PIC Action Plan
©Productivity Improvement Cell,BGMEA
Developed by :
Saad Bin A.Rashid
Productivity Improvement Cell,
BGMEA
Outline
•PRODUCTIVITY Scenario.
•Improvement Strategy.
•PIC team training condition & further
improvement plan.
•Working strategy.
©Productivity Improvement Cell,BGMEA
Productivity Scenario
©Productivity Improvement Cell,BGMEA
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Bangladesh
India
Vietnam
Pakistan
Cambodia
Bangladesh India Vietnam Pakistan Cambodia
Productivity 77% 92% 90% 88% 68%
©Productivity Improvement Cell,BGMEA
Low productivity
 Less labor efficiency.
 Less skill mid level management
 No Productivity team( IE, Work study)
 Top management lack of awareness about productivity
 Low Supply Chain Efficiency – increase lead time
©Productivity Improvement Cell,BGMEA
Productivity Improvement Strategy
©Productivity Improvement Cell,BGMEA
Productivity
Improvement
phase plan
• GSD based
training
• Zero defect
operator
training
• SOP
development
Worker eff. training
• Production
management
Training
• PL
development
Mid mgt PL program
Capacity plan
development
Factory Setup support
Direct factory
consultation
Implement
©Productivity Improvement Cell,BGMEA
PIC cell Action planFactorysetupstage
Capacity
calculation,
production
layout design,
ROI analysis,
Item knowledge
Productionstage
Direct factory
consultation by
their training &
practical
improvement
Shortcourseonskill
development
Short course
offered to
develop Mid
management
officer for
factory.
Topmanagement&buyer
attachmentseminar
Short seminar
about
productivity
improvement to
ensure smooth
business & better
growth for RMG
Sector
©Productivity Improvement Cell,BGMEA
Production Leader (PL) development Program
Floor level
position
(OJT)
• Supervisor & line chief, Floor in charge people can have very specific
idea about efficient production system by On job Training (OJT)
• They are very related to floor , so they should learn to train up
multiskilling operator
Mid level
management
• Mid level management(production management, Industrial
Engineering, quality) may be trained by module to have efficient
production system.
• This program can be further institutionalized by collaboration with
training center & Garmenting institution.
Top
management
• Top management might be keep in touch to know how about
modern production Technology.
• we can promote our activity by short seminar /fair/ gathering
©Productivity Improvement Cell,BGMEA
Production Leader (PL) development Program
OJT
Time study
Capacity
calculation
Efficiency
calculation
Production
planning&
design
Line
balanceWIP
reduction
Method
improvement
Motion study
Quality
improvement
Inventory
Control
©Productivity Improvement Cell,BGMEA
70-80%Efficiency
level
Work Measurement Technique ( NPT , SAM, Time study,
skill matrix)
Motion & Method Engineering (micro motion,
method improvement, human factor engineering)
Efficient Production system design(Production layout,
capacity , target, WIP reduction, Waste reduction)
Quality control Engineering
Kaizen, 5s tools
Cutting Fabric optimization Technique
Phase -1( standard)
©Productivity Improvement Cell,BGMEA
90-100%efficiencylevel
LEAN Manufacturing ( VSM , TQM, TPM, Pull production
System, SMED, OEE, ANDON, Kanban )
Flexible Manufacturing System(Cellular manufacturing,
Group technology)
RFID & BARCODE based production
SIX Sigma Approach
KPI Benchmarking for Factory (benchmark
performance indicator for all department)
Phase -2( Global Standard)
©Productivity Improvement Cell,BGMEA
PIC Team continuing project
•In total 6 months project with almost 24 factories.
•It covers Productivity module 1,2,3 followed by HR module, fire & safety.
•PIC team to have practical work during each module break
•PIC team need to develop own module within the short term of training for factory training.
BBW
•This program mostly related to practical implementation.
•We need to develop our basic module before attending the program.
•PIC team need to mix up experience to implement it successfully & make success story.PSES
•We need special TOT for PIC team , follow by intense practical session by them
•Training material needs to be provided to PIC ( video, presentation soft copy ) for further
implementation.
•PIC team have to develop own module based on that training for factory implementation
UNIDO
©Productivity Improvement Cell,BGMEA
PIC Team Standing
PHASE -1
1. Work Measurement
2. Method Engineering
3. Motion analysis
4. Production system design
5. Quality control
6. Cutting fabric optimization
7. Inventory planning
PHASE-2
8. LEAN Manufacturing
9. Flexible Manufacturing
system
10. RFID & Barcode based
production
11. Six sigma approach
12. KPI benchmarking
Professional training
• ERP Software training ( Fast
react or similar software)
• GSD training
• Marker software( Lectra,
Garber)
• Professional Excel training(
VBA, Macro)
• Cost benefit analysis
AfterPSES&BBWprogram
©Productivity Improvement Cell,BGMEA
TOT training team
Consultant
Full project
PIC team
Out source
trainer
LEAN Transformation project
©Productivity Improvement Cell,BGMEA
PIC Cell Factory consultation
Set
Assessment
Diagnose
improvement
scope
Develop factory
PL team
OJT-1
for PL
Action
plan
Factory
implementation(
PIC team with PL
)
OJT-2
Set pilot line
& global
change
Follow up
1 day 3 day 7 day 4 day 15 day 3 month
In house mini
workshop-1
In house mini
workshop-2
In house mini
workshop-3
4 days 1 month
6 month development plan for each factory
Cost benefit
analysis
©Productivity Improvement Cell,BGMEA
Systematic approach of Implementation
Floor Data
collection
Analysis the
data
Standardize
the data
PMTS format
development
Optimize
layout design
WIP analysis Bottleneck Balance line
Set standard
production
system
Productivity
Improvement Cell,
BGMEA
©Productivity Improvement Cell,BGMEA
Factory setup stage
Capacity
& layout
planning
Labor
planning
Item
knowledge
ROI
Analysis
©Productivity Improvement Cell,BGMEA
©Productivity Improvement Cell,BGMEA
• Competitive cost
• High Quality
• Smooth production run
• Right delivery time
• Flexibility
• CSR, safety &
compliance
• Profit
• Sustainable business
growth
• repeat business
Buyer
FactoryOwner
PIP
productivity improvement program
Cost optimization system
development
Factory productivity system
development
©Productivity Improvement Cell,BGMEA
Awareness
seminar
with owner &
buyer
Pre Setup
Engineered
planning
Short
training
program
with
factory side
Short term strategy
©Productivity Improvement Cell,BGMEA
PIP strategy
Collaboration
with
International
buyer
Collaboration
with Donor
agencies
Collaboration
with Top
management by
means of short
seminar
©Productivity Improvement Cell,BGMEA
Branding strategy
©Productivity Improvement Cell,BGMEA
Suggestion for further
Improvement
©Productivity Improvement Cell,BGMEA
Towards Competitive RMG
Sector
©Productivity Improvement Cell,BGMEA

