Introduction
• Manufacturing:
the making of products from raw materials using
various processes, equipment, operations and
manpower according to a detailed plan.
Manufacturing System
PROCESS PLANNING
• comprises the selection and sequencing of processes and
operations to transform a chosen raw material into a
finished component.
• It is the act of preparing detailed work instructions to
produce a component. This includes the selection of
manufacturing processes and operations, production
equipment, tooling and jigs and fixtures.
• It will also normally include determining manufacturing
parameters and specifying criteria for the selection of
quality assurance (QA) methods to ensure product quality
Design / Manufacturing Interface
Process Planning Methods
Manual Process Planning (MAPP)
• Traditional Approach:
Step 1: He looks at the drawing and uses his experience of manufacturing
methods, combined with knowledge of the types of resource available, to
decide how the component or assembly should be made.
Step 2: For each element of each operation, he refers to manuals to
ascertain the company's recommended tools, feeds and speeds for the
particular material on the selected machine. Also using manuals, the
planned times for all the handling and machining elements involved are
ascertained. These are then used to synthesize the set-up time and the
time per unit quantity for each operation.
All of the above particulars in Step 1 are documented in the process
planning layout, also known as a routing sheet, which lists all the
operations. For each operation there is a methods or operations list,
which specifies all the details referred to in Step 2.
MAPP
• Workbook Approach:
It involves developing workbooks of pre-determined
sequences of operations for given types of work pieces.
After having carried out the drawing interpretation and
identified the manufacturing processes required, the pre-
determined sequence of operations can be selected from the
workbook and incorporated into the process plan.
MAPP – Merits / Demerits
• Merits: low-cost task and is flexible
• Demerits:
Excessive clerical content : excessive paperwork
Lack of consistency in planning
Late design modifications
Changing technology
Computer Aided Process Planning
(CAPP)
• represents the link between design and
manufacturing in a CAD/CAM system.
• Variant or Retrieval Method of Process
Planning (Retrieval CAPP System)
• Generative method of process planning
Variant or Retrieval CAPP
• the computer makes a search of its storage or a data base or
a no. of standard or completed process plans that have been
previously developed by the company’s process planners.
• The process plan retrieved is then modified or suitably
varied (i.e., altered) by the process planner, to suit the exact
requirements of the current part design.
• Group Technology concepts, parts classification and coding
Generative CAPP
• In this method the computer uses the stored manufacturing
and design data to generate a complete list of all possible
process plans that could be used to manufacture the current
part.
• It then exhaustively searches this list for the one which
optimizes the cost function.
• This method always yields the optimum process plan
for manufacturing a particular part.
ARTIFICIAL INTELLIGENCE
CAPP – MERITS / DEMERITS
• Process rationalization and standardization
• CAPP helps in arriving at standard and consistent
process plans
• Increased productivity of process planners
• Reduced lead time for process planning
• Improved legibility and readability
• Incorporation of other application programmes
Purpose / Objective / Importance
of Process planning
• Find the systematic determination of the engg
processes & Systems
• Identify the make / Buy decision
• Make a smooth level of production
• Predict the quantity of production, Effective
use of facilities
• Reduce the manufacturing cost of production
Informations – Process planning
• Product data
• Volume of production
• Quality requirements
• Equipments & Personal available
• Time available to perform the work / Delivery
date
Process Selection
• Factors:
• Shape requirements – Solid / Hollow / Chamfer / Thread /
Groove / Hole
• Size Requirements – Volume of production
Small Size – Process layout; large Size – Fixed layout
• Tolerance requirments : Precision : Grinding > Turning
• Surface finish requirements : Reaming > Drilling
• Material requirements : Hard mtl – Carbide / Ceramic tool
Soft mtl – Jigs & fixtures need
Process selection procedure
• Developing a statement of manufacturing
operations to be performed
• Establish a provisional process
• Develop a list of process alternatives
• Step by step comparison of provisional
process with process alternatives
• Communicate the finalised process plan
• Perform & Execution
Process Selection Method – Refer
Peter Scallon Pno: 154
