SlideShare a Scribd company logo
1 of 18
 
Satyam Sing h
MBA-IFM
5 0 0 0 21 421
 Metropolitan population of over 6
million
 Seventh largest metropolitan area
in India
 Area: 464 km2
 (179 sq mi)
 Situated in prosperous western
state of Gujarat
 Founded in 1411 as a walled city
 Became a center of textile
manufacturing in the 19th
century
 Grew rapidly in the 20th
century
mostly using Town Planning
Schemes (land readjustment)
 A form of land readjustment
 A means of expanding urban
infrastructure without compulsory land
acquisition
 Promoted as equitable, participatory
and cost-effective
 Originally introduced by British Colonial
Government in 1915. Legislation
updated in 1954, 1976 and 1999.
 Areas designated for urban expansion in the city’s
development plan
 Divided into TP schemes of ~100-250 hectares
(250-500 acres), covering ~100-200 parcels
 Government pools the land, uses 30-40% for
roads, open space, other public purposes,
including 5-10% for sale.
 The remaining 60-70% is returned to original
owners, whose land value has increased
 Urban land use is now allowed on these parcels
 Landowner consultation at various stages,
regarding their individual parcels
 Land Value Capture in TPS occurs through two means:
o Betterment charges
o Sale of appropriated land
 Purpose of betterment charge: to divide the increase in land value
evenly between the landowner and the government
Betterment Charge = Final LV – Original LV
2
 Offset by compensation to landowner for appropriated land, based on
original land value
 Farmer A’s original parcel:
1000 m2
@ Rs.200/m2
=
Rs.200,000
Rs.200,000
 Govt. takes 40% from all
parcels, i.e. Farmer A
loses 400m2
 For this, govt. owes
Farmer A Rs. 80,000
(=400m2
X Rs.200/m2
)
as compensation
 Farmer A’s remaining
land is worth
Rs.120,000
(=600m2
X Rs.200/m2
)
60%
40%
Rs.120,000
Government Landowner
Rs. 80,000
 The govt. estimates the final
price after TPS to be
Rs.500/m2
 Farmer A’s remaining 600m2
is
now worth Rs.300,000
(=600m2
X Rs.500/m2
)
 Increase in land value of final
parcel = Rs.300,000 –
Rs.120,000 = Rs.180,000
 Betterment charge = 50% of
increase in LV = Rs.90,000
 Farmer A’s net gain is the
remaining Rs.90,000.
Rs.300,000
(from Rs. 120,000)
Rs. 90,000
Government Landowner
+ Rs. 180,000
 Original and final land values are supposed to be based on recent sales
 Sale prices are underreported by as much as 60%
 Government instead bases original values on a standard “reckoner”
 Final values calculated “in reverse”
 Final values on paper are much lower than in reality
 Betterment charges are therefore an ineffective means of land value capture
 However, creates the “perception of fairness”
 While not emphasized in the rhetoric, land sales are a much bigger
source of land value capture from TP schemes
 5-10% of land is “banked” by the govt. for later sale
 Land sales have been lucrative for the govt.
o Govt. claims to have collected land worth $100 million from 24 TPS
o e.g. April 2006: 20 parcels sold for $35 million (including one for Rs.61,000/m2
i.e.
$1200/m2
) to large real estate firms
 It is hard to attribute the land value increase directly to infrastructure
 Simply allowing urban use on this land may account for much of the
land value increase
 Land value increases partly due to passage of time in a rapidly
urbanizing context. It is often a very slow process: final approvals from
state governments make take 10+ years (in one case, 26 years).
Implementation may have barely begun after a decade.
Source: Google Earth
November 2003
September 2004
Source: Google Earth
January 2010
 The implementation of TPS in Ahmedabad has not been perfect, but
these flaws do not reflect on the concept of land readjustment or land
value capture itself, but on broader institutional constraints faced in
Indian cities.
 In Ahmedabad – TPS is an improvement over land acquisition other
cities
 May be streamlined by doing away with compensation and betterment
charges, as most benefit comes for land sales by both original
landowners and government.
 Land value capture relies on reliable and transparent land valuation
Land adjustment Land value capture