More Related Content

What's hot

Lean, six sigma and lean six sigma
Lean, six sigma and lean six sigmaLean, six sigma and lean six sigma
Lean, six sigma and lean six sigma
Spoorthi Sham
 
Performance Improvement Strategy PowerPoint Presentation Slides
Performance Improvement Strategy PowerPoint Presentation Slides Performance Improvement Strategy PowerPoint Presentation Slides
Performance Improvement Strategy PowerPoint Presentation Slides
SlideTeam
 
six sigma project
six sigma projectsix sigma project
six sigma project
Yogesh Tripathi
 
PPAP 101: What You Should Know About PPAP
PPAP 101: What You Should Know About PPAPPPAP 101: What You Should Know About PPAP
PPAP 101: What You Should Know About PPAP
Rapid Global Business Solutions, Inc.
 
TPM - tech talk
TPM - tech talk TPM - tech talk
CAD & CAM introduction
CAD & CAM introductionCAD & CAM introduction
CAD & CAM introduction
Jamshid khan
 
Value stream mapping - Future State
Value stream mapping - Future StateValue stream mapping - Future State
Value stream mapping - Future State
krishnaheda
 
Kaizen
KaizenKaizen
Productivity improvement techniques
Productivity improvement techniques Productivity improvement techniques
Productivity improvement techniques
prathiekraj1
 
Kaizen & Small Group Activities
Kaizen & Small Group ActivitiesKaizen & Small Group Activities
Kaizen & Small Group Activities
DEEPAK SAHOO
 
Total Quality Management TQM Day2 for E-Iidaman,
Total Quality Management TQM Day2 for E-Iidaman,  Total Quality Management TQM Day2 for E-Iidaman,
Total Quality Management TQM Day2 for E-Iidaman,
Timothy Wooi
 
TPM & OEE
TPM & OEETPM & OEE
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
Anand Subramaniam
 