Production Equipment Selection
• Factors:
 Technical factors:
 Physical size – M/c able to cope with weight of W/P
 M/c Accuracy – able to produce the products with
specification limit, geometric tolerance
 Surface Finish
 Operational factors:
 Batch size - Break Even anlaysis to find EOQ, Best M/c
 Capacity
 Availability
Production Equipment procedure
• Refer Notes
Tooling Selection
• Factors
Manufacturing Practice / Process
M/c tool characteristics
Processing time
Availability
Processing capability
Tooling Selection – Procedure
• Evaluation of Process / Machine Selection
• Analysis of machining operations
• Analysis of W/p characteristics
• Tooling analysis
• Selection of tooling
Process Planning Activities /
Procedure
• Engineering drawings interpretation ;
• knowledge of materials for manufacture;
• knowledge of manufacturing processes;
• knowledge of jigs and fixtures;
• knowledge of the relative costs of materials, processes and
tooling;
• an ability to calculate manufacturing parameters and costs;
• knowledge of inspection/QA procedures and specifications.
Process Planning Activities
• Drawing Interpretation
 contain a variety of information which can help assess the
processing requirements.
 The interpretation of the drawing will include assessing the
part geometry, dimensions and associated tolerances,
geometric tolerances, surface finish specifications, the
material specification and the number of parts required
Drawing Interpretation Uses
• to identify the relevant drawing information that helps the
process planner identify critical processing factors.
• identify appropriate supplementary information from the
drawing to aid the process planning;
• identify and interpret dimensional information from the
drawing;
• identify and interpret geometric information from the
drawing;
• identify the critical processing factors for the component
from the dimensional and geometric information.
to identify the relevant drawing information that helps the
process planner identify critical processing factors.
• Engineering Drawing
Detail Drawing; Assembly drawing; combined drawing
Detail drawings
contain all the information required to manufacture the item
or items represented. This information will include all
dimensions, tolerances, surface finish specifications, and
material specifications.
Types : : single-part drawings; collective drawings
Engineering Drawing
• Assembly drawings
contain all the information required to
assemble two or more parts together
Types:
• single-part assembly drawings; collective
assembly drawings
2. Identifying useful supplementary information apart from
geometry
• material and specification;
• notes on special material treatments;
• notes on surface finish;
• general tolerances;
• keys to geometrical tolerances;
• notes on equivalent parts;
• notes on screw thread forms;
• tool references;
• gauge references;
• quantity to be produced;
• parts lists (in the case of assembly drawings).
3. Identify and interpret dimensional information from the
drawing
• Dimensional Tolerances
• Although drawings are generally dimensioned without tolerances, in
manufacturing engineering terms, the achievement of an exact dimension
is a practical impossibility.
• Therefore, the limits within which a dimension is acceptable can be
included with that dimension
• Bilateral / Unilateral tolerances
Allowance is allowable for upper & lower limits – Bilateral tolerances
Allowance is allowable for either upper or lower limits – Unilateral tolerances
• Limits & Fits
Limits - Two extreme permissible sizes of dimension between actual size of
dimension is contained.
Fits (Degree of tightness of looseness) - relationship existing between two
mating parts with respect to amount of play or interference which is
present when they are assembled together.
Types ; Clearance fit , Interference fit, Transition fit
• Hole basis
• Shaft basis
• Clearance fit - the shaft is made smaller than the hole
under all extremes of tolerance, that is, the upper size of the
shaft is smaller than the lower size of the hole, allowing it to
rotate within the hole
Ex: shaft bearings and where it is a requirement for one part
to slide within another.
• Interference fit - the shaft is made larger than the hole
under all extremes of tolerance, that is, the lower size of the
shaft is larger than the upper size of the hole
• Ex: permanent assembly and typical applications are found in
press-fit bushes and couplings shrunk onto shafts after pre-
heating.
4. identify and interpret geometric information from the
drawing
• Geometrical tolerances
To mention the geometery allowance to the manufacturing
product.
Surface finish – symbols
Material Evaluation – Objective
• identify and describe the common materials used for
manufacture;
• identify and describe the main properties of materials;
