SlideShare a Scribd company logo
adaptivecorp.com
BUILDING AN ROI FOR 3DEXPERIENCE PLM
1
Business
Challenge:
Difficulty sharing information
between departments and/or
locations
Design intent is not accurately
maintained during manufacturing
Difficulty coordinating all product
development stakeholders
Business
Implication:
• Designs are getting accidentally
overwritten, which causes rework.
• Product development staff is not
reusing existing designs, which
causes rework.
• Some design data is being
exposed to people that should not
see it resulting in the product
being manufactured with outdated
information, which causes rework.
• Product engineering does not
define permissible changes to
make in manufacturing, which
impacts product quality.
• Manufacturing make part changes
that alter design intent and impact
how desirable product feature are
delivered to customers.
• Rework occurs because all
impacts of a product change are
not evaluated.
• The company is having difficulty
bringing products to market on-
time and on-budget with the
planned product scope.
Metrics to
Quantify
• Lost productivity due to poor
reuse
• Lost productivity from rework
• Cost of merchandise returns
• Lower sales achievement due to
missed product capabilities
• Rework and quality costs due to
poor change impact analysis
• Lower sales due to late product
launches
• Suck cost of non-viable projects
adaptivecorp.com
QUESTIONS TO ASK FOR DETERMINING ROI METRICS
2
Business
Challenge:
Difficulty sharing information between
departments and/or locations
Design intent is not accurately
maintained during manufacturing
Difficulty coordinating all product
development stakeholders
Questions
to Ask
• Do CAD assemblies ever have
unresolved component references
because they have been overwritten or
stored in an incorrect location? What
is the cost of this rework?
• Are designers unnecessarily working
on designs that already exist because
they cannot easily search for
completed designs that fit their needs?
What is the cost of the time spent on
this redesign effort?
• Do you have issues where employees
are accessing design data before it has
been released from engineering, or that
is no longer the latest revision? What
is the cost of rework due to tasks
done with outdated data?
• Do manufacturing personnel make
decisions due to production issues that
cause parts to manufactured differently
and affect quality? What is the cost of
merchandise returns due to
avoidable quality issues?
• Are changes made in manufacturing
that affect design intent and the
delivered product capabilities? Did
product sales decrease because the
manufactured product did not
deliver specified capabilities?
• Are you able to coordinate changes
across different engineering disciplines
(mechanical, electronics and software,
manufacturing, etc.? If not, what is the
rework and quality costs due to not
properly assessing change impact?
• Are you having difficulty tracking the
development project progress and
resolving bottlenecks proactively?
What is the missed revenue due to
late product launches? Have you
had project cost overruns that affect
margins?
• Are executives able to easily track
when to abandon projects that are not
achieving necessary milestones for
profitability? What has been the sunk
cost of these projects?

More Related Content

What's hot

Using ECO Manager automated change management software to improve productivity
Using ECO Manager automated change management  software to improve productivityUsing ECO Manager automated change management  software to improve productivity
Using ECO Manager automated change management software to improve productivity
Kubotek USA
 
Ptc creo dex sales presentation
Ptc creo dex sales presentationPtc creo dex sales presentation
Ptc creo dex sales presentation
Victor Mitov
 
Ptc creo aax_user-cases
Ptc creo aax_user-casesPtc creo aax_user-cases
Ptc creo aax_user-cases
Victor Mitov
 
Plural's PLM services presentation
Plural's PLM services presentationPlural's PLM services presentation
Plural's PLM services presentationPlural Technolog
 
Agile PLM implementation and systems integration at sun microsystems
Agile PLM implementation and systems integration at sun microsystemsAgile PLM implementation and systems integration at sun microsystems
Agile PLM implementation and systems integration at sun microsystems
ulfkoester
 
Engineering Change Management
Engineering Change Management Engineering Change Management
Engineering Change Management
Shobhit Singhal
 
Ptc creo fmx sales presentation
Ptc creo fmx sales presentationPtc creo fmx sales presentation
Ptc creo fmx sales presentation
Victor Mitov
 
Creo packaging and solution capabilities presentation (1) za sajta creo desig...
Creo packaging and solution capabilities presentation (1) za sajta creo desig...Creo packaging and solution capabilities presentation (1) za sajta creo desig...
Creo packaging and solution capabilities presentation (1) za sajta creo desig...
Victor Mitov
 
Ptc creo manikin sales presentation
Ptc creo manikin sales presentationPtc creo manikin sales presentation
Ptc creo manikin sales presentation
Victor Mitov
 
Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...
Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...
Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...
Synergis Engineering Design Solutions
 