Design For Six Sigma
Design For Six SigmaDesign For Six Sigma
Design For Six Sigma
Anand Subramaniam
 
Quality Process And Procedures Powerpoint Presentation Slide
Quality Process And Procedures Powerpoint Presentation SlideQuality Process And Procedures Powerpoint Presentation Slide
Quality Process And Procedures Powerpoint Presentation Slide
SlideTeam
 
different techniques to productivity improvement
different techniques to productivity improvementdifferent techniques to productivity improvement
different techniques to productivity improvement
Hemant Patil
 
Qc 7 tools
Qc 7 toolsQc 7 tools
Kaizen presentation for garments
Kaizen presentation for garmentsKaizen presentation for garments
Kaizen presentation for garments
Khalid Mehmood
 
Managing Quality
Managing QualityManaging Quality
Managing Quality
Ali BARAN
 
Lean Paper Airplane Folding Game
Lean Paper Airplane Folding GameLean Paper Airplane Folding Game
Lean Paper Airplane Folding Game
leansimulations
 

What's hot (20)

Lean, six sigma and lean six sigma
Lean, six sigma and lean six sigmaLean, six sigma and lean six sigma
Lean, six sigma and lean six sigma
 
Performance Improvement Strategy PowerPoint Presentation Slides
Performance Improvement Strategy PowerPoint Presentation Slides Performance Improvement Strategy PowerPoint Presentation Slides
Performance Improvement Strategy PowerPoint Presentation Slides
 
six sigma project
six sigma projectsix sigma project
six sigma project
 
PPAP 101: What You Should Know About PPAP
PPAP 101: What You Should Know About PPAPPPAP 101: What You Should Know About PPAP
PPAP 101: What You Should Know About PPAP
 
TPM - tech talk
TPM - tech talk TPM - tech talk
TPM - tech talk
 
CAD & CAM introduction
CAD & CAM introductionCAD & CAM introduction
CAD & CAM introduction
 
Value stream mapping - Future State
Value stream mapping - Future StateValue stream mapping - Future State
Value stream mapping - Future State
 
Kaizen
KaizenKaizen
Kaizen
 
Productivity improvement techniques
Productivity improvement techniques Productivity improvement techniques
Productivity improvement techniques
 
Kaizen & Small Group Activities
Kaizen & Small Group ActivitiesKaizen & Small Group Activities
Kaizen & Small Group Activities
 
Total Quality Management TQM Day2 for E-Iidaman,
Total Quality Management TQM Day2 for E-Iidaman,  Total Quality Management TQM Day2 for E-Iidaman,
Total Quality Management TQM Day2 for E-Iidaman,
 
TPM & OEE
TPM & OEETPM & OEE
TPM & OEE
 
Value Stream Mapping Process
Value Stream Mapping ProcessValue Stream Mapping Process
Value Stream Mapping Process
 
Design For Six Sigma
Design For Six SigmaDesign For Six Sigma
Design For Six Sigma
 
Quality Process And Procedures Powerpoint Presentation Slide
Quality Process And Procedures Powerpoint Presentation SlideQuality Process And Procedures Powerpoint Presentation Slide
Quality Process And Procedures Powerpoint Presentation Slide
 
different techniques to productivity improvement
different techniques to productivity improvementdifferent techniques to productivity improvement
different techniques to productivity improvement
 
Qc 7 tools
Qc 7 toolsQc 7 tools
Qc 7 tools
 
Kaizen presentation for garments
Kaizen presentation for garmentsKaizen presentation for garments
Kaizen presentation for garments
 
Managing Quality
Managing QualityManaging Quality
Managing Quality
 
Lean Paper Airplane Folding Game
Lean Paper Airplane Folding GameLean Paper Airplane Folding Game
Lean Paper Airplane Folding Game
 

Similar to Productivity action plan

Vegam 4i, Making factories smarter
Vegam 4i, Making factories smarterVegam 4i, Making factories smarter
Vegam 4i, Making factories smarter
Vegam Solutions
 
CITGO: Fueling Time Savings and Ensuring Quality with Automation
CITGO: Fueling Time Savings and Ensuring Quality with AutomationCITGO: Fueling Time Savings and Ensuring Quality with Automation
CITGO: Fueling Time Savings and Ensuring Quality with Automation
Worksoft
 
