SINGLE HOSE.
INTERNATIONAL SHORE CONNECTION
• STANDARD SIZED FLANGE WITH NUTS,
BOLTS, WASHERS & COUPLINGS.
• MUST BE ABLE TO WITHSTAND 10.5
BAR.
• 4 X Ø16 X 50MM BOLTS & 8 WASHERS
• JOINTS MUST BE MADE OF RUBBER
(PAPER JOINTS CAN EASILY LEAK)
• AT LEAST ONE SET ONBOARD.
• ENABLE TO CONNECT EITHER SIDE OF
SHIP.
• OD=178MM, PCD=132MM, ID=64MM,
T=14.5MM, BOLT HOLE=19MM.
Ø & PRESSURE FOR FIRE MAIN
SYSTEM
• SHALL SUFFICIENT FOR EFFECTIVE
DISTRIBUTION OF MAX DISCHARGE FROM
2 PPS SIMULTANEOUSLY.
• CARGO SHIP – Ø SHALL SUFFICIENT TO
DISCHARGE 140M³/HR.
• MINIMUM PRESSURE AT HYDRANTS WITH
ABOVE SUPPLY:
– PASSENGER SHIP > 4000 TON = 0.31N/mm²
– 1000 TO 4000 TON = 0.27N/mm²
– < 1000 TON = ADMINISTRATION DISCRETION
CONT..
• CARGO SHIP
– > 6000 TON = 0.27N/mm²
– 1000 TO 6000 TON = 0.25N/mm²
– < 1000 TON = ADMIN DISCRETION
NOZZLES
• NORMAL SIZE : 12, 16, 19mm. LARGER
DIAMETER AT ADMIN DISCRETION.
• ACCOM & SERVICE SPACES – 12MM.
• MACH SPACE & EXTERIOR –
MAXIMUM DISCHARGE i.e. 19MM.
• APPROVED DUAL PURPOSE TYPE
(SPRAY & JET) INCOPRPORATING
SHUT OFF

More Related Content

What's hot

Lect 9 ship propellers (new)
Lect 9 ship propellers (new)Lect 9 ship propellers (new)
Lect 9 ship propellers (new)
Saif Alenzi
 
Marine Diesel Engine.
Marine Diesel Engine.Marine Diesel Engine.
Marine Diesel Engine.
ely ramos
 
Ship common systems
Ship common systemsShip common systems
Ship common systems
Yasser B. A. Farag
 
Ballast Water Treatment Systems
Ballast Water Treatment SystemsBallast Water Treatment Systems
Ballast Water Treatment Systems
cmmindia2017
 
Ig system & equipment oil tankers
Ig system &  equipment oil tankersIg system &  equipment oil tankers
Ig system & equipment oil tankersjabbar2002pk200
 
Atot day 1 rev 1.01
Atot day 1 rev 1.01Atot day 1 rev 1.01
Atot day 1 rev 1.01
glenaunzo
 
Seamanship v2
Seamanship v2Seamanship v2
Seamanship v2
Hafez Ahmad
 
Pipe system
Pipe systemPipe system
Pipe system
Filip Gerasimov
 
Propulsion Systems Of Ships
Propulsion Systems Of ShipsPropulsion Systems Of Ships
Propulsion Systems Of Ships
Vipin Devaraj
 
Canals of the World
Canals of the WorldCanals of the World
Canals of the World
Lavennder M
 
Ship Construction- Bulkhead
Ship Construction- BulkheadShip Construction- Bulkhead
Ship Construction- Bulkhead
Mohammud Hanif Dewan M.Phil.
 
Rudders and propellers
Rudders and propellersRudders and propellers
Rudders and propellers
Rishi Vrmn
 
Chemical tankers
Chemical tankersChemical tankers
Chemical tankers
Capt Ashok Menon
 
double bottom structure
double bottom structuredouble bottom structure
double bottom structure
Medha Jog Katdare
 
Folleto de tecnologia naval
Folleto de tecnologia navalFolleto de tecnologia naval
Folleto de tecnologia naval
Cristhian Parraga
 
Shell and deck plating
Shell and deck platingShell and deck plating
Shell and deck plating
Corrodere
 
Deck machinery
Deck machineryDeck machinery
Deck machinery
Yasser B. A. Farag
 
Ship Propulsion system
Ship Propulsion systemShip Propulsion system
Ship Propulsion system
Yasser B. A. Farag
 