More Related Content

What's hot

Thresold analysis planning techniques bhavesh patel_20sa03up014
Thresold analysis planning techniques bhavesh patel_20sa03up014Thresold analysis planning techniques bhavesh patel_20sa03up014
Thresold analysis planning techniques bhavesh patel_20sa03up014
Kruti Galia
 
Delay informulation of TP Schemes
Delay informulation of TP SchemesDelay informulation of TP Schemes
Delay informulation of TP Schemes
Malvika Jaishal
 
Economic principles of land (real estate)
Economic principles of land (real estate)Economic principles of land (real estate)
Economic principles of land (real estate)
Tanya Mukherjee
 

What's hot (20)

Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN CA...
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN  CA...Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN  CA...
Development Plan- Planning Intervention (CRITICAL ANALYSIS OF MASTER PLAN CA...
 
Thresold analysis planning techniques bhavesh patel_20sa03up014
Thresold analysis planning techniques bhavesh patel_20sa03up014Thresold analysis planning techniques bhavesh patel_20sa03up014
Thresold analysis planning techniques bhavesh patel_20sa03up014
 
Jnnurm
JnnurmJnnurm
Jnnurm
 
Methodology for Preparation of Master Plan
Methodology  for  Preparation of Master PlanMethodology  for  Preparation of Master Plan
Methodology for Preparation of Master Plan
 
LAP Project Concept
LAP Project ConceptLAP Project Concept
LAP Project Concept
 
Land Value Capture
Land Value CaptureLand Value Capture
Land Value Capture
 
Methodology for Preparation of Master Plan
 Methodology for Preparation of Master Plan  Methodology for Preparation of Master Plan
Methodology for Preparation of Master Plan
 
Evolution of planning legislation in india
Evolution of planning legislation in india Evolution of planning legislation in india
Evolution of planning legislation in india
 
Land Pooling Models in India.pptx
Land Pooling Models in India.pptxLand Pooling Models in India.pptx
Land Pooling Models in India.pptx
 
Delay informulation of TP Schemes
Delay informulation of TP SchemesDelay informulation of TP Schemes
Delay informulation of TP Schemes
 
local area plan, Vasna ward, Ahmedabad
local area plan, Vasna ward, Ahmedabadlocal area plan, Vasna ward, Ahmedabad
local area plan, Vasna ward, Ahmedabad
 
Strategies for metropolitan planning
Strategies for metropolitan planningStrategies for metropolitan planning
Strategies for metropolitan planning
 
Urban land policies
Urban land policiesUrban land policies
Urban land policies
 
Review of Development Plans/ Master Plans of selected cities of India.
Review of Development Plans/ Master Plans of selected cities of India.Review of Development Plans/ Master Plans of selected cities of India.
Review of Development Plans/ Master Plans of selected cities of India.
 
Plan preparation techniques
Plan preparation techniquesPlan preparation techniques
Plan preparation techniques
 
Economic principles of land (real estate)
Economic principles of land (real estate)Economic principles of land (real estate)
Economic principles of land (real estate)
 
Detailed understanding of the master plan ar. m. senthil
Detailed understanding of the master plan  ar. m. senthilDetailed understanding of the master plan  ar. m. senthil
Detailed understanding of the master plan ar. m. senthil
 
Maharashtra Regional Town Planning Act
Maharashtra Regional Town Planning ActMaharashtra Regional Town Planning Act
Maharashtra Regional Town Planning Act
 
Jnnurm
JnnurmJnnurm
Jnnurm
 
Regional plan 2021 ncr
Regional plan 2021 ncrRegional plan 2021 ncr
Regional plan 2021 ncr
 

Viewers also liked

Class 9 PowerPoint Slides
Class 9 PowerPoint SlidesClass 9 PowerPoint Slides
Class 9 PowerPoint Slides
Robert Croker
 
Land readjustment _e_
Land readjustment _e_Land readjustment _e_
Land readjustment _e_
Bayar Tsend
 
Adolescent adjustment in school
Adolescent adjustment in schoolAdolescent adjustment in school
Adolescent adjustment in school
Lovelyn Garcia
 
