SlideShare a Scribd company logo
Elizabeth Rubio Villalpando
Río Paraná y
Río Baluarte # 1800 Mobile: (044) 646 161-1232
Valle Dorado ,Mexicali, B.C E-mail: elyza_rubio@hotmail.com
Industrial Engineer with 13 years of experience in World Class Manufacturing industry, high mix, low
volume and low mix and high volume and aerospace industry. Outstanding performance as Production
Control, Production Supervisor and Master Planner. Highly organized, fast and focused on results. In
the quest for growing up and development in the areas of Planning and Production Control, in world
class industries focused on the development of the human resource.
WORK EXPERIENCE
CCN Group S.A de C.V
Planner / Buyer May 2017 – Actual
Main Activities and Responsibilities
• Following Quality Norm database, actualized documents (procedures and Instructions).
• Temporally cover Production Supervisor Position.
• Maintained de database (SAP ), actualized and Cleaned.
• Confirm Production Plan every week.
• Participated in Production meeting and review KPI.
• Following 5’s project.
• Review Demand and forecast per week.
• Share Plan with customer and confirm Schedule Agreement to Suppliers.
Placas Termodinámicas S. A. de C. V.
Master Scheduler Dec 2014 – Dec 2015
Main Activities and Responsibilities
• Implemented Standard Work for 3 Production Planner.
• Confirm order according Cells capacity.
• Load and update Forecast every month.
• Monitoring Shipping orders and Past Due Order and On Time Delivery.
• Response on Expedite Request less than 24 hrs.
• Report everyday Sales and publish a final report at the end of the month.
• Check Forecast month by month.
• Level orders by week and by family.
Projects & Results
• Implemented graphic for evaluate capacity for area (Level orders).
• Actually implemented project, the propose is Planned for machine (thermoforming and CNC
machine).
• Implemented meeting in production area, for review Plan, issues and requirements for
support departments.
• Implemented MPS revision by support departments.
Page 1 of 3
Schlage de México. S. de R. L. de C. V.
Schlage de México, top class manufacturer of premium door locks and hardware. Member of the
partnership Allegion PLC (ALLE), which sales exceed the $2B USD annually. Ensenada represents the
20% of its overall sales.
Planner Scheduler Jun 2006 – Dec 2014
Main Activities and Responsibilities.
• Active participant in VSM Project for the business unit, reducing the amount of past-due
orders by lead time, reduce on the delivery time from 35 to 14 days, purchase methods
modification and automation of reports to improve the visibility for Production, involvement
in purchase process (Min –Max) >> This project set an example for its implementation on
the rest of the business units.
• Internal Auditor ISO 9000 and SOX.
• Maintenance Procedures, Instructions for de department.
• Attending External Auditors for Iso 9000.
• Help in Buyers activities, Create Purchase Order for the Supplier.
• Following as Purchase Orders with de Supplier, and delivery.
• Production programming and control based on customer requirement dates (OTD and OTR)
and Production Plan management.
• Monitoring of the Production program along with the Production Supervisor (past-due
orders).
• Customer service response on past-due orders with ETAs >> less than 24 hrs in both regular
orders as expedites.
• Weekly review of the Work Schedule (WCP and CTP process) to maintain the Plan and to
guarantee efficiency.
• Main responsible of providing a Daily Plan to Production guarantying to reach the target sales.
• Level order, workload balance analysis according to the Cells capability.
• Participate in Production Meeting every day, review results and Daily Plan.
• Review and publish sales in a Production meeting.
• Develop report to restrictions (Material Shortage)
•
Projects & Results
• Involvement in the implementation of electronic Kanban, with a goal of 50% of reduction in
transactions and errors.
• Implementation of the system to follow up orders in process by templates (Daily Hot Sheet –
“Must Go”).
• Making of the procedures for ISO9000 compliance in the department.
• Team work leader (CADET) to reduce Scrap in 25% in production cells.
• Implementation of ERP Systems (Oracle 11i and SCAP 10) for the business unit. SCAP 10.7
reduced expenses by $80K per year.
• Follow up of rescheduled orders due to material constrains or shortages.
Production Supervisor 2004 – 2006
Main Activities and Responsibilities
• Production Supervisor in charge of 4 production lines (100 employees + 4 leads).
• Resources management to increase the Production Cells Efficiency using the SFC data base.
• Development of improvement activities with the direct personnel to reduce Scrap and DPMs.
Page 2 of 3
• Hosting weekly meetings with the departments of Production Control, Planning, Quality and
Engineering to improve metrics of the Production Area.
• Line balancing.
Projects & Results
• Compliance with the Production programs (DSA vs Production Plan) up to 95%.
• Redesign of the production cells to optimize the labor usage, material flow improvement and
inventory reduction.
Professional practices – Engineering Dept. Internship 1999 - 2001
Main Activities and Projects
• Work system design (Ergonomics and Efficiency based).
• Cell design and implementation, to increase Productivity in 30%.
• Quality Systems Design (FMEA, SPC, CPK).
• New personnel training (Product Knowledge).
• Time and movements study.
• Design of materials management systems to reduce set up changes.
• Documentation of processes according to ISO9000.
Kanban system for Inventory Control on Production Line.
EDUCATION Instituto Tecnológico de Ensenada
Bachelor on Industrial Engineering
1997 – 2001
SOFT SKILLS Microsoft Office
Outlook
Word
Excel Advance (Pivots, dynamics tables, Links, graphics,
formulas, macros)
Power Point, Visio, Lotus notes.
ERP (Oracle 11i / Oracle 10.7 / Baan) for Production Scheduler/
Manufacturing, Inventory / Warehouse Control.
LANGUAGE English: 90% spoken / 90% writing
Currently studying at Patways Institute (Level 12) and working
my fluency.
TRAININGS Instructors Capacitation (CANACINTRA)
5 S’s
Internal auditor for ISO9001-2000
Internal auditor for Sarbanes Oxley
SPC Basics
Kaisen /Cadet
APICS Level 2-3-4 (in Schlage de México).
Training Value Stream methodology.
Intern Auditor IATF.
Intern Auditor VDA.
Page 3 of 3