Ship Construction - Rudder Theory
Ship Construction - Rudder TheoryShip Construction - Rudder Theory
Ship Construction - Rudder Theory
Mohammud Hanif Dewan M.Phil.
 
ground tackle (anchoring and mooring)
ground tackle (anchoring and mooring)ground tackle (anchoring and mooring)
ground tackle (anchoring and mooring)
Marvin Furton
 

What's hot (20)

Lect 9 ship propellers (new)
Lect 9 ship propellers (new)Lect 9 ship propellers (new)
Lect 9 ship propellers (new)
 
Marine Diesel Engine.
Marine Diesel Engine.Marine Diesel Engine.
Marine Diesel Engine.
 
Ship common systems
Ship common systemsShip common systems
Ship common systems
 
Ballast Water Treatment Systems
Ballast Water Treatment SystemsBallast Water Treatment Systems
Ballast Water Treatment Systems
 
Ig system & equipment oil tankers
Ig system &  equipment oil tankersIg system &  equipment oil tankers
Ig system & equipment oil tankers
 
Atot day 1 rev 1.01
Atot day 1 rev 1.01Atot day 1 rev 1.01
Atot day 1 rev 1.01
 
Seamanship v2
Seamanship v2Seamanship v2
Seamanship v2
 
Pipe system
Pipe systemPipe system
Pipe system
 
Propulsion Systems Of Ships
Propulsion Systems Of ShipsPropulsion Systems Of Ships
Propulsion Systems Of Ships
 
Canals of the World
Canals of the WorldCanals of the World
Canals of the World
 
Ship Construction- Bulkhead
Ship Construction- BulkheadShip Construction- Bulkhead
Ship Construction- Bulkhead
 
Rudders and propellers
Rudders and propellersRudders and propellers
Rudders and propellers
 
Chemical tankers
Chemical tankersChemical tankers
Chemical tankers
 
double bottom structure
double bottom structuredouble bottom structure
double bottom structure
 
Folleto de tecnologia naval
Folleto de tecnologia navalFolleto de tecnologia naval
Folleto de tecnologia naval
 
Shell and deck plating
Shell and deck platingShell and deck plating
Shell and deck plating
 
Deck machinery
Deck machineryDeck machinery
Deck machinery
 
Ship Propulsion system
Ship Propulsion systemShip Propulsion system
Ship Propulsion system
 
Ship Construction - Rudder Theory
Ship Construction - Rudder TheoryShip Construction - Rudder Theory
Ship Construction - Rudder Theory
 
ground tackle (anchoring and mooring)
ground tackle (anchoring and mooring)ground tackle (anchoring and mooring)
ground tackle (anchoring and mooring)
 

Similar to 2.7 fire main system

OISD STD 117.pptx
OISD STD 117.pptxOISD STD 117.pptx
OISD STD 117.pptx
Varun Sharma
 
BASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.ppt
BASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.pptBASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.ppt
BASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.ppt
RajeshKannan579711
 
OISD.ppt
OISD.pptOISD.ppt
OISD.ppt
SanjayQaz1
 
MALFUNCTIONS OF 210MW TPP UNIT
MALFUNCTIONS OF 210MW TPP UNITMALFUNCTIONS OF 210MW TPP UNIT
MALFUNCTIONS OF 210MW TPP UNIT
Abhijeet Mishra
 
Boiler ppt
Boiler pptBoiler ppt
Boiler ppt
Er Ramgarhia
 
Ho851 Revolving Tray Oven
Ho851 Revolving Tray OvenHo851 Revolving Tray Oven
Ho851 Revolving Tray Oven
oswaldosanchez
 
2912471 summer training
2912471 summer training2912471 summer training
2912471 summer training
Debasish Das
 
COMBINE CYCLE POWER PLANT PPT summer training
COMBINE CYCLE POWER PLANT PPT summer trainingCOMBINE CYCLE POWER PLANT PPT summer training
COMBINE CYCLE POWER PLANT PPT summer training
Debasish Das
 
Fire fighting -2 By Er. Ezaz
Fire fighting -2 By Er. EzazFire fighting -2 By Er. Ezaz
Fire fighting -2 By Er. Ezaz
EzazulHaqueSiddique
 