• identify and describe common material selection processes;
• identify and describe the common processes used for
manufacture;
• carry out an overall evaluation of the selection of materials
for manufacture in terms of processes;
• select suitable processes for a given part/product based on
the critical
• processing factors identified during the drawing
interpretation.
Materials / Properties
Material Selection Process Peter
scallon – pNo; 126
• two distinct approaches arise for the materials selection process:
the design and development of a new product;
the modification of an existing product.
• five basic steps - design and development of a new product.
(Dieter, 2000):
1. Specify the performance parameters of the design and translate
these into the required material properties, for example, strength,
hardness, etc. taking into account the cost and availability of
materials.
2. Specify the manufacturing considerations such as the quantity/
batch size; size, weight and complexity of the part; dimensional and
geometrical accuracy required, the surface finish required, any
quality requirements and the overall manufacturability of the
material.
Material Selection process contd…
• Draw up a shortlist of candidate materials from the largest
possible database of materials deemed suitable for the
application.
• Evaluate the candidate materials in more detail. Compare
each, based on product performance, cost, availability and
manufacturability. The result of this evaluation should be the
selection of a single material.
• Develop design data and/or a design specification for the
chosen material.
Existing product – matl selection
• Evaluate the current product in terms of the materials
performance, manufacturing process requirements and cost.
• Identify which characteristics have to be improved for
enhanced product performance.
• Search for alternative materials and/or manufacturing routes.
• Compile a shortlist of materials and manufacturing routes.
Evaluate each in terms of the cost of manufactured parts.
• Evaluate the results of Step 4 and employ the best
alternative.
Material selection methods
• selection with computer-aided databases;
• performance indices;
• decision matrices;
• selection with expert systems;
• value analysis (particularly for materials
substitution);
• failure analysis;
• cost-benefit analysis.
Material evaluation method
Evaluation should focus on three main areas
(DeGarmo et al., 1988):
• shape or geometry considerations;
• Material property requirements;
• manufacturing considerations.
shape or geometry considerations
• What is the relative size of the component?
• How complex is the shape? Is it symmetrical at all? Uniform
cross sections?
• Will it be more than one piece?
• Are there enough dimensions to enable manufacture?
• Are there any dimensional tolerances outside the general
tolerance requirements?
• How does this part mate in a sub-assembly or assembly?
• What are the surface finish requirements?
• Have allowances been made for wear during service?
• Are there any minor design modifications that can
significantly improve manufacturability, that is, design for
manufacture?
Material property requirements
• mechanical properties;
• physical properties;
• service environment.
Manufacturing considerations
• Have standard components and parts been specified
wherever possible?
• Has the ease of manufacture of the design been considered?
• How many components have to be made and at what rate?
• What is the minimum and maximum section thickness?
• What is the desired level of quality compared to similar
products on the market?
• What are the anticipated quality control and inspection
requirements?
• Are there any special considerations to be made for
assembly?
Geometrical, Dimensional tolerance, Surface
finish symbols - interpretation
Critical Processing Factors
• The bearing housing shown in Fig. 3.22 below
has to be manufactured and the process
planner has been given the detail drawing for
• the part. The drawing specifies that the part
material is cast iron and the batch size is 250.
The general tolerance is +/- 0.5 and the
general surface finish is N9.
Questions
• Methods (Approaches) of Process planning – Refer Peter scallon, Pno
58 & Elanchezhian – Pno 44
• Process selection – factors, Method – Refer Peter scallon 152
• Equipment selection – factors, Procedure – Refer Peter scallon 197
• Tooling selection – factors, Procedure Refer Peter scallon 207
• Material selection & Evaluation – Aim, Process, Method – Refer peter
scallon 126
• Drawing Interpretation – peter scallon – Pno: 69 & notes
• Drawing Interpretation – with analysing symbols (2 Analysis type
question – Symbols Interpretation – Refer Notes & Critical Processing
factors – Refer Peter scallon – pno: 101)
• Process Planning Procedure / Activities - Elanchezhian – Pno 39,
Information reqd - Elanchezhian – Pno 38.