अलंकार
अलंकारअलंकार
अलंकार
Rubby Sharma
 
hindi ppt for class 8
hindi ppt for class 8hindi ppt for class 8
hindi ppt for class 8
Ramanuj Singh
 
Lesson Plan PowerPoint Presentation
Lesson Plan PowerPoint PresentationLesson Plan PowerPoint Presentation
Lesson Plan PowerPoint Presentation
yseauy
 

Viewers also liked (18)

Value Capture: A Land Based Tool to Finance Urban Development
Value Capture: A Land Based Tool to Finance Urban DevelopmentValue Capture: A Land Based Tool to Finance Urban Development
Value Capture: A Land Based Tool to Finance Urban Development
 
Transit Value Capture Finance - A Global Review of Monetary Potential and Per...
Transit Value Capture Finance - A Global Review of Monetary Potential and Per...Transit Value Capture Finance - A Global Review of Monetary Potential and Per...
Transit Value Capture Finance - A Global Review of Monetary Potential and Per...
 
Hindi
HindiHindi
Hindi
 
Class 9 PowerPoint Slides
Class 9 PowerPoint SlidesClass 9 PowerPoint Slides
Class 9 PowerPoint Slides
 
Mng jp
Mng jpMng jp
Mng jp
 
Hindi
HindiHindi
Hindi
 
Land readjustment _e_
Land readjustment _e_Land readjustment _e_
Land readjustment _e_
 
Biz model 4 method of value capture
Biz model 4   method of value captureBiz model 4   method of value capture
Biz model 4 method of value capture
 
Financing Transit-Oriented Development with Land Values - Hiroaki Suzuki - Le...
Financing Transit-Oriented Development with Land Values - Hiroaki Suzuki - Le...Financing Transit-Oriented Development with Land Values - Hiroaki Suzuki - Le...
Financing Transit-Oriented Development with Land Values - Hiroaki Suzuki - Le...
 
Hidi ppt h 01
Hidi ppt h 01Hidi ppt h 01
Hidi ppt h 01
 
Adolescent adjustment in school
Adolescent adjustment in schoolAdolescent adjustment in school
Adolescent adjustment in school
 
अलंकार
अलंकारअलंकार
अलंकार
 
पद परिचय
पद परिचयपद परिचय
पद परिचय
 
hindi ppt for class 8
hindi ppt for class 8hindi ppt for class 8
hindi ppt for class 8
 
Hindi Project - Alankar
Hindi Project - AlankarHindi Project - Alankar
Hindi Project - Alankar
 
Hindi Workshop हिंदी कार्यशाला
 Hindi Workshop हिंदी कार्यशाला Hindi Workshop हिंदी कार्यशाला
Hindi Workshop हिंदी कार्यशाला
 
Hindi presentation
Hindi presentationHindi presentation
Hindi presentation
 
Lesson Plan PowerPoint Presentation
Lesson Plan PowerPoint PresentationLesson Plan PowerPoint Presentation
Lesson Plan PowerPoint Presentation
 

Similar to Land adjustment Land value capture

Land acqusition-bill-pro-cons-by-prs
Land acqusition-bill-pro-cons-by-prsLand acqusition-bill-pro-cons-by-prs
Land acqusition-bill-pro-cons-by-prs
Shailesh Mishra
 
Land acquisition India - LARRACT 2013 Note uploaded by James joseph adhikara...
Land acquisition India - LARRACT 2013  Note uploaded by James joseph adhikara...Land acquisition India - LARRACT 2013  Note uploaded by James joseph adhikara...
Land acquisition India - LARRACT 2013 Note uploaded by James joseph adhikara...
Jamesadhikaram land matter consultancy 9447464502
 

Similar to Land adjustment Land value capture (20)

Presentation on the right to fair compensation and
Presentation on the right to fair compensation andPresentation on the right to fair compensation and
Presentation on the right to fair compensation and
 
Land acqusition-bill-pro-cons-by-prs
Land acqusition-bill-pro-cons-by-prsLand acqusition-bill-pro-cons-by-prs
Land acqusition-bill-pro-cons-by-prs
 
Indian Land acquisition for public purpose - The Right to Fair Compensation a...
Indian Land acquisition for public purpose - The Right to Fair Compensation a...Indian Land acquisition for public purpose - The Right to Fair Compensation a...
Indian Land acquisition for public purpose - The Right to Fair Compensation a...
 