Gas turbine
Gas turbineGas turbine
Gas turbine
saqibsaqi123
 
Modern disruptive techniques....by dwivedi
Modern disruptive techniques....by dwivediModern disruptive techniques....by dwivedi
Modern disruptive techniques....by dwivedi
anand dwivedi
 
Boiler feed pump recirculation valve problem
Boiler feed pump recirculation valve problemBoiler feed pump recirculation valve problem
Boiler feed pump recirculation valve problem
Vudugundla Kodandapani
 
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadriAbdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul Hadi Rahmani
 
Gem steam traps brochure
Gem steam traps brochureGem steam traps brochure
Gem steam traps brochure
Tharick Ahmed
 
IRJET- Safety in Petroleum Industry
IRJET- Safety in Petroleum IndustryIRJET- Safety in Petroleum Industry
IRJET- Safety in Petroleum Industry
IRJET Journal
 
arijit summer training
arijit summer trainingarijit summer training
arijit summer trainingArijit Roy
 
Arijit summer training
Arijit summer trainingArijit summer training
Arijit summer training
Arijit Roy
 
Protect our Environment while Reducing operational expense
Protect our Environment while Reducing operational expense Protect our Environment while Reducing operational expense
Protect our Environment while Reducing operational expense
Rob Harrison
 

Similar to 2.7 fire main system (19)

OISD STD 117.pptx
OISD STD 117.pptxOISD STD 117.pptx
OISD STD 117.pptx
 
BASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.ppt
BASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.pptBASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.ppt
BASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.ppt
 
OISD.ppt
OISD.pptOISD.ppt
OISD.ppt
 
MALFUNCTIONS OF 210MW TPP UNIT
MALFUNCTIONS OF 210MW TPP UNITMALFUNCTIONS OF 210MW TPP UNIT
MALFUNCTIONS OF 210MW TPP UNIT
 
Boiler ppt
Boiler pptBoiler ppt
Boiler ppt
 
Ho851 Revolving Tray Oven
Ho851 Revolving Tray OvenHo851 Revolving Tray Oven
Ho851 Revolving Tray Oven
 
2912471 summer training
2912471 summer training2912471 summer training
2912471 summer training
 
COMBINE CYCLE POWER PLANT PPT summer training
COMBINE CYCLE POWER PLANT PPT summer trainingCOMBINE CYCLE POWER PLANT PPT summer training
COMBINE CYCLE POWER PLANT PPT summer training
 
Fire fighting -2 By Er. Ezaz
Fire fighting -2 By Er. EzazFire fighting -2 By Er. Ezaz
Fire fighting -2 By Er. Ezaz
 
Gas turbine
Gas turbineGas turbine
Gas turbine
 
Modern disruptive techniques....by dwivedi
Modern disruptive techniques....by dwivediModern disruptive techniques....by dwivedi
Modern disruptive techniques....by dwivedi
 
Boiler feed pump recirculation valve problem
Boiler feed pump recirculation valve problemBoiler feed pump recirculation valve problem
Boiler feed pump recirculation valve problem
 
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadriAbdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
Abdul hadi rahmani presentation (2018 19)at ntpc gas power plant dadri
 
Gem steam traps brochure
Gem steam traps brochureGem steam traps brochure
Gem steam traps brochure
 
IRJET- Safety in Petroleum Industry
IRJET- Safety in Petroleum IndustryIRJET- Safety in Petroleum Industry
IRJET- Safety in Petroleum Industry
 
arijit summer training
arijit summer trainingarijit summer training
arijit summer training
 
Arijit summer training
Arijit summer trainingArijit summer training
Arijit summer training
 
Protect our Environment while Reducing operational expense
Protect our Environment while Reducing operational expense Protect our Environment while Reducing operational expense
Protect our Environment while Reducing operational expense
 
LPG.PPT
LPG.PPTLPG.PPT
LPG.PPT
 

More from Hari Shankar Maurya

5 safety rules and regulations
5 safety rules and regulations5 safety rules and regulations
5 safety rules and regulations
Hari Shankar Maurya
 
6 resistance thermometry
6 resistance thermometry6 resistance thermometry
6 resistance thermometry
Hari Shankar Maurya
 
2 dieselengineprocess
2 dieselengineprocess2 dieselengineprocess
2 dieselengineprocess
Hari Shankar Maurya
 
1 power switches
1 power switches1 power switches
1 power switches
Hari Shankar Maurya
 
