JnNURM Scheme
• In 2005, the Ministry of Urban Development (MoUD), Government of India (GoI) launched the Jawaharlal Nehru
National Urban Renewal Mission (JnNURM).
• The aim of the mission was to encourage urban level reforms and fast track planned infrastructure development
of the 65 mission cities.
• The duration of the mission was from 2005-‘06 to 2011-‘12.
• However, since most of the projects have not been duly completed, the government has extended the mission
until March, 2014.
• water supply, sanitation, sewerage, solid waste management,
road network, urban transport and redevelopment of old
cities, etc.Urban Infrastructure and
Governance
• Integrating the development of slums through projects for
providing shelter, basic services and other related civic
amenities with a view to provide utilities to the urban poor.
Basic Services to the Urban Poor
Administered by the Ministry of Urban Development
Ministry of Urban Employment and Poverty Alleviation
ThemissioncomprisesoftwoSub-Missions
JnNURM Bus Funding Scheme
• On December 3, 2009 Goal announced that as a part of the second stimulus package, the funding for buses
for urban transport would be given under JnNURM as an incentive to cities and states across the country to
implement bus based public transport systems.
• The scheme guidelines were as follows :
Population of the mission
cities
Central Assistance State Assistance ULBs/ Parastatals/ Loans from
FIs
More than 4 million 35 per cent 15 per cent 50 per cent
1-4 million 50 per cent 20 per cent 30 per cent
Less than1 million 80 per cent 10 per cent 10 per cent
Jammu and Kashmir & North-
Eastern States
90 per cent 10 per cent -
• Under Central Financial Assistance, funds would be released as Additional Central Assistance (ACA) to the
State Governments or the State level Nodal Agency.
• The funds will be released in instalments.
Central Financial Assistance
The first instalment of
50 per cent will be
released upon the
sanction of the project
from the competent
authority.
The second instalment of 40 per cent
of ACA will be released upon the
receipt of Utilization Certificates (UC)
to the extent of 70 per cent of the
grants (Centre and State) and subject
to route permission from the
competent transport authority
The third instalment of 10 per
cent of ACA will be released upon
receipts of UCs to the extent of 70
per cent of the grants (Centre and
State) and subject to
commencement of satisfactory
service operations.
• Additional sales tax on petrol, additional registration fee on four-wheelers and two-wheelers, high
registration fee for personal vehicles running on diesel, annual renewal fee on driving license and
vehicle registration, etc. may be used to draw sources for the Dedicated Urban Transport Fund at
the State level.
• The funds so generated by the States can be used for new projects in urban transport.
State Urban Transport Fund
City Urban Transport Fund
• The cities can generate fund out of betterment levy on land in areas which benefit by investment
in urban transport projects; rationalization of parking-fee, property development tax,
advertisement revenue on transit corridors, etc.
• This fund at the city level can be used for establishing a fare contingency fund and to provide
ULBs' share for funding the urban transport projects.
Amritsar BRTS
(A Project sanctioned under JnNURM on January 21, 2014)
• Government of Punjab through Punjab Bus Metro Society (PBMS) has taken up the task of implementation
of Bus Rapid Transit System (BRTS) for the cities of Amritsar and Ludhiana.
• PBMS has engaged UMTC, A joint venture company of M/S IL&FS Ltd. and Ministry of Urban Development
(MoUD), GoI to carry out the design, securing approvals, tendering and project management consultancy for
complete implementation of BRTS in the cities of Amritsar and Ludhiana.
Proposed BRTS Corridors
A 31 km of BRT corridor has been proposed in city with median side double docking stations
1. Atari Road – ISBT to India Gate via Bhandari Bridge, GNDU, Chheharta (12 km);
2. Jalandhar Road – ISBT to MCA Gate via Tarawalan Pul (6 km); and
3. Verka Road – ISBT to Verka via Hussainpura Bridge, G. T. Road Bypass (13 km)
Total Project Cost is 495.54 Crores
Item Cost
1 Development Including Roads, Drainage, Street Lighting & Street Furniture 210.37
2 Foot Over Bridge 3.91
3 Bicycle Sharing Stand 0.16
4 Bus Shelter 17.17
5 Elevated BRT Corridor On Verka Road 127.67
6 Retrofitted Bus Stops At Existing Elevated Road 8.74
7 Rob At Verka Railway Crossing 40.82
8 Improvement Of Bhandari Bridge 35.43
9 Cost Of Depot 7.55
10 Cost Of ITS Infrastructure 28.07
11 Cost Of Provision For Pedestians Crossings Along BRTS Corridors 1.23
12 Contingencies @ 3% 14.43
GRAND TOTAL ALL ITEMS ( Rs. In Crores) 495.54
Sharing of Funds for Amritsar BRTS project is in proportion of 50:20:30. DPR was submitted to MOUD on
26th October 2013
Source of funding Sharing % Sharing amount
GOI 50% 247.77
GOP (share will be borne by PBMS) 20% 99.108
MC Amritsar (through PBMS) 30% 148.662
Total project cost 495.54
The total cost and funding pattern of the buses is given below :
Bus Types JNNURM /GOI State/PBMS Amritsar Municipal
Corporation (ULB)
Total (Rs Crores)
Standard AC Bus 900 mm
Diesel
50% 20% 30% 100%
Total in Rs. Crores 41.85 16.74 25.11 83.70
The 93 buses for BRT have been also proposed to procure under JNNURM Bus funding scheme for which DPR
has been approved by MOUD in the CSMC meet on 20th Feb 2014.
(Population – 2490656 (1-4 million))
Role of centre and state in finance of urban development project