Plm & windchill
Plm & windchillPlm & windchill
Plm & windchill
sumanrao33
 
ARAS - change management
ARAS - change managementARAS - change management
ARAS - change management
Patrick Willemsen
 
Integrating Autodesk Vault to PLM – Rodney Coffey, Razorleaf & Scott Stortz, ...
Integrating Autodesk Vault to PLM – Rodney Coffey, Razorleaf & Scott Stortz, ...Integrating Autodesk Vault to PLM – Rodney Coffey, Razorleaf & Scott Stortz, ...
Integrating Autodesk Vault to PLM – Rodney Coffey, Razorleaf & Scott Stortz, ...
Synergis Engineering Design Solutions
 
Building a guided analytics forecasting platform with Knime
Building a guided analytics forecasting platform with KnimeBuilding a guided analytics forecasting platform with Knime
Building a guided analytics forecasting platform with Knime
Knoldus Inc.
 
Jps16
Jps16Jps16
SAP Engineering Control Center interface to PTC Creo: Product Presentation
SAP Engineering Control Center interface to PTC Creo: Product PresentationSAP Engineering Control Center interface to PTC Creo: Product Presentation
SAP Engineering Control Center interface to PTC Creo: Product Presentation
riessengineering
 
Change Management Options
Change Management Options Change Management Options
Change Management Options Aras
 
PTC Live: Integrating PTC Windchill with Cadence PCB Design
PTC Live: Integrating PTC Windchill with Cadence PCB DesignPTC Live: Integrating PTC Windchill with Cadence PCB Design
PTC Live: Integrating PTC Windchill with Cadence PCB DesignEMA Design Automation
 
InterConnect 2015 1930 - Top practices to ensure a successful IBM Business Pr...
InterConnect 2015 1930 - Top practices to ensure a successful IBM Business Pr...InterConnect 2015 1930 - Top practices to ensure a successful IBM Business Pr...
InterConnect 2015 1930 - Top practices to ensure a successful IBM Business Pr...
Brian Petrini
 
Mes SW Factory in Siemens AS MES - 2014.05.17 - mini Italian Agile Day - Genova
Mes SW Factory in Siemens AS MES - 2014.05.17 - mini Italian Agile Day - GenovaMes SW Factory in Siemens AS MES - 2014.05.17 - mini Italian Agile Day - Genova
Mes SW Factory in Siemens AS MES - 2014.05.17 - mini Italian Agile Day - Genova
icelands
 

What's hot (20)

Using ECO Manager automated change management software to improve productivity
Using ECO Manager automated change management  software to improve productivityUsing ECO Manager automated change management  software to improve productivity
Using ECO Manager automated change management software to improve productivity
 
Ptc creo dex sales presentation
Ptc creo dex sales presentationPtc creo dex sales presentation
Ptc creo dex sales presentation
 
Ptc creo aax_user-cases
Ptc creo aax_user-casesPtc creo aax_user-cases
Ptc creo aax_user-cases
 
Plural's PLM services presentation
Plural's PLM services presentationPlural's PLM services presentation
Plural's PLM services presentation
 
Agile PLM implementation and systems integration at sun microsystems
Agile PLM implementation and systems integration at sun microsystemsAgile PLM implementation and systems integration at sun microsystems
Agile PLM implementation and systems integration at sun microsystems
 
Engineering Change Management
Engineering Change Management Engineering Change Management
Engineering Change Management
 
Ptc creo fmx sales presentation
Ptc creo fmx sales presentationPtc creo fmx sales presentation
Ptc creo fmx sales presentation
 
Creo packaging and solution capabilities presentation (1) za sajta creo desig...
Creo packaging and solution capabilities presentation (1) za sajta creo desig...Creo packaging and solution capabilities presentation (1) za sajta creo desig...
Creo packaging and solution capabilities presentation (1) za sajta creo desig...
 
Ptc creo manikin sales presentation
Ptc creo manikin sales presentationPtc creo manikin sales presentation
Ptc creo manikin sales presentation
 
Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...
Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...
Discovering New Product Introduction using Autodesk PLM 360 – Rodney Coffey, ...
 
Plm & windchill
Plm & windchillPlm & windchill
Plm & windchill
 
ARAS - change management
ARAS - change managementARAS - change management
ARAS - change management
 
Integrating Autodesk Vault to PLM – Rodney Coffey, Razorleaf & Scott Stortz, ...
Integrating Autodesk Vault to PLM – Rodney Coffey, Razorleaf & Scott Stortz, ...Integrating Autodesk Vault to PLM – Rodney Coffey, Razorleaf & Scott Stortz, ...
Integrating Autodesk Vault to PLM – Rodney Coffey, Razorleaf & Scott Stortz, ...
 