More Related Content

What's hot

T. Keith Bishop 18
T. Keith Bishop 18T. Keith Bishop 18
T. Keith Bishop 18
T. Keith Bishop
 
Deva resume march3032019
Deva resume march3032019Deva resume march3032019
Deva resume march3032019
DevanandKamble
 
Incretolli Carmine Resume 11.22.16 v1
Incretolli Carmine Resume 11.22.16 v1Incretolli Carmine Resume 11.22.16 v1
Incretolli Carmine Resume 11.22.16 v1Carmine Incretolli
 
Ruben Renteria - Resume Nov. 11. 2015
Ruben Renteria - Resume Nov. 11. 2015Ruben Renteria - Resume Nov. 11. 2015
Ruben Renteria - Resume Nov. 11. 2015Ruben Renteria
 
Resume Divyesh B. Patel
Resume Divyesh B. PatelResume Divyesh B. Patel
Resume Divyesh B. Patel
DivyeshkumarPatel5
 
SAP for SCM OTIF Improvement Project-External
SAP for SCM OTIF Improvement Project-ExternalSAP for SCM OTIF Improvement Project-External
SAP for SCM OTIF Improvement Project-ExternalAndrew Si
 
Resume Divyesh B Patel
Resume Divyesh B PatelResume Divyesh B Patel
Resume Divyesh B Patel
DivyeshkumarPatel5
 
Supply chain imporvement
Supply chain imporvementSupply chain imporvement
Supply chain imporvement
Rohit Gothwal
 
Huy Pham_Resume
Huy Pham_ResumeHuy Pham_Resume
Huy Pham_ResumeHuy Pham
 
White kent resume_2017
White kent resume_2017White kent resume_2017
White kent resume_2017
Kent White
 
Manufacturing Recap
Manufacturing RecapManufacturing Recap
Manufacturing Recap
Mark Huguet
 

What's hot (18)