More Related Content

What's hot

Bus procurement
Bus procurement Bus procurement
Bus procurement
AMIT BHARTI
 
Multi model integration of bus and train services mira bhayandar
Multi model integration of bus and train services mira bhayandarMulti model integration of bus and train services mira bhayandar
Multi model integration of bus and train services mira bhayandar
unclecruise
 
The Current Transport Policy Environment
The Current Transport Policy Environment The Current Transport Policy Environment
The Current Transport Policy Environment
Bakhtiar Zein
 
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements   Sbs Transist Vs SmrtAfa Interpretation Of Financial Statements   Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
ruoting
 
Pimpri-Chinchwad Municipal Corporation BRTS Project
Pimpri-Chinchwad Municipal Corporation BRTS ProjectPimpri-Chinchwad Municipal Corporation BRTS Project
Pimpri-Chinchwad Municipal Corporation BRTS Project
WRI Ross Center for Sustainable Cities
 
Vellore cmp
Vellore cmpVellore cmp
Vellore cmp
Rayala Spandana
 
CUSTOMER SATISFACTION LEVELS IN PUNE MUNICIPAL TRANSPORT
CUSTOMER SATISFACTION LEVELS IN PUNE MUNICIPAL TRANSPORTCUSTOMER SATISFACTION LEVELS IN PUNE MUNICIPAL TRANSPORT
CUSTOMER SATISFACTION LEVELS IN PUNE MUNICIPAL TRANSPORT
Curator PPT
 
Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...
Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...
Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...
Centre for Public Policy Research
 
City Structure and Urban Mobility
City Structure and Urban MobilityCity Structure and Urban Mobility
City Structure and Urban Mobility
WRI Ross Center for Sustainable Cities
 
Brts
BrtsBrts
Brts
Aj Reddy
 
PROMOTING BICYCLE TRANSPORT ON SECONDARY ROADS
PROMOTING BICYCLE TRANSPORT ON SECONDARY ROADSPROMOTING BICYCLE TRANSPORT ON SECONDARY ROADS
PROMOTING BICYCLE TRANSPORT ON SECONDARY ROADS
Krishna Saw
 
Estimating residential public transport trip generation rates
Estimating residential public transport trip generation ratesEstimating residential public transport trip generation rates
Estimating residential public transport trip generation rates
JumpingJaq
 
Town Planning Pimpri Chinchwad Municipal Corporation
Town Planning Pimpri Chinchwad Municipal Corporation Town Planning Pimpri Chinchwad Municipal Corporation
Town Planning Pimpri Chinchwad Municipal Corporation
Dipesh Jain
 
Possibilities for Bus Lane System
Possibilities for Bus Lane SystemPossibilities for Bus Lane System
Possibilities for Bus Lane System
guestf2886b
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015
Norma Nun
 
Comprehensive mobility plan jaipur
Comprehensive mobility plan jaipur Comprehensive mobility plan jaipur
Comprehensive mobility plan jaipur
Satyam Rai
 
Comprehensive mobility plan , patna
Comprehensive mobility plan , patnaComprehensive mobility plan , patna
Comprehensive mobility plan , patna
Md Faizan Danish
 
An Integrated Transport Systems Approach to Solving Bangalore's Mobility Prob...
An Integrated Transport Systems Approach to Solving Bangalore's Mobility Prob...An Integrated Transport Systems Approach to Solving Bangalore's Mobility Prob...
An Integrated Transport Systems Approach to Solving Bangalore's Mobility Prob...
WRI Ross Center for Sustainable Cities
 
062. Comprehensive Mobility Plan Brt
062. Comprehensive Mobility Plan   Brt062. Comprehensive Mobility Plan   Brt
062. Comprehensive Mobility Plan Brt
Ranjit Gadgil
 
Moscow, comprehensive mobility plan
Moscow, comprehensive mobility planMoscow, comprehensive mobility plan
Moscow, comprehensive mobility plan
shubham sharma
 

What's hot (20)

Bus procurement
Bus procurement Bus procurement
Bus procurement
 
Multi model integration of bus and train services mira bhayandar
Multi model integration of bus and train services mira bhayandarMulti model integration of bus and train services mira bhayandar
Multi model integration of bus and train services mira bhayandar
 
The Current Transport Policy Environment
The Current Transport Policy Environment The Current Transport Policy Environment
The Current Transport Policy Environment
 
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements   Sbs Transist Vs SmrtAfa Interpretation Of Financial Statements   Sbs Transist Vs Smrt
Afa Interpretation Of Financial Statements Sbs Transist Vs Smrt
 
Pimpri-Chinchwad Municipal Corporation BRTS Project
Pimpri-Chinchwad Municipal Corporation BRTS ProjectPimpri-Chinchwad Municipal Corporation BRTS Project
Pimpri-Chinchwad Municipal Corporation BRTS Project
 
Vellore cmp
Vellore cmpVellore cmp
Vellore cmp
 
CUSTOMER SATISFACTION LEVELS IN PUNE MUNICIPAL TRANSPORT
CUSTOMER SATISFACTION LEVELS IN PUNE MUNICIPAL TRANSPORTCUSTOMER SATISFACTION LEVELS IN PUNE MUNICIPAL TRANSPORT
CUSTOMER SATISFACTION LEVELS IN PUNE MUNICIPAL TRANSPORT
 
Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...
Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...
Data Compilation on Urban Metropolitan Transport Authority (UMTA) of Differen...
 