1. New Land Acquisition Act Process Flow
1. New Land Acquisition Act Process Flow1. New Land Acquisition Act Process Flow
1. New Land Acquisition Act Process Flow
 
Architecture and Town Planning _Unit 5_SPPU_LARR, UDPFI, RERA and MAHA-RERA b...
Architecture and Town Planning _Unit 5_SPPU_LARR, UDPFI, RERA and MAHA-RERA b...Architecture and Town Planning _Unit 5_SPPU_LARR, UDPFI, RERA and MAHA-RERA b...
Architecture and Town Planning _Unit 5_SPPU_LARR, UDPFI, RERA and MAHA-RERA b...
 
Land acquisition India - LARRACT 2013 Note uploaded by James joseph adhikara...
Land acquisition India - LARRACT 2013  Note uploaded by James joseph adhikara...Land acquisition India - LARRACT 2013  Note uploaded by James joseph adhikara...
Land acquisition India - LARRACT 2013 Note uploaded by James joseph adhikara...
 
Land Assignment Procedures in Kerala by REALUTIONZ
Land Assignment Procedures in Kerala  by REALUTIONZLand Assignment Procedures in Kerala  by REALUTIONZ
Land Assignment Procedures in Kerala by REALUTIONZ
 
Revenue acts
Revenue actsRevenue acts
Revenue acts
 
Premium for land alienation
Premium for land alienationPremium for land alienation
Premium for land alienation
 
Land assignment kerala Ppt from James Joseph Adhikarathil
Land assignment kerala Ppt from James Joseph AdhikarathilLand assignment kerala Ppt from James Joseph Adhikarathil
Land assignment kerala Ppt from James Joseph Adhikarathil
 
LARR act2013--.pptx
LARR act2013--.pptxLARR act2013--.pptx
LARR act2013--.pptx
 
Options for Sourcing Land for Sustainable Urban Development in the State of P...
Options for Sourcing Land for Sustainable Urban Development in the State of P...Options for Sourcing Land for Sustainable Urban Development in the State of P...
Options for Sourcing Land for Sustainable Urban Development in the State of P...
 
Tax ppt (2)
Tax ppt (2)Tax ppt (2)
Tax ppt (2)
 
Options for Sourcing Land For Sustainable Urban Development in the S
Options for Sourcing Land For Sustainable Urban Development in the SOptions for Sourcing Land For Sustainable Urban Development in the S
Options for Sourcing Land For Sustainable Urban Development in the S
 
Environment impact assessment conversion agricultural to commercial land
Environment impact assessment conversion agricultural to commercial landEnvironment impact assessment conversion agricultural to commercial land
Environment impact assessment conversion agricultural to commercial land
 
Land acquisition in west bengal
Land acquisition in west bengalLand acquisition in west bengal
Land acquisition in west bengal
 
Land acquisition procedure in Gujarat State
Land acquisition procedure in Gujarat StateLand acquisition procedure in Gujarat State
Land acquisition procedure in Gujarat State
 
Taxability of Capital Gain on Transfer of Agricultural Land
Taxability of Capital Gain on Transfer of Agricultural LandTaxability of Capital Gain on Transfer of Agricultural Land
Taxability of Capital Gain on Transfer of Agricultural Land
 
PRESENTATION ON LAND ACQUISITION.Final (1).pptx
PRESENTATION ON LAND ACQUISITION.Final (1).pptxPRESENTATION ON LAND ACQUISITION.Final (1).pptx
PRESENTATION ON LAND ACQUISITION.Final (1).pptx
 
India budget 2017 and real estate sector
India budget 2017 and real estate sectorIndia budget 2017 and real estate sector
India budget 2017 and real estate sector
 

More from Kartikeya Pandey

More from Kartikeya Pandey (20)

