Town Planning Pimpri Chinchwad Municipal Corporation Dipesh Jain
town planning
Pimpri Chinchwad
municipal corporation
case study
pune
introduction
information
location
climate
governing body
Pcmc schemes
vision
It firms
social
recreational facilities
Instutional setup
Projects executed
BRT'S project
Bus station
Town Planning Pimpri Chinchwad Municipal Corporation Dipesh Jain
town planning
Pimpri Chinchwad
municipal corporation
case study
pune
introduction
information
location
climate
governing body
Pcmc schemes
vision
It firms
social
recreational facilities
Instutional setup
Projects executed
BRT'S project
Bus station
Chennai the fourth largest metropolis in India. Chennai Metropolitan Area (CMA) extends over 1189 sq.km.and comprises of
Chennai Corporation,
16 Municipalities,
20 Town Panchayats and
214 villages covered in 10 Panchayats Unions
It encompasses the Chennai District (176 sq.km.), part of Thiruvallur District (637 sq.km.) and a part of Kancheepuram District (376 sq.km.).
City profile of chennai- history,demograpgy,census and transportation and issues in chennai
Note: animation content download and see slide only in slide show for more brief
Chennai the fourth largest metropolis in India. Chennai Metropolitan Area (CMA) extends over 1189 sq.km.and comprises of
Chennai Corporation,
16 Municipalities,
20 Town Panchayats and
214 villages covered in 10 Panchayats Unions
It encompasses the Chennai District (176 sq.km.), part of Thiruvallur District (637 sq.km.) and a part of Kancheepuram District (376 sq.km.).
City profile of chennai- history,demograpgy,census and transportation and issues in chennai
Note: animation content download and see slide only in slide show for more brief
Is the PMC a seat of bad governance? The Devnadi case studyAnupam Saraph
Slides for presentation at the Regional seminar on "Media, Human Development and Governance" on "Is the PMC a seat of bad governance? The Devnadi case study".
A quick summary of how bad governance is the chronic way of life at the PMC.
Pune Metro plan & 4 FSI proposal - Presentation on Issues & Impacts (Sept 201...Prashant Inamdar
We are not against Metro as a mode of mass transport. Why Pune Metro project has become a matter of great concern is because despite serious issues, DMRC’s Pune Metro DPR was blindly approved by Pune Municipal Corporation (PMC) without any independent study, transparency and public consultations. Subsequently PMC has also approved a proposal to grant 4 FSI in the Metro influence zone of 500 mtr on either side of Metro corridor. It is necessary that Citizens should have information about the Metro and 4 FSI plans so that they can form own opinion regarding whether they would want these plans to be implemented.
This presentation giving basic information about the Metro & 4 FSI plans and related issues & impacts has been prepared in a citizen friendly language & format for public information and awareness. (Updated in September 2014).
We present a case study of how Racine, Wis., a coastal city, is using its formerly industrial riverfront as a lynchpin for an ambitious revitalization project that marries the goals of economic redevelopment, environmental improvement, and bringing the public back to the water. This presentation was given by Helen Sarakinos, Policy Program Director, River Alliance of Wisconsin.
By Shivanand Swamy. Presented at Day One of Transforming Transportation 2010. Washington, D.C. January 14, 2010.
www.transformingtransportation2010.org
This Presentation shows a comparative study of 5 construction projects in India & abroad enabling us to understand the process of conducting Pre-Project feasibility analysis.
State of ICS and IoT Cyber Threat Landscape Report 2024 previewPrayukth K V
The IoT and OT threat landscape report has been prepared by the Threat Research Team at Sectrio using data from Sectrio, cyber threat intelligence farming facilities spread across over 85 cities around the world. In addition, Sectrio also runs AI-based advanced threat and payload engagement facilities that serve as sinks to attract and engage sophisticated threat actors, and newer malware including new variants and latent threats that are at an earlier stage of development.
