Your C ompany N ame
Process
Management
Introduction
Enterprise
▪ Business
Resource
▪ Money
▪ Manpower
▪ Material
▪ Machinery
▪ Marketing
▪ Methods
Planning
▪ Effective Application &
Optimization of Resources
This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 2
Functional Areas Overview
Master Data
Management
Human
Resources
Research &
Development
Controlling
Marketing &
Sales
Materials
Management Production
Needs
Assessment
Finance &
Accounting
This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 3
ERP System Architecture
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Use
Graphic User Interface
(GUI)
Web-Client
Smartphone
Apps
Adaptation
Customization
Adaptation of GUI
Integration Element
(Workflow)
Document
Adjustments
Data Storage
Database Management
System (DMBS)
Interface with other
Databases
Applications
Programming
Environment
Application Core Database-
Independent Part Database-
Dependent Part
Use of Other
Programs
User Exit
Strata
4
Task Categories of ERP Systems
Administration
Data Storage for Business Transactions
Scheduling
Automation of Routine Operations
Information
Generations of Key Figures
Analysis
Evaluation, Time Series Models
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
5
ERP Project Progress by Stage
Project Preparation ERP Software Selection ERP Implementation
▪ Project Objectives
▪ Project Plan & Concept
▪ Project Team
▪ Requirements Catalogue
▪ Market Testing
▪ Requirement/ Performance
Specifications
▪ Procurement
▪ Data Migration
▪ Key-User Training
▪ Test Phase
▪ Staff Training
▪ Real Start
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Stage 1 Stage 2 Stage 3
6
Overview of Implementation Process
Planning & Selection
Phase
Implementation
Phase
Design
Preparation/
Project Planning
Project
Organization
Process
Analysis
Conversion ImplementingAdjustment
This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 7
Planning & Selection Phase
Weeks 01 02 03 04 05 06 07 08 09 10 11 12
Goal Definition
Process Analysis
Requirements
Market Overview
Screening
Final Selection
Decision
This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 8
Implementation Phase
Project Team Adjustment
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Technical
Adjustment
Documentation &
Monitoring
Broadening of Project
Goals & Requirements
System
Tests
Adjustment of Process
or ERP System
Migration of
Master Data
9
Project Preparation
Situational Analysis-
Basic Target Concept
Software Selection
Concept Fine-
Tuning
Realization &
Implementation
Support from
Management
Support from Management
Support from Management
Support from Management
Support from Management
Communication
with Staff
Communication with Staff
Communication with Staff
Communication with Staff
Communication with Staff
Enterprise Resource Planning Funnel
This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 10
Project Preparation
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Work Steps
Project
Installation
Project
Objective
Project
Schedule
Establish
Project
Management
From Project
Team
Kick-off
Meeting
Factors
Formation of
Project team
Clear Goals
& Targets
Business
Strategy
Project
Management
Clear Commitment to the Project
Support from
Management
Communication
with Staff
11
Situational Analysis- Basic Target Concept
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Work Steps
Understand
Business
Procedures &
Processes
Software
Support
Analysis
Vulnerability
Analysis
Identify
Optimization
Potential
Derive
Requirements of
Future Software
Support
Prepare
Basic Target
Concept
(Requirements
specification)
Assessment of Results
Support from
Management
Communication
with Staff
Formation of
Project
Team
Business
Strategy
Factors
12
Software Selection Process
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Work Steps
First Market
Research or
Initial
Selection
Restrictions
(By industry,
size, distribution)
Shortlisting
(On the basis of
requirement
specifications)
Restriction
(Through
functionality)
Final Selection
(Workshops, system
presentations)
Conclusion
of Contract
Participation in the Final Selection
Support from
Management
Communication
with Staff
Project
Management
Adaptability
of ERP
System
Factors
13
Software Selection Criteria
Contract
Software
Costs
Security
Maintenance
Installation
Other
