BOILER TRANNING
ASIAN PAINTS KHANDALA PLANT
1MIS | Site Name | 2017-MM-DD
WHAT IS BOILER AND ITS USES .
It is a steam generation device .
Fire tube and water tube .
Types of Boiler –
1. Solid:- Coal, Rice Husk, Begas, wood .
2. Liquid :- Diesel , Furnace Oil .
3. Gases :- Bio gas , Cng .
Three Pass Boiler ( Air change direction)
Three Ton Capacity (3000 Ltr Steam ) .
2MIS | Site Name | 2017-MM-DD
SOLID BASE BOILER
3MIS | Site Name | 2017-MM-DD
1. Solid:- Coal, Rice Husk, Begas, wood .
2. 140 Ton steam Generating steam boiler .
LOW PRESSURE BOILER
MAIN PARTS
4MIS | Site Name | 2017-MM-DD
1. FEED WATER PUMPS .
2. DIESEL PUMPS .
3. FORCED DRAFT FAN .
4. AIR PRE HEATER .
5. BURNER .
6. FIRE TUBES .
7. SAFETY VALVES .
8. ELCTRICAL PANEL.
BOILER SLD
5MIS | Site Name | 2017-MM-DD
6MIS | Site Name | 2017-MM-DD
FEED PUMPS USED FOR MAINTANNING WATER IN TANK.
MAINTAIN WATER FOR STEAM GENRATION IN BOILER .
THREE TON WATER PER HOURS .
3000 LTR WATER = 3000 LTR STAEM .
MAX PRESSURE =10.5 KG .
FEED PUMPS
DIESEL PUMPS AND ITS VALVES
7MIS | Site Name | 2017-MM-DD
IT IS USED FOR DIESEL SUPPLY TO BURNER
1 2 3
FORCED DRAFT FAN
8MIS | Site Name | 2017-MM-DD
FIRE = AIR + FUEL + IGINATION .
THREE PASS BOILER ( BURNER , TUBES, APH ) .``
``
AIR PRE HEATER
9MIS | Site Name | 2017-MM-DD
BURNER
10MIS | Site Name | 2017-MM-DD
BURNER FIRE = AIR + FUEL + IGINATION
1 2
UV QRA2
11MIS | Site Name | 2017-MM-DD
ULTRA VIOLET CELL USE FOR FLAME SENSE .
SAFETY DEVICE IN COMBUSTION CHAMBER .
UV QRA2 IS USED FOR LFL-1.335 .
IT CAN CAPABLE TO DETECT FIRE AND
EXPLOSIONS WITHIN 3-4 MILLISECONDS ,
A TIME DELAY OF 2-3 SECONDS .
FAULTS:- SENSING ,COMBUSTION FLAME ,FIRING
`
IGINATION TRANSFORMER
12MIS | Site Name | 2017-MM-DD
IT IS USED FOR BURNER SPARKING .
INPUT = 220VAC , OUTPUT = 2X7KV FOR 4 SEC .
IT INCREASE THE VOLTAGE FOR IGINATION .
STEP UP TRANSFORMER .
FAULTS:- SPARKING , FIRING
MODULATION UNIT
13MIS | Site Name | 2017-MM-DD
SERVO MOTOR , MEHANICAL MECHANISM , POSITIONER,
PCM2-6 PRESSURE CONTROLLER MODULATION .
1 MOTOR UNIT 2 FOR DIESEL 3 FOR GAS
3
MAIN GAS VALVES
14MIS | Site Name | 2017-MM-DD
1. MAIN GAS LINE VALVE 2. GAS LINE VALVE 3.PILOT VALVE
3
Modulation unit controller – Pressure Troll
15MIS | Site Name | 2017-MM-DD
Capacity 3 Ton/ Hour .
Max Pressure = 10.5 kg .
Max Cut off = 8.5kg .
Steam Pressure switch for Boiler Cutoff
16MIS | Site Name | 2017-MM-DD
Capacity 3 Ton/ Hour .
Max Pressure = 10.5 kg .
Minimum Cut off = 7 kg .
Air Pressure Switch
17MIS | Site Name | 2017-MM-DD
IT IS FOR COMBUSTION BLOWER MAIN AIR LINE .
FIRE = AIR + FUEL + IGINATION .
SUPPLY 220VAC , ONE NO AND ONE NC .
AIR PRESSURE FOR NO TO NC 5 BAR .
INTERLOCKING WITH COMBUSTION BLOWER
BOILER INTERLOCKING
18MIS | Site Name | 2017-MM-DD
1. LEVEL - IF DIESEL TANK LEVEL LOW BOILER WILL TRIP OR WILL NOT START .
2. LEVEL - IF WATER LEVEL IN STORAGE TANK IS LOW , BOILER WILL TRIP OR NOT START .
3. MOBERY - IF LEVEL INSIDE DRUM FALL BELOW 25% BOILER WILL TRIP .
4. STACK TEMP – FLUE GASES RAISE ABOVE 270deg BURNER WILL TRIP .
5. COMBUSTION AIR SWITCH FOR COMBUSTION BLOWER .
6. PRESSURE SWITCH - IF PRESSURE INSIDE THR DRUM IS HIGH , BOILER WILL CUT OFF .
7. PHOTO CELL – IF FLAME IS NOT GENRATED IN BURNER , BOILER WILL TRIP .
8. MODULATION UNIT – IF MODULATION UNIT FEED BACK IS NOT RECEIVED , BOILER TRIP .
9. PRESSURE – IF GAS IS LESS THEN 30mbar , BOILER WILL TRIP .
Water level gauge and Mowbray Switch
19MIS | Site Name | 2017-MM-DD
1 low water level 2 Extra water low level 3 Gauge Glasses
Sequence Controller LFL-1.335
20MIS | Site Name | 2017-MM-DD
1. 24 TERMINALS , 220VAC SUPPLY.
2. PRE PURGE TIME -31 Sec .
3. PILOT TRIAL FOR IGINATION – 4 Sec .
4. MAIN TRIAL FOR IGINATION - 4 Sec .
5. MODULATION UNIT – 10.5 Sec .
6. POST PURGE TIME – 12 Sec .
7. FLAME FAILUR RESPONSE TIME – 1 Sec .
OLS , LGP , HGP,LWS , HIGH LIMIT , POC , CAB , CAS , LOW AND HIGH FIRE.
`
FLUE GAS TEMPURATOR SENSOR
21MIS | Site Name | 2017-MM-DD
STACK TEMP – FLUE GASES RAISE ABOVE
270deg BURNER WILL TRIP .
1. IT USED TO SENSE HEAT TRANSFER SYSTEM .
END OF SEASSION
22MIS | Site Name | 2017-MM-DD
THANKS
YOU
VERY MUCH