Water and sanitation
Water and sanitationWater and sanitation
Water and sanitation
 
oil & gas drilling preliminaries
oil & gas drilling preliminariesoil & gas drilling preliminaries
oil & gas drilling preliminaries
 
Supplementary benefits
Supplementary benefitsSupplementary benefits
Supplementary benefits
 
Property tax
Property taxProperty tax
Property tax
 
Metros summary by Kartikeya Pandey
Metros summary by Kartikeya PandeyMetros summary by Kartikeya Pandey
Metros summary by Kartikeya Pandey
 
Marketing product placement strategies
Marketing product placement strategiesMarketing product placement strategies
Marketing product placement strategies
 
seven cs
seven csseven cs
seven cs
 
Indian ports (1)
Indian ports (1)Indian ports (1)
Indian ports (1)
 
Human resource planning ppt.
Human resource planning ppt.Human resource planning ppt.
Human resource planning ppt.
 
Gis
GisGis
Gis
 
Fire d project
Fire d projectFire d project
Fire d project
 
Alandur sewerage proj arun
Alandur sewerage proj   arunAlandur sewerage proj   arun
Alandur sewerage proj arun
 
24 x7 water in three states of karnataka
24 x7 water in three states of karnataka24 x7 water in three states of karnataka
24 x7 water in three states of karnataka
 
4
44
4
 
Solid waste management practices in dehradun under jn nurm
Solid waste management practices in dehradun under jn nurmSolid waste management practices in dehradun under jn nurm
Solid waste management practices in dehradun under jn nurm
 
Infrastructure unbundling in south africa
Infrastructure unbundling in south africaInfrastructure unbundling in south africa
Infrastructure unbundling in south africa
 
Indian accounting standard (ind as) 27
Indian accounting standard (ind as) 27Indian accounting standard (ind as) 27
Indian accounting standard (ind as) 27
 
Hr presentation
Hr presentationHr presentation
Hr presentation
 
Going & seeing in construction
Going & seeing in constructionGoing & seeing in construction
Going & seeing in construction
 
Concrete technology
Concrete technologyConcrete technology
Concrete technology
 

Recently uploaded

Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
panagenda
 

Recently uploaded (20)

Intro in Product Management - Коротко про професію продакт менеджера
Intro in Product Management - Коротко про професію продакт менеджераIntro in Product Management - Коротко про професію продакт менеджера
Intro in Product Management - Коротко про професію продакт менеджера
 
Where to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdfWhere to Learn More About FDO _ Richard at FIDO Alliance.pdf
Where to Learn More About FDO _ Richard at FIDO Alliance.pdf
 
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdfLinux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
Linux Foundation Edge _ Overview of FDO Software Components _ Randy at Intel.pdf
 
ECS 2024 Teams Premium - Pretty Secure
ECS 2024   Teams Premium - Pretty SecureECS 2024   Teams Premium - Pretty Secure
ECS 2024 Teams Premium - Pretty Secure
 
How we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdfHow we scaled to 80K users by doing nothing!.pdf
How we scaled to 80K users by doing nothing!.pdf
 
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdfHow Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
How Red Hat Uses FDO in Device Lifecycle _ Costin and Vitaliy at Red Hat.pdf
 
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
Choosing the Right FDO Deployment Model for Your Application _ Geoffrey at In...
 
WebAssembly is Key to Better LLM Performance
WebAssembly is Key to Better LLM PerformanceWebAssembly is Key to Better LLM Performance
WebAssembly is Key to Better LLM Performance
 
Speed Wins: From Kafka to APIs in Minutes
Speed Wins: From Kafka to APIs in MinutesSpeed Wins: From Kafka to APIs in Minutes
Speed Wins: From Kafka to APIs in Minutes
 
Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024Extensible Python: Robustness through Addition - PyCon 2024
Extensible Python: Robustness through Addition - PyCon 2024
 
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
Secure Zero Touch enabled Edge compute with Dell NativeEdge via FDO _ Brad at...
 
Syngulon - Selection technology May 2024.pdf
Syngulon - Selection technology May 2024.pdfSyngulon - Selection technology May 2024.pdf
Syngulon - Selection technology May 2024.pdf
 
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
Easier, Faster, and More Powerful – Alles Neu macht der Mai -Wir durchleuchte...
 