More Related Content

What's hot

Uint 1 locating and clamping devices
Uint 1 locating and clamping devicesUint 1 locating and clamping devices
Uint 1 locating and clamping devicesS.DHARANI KUMAR
 
introduction to process planning murugananthan
introduction to process planning murugananthanintroduction to process planning murugananthan
introduction to process planning murugananthanMurugananthan K
 
superfinishing process
superfinishing processsuperfinishing process
superfinishing processDhiren Patel
 
Unit 1 Metal Cutting
Unit 1 Metal CuttingUnit 1 Metal Cutting
Unit 1 Metal CuttingMechbytes
 
Design Consideration For Casting
Design Consideration For CastingDesign Consideration For Casting
Design Consideration For CastingMohit Joon
 
Clamping and Clamping Devices
Clamping and Clamping DevicesClamping and Clamping Devices
Clamping and Clamping DevicesAmruta Rane
 
Jigs and fixtures
Jigs and fixtures Jigs and fixtures
Jigs and fixtures Zohaib Ahmad
 
MANUFACTURING TECHNOLOGY-II UNIT-2
MANUFACTURING TECHNOLOGY-II UNIT-2MANUFACTURING TECHNOLOGY-II UNIT-2
MANUFACTURING TECHNOLOGY-II UNIT-2S. Sathishkumar
 
Deburring processes
Deburring  processesDeburring  processes
Deburring processesNakul Agwan
 
Unit ii process planning activities
Unit ii process planning activitiesUnit ii process planning activities
Unit ii process planning activitiesKarpaka Raj
 
heat in metal cutting
heat in metal cuttingheat in metal cutting
heat in metal cuttingRania Atia
 
Jig and fixture
Jig and fixtureJig and fixture
Jig and fixtureNaman Dave
 
Process planning and cost estimation
Process planning and cost estimationProcess planning and cost estimation
Process planning and cost estimationRaja P
 

What's hot (20)

Types of jigs and fixtures
Types of jigs and fixtures Types of jigs and fixtures
Types of jigs and fixtures
 
Uint 1 locating and clamping devices
Uint 1 locating and clamping devicesUint 1 locating and clamping devices
Uint 1 locating and clamping devices
 
introduction to process planning murugananthan
introduction to process planning murugananthanintroduction to process planning murugananthan
introduction to process planning murugananthan
 
superfinishing process
superfinishing processsuperfinishing process
superfinishing process
 
Unit 1 Metal Cutting
Unit 1 Metal CuttingUnit 1 Metal Cutting
Unit 1 Metal Cutting
 
Design Consideration For Casting
Design Consideration For CastingDesign Consideration For Casting
Design Consideration For Casting
 
Tool Wear and Tool Life
Tool Wear and Tool Life Tool Wear and Tool Life
Tool Wear and Tool Life
 
Clamping and Clamping Devices
Clamping and Clamping DevicesClamping and Clamping Devices
Clamping and Clamping Devices
 
Tolerance analysis
Tolerance analysisTolerance analysis
Tolerance analysis
 
Jigs and fixtures
Jigs and fixtures Jigs and fixtures
Jigs and fixtures
 
Sheet metal processes
Sheet metal processesSheet metal processes
Sheet metal processes
 
Merchant's circle
Merchant's circleMerchant's circle
Merchant's circle
 
MANUFACTURING TECHNOLOGY-II UNIT-2
MANUFACTURING TECHNOLOGY-II UNIT-2MANUFACTURING TECHNOLOGY-II UNIT-2
MANUFACTURING TECHNOLOGY-II UNIT-2
 
Deburring processes
Deburring  processesDeburring  processes
Deburring processes
 
Unit ii process planning activities
Unit ii process planning activitiesUnit ii process planning activities
Unit ii process planning activities
 
Heat in metal cutting
Heat in metal cuttingHeat in metal cutting
Heat in metal cutting
 
heat in metal cutting
heat in metal cuttingheat in metal cutting
heat in metal cutting
 
Jig and fixture
Jig and fixtureJig and fixture
Jig and fixture
 
Jigs & fixtures
Jigs & fixturesJigs & fixtures
Jigs & fixtures
 
Process planning and cost estimation
Process planning and cost estimationProcess planning and cost estimation
Process planning and cost estimation
 

Similar to Process Planning & Cost Estimation

Cim presentation (1)
Cim presentation (1)Cim presentation (1)
Cim presentation (1)rajnitj19
 
INTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNINGINTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNINGSathishkumarM89
 
INTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNINGINTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNINGSathishkumarM89
 
1-unit(Introduction to process planning)-converted.docx
1-unit(Introduction to process planning)-converted.docx1-unit(Introduction to process planning)-converted.docx
1-unit(Introduction to process planning)-converted.docxprabaharjeevanananda
 
TMA Module 2........................................................
TMA Module 2........................................................TMA Module 2........................................................
TMA Module 2........................................................4PS19AU411SyedaSoubi
 
Process Planning
Process PlanningProcess Planning
Process PlanningGuhan M
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & ControlKunalJagtap5
 
INTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMS
INTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMSINTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMS
INTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMSJyotiraman De
 
Process Selection & Facility Layout.ppt
Process Selection & Facility Layout.pptProcess Selection & Facility Layout.ppt
Process Selection & Facility Layout.pptRenu Lamba
 
Computer Aided Design - Unit I Introduction
Computer Aided Design - Unit I IntroductionComputer Aided Design - Unit I Introduction
Computer Aided Design - Unit I IntroductionJayavendhanJ
 
PPCE Unit-2.pptx
PPCE Unit-2.pptxPPCE Unit-2.pptx
PPCE Unit-2.pptxDJAGADEESH1
 
Process planning activities
Process planning activitiesProcess planning activities
Process planning activitiesRaja P
 
PPCE notes PPT (1).pdf
PPCE notes PPT (1).pdfPPCE notes PPT (1).pdf
PPCE notes PPT (1).pdfmani617576
 

Similar to Process Planning & Cost Estimation (20)

Cim presentation (1)
Cim presentation (1)Cim presentation (1)
Cim presentation (1)
 
INTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNINGINTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNING
 
INTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNINGINTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNING
 
1-unit(Introduction to process planning)-converted.docx
1-unit(Introduction to process planning)-converted.docx1-unit(Introduction to process planning)-converted.docx
1-unit(Introduction to process planning)-converted.docx
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
Updated resume 31 may 15
Updated resume 31 may 15Updated resume 31 may 15
Updated resume 31 may 15
 
TMA Module 2........................................................
TMA Module 2........................................................TMA Module 2........................................................
TMA Module 2........................................................
 
Process Planning
Process PlanningProcess Planning
Process Planning
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
UNIT 1 PPCE.ppt
UNIT 1 PPCE.pptUNIT 1 PPCE.ppt
UNIT 1 PPCE.ppt
 
Process planning
Process planningProcess planning
Process planning
 
INTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMS
INTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMSINTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMS
INTELLIGENT DECISION MAKING FOR REACTIVE SCHEDULING IN FMS
 
Process Selection & Facility Layout.ppt
Process Selection & Facility Layout.pptProcess Selection & Facility Layout.ppt
Process Selection & Facility Layout.ppt
 
Computer Aided Design - Unit I Introduction
Computer Aided Design - Unit I IntroductionComputer Aided Design - Unit I Introduction
Computer Aided Design - Unit I Introduction
 
PPCE Unit-2.pptx
PPCE Unit-2.pptxPPCE Unit-2.pptx
PPCE Unit-2.pptx
 
PPCE Unit-2.pptx
PPCE Unit-2.pptxPPCE Unit-2.pptx
PPCE Unit-2.pptx
 
Process planning activities
Process planning activitiesProcess planning activities
Process planning activities
 
PPCE notes PPT (1).pdf
PPCE notes PPT (1).pdfPPCE notes PPT (1).pdf
PPCE notes PPT (1).pdf
 
TEST 2.pptx
TEST 2.pptxTEST 2.pptx
TEST 2.pptx
 

Recently uploaded

ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomnelietumpap1
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxnelietumpap1
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4MiaBumagat1
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfphamnguyenenglishnb
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxMaryGraceBautista27
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceSamikshaHamane
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Celine George
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxChelloAnnAsuncion2
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptxSherlyMaeNeri
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfMr Bounab Samir
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Jisc
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
 

Recently uploaded (20)

ENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choomENGLISH6-Q4-W3.pptxqurter our high choom
ENGLISH6-Q4-W3.pptxqurter our high choom
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
Q4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptxQ4 English4 Week3 PPT Melcnmg-based.pptx
Q4 English4 Week3 PPT Melcnmg-based.pptx
 
ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4ANG SEKTOR NG agrikultura.pptx QUARTER 4
ANG SEKTOR NG agrikultura.pptx QUARTER 4
 
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdfAMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
AMERICAN LANGUAGE HUB_Level2_Student'sBook_Answerkey.pdf
 
Science 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptxScience 7 Quarter 4 Module 2: Natural Resources.pptx
Science 7 Quarter 4 Module 2: Natural Resources.pptx
 
Roles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in PharmacovigilanceRoles & Responsibilities in Pharmacovigilance
Roles & Responsibilities in Pharmacovigilance
 
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
Incoming and Outgoing Shipments in 3 STEPS Using Odoo 17
 
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptxGrade 9 Q4-MELC1-Active and Passive Voice.pptx
Grade 9 Q4-MELC1-Active and Passive Voice.pptx
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Judging the Relevance and worth of ideas part 2.pptx
Judging the Relevance  and worth of ideas part 2.pptxJudging the Relevance  and worth of ideas part 2.pptx
Judging the Relevance and worth of ideas part 2.pptx
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdfLike-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
Like-prefer-love -hate+verb+ing & silent letters & citizenship text.pdf
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...Procuring digital preservation CAN be quick and painless with our new dynamic...
Procuring digital preservation CAN be quick and painless with our new dynamic...
 