City Structure and Urban Mobility
City Structure and Urban MobilityCity Structure and Urban Mobility
City Structure and Urban Mobility
 
Brts
BrtsBrts
Brts
 
PROMOTING BICYCLE TRANSPORT ON SECONDARY ROADS
PROMOTING BICYCLE TRANSPORT ON SECONDARY ROADSPROMOTING BICYCLE TRANSPORT ON SECONDARY ROADS
PROMOTING BICYCLE TRANSPORT ON SECONDARY ROADS
 
Estimating residential public transport trip generation rates
Estimating residential public transport trip generation ratesEstimating residential public transport trip generation rates
Estimating residential public transport trip generation rates
 
Town Planning Pimpri Chinchwad Municipal Corporation
Town Planning Pimpri Chinchwad Municipal Corporation Town Planning Pimpri Chinchwad Municipal Corporation
Town Planning Pimpri Chinchwad Municipal Corporation
 
Possibilities for Bus Lane System
Possibilities for Bus Lane SystemPossibilities for Bus Lane System
Possibilities for Bus Lane System
 
First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015First – Last Mile_MBPJ_2015
First – Last Mile_MBPJ_2015
 
Comprehensive mobility plan jaipur
Comprehensive mobility plan jaipur Comprehensive mobility plan jaipur
Comprehensive mobility plan jaipur
 
Comprehensive mobility plan , patna
Comprehensive mobility plan , patnaComprehensive mobility plan , patna
Comprehensive mobility plan , patna
 
An Integrated Transport Systems Approach to Solving Bangalore's Mobility Prob...
An Integrated Transport Systems Approach to Solving Bangalore's Mobility Prob...An Integrated Transport Systems Approach to Solving Bangalore's Mobility Prob...
An Integrated Transport Systems Approach to Solving Bangalore's Mobility Prob...
 
062. Comprehensive Mobility Plan Brt
062. Comprehensive Mobility Plan   Brt062. Comprehensive Mobility Plan   Brt
062. Comprehensive Mobility Plan Brt
 
Moscow, comprehensive mobility plan
Moscow, comprehensive mobility planMoscow, comprehensive mobility plan
Moscow, comprehensive mobility plan
 

Viewers also liked

Study and analysis of energy rating of real
Study and analysis of energy rating of realStudy and analysis of energy rating of real
Study and analysis of energy rating of real
Aditya Ghumare
 
Defining Pace of Urban Development: E-Governance in ULB's and PWD's.
Defining Pace of Urban Development: E-Governance in ULB's and PWD's.Defining Pace of Urban Development: E-Governance in ULB's and PWD's.
Defining Pace of Urban Development: E-Governance in ULB's and PWD's.
Omkar Parishwad
 
Mott MacDOnald Company Information
Mott MacDOnald Company InformationMott MacDOnald Company Information
Mott MacDOnald Company Information
john_r_foster
 
Valueofeducation
ValueofeducationValueofeducation
Valueofeducation
pallab01pb
 
Changing the Government Funding Dynamic: Alternative Revenue Sources
Changing the Government Funding Dynamic: Alternative Revenue SourcesChanging the Government Funding Dynamic: Alternative Revenue Sources
Changing the Government Funding Dynamic: Alternative Revenue Sources
West Muse
 
Approaches to Government Funding of Airports. Stephen Labson slEconomics
Approaches to Government Funding of Airports.   Stephen Labson slEconomicsApproaches to Government Funding of Airports.   Stephen Labson slEconomics
Approaches to Government Funding of Airports. Stephen Labson slEconomics
Stephen Labson
 
The $260,000 Question: The Future of Higher Education Funding as it Relates t...
The $260,000 Question: The Future of Higher Education Funding as it Relates t...The $260,000 Question: The Future of Higher Education Funding as it Relates t...
The $260,000 Question: The Future of Higher Education Funding as it Relates t...
Michael Yu
 
Public Services and the UK voluntary sector
Public Services and the UK voluntary sectorPublic Services and the UK voluntary sector
Public Services and the UK voluntary sector
Karl Wilding
 
Education funding
Education funding Education funding
Education funding
Mary Roberts
 
2013 education sector budget
2013 education sector budget2013 education sector budget
2013 education sector budget
Esther Agbon
 
The University in the Age of Web 2.0: A Value Proposition
The University in the Age of Web 2.0: A Value PropositionThe University in the Age of Web 2.0: A Value Proposition
The University in the Age of Web 2.0: A Value Proposition
Paul Brown
 
Education Funding Agency – David Ogden
Education Funding Agency – David OgdenEducation Funding Agency – David Ogden
Education Funding Agency – David Ogden
HuddleHQ
 
Technical Support in Thermal Power Generation Sector – Career Opportunities
Technical Support in Thermal Power Generation Sector – Career OpportunitiesTechnical Support in Thermal Power Generation Sector – Career Opportunities
Technical Support in Thermal Power Generation Sector – Career Opportunities
Anurak Atthasit
 
UCD Research & Innovation: Creating value from knowledge
UCD Research & Innovation: Creating value from knowledgeUCD Research & Innovation: Creating value from knowledge
UCD Research & Innovation: Creating value from knowledge
University College Dublin - UCD Research
 
sesame sub sector paln_RED
sesame sub sector paln_REDsesame sub sector paln_RED
ELEMENTOS DE POTENCIA
ELEMENTOS DE POTENCIAELEMENTOS DE POTENCIA
ELEMENTOS DE POTENCIA
reicersalazar
 
Fadi CV
Fadi CVFadi CV
Fadi CV
fadi alzaben
 
Kamrizzaman sir 4, 5 & 6 chapter, 5011
Kamrizzaman sir 4, 5 & 6 chapter, 5011Kamrizzaman sir 4, 5 & 6 chapter, 5011
Kamrizzaman sir 4, 5 & 6 chapter, 5011
S. M. Mainul Islam (Nutritionist, Agriculturist)
 
Kharkivjs javascript debugging. know your enemy
Kharkivjs   javascript debugging. know your enemyKharkivjs   javascript debugging. know your enemy
Kharkivjs javascript debugging. know your enemy
Андрей Вандакуров
 
FISH Training Module for RED
FISH Training Module for REDFISH Training Module for RED

Viewers also liked (20)

Study and analysis of energy rating of real
Study and analysis of energy rating of realStudy and analysis of energy rating of real
Study and analysis of energy rating of real
 
Defining Pace of Urban Development: E-Governance in ULB's and PWD's.
Defining Pace of Urban Development: E-Governance in ULB's and PWD's.Defining Pace of Urban Development: E-Governance in ULB's and PWD's.
Defining Pace of Urban Development: E-Governance in ULB's and PWD's.
 