CV_Vineet_BTech_ECE
CV_Vineet_BTech_ECECV_Vineet_BTech_ECE
CV_Vineet_BTech_ECE
Vineet sharma
 
Italy MAG Wire Business case _Scada system Jan 2016 english version
Italy MAG Wire Business case _Scada system Jan 2016 english versionItaly MAG Wire Business case _Scada system Jan 2016 english version
Italy MAG Wire Business case _Scada system Jan 2016 english version
Luizclaudiomatto
 
Resume -UD
Resume -UDResume -UD
Resume -UD
udham singh
 
CURRICULUM VITA ANTH
CURRICULUM VITA ANTHCURRICULUM VITA ANTH
CURRICULUM VITA ANTH
santhosh kumar
 
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
Worksoft
 
SAP QM by Direct trainer
SAP QM by Direct trainerSAP QM by Direct trainer
Resumepmlatest
ResumepmlatestResumepmlatest
Resumepmlatest
Rajasekar Sundarajan
 
Six sigma in automobile Industry
Six sigma in automobile IndustrySix sigma in automobile Industry
Six sigma in automobile Industry
Vishnu Rajoriya
 
arun
arunarun
AIPMM Phase Review Process for Product Management
AIPMM Phase Review Process for Product ManagementAIPMM Phase Review Process for Product Management
AIPMM Phase Review Process for Product Management
AIPMM Administration
 
vinayaktiwari (1)
vinayaktiwari (1)vinayaktiwari (1)
vinayaktiwari (1)
vinayak tiwari
 
CV CS
CV CSCV CS
Krishnan_Resume
Krishnan_ResumeKrishnan_Resume
Krishnan_Resume
Krishnan Virachami
 
Aghil Jith
Aghil JithAghil Jith
Aghil Jith
Aghil Jith
 
Renni Consultancy - Introduction
Renni Consultancy - IntroductionRenni Consultancy - Introduction
Renni Consultancy - Introduction
Divakaran Narasimhachari
 
20080115 03 - Qualimétrie et CMMi dans les applications temps réel embarquées
20080115 03 - Qualimétrie et CMMi dans les applications temps réel embarquées20080115 03 - Qualimétrie et CMMi dans les applications temps réel embarquées
20080115 03 - Qualimétrie et CMMi dans les applications temps réel embarquées
LeClubQualiteLogicielle
 
Resume
ResumeResume
Resume_Balachandru
Resume_BalachandruResume_Balachandru
Resume_Balachandru
balachandru venugopalan
 

Similar to Productivity action plan (20)

Vegam 4i, Making factories smarter
Vegam 4i, Making factories smarterVegam 4i, Making factories smarter
Vegam 4i, Making factories smarter
 
CITGO: Fueling Time Savings and Ensuring Quality with Automation
CITGO: Fueling Time Savings and Ensuring Quality with AutomationCITGO: Fueling Time Savings and Ensuring Quality with Automation
CITGO: Fueling Time Savings and Ensuring Quality with Automation
 
CV_Vineet_BTech_ECE
CV_Vineet_BTech_ECECV_Vineet_BTech_ECE
CV_Vineet_BTech_ECE
 
Italy MAG Wire Business case _Scada system Jan 2016 english version
Italy MAG Wire Business case _Scada system Jan 2016 english versionItaly MAG Wire Business case _Scada system Jan 2016 english version
Italy MAG Wire Business case _Scada system Jan 2016 english version
 
Resume -UD
Resume -UDResume -UD
Resume -UD
 
CURRICULUM VITA ANTH
CURRICULUM VITA ANTHCURRICULUM VITA ANTH
CURRICULUM VITA ANTH
 
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
CITGO Fueling Time Savings and Ensuring Quality with Automation – TechEd 2015
 
SAP QM by Direct trainer
SAP QM by Direct trainerSAP QM by Direct trainer
SAP QM by Direct trainer
 
Resumepmlatest
ResumepmlatestResumepmlatest
Resumepmlatest
 
Six sigma in automobile Industry
Six sigma in automobile IndustrySix sigma in automobile Industry
Six sigma in automobile Industry
 
arun
arunarun
arun
 
AIPMM Phase Review Process for Product Management
AIPMM Phase Review Process for Product ManagementAIPMM Phase Review Process for Product Management
AIPMM Phase Review Process for Product Management
 
vinayaktiwari (1)
vinayaktiwari (1)vinayaktiwari (1)
vinayaktiwari (1)
 