The latest edition of the OT/ICS and IoT security Threat Landscape Report 2024 also covers:
State of global ICS asset and network exposure
Sectoral targets and attacks as well as the cost of ransom
Global APT activity, AI usage, actor and tactic profiles, and implications
Rise in volumes of AI-powered cyberattacks
Major cyber events in 2024
Malware and malicious payload trends
Cyberattack types and targets
Vulnerability exploit attempts on CVEs
Attacks on counties – USA
Expansion of bot farms – how, where, and why
In-depth analysis of the cyber threat landscape across North America, South America, Europe, APAC, and the Middle East
Why are attacks on smart factories rising?
Cyber risk predictions
Axis of attacks – Europe
Systemic attacks in the Middle East
Download the full report from here:
https://sectrio.com/resources/ot-threat-landscape-reports/sectrio-releases-ot-ics-and-iot-security-threat-landscape-report-2024/
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf91mobiles
91mobiles recently conducted a Smart TV Buyer Insights Survey in which we asked over 3,000 respondents about the TV they own, aspects they look at on a new TV, and their TV buying preferences.
Software Delivery At the Speed of AI: Inflectra Invests In AI-Powered QualityInflectra
In this insightful webinar, Inflectra explores how artificial intelligence (AI) is transforming software development and testing. Discover how AI-powered tools are revolutionizing every stage of the software development lifecycle (SDLC), from design and prototyping to testing, deployment, and monitoring.
Learn about:
• The Future of Testing: How AI is shifting testing towards verification, analysis, and higher-level skills, while reducing repetitive tasks.
• Test Automation: How AI-powered test case generation, optimization, and self-healing tests are making testing more efficient and effective.
• Visual Testing: Explore the emerging capabilities of AI in visual testing and how it's set to revolutionize UI verification.
• Inflectra's AI Solutions: See demonstrations of Inflectra's cutting-edge AI tools like the ChatGPT plugin and Azure Open AI platform, designed to streamline your testing process.
Whether you're a developer, tester, or QA professional, this webinar will give you valuable insights into how AI is shaping the future of software delivery.
Essentials of Automations: Optimizing FME Workflows with ParametersSafe Software
Are you looking to streamline your workflows and boost your projects’ efficiency? Do you find yourself searching for ways to add flexibility and control over your FME workflows? If so, you’re in the right place.
Join us for an insightful dive into the world of FME parameters, a critical element in optimizing workflow efficiency. This webinar marks the beginning of our three-part “Essentials of Automation” series. This first webinar is designed to equip you with the knowledge and skills to utilize parameters effectively: enhancing the flexibility, maintainability, and user control of your FME projects.
Here’s what you’ll gain:
- Essentials of FME Parameters: Understand the pivotal role of parameters, including Reader/Writer, Transformer, User, and FME Flow categories. Discover how they are the key to unlocking automation and optimization within your workflows.
- Practical Applications in FME Form: Delve into key user parameter types including choice, connections, and file URLs. Allow users to control how a workflow runs, making your workflows more reusable. Learn to import values and deliver the best user experience for your workflows while enhancing accuracy.
- Optimization Strategies in FME Flow: Explore the creation and strategic deployment of parameters in FME Flow, including the use of deployment and geometry parameters, to maximize workflow efficiency.
- Pro Tips for Success: Gain insights on parameterizing connections and leveraging new features like Conditional Visibility for clarity and simplicity.
We’ll wrap up with a glimpse into future webinars, followed by a Q&A session to address your specific questions surrounding this topic.
Don’t miss this opportunity to elevate your FME expertise and drive your projects to new heights of efficiency.
Search and Society: Reimagining Information Access for Radical FuturesBhaskar Mitra
The field of Information retrieval (IR) is currently undergoing a transformative shift, at least partly due to the emerging applications of generative AI to information access. In this talk, we will deliberate on the sociotechnical implications of generative AI for information access. We will argue that there is both a critical necessity and an exciting opportunity for the IR community to re-center our research agendas on societal needs while dismantling the artificial separation between the work on fairness, accountability, transparency, and ethics in IR and the rest of IR research. Instead of adopting a reactionary strategy of trying to mitigate potential social harms from emerging technologies, the community should aim to proactively set the research agenda for the kinds of systems we should build inspired by diverse explicitly stated sociotechnical imaginaries. The sociotechnical imaginaries that underpin the design and development of information access technologies needs to be explicitly articulated, and we need to develop theories of change in context of these diverse perspectives. Our guiding future imaginaries must be informed by other academic fields, such as democratic theory and critical theory, and should be co-developed with social science scholars, legal scholars, civil rights and social justice activists, and artists, among others.