1.2 principle of fire fighting
1.2  principle of fire fighting1.2  principle of fire fighting
1.2 principle of fire fighting
Hari Shankar Maurya
 
Student misbehave
Student misbehaveStudent misbehave
Student misbehave
Hari Shankar Maurya
 
Hindi book final (1)
Hindi book final (1)Hindi book final (1)
Hindi book final (1)
Hari Shankar Maurya
 
Guidelines rhiss-hindi
Guidelines rhiss-hindiGuidelines rhiss-hindi
Guidelines rhiss-hindi
Hari Shankar Maurya
 
Guidelines for-construction-of-demonstration-houses
Guidelines for-construction-of-demonstration-housesGuidelines for-construction-of-demonstration-houses
Guidelines for-construction-of-demonstration-houses
Hari Shankar Maurya
 
Paclobutrazolpaper
PaclobutrazolpaperPaclobutrazolpaper
Paclobutrazolpaper
Hari Shankar Maurya
 
Paclobutrazolpaper
PaclobutrazolpaperPaclobutrazolpaper
Paclobutrazolpaper
Hari Shankar Maurya
 

More from Hari Shankar Maurya (12)

5 safety rules and regulations
5 safety rules and regulations5 safety rules and regulations
5 safety rules and regulations
 
6 resistance thermometry
6 resistance thermometry6 resistance thermometry
6 resistance thermometry
 
2 dieselengineprocess
2 dieselengineprocess2 dieselengineprocess
2 dieselengineprocess
 
1 4 c2 safety
1 4 c2 safety1 4 c2 safety
1 4 c2 safety
 
1 power switches
1 power switches1 power switches
1 power switches
 
1.2 principle of fire fighting
1.2  principle of fire fighting1.2  principle of fire fighting
1.2 principle of fire fighting
 
Student misbehave
Student misbehaveStudent misbehave
Student misbehave
 
Hindi book final (1)
Hindi book final (1)Hindi book final (1)
Hindi book final (1)
 
Guidelines rhiss-hindi
Guidelines rhiss-hindiGuidelines rhiss-hindi
Guidelines rhiss-hindi
 
Guidelines for-construction-of-demonstration-houses
Guidelines for-construction-of-demonstration-housesGuidelines for-construction-of-demonstration-houses
Guidelines for-construction-of-demonstration-houses
 
Paclobutrazolpaper
PaclobutrazolpaperPaclobutrazolpaper
Paclobutrazolpaper
 
Paclobutrazolpaper
PaclobutrazolpaperPaclobutrazolpaper
Paclobutrazolpaper
 

Recently uploaded

Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
abh.arya
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
Kamal Acharya
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
PrashantGoswami42
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
Kamal Acharya
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
MuhammadTufail242431
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
Massimo Talia
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
DuvanRamosGarzon1
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
seandesed
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
ankuprajapati0525
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
Kamal Acharya
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
AhmedHussein950959
 

Recently uploaded (20)

Democratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek AryaDemocratizing Fuzzing at Scale by Abhishek Arya
Democratizing Fuzzing at Scale by Abhishek Arya
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang,  ICLR 2024, MLILAB, KAIST AI.pdfJ.Yang,  ICLR 2024, MLILAB, KAIST AI.pdf
J.Yang, ICLR 2024, MLILAB, KAIST AI.pdf
 
Event Management System Vb Net Project Report.pdf
Event Management System Vb Net  Project Report.pdfEvent Management System Vb Net  Project Report.pdf
Event Management System Vb Net Project Report.pdf
 
Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.Quality defects in TMT Bars, Possible causes and Potential Solutions.
Quality defects in TMT Bars, Possible causes and Potential Solutions.
 
Automobile Management System Project Report.pdf
Automobile Management System Project Report.pdfAutomobile Management System Project Report.pdf
Automobile Management System Project Report.pdf
 
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Halogenation process of chemical process industries
Halogenation process of chemical process industriesHalogenation process of chemical process industries
Halogenation process of chemical process industries
 
Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024Nuclear Power Economics and Structuring 2024
Nuclear Power Economics and Structuring 2024
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSETECHNICAL TRAINING MANUAL   GENERAL FAMILIARIZATION COURSE
TECHNICAL TRAINING MANUAL GENERAL FAMILIARIZATION COURSE
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
Architectural Portfolio Sean Lockwood
Architectural Portfolio Sean LockwoodArchitectural Portfolio Sean Lockwood
Architectural Portfolio Sean Lockwood
 
The role of big data in decision making.
The role of big data in decision making.The role of big data in decision making.
The role of big data in decision making.
 