Conprofile.DOC
Conprofile.DOCConprofile.DOC
Conprofile.DOC
 
T. Keith Bishop 18
T. Keith Bishop 18T. Keith Bishop 18
T. Keith Bishop 18
 
PRADIPTA BHATTACHARYA_resume(L)
PRADIPTA BHATTACHARYA_resume(L)PRADIPTA BHATTACHARYA_resume(L)
PRADIPTA BHATTACHARYA_resume(L)
 
Deva resume march3032019
Deva resume march3032019Deva resume march3032019
Deva resume march3032019
 
Resume
ResumeResume
Resume
 
Incretolli Carmine Resume 11.22.16 v1
Incretolli Carmine Resume 11.22.16 v1Incretolli Carmine Resume 11.22.16 v1
Incretolli Carmine Resume 11.22.16 v1
 
Ruben Renteria - Resume Nov. 11. 2015
Ruben Renteria - Resume Nov. 11. 2015Ruben Renteria - Resume Nov. 11. 2015
Ruben Renteria - Resume Nov. 11. 2015
 
Resume
ResumeResume
Resume
 
Resume Divyesh B. Patel
Resume Divyesh B. PatelResume Divyesh B. Patel
Resume Divyesh B. Patel
 
my Job profile and responsabilities
my Job profile and responsabilitiesmy Job profile and responsabilities
my Job profile and responsabilities
 
praveen
praveenpraveen
praveen
 
SAP for SCM OTIF Improvement Project-External
SAP for SCM OTIF Improvement Project-ExternalSAP for SCM OTIF Improvement Project-External
SAP for SCM OTIF Improvement Project-External
 
Resume Divyesh B Patel
Resume Divyesh B PatelResume Divyesh B Patel
Resume Divyesh B Patel
 
HeenanResume2016 R1
HeenanResume2016 R1HeenanResume2016 R1
HeenanResume2016 R1
 
Supply chain imporvement
Supply chain imporvementSupply chain imporvement
Supply chain imporvement
 
Huy Pham_Resume
Huy Pham_ResumeHuy Pham_Resume
Huy Pham_Resume
 
White kent resume_2017
White kent resume_2017White kent resume_2017
White kent resume_2017
 
Manufacturing Recap
Manufacturing RecapManufacturing Recap
Manufacturing Recap
 

Similar to Elizabeth rubio cv-2

Elizabeth rubio cv-2
Elizabeth rubio   cv-2Elizabeth rubio   cv-2
Elizabeth rubio cv-2
Elizabeth Rubio
 
Kenneth probst resume 2016
Kenneth probst resume 2016Kenneth probst resume 2016
Kenneth probst resume 2016
Ken Probst
 
ERP II Overview.ppt
ERP II Overview.pptERP II Overview.ppt
ERP II Overview.ppt
FirasAlhilu
 
Luis A Carmona - Resume ene2016
Luis A Carmona - Resume ene2016Luis A Carmona - Resume ene2016
Luis A Carmona - Resume ene2016Luis A. Carmona
 
Angela Gallegos - Sept 2015 v1
Angela Gallegos - Sept 2015 v1Angela Gallegos - Sept 2015 v1
Angela Gallegos - Sept 2015 v1Angela H. Gallegos
 
Eric VanAuken detailed resume
Eric VanAuken detailed resumeEric VanAuken detailed resume
Eric VanAuken detailed resume
Eric VanAuken
 
Plant head (operation)
Plant head (operation)Plant head (operation)
Plant head (operation)
RAFIQUL ISLAM
 
Dennis Bertoni Resume Review (1)
Dennis Bertoni Resume Review (1)Dennis Bertoni Resume Review (1)
Dennis Bertoni Resume Review (1)Dennis Bertoni
 
My Resume 2008
My Resume 2008My Resume 2008
My Resume 2008SteveSpiva
 
Seanresume3-15.docx-2
Seanresume3-15.docx-2Seanresume3-15.docx-2
Seanresume3-15.docx-2Sean Hedden
 
Rakesh burman resume
Rakesh burman resume Rakesh burman resume
Rakesh burman resume Rakesh burman
 