Epistemic Interaction - tuning interfaces to provide information for AI supportAlan Dix
Paper presented at SYNERGY workshop at AVI 2024, Genoa, Italy. 3rd June 2024
https://alandix.com/academic/papers/synergy2024-epistemic/
As machine learning integrates deeper into human-computer interactions, the concept of epistemic interaction emerges, aiming to refine these interactions to enhance system adaptability. This approach encourages minor, intentional adjustments in user behaviour to enrich the data available for system learning. This paper introduces epistemic interaction within the context of human-system communication, illustrating how deliberate interaction design can improve system understanding and adaptation. Through concrete examples, we demonstrate the potential of epistemic interaction to significantly advance human-computer interaction by leveraging intuitive human communication strategies to inform system design and functionality, offering a novel pathway for enriching user-system engagements.
Accelerate your Kubernetes clusters with Varnish CachingThijs Feryn
A presentation about the usage and availability of Varnish on Kubernetes. This talk explores the capabilities of Varnish caching and shows how to use the Varnish Helm chart to deploy it to Kubernetes.
This presentation was delivered at K8SUG Singapore. See https://feryn.eu/presentations/accelerate-your-kubernetes-clusters-with-varnish-caching-k8sug-singapore-28-2024 for more details.
GraphRAG is All You need? LLM & Knowledge GraphGuy Korland
Guy Korland, CEO and Co-founder of FalkorDB, will review two articles on the integration of language models with knowledge graphs.
1. Unifying Large Language Models and Knowledge Graphs: A Roadmap.
https://arxiv.org/abs/2306.08302
2. Microsoft Research's GraphRAG paper and a review paper on various uses of knowledge graphs:
https://www.microsoft.com/en-us/research/blog/graphrag-unlocking-llm-discovery-on-narrative-private-data/
JMeter webinar - integration with InfluxDB and GrafanaRTTS
Watch this recorded webinar about real-time monitoring of application performance. See how to integrate Apache JMeter, the open-source leader in performance testing, with InfluxDB, the open-source time-series database, and Grafana, the open-source analytics and visualization application.
In this webinar, we will review the benefits of leveraging InfluxDB and Grafana when executing load tests and demonstrate how these tools are used to visualize performance metrics.
Length: 30 minutes
Session Overview
-------------------------------------------
During this webinar, we will cover the following topics while demonstrating the integrations of JMeter, InfluxDB and Grafana:
- What out-of-the-box solutions are available for real-time monitoring JMeter tests?
- What are the benefits of integrating InfluxDB and Grafana into the load testing stack?
- Which features are provided by Grafana?
- Demonstration of InfluxDB and Grafana using a practice web application
To view the webinar recording, go to:
https://www.rttsweb.com/jmeter-integration-webinar
3. Would Like to Share
About Pimpri Chinchwad City
Institutional Set Up & Key Responsibilities
BRTS Projects
Progress / Achievements / Work completed
Bus Station
ITMS
.
5. Located towards North of Pune
Area of 181 sq.km
Population: 1.8 million (approx)
PCMC received “BEST CITY “ award
0n 13th
Dec.2012 From GOI for its
best performance in JnNURM
• Area under Green Cover: 27%
• Annual Budget (2013-2014): Rs.
1800 Cr.
• Credit Rating: AA+ (SO) by CRISIL
Ratings (S&P)
Pimpri Chinchwad at a Glance
6. Vibrant city in the state of Maharashtra, India
Strong industrial base
Small & medium industrial units of about 6,000
Large industrial units of about 50
Auto and ancillary industrial Hub
8. Social and recreational facilities
Strong Social Infrastructure with Municipal
Hospitals and Dispensaries, Public Gardens,
Libraries, Auditoriums, Play grounds etc.
Strong educational infrastructure including
Municipal Schools, Medical, Engineering, IT and
Management institutes.