▪ Scope of Services
▪ Probation Period
▪ Warranty Period & Terms
▪ Customization & Service
▪ Ongoing
▪ One-time
▪ Access Protection
▪ Adherence to Legal
Requirements
▪ Scope & Costs
▪ Response Time
▪ Consultation
▪ Support
▪ Training
▪ References
▪ Programming
▪ Interfaces & Modularity
▪ Safety of Investment
General Selection Criteria
This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 14
Software Selection Criteria
Functionality
▪ Requirements
▪ Adjustment
▪ Versatility
Documentation
▪ Thoroughness & Clarity
▪ Structure
▪ Relevance
Performance
▪ Operator Guidance
▪ Screen Layout
▪ Robust
▪ Learning Curve
▪ Manual & Help Function
Service
▪ Data Management
▪ Response & Time
Input
▪ Error Checking &
Correction
▪ Simplicity
Output
▪ Choice of Output Medium
▪ Formats & Layouts
▪ Speed
This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 15
Fine -Tuning of Concept
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Work Steps
Expand
Project Team
(I.E., Set key-
users)
Refine Project
Plan
Determine
Decision-making
Authority
Definition of
Target Processes,
Interfaces &
Systems
Adjustments
Data
Migration
Plan
Set test &
Training Plans
(With involvement
of key-users)
Factors
Review of Results & Project Completion
Support from
Management
Communication
with Staff
Composition of
Project Team
Discretionary
Competence of
Project Manager
Systems
Adjustments &
Modifications
Training for
Users
Project
Management
16
Fine -Tuning of Concept
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Work Steps
Realization of
Target
Concept
Creation of
Pilot System
Implementation
of System
adjustments &
Data Migration
Implementation
of Training for
Users
Implementation
of Extensive
System Tests
Improvements &
Adjustments in
Operations
Review of Results & Project Completion
Support from
Management
Communication
with Staff
Factors
Adjustments in
ERP System
System Tests
& Testing
Procedures
Training for
Users
17
V Model for Implementation of ERP System
Revise
Assessment
Process
Analysis
Process
Optimization
Preparation of
Requirement
Specifications
Signing of
Contracts
ERP Selection by
Manufacturers
Presentations
Launch
Workshop
Training
Preparation of
Functional
Specifications
Make
Adjustments
Test
Go-Live
Acceptance
This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 18
Tips for Selecting ERP System
Planning of costs & determining the budget
directly affect the functionality of the ERP system
& the selection of potential providers
Cost Planning
ERP solutions must adapt to the different
requirement areas of various industry sectors
ERP Industry Solutions
A detailed review of the current business
processes helps determine how future software
should perform
Requirement Analysis
The user interface is the meeting point between
user & software. Therefore it must be clear & easily
adaptable to the needs of the customer
Usability Requirements
The ERP System should adapt to the growing
or changing needs of the company. Cost is, of
course, an issue
Versatility & Expandability
It is important to determine whether a company needs
support after the implementation of ERP. Support can be
provided, for example, by telephone, internet, or email
Analysis of Service & Support
This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 19
ERP Criteria List - Technical Requirement
Point Criteria Notes M 0
1 Technical Requirements Text Here
1.1 General Functions Text Here
1.1.1 Multi-User Support Text Here
1.1.2 Adaptable to Countries Text Here
1.1.3 Foreign Language Support Text Here
1.1.4 … Text Here
1.2 Operating System Text Here
1.2.1 Windows Text Here
1.2.2 Linux Text Here
1.2.3 Apple Text Here
1.2.4 Other Text Here
This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 20
ERP Criteria List - Functional Requirement
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Point Criteria Notes M 0
2 Functional Criteria Text Here
2.1 Marketing Text Here
2.1.1 Sales Planning Text Here
2.1.2 Marketing Planning Text Here
2.1.3 Product Management Text Here
2.1.4 Merchandising Text Here
2.2 Sales Text Here
2.2.1 Proposal Preparation Text Here
2.2.2 Pricing Text Here
2.2.3 Availability Check Text Here
2.2.4 Framework Agreements Text Here
21
ERP Criteria List - Provider Services
This slide is 100% editable. Adapt it to your needs and capture your audience's attention.