More Related Content

What's hot

Gas turbine
Gas turbineGas turbine
Gas turbine
Muhammad Tahir
 
Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)
Jigyasa Singh
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its Auxillaries
Vaibhav Paydelwar
 
Gas power cycles
Gas power cyclesGas power cycles
Gas power cycles
FilzaShahid2
 
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
Jaypee power ventures limited
 
Chiller ppt
Chiller pptChiller ppt
Chiller ppt
Er Ramgarhia
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbines
Boben Anto Chemmannoor
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]Amardeep Jadeja
 
METHODS OF IMPROVING STEAM TURBINE PERFORMANCE
METHODS OF IMPROVING STEAM TURBINE PERFORMANCEMETHODS OF IMPROVING STEAM TURBINE PERFORMANCE
METHODS OF IMPROVING STEAM TURBINE PERFORMANCE
Vanita Thakkar
 
Brayton cycle
Brayton cycleBrayton cycle
Hydrogen Purge and Fill
Hydrogen Purge and FillHydrogen Purge and Fill
Hydrogen Purge and FillShad Edwards
 
Boiler
BoilerBoiler
Boileravik
 
Heat rate audit in thermal power plant
Heat rate audit in thermal power plantHeat rate audit in thermal power plant
Heat rate audit in thermal power plantSHIVAJI CHOUDHURY
 
Gas turbine
Gas turbine Gas turbine
Gas turbine
Prem Baboo
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsSHIVAJI CHOUDHURY
 