9. Population growth
The city has a population of about 1.8 millions growing annually at
over 6% p.a. (national average 2.1%)
Growth is fuelled by prospects of economic activity, good quality
of infrastructure services and strong connectivity to the industrial
capital of India i.e. Mumbai
Population Growth
0
200,000
400,000
600,000
800,000
1,000,000
1,200,000
1951 1961 1971 1981 1991 2001
Year
Population
Population
Growth of
PCMC
11. Pimpri – Chinchwad Municipal Corporation (PCMC) constituted in
the year 1982
The body constitutes of
Elected wing headed by – Mayor
Administrative wing headed by – Municipal Commissioner
We manage about 181 sq.kms of area through our 4 Ward offices
We have over 40 departments with a workforce of about 7500
employees
Institutional set up
12. Institutional set up
We are fully e-governed Corporation
We received International Organization of
Standard (ISO) Certification (ISO 9001:2008) for
Quality Management System.
13. Responsible for
Area planning
Infrastructure planning, implementation and operation &
maintenance of services in the areas of
Water Supply,
Sewerage and Sanitation,
Solid Waste Management,
Roads and Transportation,
Street lighting,
Health and recreational facilities,
Education (134 primary and 18 secondary schools)
Preservation of natural heritage (river conservation),
Development of housing facility for urban poor/ slums.
14. Vision
To make Pimpri Chinchwad, a city of and for the next generation
Economically vibrant, attracting top business houses
And meet the requirements of all its citizens
A city to Live, Spend and Entertain
16. BRTSPROJECTSIN PCMC AREA
AUNDH RAWET
ROAD Length =
14.50 Km.
Tender Cost
=191.40
KALEWADI
ROAD Length =
10.275 Km.
Tender Cost
=219.20
NASHIK PHATA
ROAD Length =
7.90 Km. Tender
Cost =206.80
PUNE MUMBAI
ROAD Length =
11.90 Km.
Tender Cost
=120.74
Total BRTS Corridor Length = 44.575 Km.
First
Intersection
Second
Intersection
17. DESCRIPTION OF REVISIONS INTIALS
A B C
REV DATE
NTS
SCALE:
R1/R2 22-12-2006
TYPICAL CROSS SECTION
61mBRTSCROSSSECTION
18. 45MBRTSCROSSSECTION
REVISEDTYPICAL CROSSSECTIONFOR45.0M
300
REVISEDTYPICAL CROSSSECTIONWITHBUSSTOP
300
CLIENTPROJECTDRAWING TITLE
SCALE-:1:100
DATEREV.
DATE : -09/12/2011DRG. NO:-CVKCPL/PCMC/ANNUITY/KALEWADI/CROSS-SECTION/45.00m/04
STATUS
C.V.KAND CONSULTANTS
PRIVATE LIMITED
CONSTRUCTUION OF BRTS CORRIDOR
KALEWADI TO DEHU-ALANDI ROAD
(PACKAGE-II)
FROM CH:-1+600 TO 3+000
4108
.
11
icaM
k iTbaQdajanaiht aya
mahanagar pail aka
REVISED TYPICAL CROSS SECTION & PLAN
FOR 45.00 m WIDE ROAD
PIMPRI CHINCHWAD MUNICIPAL CORPORATION
15/07/2011R1
R2 08/12/2011
R3 22/12/2011
SHEET 1 OF 1
19. Corridor No 1 2 3 4
BRT
CORRIDOR
Pune-Mumbai
Highway
Aundh Ravet Road
Nashik Phata To
Wakad
Kalewadi Phata to
Dehu Alandi
Length in KM. 12.00 14.50 8.00
10.275
Expected
Project Cost
on completion
Rs. In. Cr.
254.59 305.00 227.00 241.00
Expenditure as
on 31St
March
2013. Rs. In.
Cr.
254.59 229.65 180.82 86.50
Expected
Completion
Date
Dec 2013 Dec 2013 Dec 2013 Oct. 2014
BRTS Project Status
20. BRTS Project status
Corridor No 1 2 3 4
BRT CORRIDOR
Pune-Mumbai Highway Aundh Ravet Road Nashik Phata To Wakad
Kalewadi Phata to Dehu
Alandi
Present Status
• Work is completed
• 16 BRT bus
stations are under
construction on
PPP basis.