Mott MacDOnald Company Information
Mott MacDOnald Company InformationMott MacDOnald Company Information
Mott MacDOnald Company Information
 
Valueofeducation
ValueofeducationValueofeducation
Valueofeducation
 
Changing the Government Funding Dynamic: Alternative Revenue Sources
Changing the Government Funding Dynamic: Alternative Revenue SourcesChanging the Government Funding Dynamic: Alternative Revenue Sources
Changing the Government Funding Dynamic: Alternative Revenue Sources
 
Approaches to Government Funding of Airports. Stephen Labson slEconomics
Approaches to Government Funding of Airports.   Stephen Labson slEconomicsApproaches to Government Funding of Airports.   Stephen Labson slEconomics
Approaches to Government Funding of Airports. Stephen Labson slEconomics
 
The $260,000 Question: The Future of Higher Education Funding as it Relates t...
The $260,000 Question: The Future of Higher Education Funding as it Relates t...The $260,000 Question: The Future of Higher Education Funding as it Relates t...
The $260,000 Question: The Future of Higher Education Funding as it Relates t...
 
Public Services and the UK voluntary sector
Public Services and the UK voluntary sectorPublic Services and the UK voluntary sector
Public Services and the UK voluntary sector
 
Education funding
Education funding Education funding
Education funding
 
2013 education sector budget
2013 education sector budget2013 education sector budget
2013 education sector budget
 
The University in the Age of Web 2.0: A Value Proposition
The University in the Age of Web 2.0: A Value PropositionThe University in the Age of Web 2.0: A Value Proposition
The University in the Age of Web 2.0: A Value Proposition
 
Education Funding Agency – David Ogden
Education Funding Agency – David OgdenEducation Funding Agency – David Ogden
Education Funding Agency – David Ogden
 
Technical Support in Thermal Power Generation Sector – Career Opportunities
Technical Support in Thermal Power Generation Sector – Career OpportunitiesTechnical Support in Thermal Power Generation Sector – Career Opportunities
Technical Support in Thermal Power Generation Sector – Career Opportunities
 
UCD Research & Innovation: Creating value from knowledge
UCD Research & Innovation: Creating value from knowledgeUCD Research & Innovation: Creating value from knowledge
UCD Research & Innovation: Creating value from knowledge
 
sesame sub sector paln_RED
sesame sub sector paln_REDsesame sub sector paln_RED
sesame sub sector paln_RED
 
ELEMENTOS DE POTENCIA
ELEMENTOS DE POTENCIAELEMENTOS DE POTENCIA
ELEMENTOS DE POTENCIA
 
Fadi CV
Fadi CVFadi CV
Fadi CV
 
Kamrizzaman sir 4, 5 & 6 chapter, 5011
Kamrizzaman sir 4, 5 & 6 chapter, 5011Kamrizzaman sir 4, 5 & 6 chapter, 5011
Kamrizzaman sir 4, 5 & 6 chapter, 5011
 
Kharkivjs javascript debugging. know your enemy
Kharkivjs   javascript debugging. know your enemyKharkivjs   javascript debugging. know your enemy
Kharkivjs javascript debugging. know your enemy
 
FISH Training Module for RED
FISH Training Module for REDFISH Training Module for RED
FISH Training Module for RED
 

Similar to Role of centre and state in finance of urban development project

AMRUT MoUD
AMRUT MoUDAMRUT MoUD
Special purpose vehicle (SPV)
Special purpose vehicle (SPV)Special purpose vehicle (SPV)
Special purpose vehicle (SPV)
Centre for Public Policy Research
 
India Smart Cities and Urban Transport
India Smart Cities and Urban TransportIndia Smart Cities and Urban Transport
India Smart Cities and Urban Transport
WRI Ross Center for Sustainable Cities
 
Bus system reform in India through JnNURM
Bus system reform in India through JnNURMBus system reform in India through JnNURM
Bus system reform in India through JnNURM
Jaspal Singh
 
JKR Paper_New Mobility_SPAD
JKR Paper_New Mobility_SPADJKR Paper_New Mobility_SPAD
JKR Paper_New Mobility_SPAD
Norma Nun
 
JnNURM Bus Financing - Delhi Experience
JnNURM Bus Financing - Delhi ExperienceJnNURM Bus Financing - Delhi Experience
JnNURM Bus Financing - Delhi Experience
Jaspal Singh
 
Role of Auto-Rickshaws and Taxis in Sustainable Transport - RK Singh
Role of Auto-Rickshaws and Taxis in Sustainable Transport - RK SinghRole of Auto-Rickshaws and Taxis in Sustainable Transport - RK Singh
Role of Auto-Rickshaws and Taxis in Sustainable Transport - RK Singh
WRI Ross Center for Sustainable Cities
 
Urban Transportation Market In India
Urban Transportation Market In IndiaUrban Transportation Market In India
Urban Transportation Market In India
Jaspal Singh
 
Urban-Bus-Specifications-II.pdf
Urban-Bus-Specifications-II.pdfUrban-Bus-Specifications-II.pdf
Urban-Bus-Specifications-II.pdf
ssuserdec673
 
Ravi sharma put20278 transport policies and acts
Ravi sharma put20278 transport policies and actsRavi sharma put20278 transport policies and acts
Ravi sharma put20278 transport policies and acts
Ravi Sharma
 