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
ASRock Industrial FDO Solutions in Action for Industrial Edge AI _ Kenny at A...
 
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptxUnpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
Unpacking Value Delivery - Agile Oxford Meetup - May 2024.pptx
 
WSO2CONMay2024OpenSourceConferenceDebrief.pptx
WSO2CONMay2024OpenSourceConferenceDebrief.pptxWSO2CONMay2024OpenSourceConferenceDebrief.pptx
WSO2CONMay2024OpenSourceConferenceDebrief.pptx
 
Optimizing NoSQL Performance Through Observability
Optimizing NoSQL Performance Through ObservabilityOptimizing NoSQL Performance Through Observability
Optimizing NoSQL Performance Through Observability
 
Enterprise Knowledge Graphs - Data Summit 2024
Enterprise Knowledge Graphs - Data Summit 2024Enterprise Knowledge Graphs - Data Summit 2024
Enterprise Knowledge Graphs - Data Summit 2024
 
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
Behind the Scenes From the Manager's Chair: Decoding the Secrets of Successfu...
 
IESVE for Early Stage Design and Planning
IESVE for Early Stage Design and PlanningIESVE for Early Stage Design and Planning
IESVE for Early Stage Design and Planning
 

Land adjustment Land value capture

  • 1.   Satyam Sing h MBA-IFM 5 0 0 0 21 421
  • 2.  Metropolitan population of over 6 million  Seventh largest metropolitan area in India  Area: 464 km2  (179 sq mi)  Situated in prosperous western state of Gujarat  Founded in 1411 as a walled city  Became a center of textile manufacturing in the 19th century  Grew rapidly in the 20th century mostly using Town Planning Schemes (land readjustment)
  • 3.  A form of land readjustment  A means of expanding urban infrastructure without compulsory land acquisition  Promoted as equitable, participatory and cost-effective  Originally introduced by British Colonial Government in 1915. Legislation updated in 1954, 1976 and 1999.
  • 4.  Areas designated for urban expansion in the city’s development plan  Divided into TP schemes of ~100-250 hectares (250-500 acres), covering ~100-200 parcels  Government pools the land, uses 30-40% for roads, open space, other public purposes, including 5-10% for sale.  The remaining 60-70% is returned to original owners, whose land value has increased  Urban land use is now allowed on these parcels  Landowner consultation at various stages, regarding their individual parcels
  • 5.
  • 6.  Land Value Capture in TPS occurs through two means: o Betterment charges o Sale of appropriated land  Purpose of betterment charge: to divide the increase in land value evenly between the landowner and the government Betterment Charge = Final LV – Original LV 2  Offset by compensation to landowner for appropriated land, based on original land value
  • 7.  Farmer A’s original parcel: 1000 m2 @ Rs.200/m2 = Rs.200,000 Rs.200,000
  • 8.  Govt. takes 40% from all parcels, i.e. Farmer A loses 400m2  For this, govt. owes Farmer A Rs. 80,000 (=400m2 X Rs.200/m2 ) as compensation  Farmer A’s remaining land is worth Rs.120,000 (=600m2 X Rs.200/m2 ) 60% 40% Rs.120,000 Government Landowner Rs. 80,000
  • 9.  The govt. estimates the final price after TPS to be Rs.500/m2  Farmer A’s remaining 600m2 is now worth Rs.300,000 (=600m2 X Rs.500/m2 )  Increase in land value of final parcel = Rs.300,000 – Rs.120,000 = Rs.180,000  Betterment charge = 50% of increase in LV = Rs.90,000  Farmer A’s net gain is the remaining Rs.90,000. Rs.300,000 (from Rs. 120,000) Rs. 90,000 Government Landowner + Rs. 180,000
  • 10.  Original and final land values are supposed to be based on recent sales  Sale prices are underreported by as much as 60%  Government instead bases original values on a standard “reckoner”  Final values calculated “in reverse”  Final values on paper are much lower than in reality  Betterment charges are therefore an ineffective means of land value capture  However, creates the “perception of fairness”
  • 11.
  • 12.  While not emphasized in the rhetoric, land sales are a much bigger source of land value capture from TP schemes  5-10% of land is “banked” by the govt. for later sale  Land sales have been lucrative for the govt. o Govt. claims to have collected land worth $100 million from 24 TPS o e.g. April 2006: 20 parcels sold for $35 million (including one for Rs.61,000/m2 i.e. $1200/m2 ) to large real estate firms
  • 13.  It is hard to attribute the land value increase directly to infrastructure  Simply allowing urban use on this land may account for much of the land value increase  Land value increases partly due to passage of time in a rapidly urbanizing context. It is often a very slow process: final approvals from state governments make take 10+ years (in one case, 26 years). Implementation may have barely begun after a decade.
  • 17.  The implementation of TPS in Ahmedabad has not been perfect, but these flaws do not reflect on the concept of land readjustment or land value capture itself, but on broader institutional constraints faced in Indian cities.  In Ahmedabad – TPS is an improvement over land acquisition other cities  May be streamlined by doing away with compensation and betterment charges, as most benefit comes for land sales by both original landowners and government.  Land value capture relies on reliable and transparent land valuation