CV CS
CV CSCV CS
CV CS
 
Krishnan_Resume
Krishnan_ResumeKrishnan_Resume
Krishnan_Resume
 
Aghil Jith
Aghil JithAghil Jith
Aghil Jith
 
Renni Consultancy - Introduction
Renni Consultancy - IntroductionRenni Consultancy - Introduction
Renni Consultancy - Introduction
 
20080115 03 - Qualimétrie et CMMi dans les applications temps réel embarquées
20080115 03 - Qualimétrie et CMMi dans les applications temps réel embarquées20080115 03 - Qualimétrie et CMMi dans les applications temps réel embarquées
20080115 03 - Qualimétrie et CMMi dans les applications temps réel embarquées
 
Resume
ResumeResume
Resume
 
Resume_Balachandru
Resume_BalachandruResume_Balachandru
Resume_Balachandru
 

Recently uploaded

spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
LAXMAREDDY22
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
AjmalKhan50578
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
TaghreedAltamimi
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
GauravCar
 
An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...
IJECEIAES
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
KrishnaveniKrishnara1
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
ElakkiaU
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
Madan Karki
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
SakkaravarthiShanmug
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
shadow0702a
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
architagupta876
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
Mahmoud Morsy
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
co23btech11018
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
ecqow
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 

Recently uploaded (20)

spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
 
artificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptxartificial intelligence and data science contents.pptx
artificial intelligence and data science contents.pptx
 
An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...An improved modulation technique suitable for a three level flying capacitor ...
An improved modulation technique suitable for a three level flying capacitor ...
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt22CYT12-Unit-V-E Waste and its Management.ppt
22CYT12-Unit-V-E Waste and its Management.ppt
 
An Introduction to the Compiler Designss
An Introduction to the Compiler DesignssAn Introduction to the Compiler Designss
An Introduction to the Compiler Designss
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
Manufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptxManufacturing Process of molasses based distillery ppt.pptx
Manufacturing Process of molasses based distillery ppt.pptx
 
cnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classicationcnn.pptx Convolutional neural network used for image classication
cnn.pptx Convolutional neural network used for image classication
 
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
Use PyCharm for remote debugging of WSL on a Windo cf5c162d672e4e58b4dde5d797...
 
AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
 
Certificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi AhmedCertificates - Mahmoud Mohamed Moursi Ahmed
Certificates - Mahmoud Mohamed Moursi Ahmed
 
Computational Engineering IITH Presentation
Computational Engineering IITH PresentationComputational Engineering IITH Presentation
Computational Engineering IITH Presentation
 
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
一比一原版(CalArts毕业证)加利福尼亚艺术学院毕业证如何办理
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 