Fans in thermal power plants
Fans in thermal power plantsFans in thermal power plants
Fans in thermal power plantsSHIVAJI CHOUDHURY
 
Ci
CiCi
210 MW simulator, loading to full 210 MW
210 MW simulator, loading to full 210 MW210 MW simulator, loading to full 210 MW
210 MW simulator, loading to full 210 MW
Manohar Tatwawadi
 
ThermoDynamics (Working of steam power plant and rankine cyle)
ThermoDynamics (Working of steam power plant and rankine cyle)ThermoDynamics (Working of steam power plant and rankine cyle)
ThermoDynamics (Working of steam power plant and rankine cyle)
Graphic Era University.
 

What's hot (20)

Gas turbine
Gas turbineGas turbine
Gas turbine
 
Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)Furnace Guard Supervisory System (FSSS)
Furnace Guard Supervisory System (FSSS)
 
chillers
chillerschillers
chillers
 
Thermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its AuxillariesThermal Power plant familarisation & its Auxillaries
Thermal Power plant familarisation & its Auxillaries
 
Gas power cycles
Gas power cyclesGas power cycles
Gas power cycles
 
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
FURNACE SAFEGUARD SUPERVISORY SYSTEM (FSSS)
 
Chiller ppt
Chiller pptChiller ppt
Chiller ppt
 
Hp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbinesHp/ lp bypass system for steam turbines
Hp/ lp bypass system for steam turbines
 
Amardeep jadeja copy.ppt [autosaved]
Amardeep jadeja   copy.ppt [autosaved]Amardeep jadeja   copy.ppt [autosaved]
Amardeep jadeja copy.ppt [autosaved]
 
METHODS OF IMPROVING STEAM TURBINE PERFORMANCE
METHODS OF IMPROVING STEAM TURBINE PERFORMANCEMETHODS OF IMPROVING STEAM TURBINE PERFORMANCE
METHODS OF IMPROVING STEAM TURBINE PERFORMANCE
 
Brayton cycle
Brayton cycleBrayton cycle
Brayton cycle
 
Hydrogen Purge and Fill
Hydrogen Purge and FillHydrogen Purge and Fill
Hydrogen Purge and Fill
 
Boiler
BoilerBoiler
Boiler
 
Heat rate audit in thermal power plant
Heat rate audit in thermal power plantHeat rate audit in thermal power plant
Heat rate audit in thermal power plant
 
Gas turbine
Gas turbine Gas turbine
Gas turbine
 
Feedwater heaters in thermal power plants
Feedwater heaters in thermal power plantsFeedwater heaters in thermal power plants
Feedwater heaters in thermal power plants
 
Fans in thermal power plants
Fans in thermal power plantsFans in thermal power plants
Fans in thermal power plants
 
Ci
CiCi
Ci
 
210 MW simulator, loading to full 210 MW
210 MW simulator, loading to full 210 MW210 MW simulator, loading to full 210 MW
210 MW simulator, loading to full 210 MW
 
ThermoDynamics (Working of steam power plant and rankine cyle)
ThermoDynamics (Working of steam power plant and rankine cyle)ThermoDynamics (Working of steam power plant and rankine cyle)
ThermoDynamics (Working of steam power plant and rankine cyle)
 

Similar to Boiler ppt

Low charge ammonia vapour compression refrigeration system for residential ai...
Low charge ammonia vapour compression refrigeration system for residential ai...Low charge ammonia vapour compression refrigeration system for residential ai...
Low charge ammonia vapour compression refrigeration system for residential ai...
RAJESHKUMAR4616
 
MALFUNCTIONS OF 210MW TPP UNIT
MALFUNCTIONS OF 210MW TPP UNITMALFUNCTIONS OF 210MW TPP UNIT
MALFUNCTIONS OF 210MW TPP UNIT
Abhijeet Mishra
 
Ieee waste to electrical energy
Ieee waste to electrical energyIeee waste to electrical energy
Ieee waste to electrical energy
Ganesh Yamavarapu
 
Condensate Collection By Dk Singhal
Condensate Collection By Dk SinghalCondensate Collection By Dk Singhal
Condensate Collection By Dk Singhal
deveshksinghal
 