Editor's Notes

  1. TP schemes are a form of land readjustment, a process not unique to India. Variants of it have been used extensively in Germany, Japan, Korea, Taiwan, Australia, and elsewhere. (Washington DC). (read slides) The TP scheme version of land readjustment has a long history in Ahmedabad dating back to the early 20 th century – most of the city has been built this way, and there have been around 200 such schemes. It has been used particularly extensively in the last decade or so, following some legislative changes.
  2. (read slides) On the right are some photographs from landowner meetings, which as you can see are as orderly and efficient as India as a whole is. The landowners sell their parcels on the market, and usually receive a high price from real estate developers. In theory, they pay half of the increase in value of their land to the government as a betterment charge (which I will explain in more detail shortly), while the remaining increase is theirs to keep. The government benefits because it avoids taking land compulsorily and all the delays and difficulties that that involves, and can pay for the infrastructure through land value capture. According to the proponents of TP schemes, both landowners and the government benefit, making it a 'win-win' proposition. The pace of expansion using TP schemes has increased since the turn of the century. Between 2000 and 2009, AMC and AUDA developed over 77 sq. miles (200 sq. km.) of land using TP schemes, as opposed to only half that area in the preceding 25 years (Annez, Bertaud et al. 2010). As of late 2009, around 100 schemes under AMC and another 100 under AUDA had been prepared or were underway, with another 200 envisioned under the 2002 development plan (Ballaney 2009). Between 2005 and 2010, AUDA also built over 11,000 units of low-income housing using land obtained through TP schemes
  3. Here is an example of a real town planning scheme in Ahmedabad, showing the process of plot reconstitution.
  4. (read slides) In theory, the betterment charge owed by the landowner to the government is half the difference between the original land value and the final value. The idea is that the landowner has benefited through the government’s actions, and so owes the government something – the fact that it is 50% is arbitrary.
  5. So here is a simple example that can illustrate the financial side of TPS, including how the betterment charge is calculated. Let us imagine that a farmer owns a parcel of land within a proposed TPS with an area of 1000 sq. m., which is valued at 200 rupees per sq. m.
  6. As part of the TPS, (read)
  7. Farmer A’s original parcel: 1000 m 2 @ Rs.200/m 2 = Rs.200,000 Govt. takes 40% from all parcels, i.e. Farmer A loses 400m 2 For this, govt. owes Farmer A Rs. 80,000 (=400m 2 X Rs.200/m 2 ) as compensation Farmer A’s remaining land is worth Rs.120,000 (=600m 2 X Rs.200/m 2 ) The govt. estimates the final price after TPS to be Rs.500/m 2 Farmer A’s remaining 600m 2 is now worth Rs.300,000 (=600m 2 X Rs.500/m 2 ) Increase in land value = Rs.300,000 – Rs.120,000 = Rs.180,000 Betterment charge = 50% of increase in LV = Rs.90,000 Total owed by Farmer A to govt. = Betterment charge - compensation = Rs.10,000 Farmer A’s net gain is Rs.90,000 A hypothetical example may be useful here in order to illustrate this somewhat complicated process. (The values used in this example are comparable to actual observed values). Let us imagine that a farmer, Mr. X, owns a plot of agricultural land of 1,000 square meters on the periphery of Ahmedabad. His plot falls within the boundaries of a new TP scheme being prepared by AMC. AMC assesses the value of this plot to be `200 per sq. m., i.e. `200,000 in total. While preparing the TP scheme, AMC decides that 40% of land will be taken from each plot, which means that it takes 400 sq. m. of land from Mr. X, which is worth `80,000 in compensation. So AMC now owes Mr. X `80,000. 