[Transportation] 11.12. enkh, shatar (ulaanbaatar)
[Transportation] 11.12. enkh, shatar (ulaanbaatar)[Transportation] 11.12. enkh, shatar (ulaanbaatar)
[Transportation] 11.12. enkh, shatar (ulaanbaatar)
shrdcinfo
 
Bhubaneswar E-Mobility Plan
Bhubaneswar E-Mobility PlanBhubaneswar E-Mobility Plan
Bhubaneswar E-Mobility Plan
SAMVRANTMISHRA
 
National Urban Transport Policy
National Urban Transport PolicyNational Urban Transport Policy
National Urban Transport Policy
MeenuSajeev
 
Session 7b: Part I- Decarbonising urban transport - WB
Session 7b: Part I- Decarbonising urban transport - WBSession 7b: Part I- Decarbonising urban transport - WB
Session 7b: Part I- Decarbonising urban transport - WB
OECD Environment
 
Unified traffic and transport authority
Unified traffic and transport authorityUnified traffic and transport authority
Unified traffic and transport authority
Jas Preet
 
Smart cities mission
Smart cities missionSmart cities mission
Smart cities mission
Col Mukteshwar Prasad
 
Policy Changes & Implementation strategies for Transport
Policy Changes & Implementation strategies for TransportPolicy Changes & Implementation strategies for Transport
Policy Changes & Implementation strategies for Transport
DALJEETSINGH727748
 
003shrikanthsavane 130424025649-phpapp02 (1)
003shrikanthsavane 130424025649-phpapp02 (1)003shrikanthsavane 130424025649-phpapp02 (1)
003shrikanthsavane 130424025649-phpapp02 (1)
Pradeep Methakar
 
Road ppt 14 12 15 final
Road ppt 14 12 15 finalRoad ppt 14 12 15 final
Road ppt 14 12 15 final
arpitgoel075
 
3 asrtu2-8827370494.ppt
3 asrtu2-8827370494.ppt3 asrtu2-8827370494.ppt
3 asrtu2-8827370494.ppt
ShivanshiRaj
 

Similar to Role of centre and state in finance of urban development project (20)

AMRUT MoUD
AMRUT MoUDAMRUT MoUD
AMRUT MoUD
 
Special purpose vehicle (SPV)
Special purpose vehicle (SPV)Special purpose vehicle (SPV)
Special purpose vehicle (SPV)
 
India Smart Cities and Urban Transport
India Smart Cities and Urban TransportIndia Smart Cities and Urban Transport
India Smart Cities and Urban Transport
 
Bus system reform in India through JnNURM
Bus system reform in India through JnNURMBus system reform in India through JnNURM
Bus system reform in India through JnNURM
 
JKR Paper_New Mobility_SPAD
JKR Paper_New Mobility_SPADJKR Paper_New Mobility_SPAD
JKR Paper_New Mobility_SPAD
 
JnNURM Bus Financing - Delhi Experience
JnNURM Bus Financing - Delhi ExperienceJnNURM Bus Financing - Delhi Experience
JnNURM Bus Financing - Delhi Experience
 
Role of Auto-Rickshaws and Taxis in Sustainable Transport - RK Singh
Role of Auto-Rickshaws and Taxis in Sustainable Transport - RK SinghRole of Auto-Rickshaws and Taxis in Sustainable Transport - RK Singh
Role of Auto-Rickshaws and Taxis in Sustainable Transport - RK Singh
 
Urban Transportation Market In India
Urban Transportation Market In IndiaUrban Transportation Market In India
Urban Transportation Market In India
 
Urban-Bus-Specifications-II.pdf
Urban-Bus-Specifications-II.pdfUrban-Bus-Specifications-II.pdf
Urban-Bus-Specifications-II.pdf
 
Ravi sharma put20278 transport policies and acts
Ravi sharma put20278 transport policies and actsRavi sharma put20278 transport policies and acts
Ravi sharma put20278 transport policies and acts
 
[Transportation] 11.12. enkh, shatar (ulaanbaatar)
[Transportation] 11.12. enkh, shatar (ulaanbaatar)[Transportation] 11.12. enkh, shatar (ulaanbaatar)
[Transportation] 11.12. enkh, shatar (ulaanbaatar)
 
Bhubaneswar E-Mobility Plan
Bhubaneswar E-Mobility PlanBhubaneswar E-Mobility Plan
Bhubaneswar E-Mobility Plan
 
National Urban Transport Policy
National Urban Transport PolicyNational Urban Transport Policy
National Urban Transport Policy
 
Session 7b: Part I- Decarbonising urban transport - WB
Session 7b: Part I- Decarbonising urban transport - WBSession 7b: Part I- Decarbonising urban transport - WB
Session 7b: Part I- Decarbonising urban transport - WB
 
Unified traffic and transport authority
Unified traffic and transport authorityUnified traffic and transport authority
Unified traffic and transport authority
 
Smart cities mission
Smart cities missionSmart cities mission
Smart cities mission
 
Policy Changes & Implementation strategies for Transport
Policy Changes & Implementation strategies for TransportPolicy Changes & Implementation strategies for Transport
Policy Changes & Implementation strategies for Transport
 
003shrikanthsavane 130424025649-phpapp02 (1)
003shrikanthsavane 130424025649-phpapp02 (1)003shrikanthsavane 130424025649-phpapp02 (1)
003shrikanthsavane 130424025649-phpapp02 (1)
 
Road ppt 14 12 15 final
Road ppt 14 12 15 finalRoad ppt 14 12 15 final
Road ppt 14 12 15 final
 
3 asrtu2-8827370494.ppt
3 asrtu2-8827370494.ppt3 asrtu2-8827370494.ppt
3 asrtu2-8827370494.ppt
 