Building a guided analytics forecasting platform with Knime
Building a guided analytics forecasting platform with KnimeBuilding a guided analytics forecasting platform with Knime
Building a guided analytics forecasting platform with Knime
 
Jps16
Jps16Jps16
Jps16
 
SAP Engineering Control Center interface to PTC Creo: Product Presentation
SAP Engineering Control Center interface to PTC Creo: Product PresentationSAP Engineering Control Center interface to PTC Creo: Product Presentation
SAP Engineering Control Center interface to PTC Creo: Product Presentation
 
Change Management Options
Change Management Options Change Management Options
Change Management Options
 
PTC Live: Integrating PTC Windchill with Cadence PCB Design
PTC Live: Integrating PTC Windchill with Cadence PCB DesignPTC Live: Integrating PTC Windchill with Cadence PCB Design
PTC Live: Integrating PTC Windchill with Cadence PCB Design
 
InterConnect 2015 1930 - Top practices to ensure a successful IBM Business Pr...
InterConnect 2015 1930 - Top practices to ensure a successful IBM Business Pr...InterConnect 2015 1930 - Top practices to ensure a successful IBM Business Pr...
InterConnect 2015 1930 - Top practices to ensure a successful IBM Business Pr...
 
Mes SW Factory in Siemens AS MES - 2014.05.17 - mini Italian Agile Day - Genova
Mes SW Factory in Siemens AS MES - 2014.05.17 - mini Italian Agile Day - GenovaMes SW Factory in Siemens AS MES - 2014.05.17 - mini Italian Agile Day - Genova
Mes SW Factory in Siemens AS MES - 2014.05.17 - mini Italian Agile Day - Genova
 

Similar to Building An ROI for 3DEXPERIENCE PLM

Product innovation & process innovation
Product innovation & process innovationProduct innovation & process innovation
Product innovation & process innovation
VijayKrKhurana
 
2-SE Process Models.pptx
2-SE Process Models.pptx2-SE Process Models.pptx
2-SE Process Models.pptx
MaryamMahjabeenYouni
 
Product Design.pptx
Product Design.pptxProduct Design.pptx
Product Design.pptx
RiadHasan25
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Chris Baichoo
 
Eliminate Bottlenecks in Software Development & Delivery
Eliminate Bottlenecks in Software Development & DeliveryEliminate Bottlenecks in Software Development & Delivery
Eliminate Bottlenecks in Software Development & Delivery
Micro Focus
 
3.2 Managing Engineering Design.ppt
3.2 Managing Engineering Design.ppt3.2 Managing Engineering Design.ppt
3.2 Managing Engineering Design.ppt
KrishnaGupta191
 
Microsoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case StudiesMicrosoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case Studies
meritweb
 
Process and Manufacturing Engineering..
Process and Manufacturing Engineering..Process and Manufacturing Engineering..
Process and Manufacturing Engineering..
RAFIQUL ISLAM
 
Process & Manufacturing Engineering
Process & Manufacturing EngineeringProcess & Manufacturing Engineering
Process & Manufacturing Engineering
RAFIQUL ISLAM
 
Process & Manufacturing Engineering
Process & Manufacturing EngineeringProcess & Manufacturing Engineering
Process & Manufacturing Engineering
RAFIQUL ISLAM
 
Software Process Models
Software Process ModelsSoftware Process Models
Software Process Models
Atul Karmyal
 
ISTQB - Software development life cycle
ISTQB - Software development life cycleISTQB - Software development life cycle
ISTQB - Software development life cycle
HoangThiHien1
 
Module-02.pptx
Module-02.pptxModule-02.pptx
Module-02.pptx
AbcXyz302255
 
Plant head (operation)
Plant head (operation)Plant head (operation)
Plant head (operation)
RAFIQUL ISLAM
 
Software Process Models
Software Process ModelsSoftware Process Models
Software Process Models
andyr91
 
Mod 1 Lecture_PDC.pdf
Mod 1 Lecture_PDC.pdfMod 1 Lecture_PDC.pdf
Mod 1 Lecture_PDC.pdf
sankaranarayanans23
 
Eng design 2
Eng design 2Eng design 2
Eng design 2
Masimbaashe Musekiwa
 

Similar to Building An ROI for 3DEXPERIENCE PLM (20)

3 f.pptx
3 f.pptx3 f.pptx
3 f.pptx
 
Product innovation & process innovation
Product innovation & process innovationProduct innovation & process innovation
Product innovation & process innovation
 