Point Criteria Notes M
3 Provider Services Text Here
3.1 References Text Here
3.1.1 Whole of Germany Text Here
3.1.2 Trade Text Here
3.1.3 Commerce Text Here
3.1.4 Manufacturing Text Here
3.2 Financing Concept Text Here
3.2.1 Purchasing Text Here
3.2.2 Rent Text Here
3.2.3 Leasing Text Here
3 Provider Services Text Here
22
ERP Implementation – Selection Phase
The project’s inventory of requirements
should be as accurate as possible as it
will later act as a basis for negotiations,
and as a contractual basis
A thorough Analysis of the
company processes & functions
should be carried out
During the selection phase, a thorough
supplier selection should take place & a
formal project contract should be
negotiated. This should include, for
example, the support needed during
implementation as well as during the
initial period of operation
Goals to be achieved with the
introduction of software
should be precise & realistic
Pay attention to how the project team
is built (Management & Technical
departments must be included)
ERP
This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 23
11:00 a.m. –
11:15 a.m.Coffee Break
24
Additional Slides
25
Our Mission
Vision
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Mission
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
Goal
This slide is 100% editable. Adapt it
to your needs and capture your
audience's attention.
26
Our Team
This slide is 100%
editable. Adapt it to your
needs and capture your
audience's attention.
Mary Parker
CEO & Founder
This slide is 100%
editable. Adapt it to your
needs and capture your
audience's attention.
Robin Clark
Designer
This slide is 100%
editable. Adapt it to your
needs and capture your
audience's attention.
Jess Leo
Finance Manager
27
Timeline
2016
This slide is 100%
editable. Adapt it to your
needs and capture your
audience's attention.
2019
This slide is 100%
editable. Adapt it to your
needs and capture your
audience's attention.
2018
This slide is 100%
editable. Adapt it to your
needs and capture your
audience's attention.
2017
This slide is 100%
editable. Adapt it to your
needs and capture your
audience's attention.
28
Comparison
40%
60%
Male
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
Female
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
29
Venn
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
30
Magnifying Glass
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
This slide is 100% editable. Adapt it to your
needs and capture your audience's attention.
31
Thanks for Watching
Address
# Street Number, City, State
Contact Numbers
0123456789
Email Address
emailaddress123@gmail.com
32

Corporate Process Management PowerPoint Presentation Slide

  • 1.
    Your C ompanyN ame Process Management
  • 2.
    Introduction Enterprise ▪ Business Resource ▪ Money ▪Manpower ▪ Material ▪ Machinery ▪ Marketing ▪ Methods Planning ▪ Effective Application & Optimization of Resources This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 2
  • 3.
    Functional Areas Overview MasterData Management Human Resources Research & Development Controlling Marketing & Sales Materials Management Production Needs Assessment Finance & Accounting This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 3
  • 4.
    ERP System Architecture Thisslide is 100% editable. Adapt it to your needs and capture your audience's attention. Use Graphic User Interface (GUI) Web-Client Smartphone Apps Adaptation Customization Adaptation of GUI Integration Element (Workflow) Document Adjustments Data Storage Database Management System (DMBS) Interface with other Databases Applications Programming Environment Application Core Database- Independent Part Database- Dependent Part Use of Other Programs User Exit Strata 4
  • 5.
    Task Categories ofERP Systems Administration Data Storage for Business Transactions Scheduling Automation of Routine Operations Information Generations of Key Figures Analysis Evaluation, Time Series Models This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 5
  • 6.
    ERP Project Progressby Stage Project Preparation ERP Software Selection ERP Implementation ▪ Project Objectives ▪ Project Plan & Concept ▪ Project Team ▪ Requirements Catalogue ▪ Market Testing ▪ Requirement/ Performance Specifications ▪ Procurement ▪ Data Migration ▪ Key-User Training ▪ Test Phase ▪ Staff Training ▪ Real Start This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Stage 1 Stage 2 Stage 3 6
  • 7.
    Overview of ImplementationProcess Planning & Selection Phase Implementation Phase Design Preparation/ Project Planning Project Organization Process Analysis Conversion ImplementingAdjustment This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 7
  • 8.