Recently uploaded

The WhatsPump Pseudonym Problem and the Hilarious Downfall of Artificial Enga...
The WhatsPump Pseudonym Problem and the Hilarious Downfall of Artificial Enga...The WhatsPump Pseudonym Problem and the Hilarious Downfall of Artificial Enga...
The WhatsPump Pseudonym Problem and the Hilarious Downfall of Artificial Enga...
muslimdavidovich670
 
Solution Manual For Financial Accounting, 8th Canadian Edition 2024, by Libby...
Solution Manual For Financial Accounting, 8th Canadian Edition 2024, by Libby...Solution Manual For Financial Accounting, 8th Canadian Edition 2024, by Libby...
Solution Manual For Financial Accounting, 8th Canadian Edition 2024, by Libby...
Donc Test
 
when will pi network coin be available on crypto exchange.
when will pi network coin be available on crypto exchange.when will pi network coin be available on crypto exchange.
when will pi network coin be available on crypto exchange.
DOT TECH
 
G20 summit held in India. Proper presentation for G20 summit
G20 summit held in India. Proper presentation for G20 summitG20 summit held in India. Proper presentation for G20 summit
G20 summit held in India. Proper presentation for G20 summit
rohitsaxena882511
 
BONKMILLON Unleashes Its Bonkers Potential on Solana.pdf
BONKMILLON Unleashes Its Bonkers Potential on Solana.pdfBONKMILLON Unleashes Its Bonkers Potential on Solana.pdf
BONKMILLON Unleashes Its Bonkers Potential on Solana.pdf
coingabbar
 
SWAIAP Fraud Risk Mitigation Prof Oyedokun.pptx
SWAIAP Fraud Risk Mitigation   Prof Oyedokun.pptxSWAIAP Fraud Risk Mitigation   Prof Oyedokun.pptx
SWAIAP Fraud Risk Mitigation Prof Oyedokun.pptx
Godwin Emmanuel Oyedokun MBA MSc PhD FCA FCTI FCNA CFE FFAR
 
WhatsPump Thriving in the Whirlwind of Biden’s Crypto Roller Coaster
WhatsPump Thriving in the Whirlwind of Biden’s Crypto Roller CoasterWhatsPump Thriving in the Whirlwind of Biden’s Crypto Roller Coaster
WhatsPump Thriving in the Whirlwind of Biden’s Crypto Roller Coaster
muslimdavidovich670
 
一比一原版(UCSB毕业证)圣芭芭拉分校毕业证如何办理
一比一原版(UCSB毕业证)圣芭芭拉分校毕业证如何办理一比一原版(UCSB毕业证)圣芭芭拉分校毕业证如何办理
一比一原版(UCSB毕业证)圣芭芭拉分校毕业证如何办理
bbeucd
 
Tumelo-deep-dive-into-pass-through-voting-Feb23 (1).pdf
Tumelo-deep-dive-into-pass-through-voting-Feb23 (1).pdfTumelo-deep-dive-into-pass-through-voting-Feb23 (1).pdf
Tumelo-deep-dive-into-pass-through-voting-Feb23 (1).pdf
Henry Tapper
 
1. Elemental Economics - Introduction to mining.pdf
1. Elemental Economics - Introduction to mining.pdf1. Elemental Economics - Introduction to mining.pdf
1. Elemental Economics - Introduction to mining.pdf
Neal Brewster
 
The Rise of Generative AI in Finance: Reshaping the Industry with Synthetic Data
The Rise of Generative AI in Finance: Reshaping the Industry with Synthetic DataThe Rise of Generative AI in Finance: Reshaping the Industry with Synthetic Data
The Rise of Generative AI in Finance: Reshaping the Industry with Synthetic Data
Champak Jhagmag
 
Instant Issue Debit Cards
Instant Issue Debit CardsInstant Issue Debit Cards
Instant Issue Debit Cards
egoetzinger
 
how to sell pi coins effectively (from 50 - 100k pi)
how to sell pi coins effectively (from 50 - 100k  pi)how to sell pi coins effectively (from 50 - 100k  pi)
how to sell pi coins effectively (from 50 - 100k pi)
DOT TECH
 
2. Elemental Economics - Mineral demand.pdf
2. Elemental Economics - Mineral demand.pdf2. Elemental Economics - Mineral demand.pdf
2. Elemental Economics - Mineral demand.pdf
Neal Brewster
 
can I really make money with pi network.
can I really make money with pi network.can I really make money with pi network.
can I really make money with pi network.
DOT TECH
 
快速制作美国迈阿密大学牛津分校毕业证文凭证书英文原版一模一样
快速制作美国迈阿密大学牛津分校毕业证文凭证书英文原版一模一样快速制作美国迈阿密大学牛津分校毕业证文凭证书英文原版一模一样
快速制作美国迈阿密大学牛津分校毕业证文凭证书英文原版一模一样
rlo9fxi
 
This assessment plan proposal is to outline a structured approach to evaluati...
This assessment plan proposal is to outline a structured approach to evaluati...This assessment plan proposal is to outline a structured approach to evaluati...
This assessment plan proposal is to outline a structured approach to evaluati...
lamluanvan.net Viết thuê luận văn
 
Independent Study - College of Wooster Research (2023-2024) FDI, Culture, Glo...
Independent Study - College of Wooster Research (2023-2024) FDI, Culture, Glo...Independent Study - College of Wooster Research (2023-2024) FDI, Culture, Glo...
Independent Study - College of Wooster Research (2023-2024) FDI, Culture, Glo...
AntoniaOwensDetwiler
 
Independent Study - College of Wooster Research (2023-2024)
Independent Study - College of Wooster Research (2023-2024)Independent Study - College of Wooster Research (2023-2024)
Independent Study - College of Wooster Research (2023-2024)
AntoniaOwensDetwiler
 
5 Tips for Creating Standard Financial Reports
5 Tips for Creating Standard Financial Reports5 Tips for Creating Standard Financial Reports
5 Tips for Creating Standard Financial Reports
EasyReports
 

Recently uploaded (20)

The WhatsPump Pseudonym Problem and the Hilarious Downfall of Artificial Enga...
The WhatsPump Pseudonym Problem and the Hilarious Downfall of Artificial Enga...The WhatsPump Pseudonym Problem and the Hilarious Downfall of Artificial Enga...
The WhatsPump Pseudonym Problem and the Hilarious Downfall of Artificial Enga...
 