2-SE Process Models.pptx
2-SE Process Models.pptx2-SE Process Models.pptx
2-SE Process Models.pptx
 
Product Design.pptx
Product Design.pptxProduct Design.pptx
Product Design.pptx
 
Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006Using lean to reduce prototype lead time 2006
Using lean to reduce prototype lead time 2006
 
Eliminate Bottlenecks in Software Development & Delivery
Eliminate Bottlenecks in Software Development & DeliveryEliminate Bottlenecks in Software Development & Delivery
Eliminate Bottlenecks in Software Development & Delivery
 
3.2 Managing Engineering Design.ppt
3.2 Managing Engineering Design.ppt3.2 Managing Engineering Design.ppt
3.2 Managing Engineering Design.ppt
 
Microsoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case StudiesMicrosoft Dynamics AX Implementation Stabilization Case Studies
Microsoft Dynamics AX Implementation Stabilization Case Studies
 
Crivac Mark
Crivac MarkCrivac Mark
Crivac Mark
 
Process and Manufacturing Engineering..
Process and Manufacturing Engineering..Process and Manufacturing Engineering..
Process and Manufacturing Engineering..
 
Process & Manufacturing Engineering
Process & Manufacturing EngineeringProcess & Manufacturing Engineering
Process & Manufacturing Engineering
 
Process & Manufacturing Engineering
Process & Manufacturing EngineeringProcess & Manufacturing Engineering
Process & Manufacturing Engineering
 
Software Process Models
Software Process ModelsSoftware Process Models
Software Process Models
 
ISTQB - Software development life cycle
ISTQB - Software development life cycleISTQB - Software development life cycle
ISTQB - Software development life cycle
 
Module-02.pptx
Module-02.pptxModule-02.pptx
Module-02.pptx
 
Plant head (operation)
Plant head (operation)Plant head (operation)
Plant head (operation)
 
Pe ch 1
Pe ch   1Pe ch   1
Pe ch 1
 
Software Process Models
Software Process ModelsSoftware Process Models
Software Process Models
 
Mod 1 Lecture_PDC.pdf
Mod 1 Lecture_PDC.pdfMod 1 Lecture_PDC.pdf
Mod 1 Lecture_PDC.pdf
 
Eng design 2
Eng design 2Eng design 2
Eng design 2
 

More from Adaptive Corporation

EXALEAD OnePart Reuse Booklet
EXALEAD OnePart Reuse BookletEXALEAD OnePart Reuse Booklet
EXALEAD OnePart Reuse Booklet
Adaptive Corporation
 
Introduction to EXALEAD OnePart
Introduction to EXALEAD OnePartIntroduction to EXALEAD OnePart
Introduction to EXALEAD OnePart
Adaptive Corporation
 
Additive Manufacturing Series: Design Optimization
Additive Manufacturing Series: Design OptimizationAdditive Manufacturing Series: Design Optimization
Additive Manufacturing Series: Design Optimization
Adaptive Corporation
 
Additive Manufacturing Series: Why You Need 3D Printing In Additive Manufactu...
Additive Manufacturing Series: Why You Need 3D Printing In Additive Manufactu...Additive Manufacturing Series: Why You Need 3D Printing In Additive Manufactu...
Additive Manufacturing Series: Why You Need 3D Printing In Additive Manufactu...
Adaptive Corporation
 
Progress your PLM: Stop Using Excel for Issue Management
Progress your PLM: Stop Using Excel for Issue ManagementProgress your PLM: Stop Using Excel for Issue Management
Progress your PLM: Stop Using Excel for Issue Management
Adaptive Corporation
 
Simulation in Action: Fatigue Analysis on 1243 Scraper Tail
Simulation in Action: Fatigue Analysis on 1243 Scraper Tail Simulation in Action: Fatigue Analysis on 1243 Scraper Tail
Simulation in Action: Fatigue Analysis on 1243 Scraper Tail
Adaptive Corporation
 

More from Adaptive Corporation (6)

EXALEAD OnePart Reuse Booklet
EXALEAD OnePart Reuse BookletEXALEAD OnePart Reuse Booklet
EXALEAD OnePart Reuse Booklet
 
Introduction to EXALEAD OnePart
Introduction to EXALEAD OnePartIntroduction to EXALEAD OnePart
Introduction to EXALEAD OnePart
 
Additive Manufacturing Series: Design Optimization
Additive Manufacturing Series: Design OptimizationAdditive Manufacturing Series: Design Optimization
Additive Manufacturing Series: Design Optimization
 
Additive Manufacturing Series: Why You Need 3D Printing In Additive Manufactu...
Additive Manufacturing Series: Why You Need 3D Printing In Additive Manufactu...Additive Manufacturing Series: Why You Need 3D Printing In Additive Manufactu...
Additive Manufacturing Series: Why You Need 3D Printing In Additive Manufactu...
 