Condensate Collection By D K Singhal
Condensate Collection By D K SinghalCondensate Collection By D K Singhal
Condensate Collection By D K Singhal
deveshksinghal
 
Increasing refractory lining life and energy saving in furnace operations.
Increasing refractory lining life and energy saving in furnace operations.Increasing refractory lining life and energy saving in furnace operations.
Increasing refractory lining life and energy saving in furnace operations.
Srikar Shenoy
 
Talk on energy efficiency by ajai arora
Talk on energy efficiency  by ajai aroraTalk on energy efficiency  by ajai arora
Talk on energy efficiency by ajai arora
Ratan Kuber
 
Indusrial training -MUKUL KUMAR
Indusrial training -MUKUL KUMARIndusrial training -MUKUL KUMAR
Indusrial training -MUKUL KUMARMUKUL KUMAR
 
Combustion and dry low nox 2.6 dln system
Combustion and dry low nox 2.6 dln systemCombustion and dry low nox 2.6 dln system
Combustion and dry low nox 2.6 dln system
Faisal Nadeem
 
BASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.ppt
BASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.pptBASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.ppt
BASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.ppt
RajeshKannan579711
 
NOx SOx CO2 and Urea Dust Control inFertilizers Plants.pdf
NOx SOx CO2 and Urea Dust Control inFertilizers  Plants.pdfNOx SOx CO2 and Urea Dust Control inFertilizers  Plants.pdf
NOx SOx CO2 and Urea Dust Control inFertilizers Plants.pdf
PremBaboo4
 
Dev
DevDev
Unit i
Unit iUnit i
Unit i
javamava
 
Biodigester
BiodigesterBiodigester
Biodigester
Dr. Deljo Davis
 
Condensing Economisers
Condensing EconomisersCondensing Economisers
Condensing Economisers
Aditya Shiva Appalla
 
Co-Generation
Co-GenerationCo-Generation
Sepl mixing plant presentation
Sepl mixing plant presentationSepl mixing plant presentation
Sepl mixing plant presentation
ramprasad89
 
Gas turbine
Gas turbineGas turbine
Gas turbine
saqibsaqi123
 
Energy saving and process optimization in Hot Strip Mill Descaling system
Energy saving and process optimization in Hot Strip Mill Descaling systemEnergy saving and process optimization in Hot Strip Mill Descaling system
Energy saving and process optimization in Hot Strip Mill Descaling system
Bilal Akgül
 

Similar to Boiler ppt (20)

Low charge ammonia vapour compression refrigeration system for residential ai...
Low charge ammonia vapour compression refrigeration system for residential ai...Low charge ammonia vapour compression refrigeration system for residential ai...
Low charge ammonia vapour compression refrigeration system for residential ai...
 
MALFUNCTIONS OF 210MW TPP UNIT
MALFUNCTIONS OF 210MW TPP UNITMALFUNCTIONS OF 210MW TPP UNIT
MALFUNCTIONS OF 210MW TPP UNIT
 
Ieee waste to electrical energy
Ieee waste to electrical energyIeee waste to electrical energy
Ieee waste to electrical energy
 
temp
temptemp
temp
 
Condensate Collection By Dk Singhal
Condensate Collection By Dk SinghalCondensate Collection By Dk Singhal
Condensate Collection By Dk Singhal
 
Condensate Collection By D K Singhal
Condensate Collection By D K SinghalCondensate Collection By D K Singhal
Condensate Collection By D K Singhal
 
Increasing refractory lining life and energy saving in furnace operations.
Increasing refractory lining life and energy saving in furnace operations.Increasing refractory lining life and energy saving in furnace operations.
Increasing refractory lining life and energy saving in furnace operations.
 