Productivity action plan

  • 1. PIC Action Plan ©Productivity Improvement Cell,BGMEA Developed by : Saad Bin A.Rashid Productivity Improvement Cell, BGMEA
  • 2. Outline •PRODUCTIVITY Scenario. •Improvement Strategy. •PIC team training condition & further improvement plan. •Working strategy. ©Productivity Improvement Cell,BGMEA
  • 3. Productivity Scenario ©Productivity Improvement Cell,BGMEA 0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% Bangladesh India Vietnam Pakistan Cambodia Bangladesh India Vietnam Pakistan Cambodia Productivity 77% 92% 90% 88% 68%
  • 5. Low productivity  Less labor efficiency.  Less skill mid level management  No Productivity team( IE, Work study)  Top management lack of awareness about productivity  Low Supply Chain Efficiency – increase lead time ©Productivity Improvement Cell,BGMEA
  • 7. Productivity Improvement phase plan • GSD based training • Zero defect operator training • SOP development Worker eff. training • Production management Training • PL development Mid mgt PL program Capacity plan development Factory Setup support Direct factory consultation Implement ©Productivity Improvement Cell,BGMEA
  • 8. PIC cell Action planFactorysetupstage Capacity calculation, production layout design, ROI analysis, Item knowledge Productionstage Direct factory consultation by their training & practical improvement Shortcourseonskill development Short course offered to develop Mid management officer for factory. Topmanagement&buyer attachmentseminar Short seminar about productivity improvement to ensure smooth business & better growth for RMG Sector ©Productivity Improvement Cell,BGMEA
  • 9. Production Leader (PL) development Program Floor level position (OJT) • Supervisor & line chief, Floor in charge people can have very specific idea about efficient production system by On job Training (OJT) • They are very related to floor , so they should learn to train up multiskilling operator Mid level management • Mid level management(production management, Industrial Engineering, quality) may be trained by module to have efficient production system. • This program can be further institutionalized by collaboration with training center & Garmenting institution. Top management • Top management might be keep in touch to know how about modern production Technology. • we can promote our activity by short seminar /fair/ gathering ©Productivity Improvement Cell,BGMEA
  • 10. Production Leader (PL) development Program OJT Time study Capacity calculation Efficiency calculation Production planning& design Line balanceWIP reduction Method improvement Motion study Quality improvement Inventory Control ©Productivity Improvement Cell,BGMEA
  • 11. 70-80%Efficiency level Work Measurement Technique ( NPT , SAM, Time study, skill matrix) Motion & Method Engineering (micro motion, method improvement, human factor engineering) Efficient Production system design(Production layout, capacity , target, WIP reduction, Waste reduction) Quality control Engineering Kaizen, 5s tools Cutting Fabric optimization Technique Phase -1( standard) ©Productivity Improvement Cell,BGMEA
  • 12. 90-100%efficiencylevel LEAN Manufacturing ( VSM , TQM, TPM, Pull production System, SMED, OEE, ANDON, Kanban ) Flexible Manufacturing System(Cellular manufacturing, Group technology) RFID & BARCODE based production SIX Sigma Approach KPI Benchmarking for Factory (benchmark performance indicator for all department) Phase -2( Global Standard) ©Productivity Improvement Cell,BGMEA
  • 13. PIC Team continuing project •In total 6 months project with almost 24 factories. •It covers Productivity module 1,2,3 followed by HR module, fire & safety. •PIC team to have practical work during each module break •PIC team need to develop own module within the short term of training for factory training. BBW •This program mostly related to practical implementation. •We need to develop our basic module before attending the program. •PIC team need to mix up experience to implement it successfully & make success story.PSES •We need special TOT for PIC team , follow by intense practical session by them •Training material needs to be provided to PIC ( video, presentation soft copy ) for further implementation. •PIC team have to develop own module based on that training for factory implementation UNIDO ©Productivity Improvement Cell,BGMEA
  • 14. PIC Team Standing PHASE -1 1. Work Measurement 2. Method Engineering 3. Motion analysis 4. Production system design 5. Quality control 6. Cutting fabric optimization 7. Inventory planning PHASE-2 8. LEAN Manufacturing 9. Flexible Manufacturing system 10. RFID & Barcode based production 11. Six sigma approach 12. KPI benchmarking Professional training • ERP Software training ( Fast react or similar software) • GSD training • Marker software( Lectra, Garber) • Professional Excel training( VBA, Macro) • Cost benefit analysis AfterPSES&BBWprogram ©Productivity Improvement Cell,BGMEA
  • 15. TOT training team Consultant Full project PIC team Out source trainer LEAN Transformation project ©Productivity Improvement Cell,BGMEA
  • 16. PIC Cell Factory consultation Set Assessment Diagnose improvement scope Develop factory PL team OJT-1 for PL Action plan Factory implementation( PIC team with PL ) OJT-2 Set pilot line & global change Follow up 1 day 3 day 7 day 4 day 15 day 3 month In house mini workshop-1 In house mini workshop-2 In house mini workshop-3 4 days 1 month 6 month development plan for each factory Cost benefit analysis ©Productivity Improvement Cell,BGMEA
  • 17. Systematic approach of Implementation Floor Data collection Analysis the data Standardize the data PMTS format development Optimize layout design WIP analysis Bottleneck Balance line Set standard production system Productivity Improvement Cell, BGMEA ©Productivity Improvement Cell,BGMEA
  • 18. Factory setup stage Capacity & layout planning Labor planning Item knowledge ROI Analysis ©Productivity Improvement Cell,BGMEA
  • 20. • Competitive cost • High Quality • Smooth production run • Right delivery time • Flexibility • CSR, safety & compliance • Profit • Sustainable business growth • repeat business Buyer FactoryOwner PIP productivity improvement program Cost optimization system development Factory productivity system development ©Productivity Improvement Cell,BGMEA
  • 21. Awareness seminar with owner & buyer Pre Setup Engineered planning Short training program with factory side Short term strategy ©Productivity Improvement Cell,BGMEA
  • 22. PIP strategy Collaboration with International buyer Collaboration with Donor agencies Collaboration with Top management by means of short seminar ©Productivity Improvement Cell,BGMEA