    Planning & SelectionPhase Weeks 01 02 03 04 05 06 07 08 09 10 11 12 Goal Definition Process Analysis Requirements Market Overview Screening Final Selection Decision This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 8
  • 9.
    Implementation Phase Project TeamAdjustment This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Technical Adjustment Documentation & Monitoring Broadening of Project Goals & Requirements System Tests Adjustment of Process or ERP System Migration of Master Data 9
  • 10.
    Project Preparation Situational Analysis- BasicTarget Concept Software Selection Concept Fine- Tuning Realization & Implementation Support from Management Support from Management Support from Management Support from Management Support from Management Communication with Staff Communication with Staff Communication with Staff Communication with Staff Communication with Staff Enterprise Resource Planning Funnel This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 10
  • 11.
    Project Preparation This slideis 100% editable. Adapt it to your needs and capture your audience's attention. Work Steps Project Installation Project Objective Project Schedule Establish Project Management From Project Team Kick-off Meeting Factors Formation of Project team Clear Goals & Targets Business Strategy Project Management Clear Commitment to the Project Support from Management Communication with Staff 11
  • 12.
    Situational Analysis- BasicTarget Concept This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Work Steps Understand Business Procedures & Processes Software Support Analysis Vulnerability Analysis Identify Optimization Potential Derive Requirements of Future Software Support Prepare Basic Target Concept (Requirements specification) Assessment of Results Support from Management Communication with Staff Formation of Project Team Business Strategy Factors 12
  • 13.
    Software Selection Process Thisslide is 100% editable. Adapt it to your needs and capture your audience's attention. Work Steps First Market Research or Initial Selection Restrictions (By industry, size, distribution) Shortlisting (On the basis of requirement specifications) Restriction (Through functionality) Final Selection (Workshops, system presentations) Conclusion of Contract Participation in the Final Selection Support from Management Communication with Staff Project Management Adaptability of ERP System Factors 13
  • 14.
    Software Selection Criteria Contract Software Costs Security Maintenance Installation Other ▪Scope of Services ▪ Probation Period ▪ Warranty Period & Terms ▪ Customization & Service ▪ Ongoing ▪ One-time ▪ Access Protection ▪ Adherence to Legal Requirements ▪ Scope & Costs ▪ Response Time ▪ Consultation ▪ Support ▪ Training ▪ References ▪ Programming ▪ Interfaces & Modularity ▪ Safety of Investment General Selection Criteria This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 14
  • 15.
    Software Selection Criteria Functionality ▪Requirements ▪ Adjustment ▪ Versatility Documentation ▪ Thoroughness & Clarity ▪ Structure ▪ Relevance Performance ▪ Operator Guidance ▪ Screen Layout ▪ Robust ▪ Learning Curve ▪ Manual & Help Function Service ▪ Data Management ▪ Response & Time Input ▪ Error Checking & Correction ▪ Simplicity Output ▪ Choice of Output Medium ▪ Formats & Layouts ▪ Speed This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 15
  • 16.
    Fine -Tuning ofConcept This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Work Steps Expand Project Team (I.E., Set key- users) Refine Project Plan Determine Decision-making Authority Definition of Target Processes, Interfaces & Systems Adjustments Data Migration Plan Set test & Training Plans (With involvement of key-users) Factors Review of Results & Project Completion Support from Management Communication with Staff Composition of Project Team Discretionary Competence of Project Manager Systems Adjustments & Modifications Training for Users Project Management 16
  • 17.
    Fine -Tuning ofConcept This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Work Steps Realization of Target Concept Creation of Pilot System Implementation of System adjustments & Data Migration Implementation of Training for Users Implementation of Extensive System Tests Improvements & Adjustments in Operations Review of Results & Project Completion Support from Management Communication with Staff Factors Adjustments in ERP System System Tests & Testing Procedures Training for Users 17
  • 18.