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
 

Process Planning & Cost Estimation

  • 1. PROCESS PLANNING & COST ESTIMATION Unit – I INTRODUCTION TO PROCESS PLANNING B.Prabhu AP /Mechanical, Kamaraj College of Engineering & Technology, Madurai
  • 2. Introduction • Manufacturing: the making of products from raw materials using various processes, equipment, operations and manpower according to a detailed plan.
  • 4. PROCESS PLANNING • comprises the selection and sequencing of processes and operations to transform a chosen raw material into a finished component. • It is the act of preparing detailed work instructions to produce a component. This includes the selection of manufacturing processes and operations, production equipment, tooling and jigs and fixtures. • It will also normally include determining manufacturing parameters and specifying criteria for the selection of quality assurance (QA) methods to ensure product quality
  • 7. Manual Process Planning (MAPP) • Traditional Approach: Step 1: He looks at the drawing and uses his experience of manufacturing methods, combined with knowledge of the types of resource available, to decide how the component or assembly should be made. Step 2: For each element of each operation, he refers to manuals to ascertain the company's recommended tools, feeds and speeds for the particular material on the selected machine. Also using manuals, the planned times for all the handling and machining elements involved are ascertained. These are then used to synthesize the set-up time and the time per unit quantity for each operation. All of the above particulars in Step 1 are documented in the process planning layout, also known as a routing sheet, which lists all the operations. For each operation there is a methods or operations list, which specifies all the details referred to in Step 2.
  • 8. MAPP • Workbook Approach: It involves developing workbooks of pre-determined sequences of operations for given types of work pieces. After having carried out the drawing interpretation and identified the manufacturing processes required, the pre- determined sequence of operations can be selected from the workbook and incorporated into the process plan.
  • 9. MAPP – Merits / Demerits • Merits: low-cost task and is flexible • Demerits: Excessive clerical content : excessive paperwork Lack of consistency in planning Late design modifications Changing technology
  • 10. Computer Aided Process Planning (CAPP) • represents the link between design and manufacturing in a CAD/CAM system. • Variant or Retrieval Method of Process Planning (Retrieval CAPP System) • Generative method of process planning
  • 11. Variant or Retrieval CAPP • the computer makes a search of its storage or a data base or a no. of standard or completed process plans that have been previously developed by the company’s process planners. • The process plan retrieved is then modified or suitably varied (i.e., altered) by the process planner, to suit the exact requirements of the current part design. • Group Technology concepts, parts classification and coding
  • 12.
  • 13. Generative CAPP • In this method the computer uses the stored manufacturing and design data to generate a complete list of all possible process plans that could be used to manufacture the current part. • It then exhaustively searches this list for the one which optimizes the cost function. • This method always yields the optimum process plan for manufacturing a particular part. ARTIFICIAL INTELLIGENCE
  • 14. CAPP – MERITS / DEMERITS • Process rationalization and standardization • CAPP helps in arriving at standard and consistent process plans • Increased productivity of process planners • Reduced lead time for process planning • Improved legibility and readability • Incorporation of other application programmes
  • 15. Purpose / Objective / Importance of Process planning • Find the systematic determination of the engg processes & Systems • Identify the make / Buy decision • Make a smooth level of production • Predict the quantity of production, Effective use of facilities • Reduce the manufacturing cost of production
  • 16. Informations – Process planning • Product data • Volume of production • Quality requirements • Equipments & Personal available • Time available to perform the work / Delivery date
  • 17. Process Selection • Factors: • Shape requirements – Solid / Hollow / Chamfer / Thread / Groove / Hole • Size Requirements – Volume of production Small Size – Process layout; large Size – Fixed layout • Tolerance requirments : Precision : Grinding > Turning • Surface finish requirements : Reaming > Drilling • Material requirements : Hard mtl – Carbide / Ceramic tool Soft mtl – Jigs & fixtures need
  • 18. Process selection procedure • Developing a statement of manufacturing operations to be performed • Establish a provisional process • Develop a list of process alternatives • Step by step comparison of provisional process with process alternatives • Communicate the finalised process plan • Perform & Execution
  • 19. Process Selection Method – Refer Peter Scallon Pno: 154
  • 20. Production Equipment Selection • Factors:  Technical factors:  Physical size – M/c able to cope with weight of W/P  M/c Accuracy – able to produce the products with specification limit, geometric tolerance  Surface Finish  Operational factors:  Batch size - Break Even anlaysis to find EOQ, Best M/c  Capacity  Availability
  • 22. Tooling Selection • Factors Manufacturing Practice / Process M/c tool characteristics Processing time Availability Processing capability
  • 23. Tooling Selection – Procedure • Evaluation of Process / Machine Selection • Analysis of machining operations • Analysis of W/p characteristics • Tooling analysis • Selection of tooling
  • 24. Process Planning Activities / Procedure • Engineering drawings interpretation ; • knowledge of materials for manufacture; • knowledge of manufacturing processes; • knowledge of jigs and fixtures; • knowledge of the relative costs of materials, processes and tooling; • an ability to calculate manufacturing parameters and costs; • knowledge of inspection/QA procedures and specifications.
  • 25. Process Planning Activities • Drawing Interpretation  contain a variety of information which can help assess the processing requirements.  The interpretation of the drawing will include assessing the part geometry, dimensions and associated tolerances, geometric tolerances, surface finish specifications, the material specification and the number of parts required
  • 26. Drawing Interpretation Uses • to identify the relevant drawing information that helps the process planner identify critical processing factors. • identify appropriate supplementary information from the drawing to aid the process planning; • identify and interpret dimensional information from the drawing; • identify and interpret geometric information from the drawing; • identify the critical processing factors for the component from the dimensional and geometric information.