Robert Miller Public Resume
Robert Miller Public ResumeRobert Miller Public Resume
Robert Miller Public Resume
Robert Miller
 

Similar to Elizabeth rubio cv-2 (20)

Elizabeth rubio cv-2
Elizabeth rubio   cv-2Elizabeth rubio   cv-2
Elizabeth rubio cv-2
 
TCN_CV_R3ap
TCN_CV_R3apTCN_CV_R3ap
TCN_CV_R3ap
 
Kenneth probst resume 2016
Kenneth probst resume 2016Kenneth probst resume 2016
Kenneth probst resume 2016
 
ERP II Overview.ppt
ERP II Overview.pptERP II Overview.ppt
ERP II Overview.ppt
 
Resume GRV
Resume GRVResume GRV
Resume GRV
 
Luis A Carmona - Resume ene2016
Luis A Carmona - Resume ene2016Luis A Carmona - Resume ene2016
Luis A Carmona - Resume ene2016
 
Angela Gallegos - Sept 2015 v1
Angela Gallegos - Sept 2015 v1Angela Gallegos - Sept 2015 v1
Angela Gallegos - Sept 2015 v1
 
Bhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.EngBhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.Eng
 
Eric VanAuken detailed resume
Eric VanAuken detailed resumeEric VanAuken detailed resume
Eric VanAuken detailed resume
 
Resumepmlatest
ResumepmlatestResumepmlatest
Resumepmlatest
 
Plant head (operation)
Plant head (operation)Plant head (operation)
Plant head (operation)
 
Dennis Bertoni Resume Review (1)
Dennis Bertoni Resume Review (1)Dennis Bertoni Resume Review (1)
Dennis Bertoni Resume Review (1)
 
My Resume 2008
My Resume 2008My Resume 2008
My Resume 2008
 
Seanresume3-15.docx-2
Seanresume3-15.docx-2Seanresume3-15.docx-2
Seanresume3-15.docx-2
 
CV M Hervella
CV M HervellaCV M Hervella
CV M Hervella
 
vikas goel
vikas goelvikas goel
vikas goel
 
Nantha Kumaran CV_1
Nantha Kumaran CV_1Nantha Kumaran CV_1
Nantha Kumaran CV_1
 
Rakesh burman resume
Rakesh burman resume Rakesh burman resume
Rakesh burman resume
 
Robert Miller Public Resume
Robert Miller Public ResumeRobert Miller Public Resume
Robert Miller Public Resume
 
Resume R.Coronado
Resume R.CoronadoResume R.Coronado
Resume R.Coronado
 

Recently uploaded

What Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMWWhat Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMW
Tanner Motors
 
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Hyundai Motor Group
 
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptxStatistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
coc7987515756
 
What Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It WorkWhat Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It Work
Motor Cars International
 
Why Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release CommandsWhy Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release Commands
Dart Auto
 
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
European Service Center
 
Ec460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdfEc460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdf
Excavator
 
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
Autohaus Service and Sales
 
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs  Consulting SMEs.pptxEmpowering Limpopo Entrepreneurs  Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Precious Mvulane CA (SA),RA
 
Ec330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdfEc330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdf
Excavator
 
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
psavhef
 
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtycccccccccccccccccccccccccccccccccccccccccccccccccccccccgtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
4thzenzstar
 
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
amvovau
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
Antique Plastic Traders
 
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out HereWhy Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Masters European & Gapanese Auto Repair
 
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to TellWondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Vic Auto Collision & Repair
 
Things to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your carThings to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your car
jennifermiller8137
 
Tyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEATTyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEAT
kshamashah95
 
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
Bertini's German Motors
 

Recently uploaded (19)

What Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMWWhat Does the Active Steering Malfunction Warning Mean for Your BMW
What Does the Active Steering Malfunction Warning Mean for Your BMW
 
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'Core technology of Hyundai Motor Group's EV platform 'E-GMP'
Core technology of Hyundai Motor Group's EV platform 'E-GMP'
 
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptxStatistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
Statistics5,c.xz,c.;c.;d.c;d;ssssss.pptx
 
What Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It WorkWhat Exactly Is The Common Rail Direct Injection System & How Does It Work
What Exactly Is The Common Rail Direct Injection System & How Does It Work
 
Why Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release CommandsWhy Is Your BMW X3 Hood Not Responding To Release Commands
Why Is Your BMW X3 Hood Not Responding To Release Commands
 
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
What Causes 'Trans Failsafe Prog' to Trigger in BMW X5
 
Ec460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdfEc460b lc Excavator Volvo Service Repair.pdf
Ec460b lc Excavator Volvo Service Repair.pdf
 
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
What Does the PARKTRONIC Inoperative, See Owner's Manual Message Mean for You...
 
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs  Consulting SMEs.pptxEmpowering Limpopo Entrepreneurs  Consulting SMEs.pptx
Empowering Limpopo Entrepreneurs Consulting SMEs.pptx
 
Ec330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdfEc330B Lc Excavator Volvo Service Repair.pdf
Ec330B Lc Excavator Volvo Service Repair.pdf
 
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
一比一原版SDSU毕业证圣地亚哥州立大学毕业证成绩单如何办理
 
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtycccccccccccccccccccccccccccccccccccccccccccccccccccccccgtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
gtyccccccccccccccccccccccccccccccccccccccccccccccccccccccc
 
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
一比一原版BC毕业证波士顿学院毕业证成绩单如何办理
 
Antique Plastic Traders Company Profile
Antique Plastic Traders Company ProfileAntique Plastic Traders Company Profile
Antique Plastic Traders Company Profile
 
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out HereWhy Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
Why Isn't Your BMW X5's Comfort Access Functioning Properly Find Out Here
 
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to TellWondering if Your Mercedes EIS is at Fault Here’s How to Tell
Wondering if Your Mercedes EIS is at Fault Here’s How to Tell
 
Things to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your carThings to remember while upgrading the brakes of your car
Things to remember while upgrading the brakes of your car
 
Tyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEATTyre Industrymarket overview with examples of CEAT
Tyre Industrymarket overview with examples of CEAT
 
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
5 Warning Signs Your BMW's Intelligent Battery Sensor Needs Attention
 