    V Model forImplementation of ERP System Revise Assessment Process Analysis Process Optimization Preparation of Requirement Specifications Signing of Contracts ERP Selection by Manufacturers Presentations Launch Workshop Training Preparation of Functional Specifications Make Adjustments Test Go-Live Acceptance This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 18
  • 19.
    Tips for SelectingERP System Planning of costs & determining the budget directly affect the functionality of the ERP system & the selection of potential providers Cost Planning ERP solutions must adapt to the different requirement areas of various industry sectors ERP Industry Solutions A detailed review of the current business processes helps determine how future software should perform Requirement Analysis The user interface is the meeting point between user & software. Therefore it must be clear & easily adaptable to the needs of the customer Usability Requirements The ERP System should adapt to the growing or changing needs of the company. Cost is, of course, an issue Versatility & Expandability It is important to determine whether a company needs support after the implementation of ERP. Support can be provided, for example, by telephone, internet, or email Analysis of Service & Support This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 19
  • 20.
    ERP Criteria List- Technical Requirement Point Criteria Notes M 0 1 Technical Requirements Text Here 1.1 General Functions Text Here 1.1.1 Multi-User Support Text Here 1.1.2 Adaptable to Countries Text Here 1.1.3 Foreign Language Support Text Here 1.1.4 … Text Here 1.2 Operating System Text Here 1.2.1 Windows Text Here 1.2.2 Linux Text Here 1.2.3 Apple Text Here 1.2.4 Other Text Here This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 20
  • 21.
    ERP Criteria List- Functional Requirement This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Point Criteria Notes M 0 2 Functional Criteria Text Here 2.1 Marketing Text Here 2.1.1 Sales Planning Text Here 2.1.2 Marketing Planning Text Here 2.1.3 Product Management Text Here 2.1.4 Merchandising Text Here 2.2 Sales Text Here 2.2.1 Proposal Preparation Text Here 2.2.2 Pricing Text Here 2.2.3 Availability Check Text Here 2.2.4 Framework Agreements Text Here 21
  • 22.
    ERP Criteria List- Provider Services This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Point Criteria Notes M 3 Provider Services Text Here 3.1 References Text Here 3.1.1 Whole of Germany Text Here 3.1.2 Trade Text Here 3.1.3 Commerce Text Here 3.1.4 Manufacturing Text Here 3.2 Financing Concept Text Here 3.2.1 Purchasing Text Here 3.2.2 Rent Text Here 3.2.3 Leasing Text Here 3 Provider Services Text Here 22
  • 23.
    ERP Implementation –Selection Phase The project’s inventory of requirements should be as accurate as possible as it will later act as a basis for negotiations, and as a contractual basis A thorough Analysis of the company processes & functions should be carried out During the selection phase, a thorough supplier selection should take place & a formal project contract should be negotiated. This should include, for example, the support needed during implementation as well as during the initial period of operation Goals to be achieved with the introduction of software should be precise & realistic Pay attention to how the project team is built (Management & Technical departments must be included) ERP This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 23
  • 24.
    11:00 a.m. – 11:15a.m.Coffee Break 24
  • 25.
  • 26.
    Our Mission Vision This slideis 100% editable. Adapt it to your needs and capture your audience's attention. Mission This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Goal This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 26
  • 27.
    Our Team This slideis 100% editable. Adapt it to your needs and capture your audience's attention. Mary Parker CEO & Founder This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Robin Clark Designer This slide is 100% editable. Adapt it to your needs and capture your audience's attention. Jess Leo Finance Manager 27
  • 28.
    Timeline 2016 This slide is100% editable. Adapt it to your needs and capture your audience's attention. 2019 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 2018 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 2017 This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 28
  • 29.
    Comparison 40% 60% Male This slide is100% editable. Adapt it to your needs and capture your audience's attention. Female This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 29
  • 30.
    Venn This slide is100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 30
  • 31.
    Magnifying Glass This slideis 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. This slide is 100% editable. Adapt it to your needs and capture your audience's attention. 31
  • 32.
    Thanks for Watching Address #Street Number, City, State Contact Numbers 0123456789 Email Address emailaddress123@gmail.com 32