Solution Manual For Financial Accounting, 8th Canadian Edition 2024, by Libby...
Solution Manual For Financial Accounting, 8th Canadian Edition 2024, by Libby...Solution Manual For Financial Accounting, 8th Canadian Edition 2024, by Libby...
Solution Manual For Financial Accounting, 8th Canadian Edition 2024, by Libby...
 
when will pi network coin be available on crypto exchange.
when will pi network coin be available on crypto exchange.when will pi network coin be available on crypto exchange.
when will pi network coin be available on crypto exchange.
 
G20 summit held in India. Proper presentation for G20 summit
G20 summit held in India. Proper presentation for G20 summitG20 summit held in India. Proper presentation for G20 summit
G20 summit held in India. Proper presentation for G20 summit
 
BONKMILLON Unleashes Its Bonkers Potential on Solana.pdf
BONKMILLON Unleashes Its Bonkers Potential on Solana.pdfBONKMILLON Unleashes Its Bonkers Potential on Solana.pdf
BONKMILLON Unleashes Its Bonkers Potential on Solana.pdf
 
SWAIAP Fraud Risk Mitigation Prof Oyedokun.pptx
SWAIAP Fraud Risk Mitigation   Prof Oyedokun.pptxSWAIAP Fraud Risk Mitigation   Prof Oyedokun.pptx
SWAIAP Fraud Risk Mitigation Prof Oyedokun.pptx
 
WhatsPump Thriving in the Whirlwind of Biden’s Crypto Roller Coaster
WhatsPump Thriving in the Whirlwind of Biden’s Crypto Roller CoasterWhatsPump Thriving in the Whirlwind of Biden’s Crypto Roller Coaster
WhatsPump Thriving in the Whirlwind of Biden’s Crypto Roller Coaster
 
一比一原版(UCSB毕业证)圣芭芭拉分校毕业证如何办理
一比一原版(UCSB毕业证)圣芭芭拉分校毕业证如何办理一比一原版(UCSB毕业证)圣芭芭拉分校毕业证如何办理
一比一原版(UCSB毕业证)圣芭芭拉分校毕业证如何办理
 
Tumelo-deep-dive-into-pass-through-voting-Feb23 (1).pdf
Tumelo-deep-dive-into-pass-through-voting-Feb23 (1).pdfTumelo-deep-dive-into-pass-through-voting-Feb23 (1).pdf
Tumelo-deep-dive-into-pass-through-voting-Feb23 (1).pdf
 
1. Elemental Economics - Introduction to mining.pdf
1. Elemental Economics - Introduction to mining.pdf1. Elemental Economics - Introduction to mining.pdf
1. Elemental Economics - Introduction to mining.pdf
 
The Rise of Generative AI in Finance: Reshaping the Industry with Synthetic Data
The Rise of Generative AI in Finance: Reshaping the Industry with Synthetic DataThe Rise of Generative AI in Finance: Reshaping the Industry with Synthetic Data
The Rise of Generative AI in Finance: Reshaping the Industry with Synthetic Data
 
Instant Issue Debit Cards
Instant Issue Debit CardsInstant Issue Debit Cards
Instant Issue Debit Cards
 
how to sell pi coins effectively (from 50 - 100k pi)
how to sell pi coins effectively (from 50 - 100k  pi)how to sell pi coins effectively (from 50 - 100k  pi)
how to sell pi coins effectively (from 50 - 100k pi)
 
2. Elemental Economics - Mineral demand.pdf
2. Elemental Economics - Mineral demand.pdf2. Elemental Economics - Mineral demand.pdf
2. Elemental Economics - Mineral demand.pdf
 
can I really make money with pi network.
can I really make money with pi network.can I really make money with pi network.
can I really make money with pi network.
 
快速制作美国迈阿密大学牛津分校毕业证文凭证书英文原版一模一样
快速制作美国迈阿密大学牛津分校毕业证文凭证书英文原版一模一样快速制作美国迈阿密大学牛津分校毕业证文凭证书英文原版一模一样
快速制作美国迈阿密大学牛津分校毕业证文凭证书英文原版一模一样
 
This assessment plan proposal is to outline a structured approach to evaluati...
This assessment plan proposal is to outline a structured approach to evaluati...This assessment plan proposal is to outline a structured approach to evaluati...
This assessment plan proposal is to outline a structured approach to evaluati...
 
Independent Study - College of Wooster Research (2023-2024) FDI, Culture, Glo...
Independent Study - College of Wooster Research (2023-2024) FDI, Culture, Glo...Independent Study - College of Wooster Research (2023-2024) FDI, Culture, Glo...
Independent Study - College of Wooster Research (2023-2024) FDI, Culture, Glo...
 