Elizabeth rubio cv-2

  • 1. Elizabeth Rubio Villalpando Río Paraná y Río Baluarte # 1800 Mobile: (044) 646 161-1232 Valle Dorado ,Mexicali, B.C E-mail: elyza_rubio@hotmail.com Industrial Engineer with 13 years of experience in World Class Manufacturing industry, high mix, low volume and low mix and high volume and aerospace industry. Outstanding performance as Production Control, Production Supervisor and Master Planner. Highly organized, fast and focused on results. In the quest for growing up and development in the areas of Planning and Production Control, in world class industries focused on the development of the human resource. WORK EXPERIENCE CCN Group S.A de C.V Planner / Buyer May 2017 – Actual Main Activities and Responsibilities • Following Quality Norm database, actualized documents (procedures and Instructions). • Temporally cover Production Supervisor Position. • Maintained de database (SAP ), actualized and Cleaned. • Confirm Production Plan every week. • Participated in Production meeting and review KPI. • Following 5’s project. • Review Demand and forecast per week. • Share Plan with customer and confirm Schedule Agreement to Suppliers. Placas Termodinámicas S. A. de C. V. Master Scheduler Dec 2014 – Dec 2015 Main Activities and Responsibilities • Implemented Standard Work for 3 Production Planner. • Confirm order according Cells capacity. • Load and update Forecast every month. • Monitoring Shipping orders and Past Due Order and On Time Delivery. • Response on Expedite Request less than 24 hrs. • Report everyday Sales and publish a final report at the end of the month. • Check Forecast month by month. • Level orders by week and by family. Projects & Results • Implemented graphic for evaluate capacity for area (Level orders). • Actually implemented project, the propose is Planned for machine (thermoforming and CNC machine). • Implemented meeting in production area, for review Plan, issues and requirements for support departments. • Implemented MPS revision by support departments. Page 1 of 3
  • 2. Schlage de México. S. de R. L. de C. V. Schlage de México, top class manufacturer of premium door locks and hardware. Member of the partnership Allegion PLC (ALLE), which sales exceed the $2B USD annually. Ensenada represents the 20% of its overall sales. Planner Scheduler Jun 2006 – Dec 2014 Main Activities and Responsibilities. • Active participant in VSM Project for the business unit, reducing the amount of past-due orders by lead time, reduce on the delivery time from 35 to 14 days, purchase methods modification and automation of reports to improve the visibility for Production, involvement in purchase process (Min –Max) >> This project set an example for its implementation on the rest of the business units. • Internal Auditor ISO 9000 and SOX. • Maintenance Procedures, Instructions for de department. • Attending External Auditors for Iso 9000. • Help in Buyers activities, Create Purchase Order for the Supplier. • Following as Purchase Orders with de Supplier, and delivery. • Production programming and control based on customer requirement dates (OTD and OTR) and Production Plan management. • Monitoring of the Production program along with the Production Supervisor (past-due orders). • Customer service response on past-due orders with ETAs >> less than 24 hrs in both regular orders as expedites. • Weekly review of the Work Schedule (WCP and CTP process) to maintain the Plan and to guarantee efficiency. • Main responsible of providing a Daily Plan to Production guarantying to reach the target sales. • Level order, workload balance analysis according to the Cells capability. • Participate in Production Meeting every day, review results and Daily Plan. • Review and publish sales in a Production meeting. • Develop report to restrictions (Material Shortage) • Projects & Results • Involvement in the implementation of electronic Kanban, with a goal of 50% of reduction in transactions and errors. • Implementation of the system to follow up orders in process by templates (Daily Hot Sheet – “Must Go”). • Making of the procedures for ISO9000 compliance in the department. • Team work leader (CADET) to reduce Scrap in 25% in production cells. • Implementation of ERP Systems (Oracle 11i and SCAP 10) for the business unit. SCAP 10.7 reduced expenses by $80K per year. • Follow up of rescheduled orders due to material constrains or shortages. Production Supervisor 2004 – 2006 Main Activities and Responsibilities • Production Supervisor in charge of 4 production lines (100 employees + 4 leads). • Resources management to increase the Production Cells Efficiency using the SFC data base. • Development of improvement activities with the direct personnel to reduce Scrap and DPMs. Page 2 of 3
  • 3. • Hosting weekly meetings with the departments of Production Control, Planning, Quality and Engineering to improve metrics of the Production Area. • Line balancing. Projects & Results • Compliance with the Production programs (DSA vs Production Plan) up to 95%. • Redesign of the production cells to optimize the labor usage, material flow improvement and inventory reduction. Professional practices – Engineering Dept. Internship 1999 - 2001 Main Activities and Projects • Work system design (Ergonomics and Efficiency based). • Cell design and implementation, to increase Productivity in 30%. • Quality Systems Design (FMEA, SPC, CPK). • New personnel training (Product Knowledge). • Time and movements study. • Design of materials management systems to reduce set up changes. • Documentation of processes according to ISO9000. Kanban system for Inventory Control on Production Line. EDUCATION Instituto Tecnológico de Ensenada Bachelor on Industrial Engineering 1997 – 2001 SOFT SKILLS Microsoft Office Outlook Word Excel Advance (Pivots, dynamics tables, Links, graphics, formulas, macros) Power Point, Visio, Lotus notes. ERP (Oracle 11i / Oracle 10.7 / Baan) for Production Scheduler/ Manufacturing, Inventory / Warehouse Control. LANGUAGE English: 90% spoken / 90% writing Currently studying at Patways Institute (Level 12) and working my fluency. TRAININGS Instructors Capacitation (CANACINTRA) 5 S’s Internal auditor for ISO9001-2000 Internal auditor for Sarbanes Oxley SPC Basics Kaisen /Cadet APICS Level 2-3-4 (in Schlage de México). Training Value Stream methodology. Intern Auditor IATF. Intern Auditor VDA. Page 3 of 3