Progress your PLM: Stop Using Excel for Issue Management
Progress your PLM: Stop Using Excel for Issue ManagementProgress your PLM: Stop Using Excel for Issue Management
Progress your PLM: Stop Using Excel for Issue Management
 
Simulation in Action: Fatigue Analysis on 1243 Scraper Tail
Simulation in Action: Fatigue Analysis on 1243 Scraper Tail Simulation in Action: Fatigue Analysis on 1243 Scraper Tail
Simulation in Action: Fatigue Analysis on 1243 Scraper Tail
 

Recently uploaded

An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.
Any kyc Account
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
LuanWise
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
Norma Mushkat Gaffin
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
bosssp10
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
JeremyPeirce1
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
NZSG
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
DerekIwanaka1
 
Auditing study material for b.com final year students
Auditing study material for b.com final year  studentsAuditing study material for b.com final year  students
Auditing study material for b.com final year students
narasimhamurthyh4
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
Corey Perlman, Social Media Speaker and Consultant
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
daothibichhang1
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Lviv Startup Club
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 

Recently uploaded (20)

An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.An introduction to the cryptocurrency investment platform Binance Savings.
An introduction to the cryptocurrency investment platform Binance Savings.
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
Top mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptxTop mailing list providers in the USA.pptx
Top mailing list providers in the USA.pptx
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
BeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdfBeMetals Investor Presentation_June 1, 2024.pdf
BeMetals Investor Presentation_June 1, 2024.pdf
 
Auditing study material for b.com final year students
Auditing study material for b.com final year  studentsAuditing study material for b.com final year  students
Auditing study material for b.com final year students
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
 
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.docBài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
Bài tập - Tiếng anh 11 Global Success UNIT 1 - Bản HS.doc
 
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
Evgen Osmak: Methods of key project parameters estimation: from the shaman-in...
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 

Building An ROI for 3DEXPERIENCE PLM

  • 1. adaptivecorp.com BUILDING AN ROI FOR 3DEXPERIENCE PLM 1 Business Challenge: Difficulty sharing information between departments and/or locations Design intent is not accurately maintained during manufacturing Difficulty coordinating all product development stakeholders Business Implication: • Designs are getting accidentally overwritten, which causes rework. • Product development staff is not reusing existing designs, which causes rework. • Some design data is being exposed to people that should not see it resulting in the product being manufactured with outdated information, which causes rework. • Product engineering does not define permissible changes to make in manufacturing, which impacts product quality. • Manufacturing make part changes that alter design intent and impact how desirable product feature are delivered to customers. • Rework occurs because all impacts of a product change are not evaluated. • The company is having difficulty bringing products to market on- time and on-budget with the planned product scope. Metrics to Quantify • Lost productivity due to poor reuse • Lost productivity from rework • Cost of merchandise returns • Lower sales achievement due to missed product capabilities • Rework and quality costs due to poor change impact analysis • Lower sales due to late product launches • Suck cost of non-viable projects
  • 2. adaptivecorp.com QUESTIONS TO ASK FOR DETERMINING ROI METRICS 2 Business Challenge: Difficulty sharing information between departments and/or locations Design intent is not accurately maintained during manufacturing Difficulty coordinating all product development stakeholders Questions to Ask • Do CAD assemblies ever have unresolved component references because they have been overwritten or stored in an incorrect location? What is the cost of this rework? • Are designers unnecessarily working on designs that already exist because they cannot easily search for completed designs that fit their needs? What is the cost of the time spent on this redesign effort? • Do you have issues where employees are accessing design data before it has been released from engineering, or that is no longer the latest revision? What is the cost of rework due to tasks done with outdated data? • Do manufacturing personnel make decisions due to production issues that cause parts to manufactured differently and affect quality? What is the cost of merchandise returns due to avoidable quality issues? • Are changes made in manufacturing that affect design intent and the delivered product capabilities? Did product sales decrease because the manufactured product did not deliver specified capabilities? • Are you able to coordinate changes across different engineering disciplines (mechanical, electronics and software, manufacturing, etc.? If not, what is the rework and quality costs due to not properly assessing change impact? • Are you having difficulty tracking the development project progress and resolving bottlenecks proactively? What is the missed revenue due to late product launches? Have you had project cost overruns that affect margins? • Are executives able to easily track when to abandon projects that are not achieving necessary milestones for profitability? What has been the sunk cost of these projects?