Independent Study - College of Wooster Research (2023-2024)
Independent Study - College of Wooster Research (2023-2024)Independent Study - College of Wooster Research (2023-2024)
Independent Study - College of Wooster Research (2023-2024)
 
5 Tips for Creating Standard Financial Reports
5 Tips for Creating Standard Financial Reports5 Tips for Creating Standard Financial Reports
5 Tips for Creating Standard Financial Reports
 

Role of centre and state in finance of urban development project

  • 1. The role of center and State government for funding Urban infrastructure project Anupriya sharma 11507534 M.plan 2nd year Case study of JnNURM Amritsar BRTS project
  • 2. JnNURM Scheme • In 2005, the Ministry of Urban Development (MoUD), Government of India (GoI) launched the Jawaharlal Nehru National Urban Renewal Mission (JnNURM). • The aim of the mission was to encourage urban level reforms and fast track planned infrastructure development of the 65 mission cities. • The duration of the mission was from 2005-‘06 to 2011-‘12. • However, since most of the projects have not been duly completed, the government has extended the mission until March, 2014.
  • 3. • water supply, sanitation, sewerage, solid waste management, road network, urban transport and redevelopment of old cities, etc.Urban Infrastructure and Governance • Integrating the development of slums through projects for providing shelter, basic services and other related civic amenities with a view to provide utilities to the urban poor. Basic Services to the Urban Poor Administered by the Ministry of Urban Development Ministry of Urban Employment and Poverty Alleviation ThemissioncomprisesoftwoSub-Missions
  • 4. JnNURM Bus Funding Scheme • On December 3, 2009 Goal announced that as a part of the second stimulus package, the funding for buses for urban transport would be given under JnNURM as an incentive to cities and states across the country to implement bus based public transport systems. • The scheme guidelines were as follows : Population of the mission cities Central Assistance State Assistance ULBs/ Parastatals/ Loans from FIs More than 4 million 35 per cent 15 per cent 50 per cent 1-4 million 50 per cent 20 per cent 30 per cent Less than1 million 80 per cent 10 per cent 10 per cent Jammu and Kashmir & North- Eastern States 90 per cent 10 per cent -
  • 5. • Under Central Financial Assistance, funds would be released as Additional Central Assistance (ACA) to the State Governments or the State level Nodal Agency. • The funds will be released in instalments. Central Financial Assistance The first instalment of 50 per cent will be released upon the sanction of the project from the competent authority. The second instalment of 40 per cent of ACA will be released upon the receipt of Utilization Certificates (UC) to the extent of 70 per cent of the grants (Centre and State) and subject to route permission from the competent transport authority The third instalment of 10 per cent of ACA will be released upon receipts of UCs to the extent of 70 per cent of the grants (Centre and State) and subject to commencement of satisfactory service operations.
  • 6. • Additional sales tax on petrol, additional registration fee on four-wheelers and two-wheelers, high registration fee for personal vehicles running on diesel, annual renewal fee on driving license and vehicle registration, etc. may be used to draw sources for the Dedicated Urban Transport Fund at the State level. • The funds so generated by the States can be used for new projects in urban transport. State Urban Transport Fund City Urban Transport Fund • The cities can generate fund out of betterment levy on land in areas which benefit by investment in urban transport projects; rationalization of parking-fee, property development tax, advertisement revenue on transit corridors, etc. • This fund at the city level can be used for establishing a fare contingency fund and to provide ULBs' share for funding the urban transport projects.
  • 7. Amritsar BRTS (A Project sanctioned under JnNURM on January 21, 2014) • Government of Punjab through Punjab Bus Metro Society (PBMS) has taken up the task of implementation of Bus Rapid Transit System (BRTS) for the cities of Amritsar and Ludhiana. • PBMS has engaged UMTC, A joint venture company of M/S IL&FS Ltd. and Ministry of Urban Development (MoUD), GoI to carry out the design, securing approvals, tendering and project management consultancy for complete implementation of BRTS in the cities of Amritsar and Ludhiana.
  • 8. Proposed BRTS Corridors A 31 km of BRT corridor has been proposed in city with median side double docking stations 1. Atari Road – ISBT to India Gate via Bhandari Bridge, GNDU, Chheharta (12 km); 2. Jalandhar Road – ISBT to MCA Gate via Tarawalan Pul (6 km); and 3. Verka Road – ISBT to Verka via Hussainpura Bridge, G. T. Road Bypass (13 km)
  • 9. Total Project Cost is 495.54 Crores Item Cost 1 Development Including Roads, Drainage, Street Lighting & Street Furniture 210.37 2 Foot Over Bridge 3.91 3 Bicycle Sharing Stand 0.16 4 Bus Shelter 17.17 5 Elevated BRT Corridor On Verka Road 127.67 6 Retrofitted Bus Stops At Existing Elevated Road 8.74 7 Rob At Verka Railway Crossing 40.82 8 Improvement Of Bhandari Bridge 35.43 9 Cost Of Depot 7.55 10 Cost Of ITS Infrastructure 28.07 11 Cost Of Provision For Pedestians Crossings Along BRTS Corridors 1.23 12 Contingencies @ 3% 14.43 GRAND TOTAL ALL ITEMS ( Rs. In Crores) 495.54
  • 10. Sharing of Funds for Amritsar BRTS project is in proportion of 50:20:30. DPR was submitted to MOUD on 26th October 2013 Source of funding Sharing % Sharing amount GOI 50% 247.77 GOP (share will be borne by PBMS) 20% 99.108 MC Amritsar (through PBMS) 30% 148.662 Total project cost 495.54 The total cost and funding pattern of the buses is given below : Bus Types JNNURM /GOI State/PBMS Amritsar Municipal Corporation (ULB) Total (Rs Crores) Standard AC Bus 900 mm Diesel 50% 20% 30% 100% Total in Rs. Crores 41.85 16.74 25.11 83.70 The 93 buses for BRT have been also proposed to procure under JNNURM Bus funding scheme for which DPR has been approved by MOUD in the CSMC meet on 20th Feb 2014. (Population – 2490656 (1-4 million))