• Remaining 20 BRT
bus stations will be
completed by Dec-
13.
• Out of 16 BRT bus
stations 12 bus
stations completed
& remaining 4 are
in progress.
• Unless all bus
stations (16+20)
completed BRT
service cannot be
started, so far all
bus station will be
completed by Dec.
13.
• Length 14.50
Km- length 10.5
km completed.
• 4.00 km work is
in Progress.
Defence land is
transferred in the
month of Aug.12.
• 20 bus stations
are planned &
execution will be
completed by
Dec 13.
• Work is in Progress.
• 83% of flyover work is
completed and total
completion is
expected by Oct. 13.
• Road work is in
Progress. Defence
land is transferred in
the month of Aug.12.
• 75% of road work is
completed other than
WP in High
Court/District Court
against land
acquisition. (600m
length of road out of
7.90 km).
• 15 bus stations are
planned & execution
will be completed by
Dec 13.
• Work is in
Progress.
• 28% of flyover work
is completed and
stipulated date of
completion is Oct.
13 and extension of
time requested is
31st
Aug 2014.
• Road work is in
Progress.
• WP in High Court
against land
acquisition.
Rehabilitation &
Resettlement of 184
PAP’s is in process
(1.6 km out of
10.275).
• 19 bus stations are
planned &
execution will be
completed by Oct
14.
21. BRTS SUTP PROJECT STATUS
BRT CORRIDOR :- Aundh- Ravet Road
SECTION – IV WORK COMPLETED
SECTION – III WORK COMPLETED
22. BRTS SUTP PROJECT STATUS
BRT CORRIDOR :- Aundh- Ravet Road
SECTION – VI WORK COMPLETED
SECTION – V WORK COMPLETED
23. BRTS SUTP PROJECT STATUS
BRT CORRIDOR :- Aundh- Ravet Road
SECTION – I & II WORK IN PROGRESS
SECTION – VII WORK COMPLETED
24. BRTS SUTP PROJECT STATUS
BRT CORRIDOR :- Nashik Phata To Wakad (8 Km)
NASHIK PHATA JUNCTION - 2nd
Tier
NASHIK PHATA JUNCTION - 1st
Tier
25. BRTS SUTP PROJECT STATUS
BRT CORRIDOR :- Nashik Phata To Wakad (8 Km)
ROAD WORK IN PROGRESS
26. BRTS SUTP PROJECT STATUS
BRT CORRIDOR :- Kalewadi Phata to Dehu Alandi (10.2 Km)
EMPIRE ESTATE PORTION
SEGEMENT CASTING YARD
27. BRTS SUTP PROJECT STATUS
BRT CORRIDOR :- Kalewadi Phata to Dehu Alandi (10.2 Km)
ROAD WORK IN PROGRESS
32. The Intelligent Transit Management System (ITMS) shall comprise of
the following distinctive applications.
• Automated Fare Collection System
• GPS based Fleet Monitoring System
• Vehicle Scheduling & Dispatch System
• Passenger Information System
• Financial Management System / Central Clearing House System
• Depot Management System & Bus Terminal Management System
• Incident Management System / Call centre Management System
• Business Intelligent System
• Enterprise Management System
The estimated cost is Rs.19.07 Cr. for both hardware & software part
of ITMS. The total O & M cost for 6 years on annuity basis is worked out
as Rs. 30.65 Cr.
ITMS
33. Technical Studies
Procurement of Consultant for
Monitoring & Evaluation of BTRS services on all 4 corridors in PCMC area
—
IBI Group, Canada has been appointed on 1st
March 2013.
Access plan to BRT corridor by Pedestrian & NMT–
Proposal from MVA Asia consultancy is in process of acceptance.
Parking policy & Management --
Proposal from UMTC consultancy is in process of acceptance.
Promotion & Out reach Program –
Proposal from IBI Group Canada consultancy is in process of
acceptance.
Consultancy for O & D survey of corridor No. 3&4 –
Aakar Abhinav,Mumbai has been appointed on 1st
March 2013.
Consultancy for Safety Audit of Pune –Mumbai Road.
Proposal from IIT Mumbai (Powai) is in process of acceptance.