Talk on energy efficiency by ajai arora
Talk on energy efficiency  by ajai aroraTalk on energy efficiency  by ajai arora
Talk on energy efficiency by ajai arora
 
Indusrial training -MUKUL KUMAR
Indusrial training -MUKUL KUMARIndusrial training -MUKUL KUMAR
Indusrial training -MUKUL KUMAR
 
Combustion and dry low nox 2.6 dln system
Combustion and dry low nox 2.6 dln systemCombustion and dry low nox 2.6 dln system
Combustion and dry low nox 2.6 dln system
 
BASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.ppt
BASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.pptBASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.ppt
BASICS OF FIRE PROTECTION SYSTEM, HYDRANT SYSTEM.ppt
 
NOx SOx CO2 and Urea Dust Control inFertilizers Plants.pdf
NOx SOx CO2 and Urea Dust Control inFertilizers  Plants.pdfNOx SOx CO2 and Urea Dust Control inFertilizers  Plants.pdf
NOx SOx CO2 and Urea Dust Control inFertilizers Plants.pdf
 
Dev
DevDev
Dev
 
Unit i
Unit iUnit i
Unit i
 
Biodigester
BiodigesterBiodigester
Biodigester
 
Condensing Economisers
Condensing EconomisersCondensing Economisers
Condensing Economisers
 
Co-Generation
Co-GenerationCo-Generation
Co-Generation
 
Sepl mixing plant presentation
Sepl mixing plant presentationSepl mixing plant presentation
Sepl mixing plant presentation
 
Gas turbine
Gas turbineGas turbine
Gas turbine
 
Energy saving and process optimization in Hot Strip Mill Descaling system
Energy saving and process optimization in Hot Strip Mill Descaling systemEnergy saving and process optimization in Hot Strip Mill Descaling system
Energy saving and process optimization in Hot Strip Mill Descaling system
 

More from Er Ramgarhia

Electrical safety ppt(1)
Electrical safety ppt(1)Electrical safety ppt(1)
Electrical safety ppt(1)
Er Ramgarhia
 
Vcb ppt.
Vcb ppt.Vcb ppt.
Vcb ppt.
Er Ramgarhia
 
Chiller ppt
Chiller pptChiller ppt
Chiller ppt
Er Ramgarhia
 
Fire fighting ert
Fire fighting ertFire fighting ert
Fire fighting ert
Er Ramgarhia
 
Electrical safety ppt
Electrical safety pptElectrical safety ppt
Electrical safety ppt
Er Ramgarhia
 
Power saving ppt
Power saving pptPower saving ppt
Power saving ppt
Er Ramgarhia
 
Solar sYSTEM
Solar sYSTEMSolar sYSTEM
Solar sYSTEM
Er Ramgarhia
 
Heat tracing ppt
Heat tracing pptHeat tracing ppt
Heat tracing ppt
Er Ramgarhia
 
Piping system presentation
Piping system presentationPiping system presentation
Piping system presentation
Er Ramgarhia
 
Compressor ppt
Compressor pptCompressor ppt
Compressor ppt
Er Ramgarhia
 
Dol and star delta
Dol and star deltaDol and star delta
Dol and star delta
Er Ramgarhia
 

More from Er Ramgarhia (11)

Electrical safety ppt(1)
Electrical safety ppt(1)Electrical safety ppt(1)
Electrical safety ppt(1)
 
Vcb ppt.
Vcb ppt.Vcb ppt.
Vcb ppt.
 
Chiller ppt
Chiller pptChiller ppt
Chiller ppt
 
Fire fighting ert
Fire fighting ertFire fighting ert
Fire fighting ert
 
Electrical safety ppt
Electrical safety pptElectrical safety ppt
Electrical safety ppt
 
Power saving ppt
Power saving pptPower saving ppt
Power saving ppt
 
Solar sYSTEM
Solar sYSTEMSolar sYSTEM
Solar sYSTEM
 
Heat tracing ppt
Heat tracing pptHeat tracing ppt
Heat tracing ppt
 
Piping system presentation
Piping system presentationPiping system presentation
Piping system presentation
 
Compressor ppt
Compressor pptCompressor ppt
Compressor ppt
 
Dol and star delta
Dol and star deltaDol and star delta
Dol and star delta
 

Recently uploaded

Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation & Control
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
AJAYKUMARPUND1
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
Aditya Rajan Patra
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
BrazilAccount1
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
SyedAbiiAzazi1
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
aqil azizi
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
Kerry Sado
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Sreedhar Chowdam
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Soumen Santra
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
MdTanvirMahtab2
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 

Recently uploaded (20)

Water Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdfWater Industry Process Automation and Control Monthly - May 2024.pdf
Water Industry Process Automation and Control Monthly - May 2024.pdf
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
Pile Foundation by Venkatesh Taduvai (Sub Geotechnical Engineering II)-conver...
 
Recycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part IIIRecycled Concrete Aggregate in Construction Part III
Recycled Concrete Aggregate in Construction Part III
 
AP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specificAP LAB PPT.pdf ap lab ppt no title specific
AP LAB PPT.pdf ap lab ppt no title specific
 
14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application14 Template Contractual Notice - EOT Application
14 Template Contractual Notice - EOT Application
 
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdfTutorial for 16S rRNA Gene Analysis with QIIME2.pdf
Tutorial for 16S rRNA Gene Analysis with QIIME2.pdf
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 
Hierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power SystemHierarchical Digital Twin of a Naval Power System
Hierarchical Digital Twin of a Naval Power System
 
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&BDesign and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
Design and Analysis of Algorithms-DP,Backtracking,Graphs,B&B
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
Standard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - NeometrixStandard Reomte Control Interface - Neometrix
Standard Reomte Control Interface - Neometrix
 
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTSHeap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
Heap Sort (SS).ppt FOR ENGINEERING GRADUATES, BCA, MCA, MTECH, BSC STUDENTS
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 

Boiler ppt

  • 1. BOILER TRANNING ASIAN PAINTS KHANDALA PLANT 1MIS | Site Name | 2017-MM-DD
  • 2. WHAT IS BOILER AND ITS USES . It is a steam generation device . Fire tube and water tube . Types of Boiler – 1. Solid:- Coal, Rice Husk, Begas, wood . 2. Liquid :- Diesel , Furnace Oil . 3. Gases :- Bio gas , Cng . Three Pass Boiler ( Air change direction) Three Ton Capacity (3000 Ltr Steam ) . 2MIS | Site Name | 2017-MM-DD
  • 3. SOLID BASE BOILER 3MIS | Site Name | 2017-MM-DD 1. Solid:- Coal, Rice Husk, Begas, wood . 2. 140 Ton steam Generating steam boiler .
  • 4. LOW PRESSURE BOILER MAIN PARTS 4MIS | Site Name | 2017-MM-DD 1. FEED WATER PUMPS . 2. DIESEL PUMPS . 3. FORCED DRAFT FAN . 4. AIR PRE HEATER . 5. BURNER . 6. FIRE TUBES . 7. SAFETY VALVES . 8. ELCTRICAL PANEL.
  • 5. BOILER SLD 5MIS | Site Name | 2017-MM-DD
  • 6. 6MIS | Site Name | 2017-MM-DD FEED PUMPS USED FOR MAINTANNING WATER IN TANK. MAINTAIN WATER FOR STEAM GENRATION IN BOILER . THREE TON WATER PER HOURS . 3000 LTR WATER = 3000 LTR STAEM . MAX PRESSURE =10.5 KG . FEED PUMPS
  • 7. DIESEL PUMPS AND ITS VALVES 7MIS | Site Name | 2017-MM-DD IT IS USED FOR DIESEL SUPPLY TO BURNER 1 2 3
  • 8. FORCED DRAFT FAN 8MIS | Site Name | 2017-MM-DD FIRE = AIR + FUEL + IGINATION . THREE PASS BOILER ( BURNER , TUBES, APH ) .`` ``
  • 9. AIR PRE HEATER 9MIS | Site Name | 2017-MM-DD