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdfCOLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
COLLEGE BUS MANAGEMENT SYSTEM PROJECT REPORT.pdf
 
ASME IX(9) 2007 Full Version .pdf
ASME IX(9)  2007 Full Version       .pdfASME IX(9)  2007 Full Version       .pdf
ASME IX(9) 2007 Full Version .pdf
 

2.7 fire main system

  • 2. TYPE OF INSTALLATION • SINGLE MAIN LINE SYSTEM  Economical (cost) • LOOPED MAIN LINE SYSTEM  More comprehensive coverage.  Uninterruptible supply even though one section may be isolated for maintenance, breakdown etc.
  • 3. ADVANTAGE • ABUNDANTLY AVAILABLE • GREAT COOLING EFFECT – SPECIFIC HEAT OF WATER = 4.2 kJ/kg°K – LATENT HEAT OF EVAPORATION = 2256.7 kJ/kg • SMOTHERING ACTION OF WATER AND STEAM • EASILY HANDLED & TRANSPORT TO THE SCENE OF FIRE.
  • 4. DISADVANTAGE • WATER DAMAGE – CARGO • ENDANGERING STABILITY – WHEN LARGE QUANTITY BEING USED • DANGER TO ELECTRICAL SYSTEM • DANGER TO SOME CARGOES • DANGEROUS TO USE WATER AS A JET ON DEEP SEATED BURNING OIL / FAT – FIRE SPREAD DUE TO VIOLENT BOILING WATER.
  • 5. HOW FIRE IS PUT OFF? • PRIMARILY AS A COOLING AGENT. • ABSORBS HEAT MORE EFFICIENTLY. • MOST EFFICIENT WHEN IT ABSORBS HEAT TILL IT REACHES 100ºC AND TURN INTO STEAM. • REMOVES THE HEAT AWAY FROM THE SEAT OF FIRE. • STEAM ALSO SMOTHERS AND THUS DEPRIVES FIRE OF OXYGEN.
  • 6. ISOLATING VALVE • ENABLE TO SEPARATE SECTION WHICH IS REQD ATTENTION. • THE 1ST ONE SHALL BE LOCATED OUTSIDE ENGINE ROOM. • EASILY ACCESSIBLE • WHEN IN USE, WATER SUPPLY CAN BE MAINTAINED BY OTHER FIRE PUMP. • ADMINISTRATION MAY PERMIT SHORT LENGTHS OF EMERGENCY FIRE PP CONNECTION TO ER IF IMPRACTICLE TO ROUTE EXTERNALLY, PROVIDED INTEGRITY OF FIRE PP MAINTAINED BY PIPING ENCLOSURE.
  • 7. QUANTITY OF FIRE PUMP REQD: • PASSENGER SHIP > 4000 TON – AT LEAST 3 PUMPS • PASSENGER SHIP < 4000 TON & CARGO SHIP > 1000 TON – AT LEAST 2 PUMPS • CARGO SHIP < 1000 TON – ADMINISTRATION DISCRETION • SANITARY, BALLAST, BILGE OR GS PUMP MAY ACCEPTED AS FIRE PP PROVIDED: – NOT NORMALLY USED FOR PUMPING OIL. – IF OCCASIONAL DUTY PUMPING OIL, SUITABLE C/O ARRANGEMENTS ARE FITTED.
  • 8. FIRE PUMP CAPACITY • PASSENGER SHIP - > 2/3 OF BILGE PUMPS CAPACITY WHEN PUMPING BILGES. • CARGO SHIP - > 4/3 OF BILGE PUMP CAPACITY PROVIDED TOTAL CAPACITY OF FIRE PUMPS > 180M³/HR (EXCLUDING EMERGENCY FIRE PP) • EACH PUMP CAPACITY > 80% OF TOTAL REQD CAPACITY ÷ MIN NO. OF REQD FIRE PP & IN ANY CASES > 25M³/HR. • CAPABLE OF DELIVERING > 2 JETS OF WATER.