600 sq. m. of land, worth `120,000, remains with Mr. X. AMC estimates that once the improvements have been made, the value of the land in Mr. X's reshaped final plot will increase from `200 to `500 per sq. m., i.e. the total value of his land will increase from `120,000 to `300,000. The improvements have thus caused the value of his remaining land to go up by `180,000. In order to share this benefit with the government, he now owes 50% of this, `90,000, to AMC as a betterment charge, which goes towards AMC's project costs. Since AMC already owed him `80,000 for the land it originally took, his net payment to AMC is `10,000. The other 50% of the estimated increase in his land value, `90,000, is his to keep. If all estimations used above are accurate, in total Mr. X is `90,000 better off than he was before.
  8. That was how it’s supposed to work. The way it works in reality is different. Original and final land values are supposed to be based on recent land sales. However, sale prices are not a reliable guide to actual market value, as they are routinely underreported, sometimes by up to 60% (the remainder is paid in cash), to avoid stamp duties and taxes. Instead the government bases original values on a standard “reckoner”, or guidelines to estimate land value, which do not really reflect market values. It calculates final values in reverse, based on how much they want to recover through betterment charges. That is – they decide how much they need the betterment charge to be, and work backwards, fixing final land values so that they yield this result. While it may seem like the government is taking unfair advantage somehow, in fact the final values on paper are much lower than market values, which means that the betterment charges recovered are also very low. The government does not really exercise its ability to take back half the real increase in land value, treating the betterment charge as a nominal fee. e.g. instead of Rs.500/m 2 as used to calculate the betterment charge, the actual sale price may be Rs.20,000 – 60,000 per sq. m. So betterment charges here are an ineffective means of land value capture for the government. This leads to two questions. Why does the government not calculate betterment charges more realistically, and recover more money? The explanation one hears is that this would be politically unpopular. TP schemes are accepted now because landowners don’t have to give up too much. The government seems to not think it worthwhile to upset this understanding. The other question is, since the amounts are so small, why bother with betterment charges at all? The answer to this that is sometimes given is that varying the nominal charge it from one landowner to another based on parcel characteristics creates the perception of fairness.
  9. Here is an illustration of the differences between final land values on paper and on the market. The draft scheme as sanctioned in 2006 (left) shows low estimated final plot values.
  10. (read slides) [[[[[ The sale of land obtained through TP schemes has become an important source of income for AUDA. Between 2001-02 and 2004-05, AUDA's total capital budget increased sevenfold, from `32 crore to `227 crore4 (US$ 7 million to US$ 50 million). On average, between 2003-04 and 2008-09, 29% of AUDA's revenue came from the sale of land. In April 2006, AUDA auctioned 20 plots for `172 crore (US$ 38 million), to large real estate firms. In that year, 65% of AUDA's revenue came from land sales. The proceeds from land sales have been used by AUDA to finance large infrastructure projects, mostly road development, water supply, sanitation, drainage, etc (Mahadevia 2009; Sridhar and Reddy 2009). A recent development plan states that from 24 schemes, AUDA has created a land bank worth `500 crores, i.e. over US$ 100 million (AUDA/ AMC City Development Plan 2006-2012).]]]]]]
  11. Here is an illustration of the lengths of time taken to implement TP schemes. This is an area in northern Ahmedabad as seen before a TPS.
  12. This shows the TPS prepared in 2004.
  13. And this shows it in 2010, with hardly any infrastructure built. It is the same in more recent satellite images. This is not an unusual situation.