  • 10. BURNER 10MIS | Site Name | 2017-MM-DD BURNER FIRE = AIR + FUEL + IGINATION 1 2
  • 11. UV QRA2 11MIS | Site Name | 2017-MM-DD ULTRA VIOLET CELL USE FOR FLAME SENSE . SAFETY DEVICE IN COMBUSTION CHAMBER . UV QRA2 IS USED FOR LFL-1.335 . IT CAN CAPABLE TO DETECT FIRE AND EXPLOSIONS WITHIN 3-4 MILLISECONDS , A TIME DELAY OF 2-3 SECONDS . FAULTS:- SENSING ,COMBUSTION FLAME ,FIRING `
  • 12. IGINATION TRANSFORMER 12MIS | Site Name | 2017-MM-DD IT IS USED FOR BURNER SPARKING . INPUT = 220VAC , OUTPUT = 2X7KV FOR 4 SEC . IT INCREASE THE VOLTAGE FOR IGINATION . STEP UP TRANSFORMER . FAULTS:- SPARKING , FIRING
  • 13. MODULATION UNIT 13MIS | Site Name | 2017-MM-DD SERVO MOTOR , MEHANICAL MECHANISM , POSITIONER, PCM2-6 PRESSURE CONTROLLER MODULATION . 1 MOTOR UNIT 2 FOR DIESEL 3 FOR GAS 3
  • 14. MAIN GAS VALVES 14MIS | Site Name | 2017-MM-DD 1. MAIN GAS LINE VALVE 2. GAS LINE VALVE 3.PILOT VALVE 3
  • 15. Modulation unit controller – Pressure Troll 15MIS | Site Name | 2017-MM-DD Capacity 3 Ton/ Hour . Max Pressure = 10.5 kg . Max Cut off = 8.5kg .
  • 16. Steam Pressure switch for Boiler Cutoff 16MIS | Site Name | 2017-MM-DD Capacity 3 Ton/ Hour . Max Pressure = 10.5 kg . Minimum Cut off = 7 kg .
  • 17. Air Pressure Switch 17MIS | Site Name | 2017-MM-DD IT IS FOR COMBUSTION BLOWER MAIN AIR LINE . FIRE = AIR + FUEL + IGINATION . SUPPLY 220VAC , ONE NO AND ONE NC . AIR PRESSURE FOR NO TO NC 5 BAR . INTERLOCKING WITH COMBUSTION BLOWER
  • 18. BOILER INTERLOCKING 18MIS | Site Name | 2017-MM-DD 1. LEVEL - IF DIESEL TANK LEVEL LOW BOILER WILL TRIP OR WILL NOT START . 2. LEVEL - IF WATER LEVEL IN STORAGE TANK IS LOW , BOILER WILL TRIP OR NOT START . 3. MOBERY - IF LEVEL INSIDE DRUM FALL BELOW 25% BOILER WILL TRIP . 4. STACK TEMP – FLUE GASES RAISE ABOVE 270deg BURNER WILL TRIP . 5. COMBUSTION AIR SWITCH FOR COMBUSTION BLOWER . 6. PRESSURE SWITCH - IF PRESSURE INSIDE THR DRUM IS HIGH , BOILER WILL CUT OFF . 7. PHOTO CELL – IF FLAME IS NOT GENRATED IN BURNER , BOILER WILL TRIP . 8. MODULATION UNIT – IF MODULATION UNIT FEED BACK IS NOT RECEIVED , BOILER TRIP . 9. PRESSURE – IF GAS IS LESS THEN 30mbar , BOILER WILL TRIP .
  • 19. Water level gauge and Mowbray Switch 19MIS | Site Name | 2017-MM-DD 1 low water level 2 Extra water low level 3 Gauge Glasses
  • 20. Sequence Controller LFL-1.335 20MIS | Site Name | 2017-MM-DD 1. 24 TERMINALS , 220VAC SUPPLY. 2. PRE PURGE TIME -31 Sec . 3. PILOT TRIAL FOR IGINATION – 4 Sec . 4. MAIN TRIAL FOR IGINATION - 4 Sec . 5. MODULATION UNIT – 10.5 Sec . 6. POST PURGE TIME – 12 Sec . 7. FLAME FAILUR RESPONSE TIME – 1 Sec . OLS , LGP , HGP,LWS , HIGH LIMIT , POC , CAB , CAS , LOW AND HIGH FIRE. `
  • 21. FLUE GAS TEMPURATOR SENSOR 21MIS | Site Name | 2017-MM-DD STACK TEMP – FLUE GASES RAISE ABOVE 270deg BURNER WILL TRIP . 1. IT USED TO SENSE HEAT TRANSFER SYSTEM .