  • 9. REQUIREMENTS FOR EMERGENCY FIRE PUMP • MUST NOT LOCATED SAME COMPARTMENT WITH MAIN FIRE PUMPS. • DRIVEN BY SELF CONTAINED POWER SOURCE – (ICE, ELECTRICAL OR HYDRAULIC) • ITS SEA SUCTION, PRIMING UNIT, POWER SOURCE SWBD, CABLES ETC MUST NOT SAME LOCATION WITH MAIN FIRE PUMP. • SUCTION LINE TO BE POSITIONED WHERE PP RUNNING EFFICIENTLY AT LIGHTEST DRAFT.
  • 10. • PRIMING UNIT MUST BE FITTED IF PP LOCATION > 2 MTR ABOVE LIGHTEST DRAFT. • ARRANGEMENT SHOULD PERMIT THE ISOLATION OF FIRE MAIN FROM MACHINERY SPACES. • STARTING ARRANGEMENT MUST BE OUTSIDE, INDEPENDENT FROM MAIN FIRE PP SPACE. • DIESEL DRIVEN – CAPABLE TO START AT 0ºC MANUALLY, IF NOT, HEATING SHALL BE APPLY TOGETHER WITH MAINTENANCE. (COMPRESSION RATIO 20:1)
  • 11. • IF UNABLE, OTHER MEANS BY > 6 TIMES WITHIN 30 MIN, > 2 TIMES WITHIN 10 MIN. • SUFFICIENT FUEL SUPPLY FOR > 3 HRS & RESERVE SUPPLY FOR 15 HRS. • TOTAL SUCTION HEAD < 4.5 MTR UNDER ALL CONDITIONS OF LIST & TRIM – SUCTION LINE TO BE DESIGNED TO MINIMISE SUCTION LOSSES. • BOUNDARIES FOR PP SPACE INSULATED SIMILAR TO CONTROL STATION PROTECTION (REG 44)
  • 12. EMERGENCY FIRE PUMP LOCATION • STEERING GEAR FLAT • SHAFT TUNNEL • FWD OF SHIP (AFT OF COLLISION BULKHEAD)
  • 13.
  • 14. EMERGENCY FIRE PUMP CAPACITY • NOT LESS THAN 40% OF TOTAL CAPACITY OF MAIN FIRE PUMPS REQD. • IN ANY CASES, NOT LESS THAN 25M³/HR. • POSSIBLE TO MAINTAIN 2.5 BAR WHILE SUPPLYING 2 HYDRANT USING SINGLE HOSE.
  • 15. INTERNATIONAL SHORE CONNECTION • STANDARD SIZED FLANGE WITH NUTS, BOLTS, WASHERS & COUPLINGS. • MUST BE ABLE TO WITHSTAND 10.5 BAR. • 4 X Ø16 X 50MM BOLTS & 8 WASHERS • JOINTS MUST BE MADE OF RUBBER (PAPER JOINTS CAN EASILY LEAK) • AT LEAST ONE SET ONBOARD. • ENABLE TO CONNECT EITHER SIDE OF SHIP. • OD=178MM, PCD=132MM, ID=64MM, T=14.5MM, BOLT HOLE=19MM.
  • 16. Ø & PRESSURE FOR FIRE MAIN SYSTEM • SHALL SUFFICIENT FOR EFFECTIVE DISTRIBUTION OF MAX DISCHARGE FROM 2 PPS SIMULTANEOUSLY. • CARGO SHIP – Ø SHALL SUFFICIENT TO DISCHARGE 140M³/HR. • MINIMUM PRESSURE AT HYDRANTS WITH ABOVE SUPPLY: – PASSENGER SHIP > 4000 TON = 0.31N/mm² – 1000 TO 4000 TON = 0.27N/mm² – < 1000 TON = ADMINISTRATION DISCRETION
  • 17. CONT.. • CARGO SHIP – > 6000 TON = 0.27N/mm² – 1000 TO 6000 TON = 0.25N/mm² – < 1000 TON = ADMIN DISCRETION
  • 18. NOZZLES • NORMAL SIZE : 12, 16, 19mm. LARGER DIAMETER AT ADMIN DISCRETION. • ACCOM & SERVICE SPACES – 12MM. • MACH SPACE & EXTERIOR – MAXIMUM DISCHARGE i.e. 19MM. • APPROVED DUAL PURPOSE TYPE (SPRAY & JET) INCOPRPORATING SHUT OFF