  • 27. to identify the relevant drawing information that helps the process planner identify critical processing factors. • Engineering Drawing Detail Drawing; Assembly drawing; combined drawing Detail drawings contain all the information required to manufacture the item or items represented. This information will include all dimensions, tolerances, surface finish specifications, and material specifications. Types : : single-part drawings; collective drawings
  • 28. Engineering Drawing • Assembly drawings contain all the information required to assemble two or more parts together Types: • single-part assembly drawings; collective assembly drawings
  • 29. 2. Identifying useful supplementary information apart from geometry • material and specification; • notes on special material treatments; • notes on surface finish; • general tolerances; • keys to geometrical tolerances; • notes on equivalent parts; • notes on screw thread forms; • tool references; • gauge references; • quantity to be produced; • parts lists (in the case of assembly drawings).
  • 30. 3. Identify and interpret dimensional information from the drawing • Dimensional Tolerances • Although drawings are generally dimensioned without tolerances, in manufacturing engineering terms, the achievement of an exact dimension is a practical impossibility. • Therefore, the limits within which a dimension is acceptable can be included with that dimension
  • 31. • Bilateral / Unilateral tolerances Allowance is allowable for upper & lower limits – Bilateral tolerances Allowance is allowable for either upper or lower limits – Unilateral tolerances • Limits & Fits Limits - Two extreme permissible sizes of dimension between actual size of dimension is contained. Fits (Degree of tightness of looseness) - relationship existing between two mating parts with respect to amount of play or interference which is present when they are assembled together. Types ; Clearance fit , Interference fit, Transition fit
  • 32. • Hole basis • Shaft basis • Clearance fit - the shaft is made smaller than the hole under all extremes of tolerance, that is, the upper size of the shaft is smaller than the lower size of the hole, allowing it to rotate within the hole Ex: shaft bearings and where it is a requirement for one part to slide within another.
  • 33. • Interference fit - the shaft is made larger than the hole under all extremes of tolerance, that is, the lower size of the shaft is larger than the upper size of the hole • Ex: permanent assembly and typical applications are found in press-fit bushes and couplings shrunk onto shafts after pre- heating.
  • 34. 4. identify and interpret geometric information from the drawing • Geometrical tolerances To mention the geometery allowance to the manufacturing product.
  • 35.
  • 37. Material Evaluation – Objective • identify and describe the common materials used for manufacture; • identify and describe the main properties of materials; • identify and describe common material selection processes; • identify and describe the common processes used for manufacture; • carry out an overall evaluation of the selection of materials for manufacture in terms of processes; • select suitable processes for a given part/product based on the critical • processing factors identified during the drawing interpretation.
  • 39. Material Selection Process Peter scallon – pNo; 126 • two distinct approaches arise for the materials selection process: the design and development of a new product; the modification of an existing product. • five basic steps - design and development of a new product. (Dieter, 2000): 1. Specify the performance parameters of the design and translate these into the required material properties, for example, strength, hardness, etc. taking into account the cost and availability of materials. 2. Specify the manufacturing considerations such as the quantity/ batch size; size, weight and complexity of the part; dimensional and geometrical accuracy required, the surface finish required, any quality requirements and the overall manufacturability of the material.
  • 40. Material Selection process contd… • Draw up a shortlist of candidate materials from the largest possible database of materials deemed suitable for the application. • Evaluate the candidate materials in more detail. Compare each, based on product performance, cost, availability and manufacturability. The result of this evaluation should be the selection of a single material. • Develop design data and/or a design specification for the chosen material.
  • 41. Existing product – matl selection • Evaluate the current product in terms of the materials performance, manufacturing process requirements and cost. • Identify which characteristics have to be improved for enhanced product performance. • Search for alternative materials and/or manufacturing routes. • Compile a shortlist of materials and manufacturing routes. Evaluate each in terms of the cost of manufactured parts. • Evaluate the results of Step 4 and employ the best alternative.
  • 42. Material selection methods • selection with computer-aided databases; • performance indices; • decision matrices; • selection with expert systems; • value analysis (particularly for materials substitution); • failure analysis; • cost-benefit analysis.
  • 43. Material evaluation method Evaluation should focus on three main areas (DeGarmo et al., 1988): • shape or geometry considerations; • Material property requirements; • manufacturing considerations.
  • 44. shape or geometry considerations • What is the relative size of the component? • How complex is the shape? Is it symmetrical at all? Uniform cross sections? • Will it be more than one piece? • Are there enough dimensions to enable manufacture? • Are there any dimensional tolerances outside the general tolerance requirements? • How does this part mate in a sub-assembly or assembly? • What are the surface finish requirements? • Have allowances been made for wear during service? • Are there any minor design modifications that can significantly improve manufacturability, that is, design for manufacture?
  • 45. Material property requirements • mechanical properties; • physical properties; • service environment.
  • 46. Manufacturing considerations • Have standard components and parts been specified wherever possible? • Has the ease of manufacture of the design been considered? • How many components have to be made and at what rate? • What is the minimum and maximum section thickness? • What is the desired level of quality compared to similar products on the market? • What are the anticipated quality control and inspection requirements? • Are there any special considerations to be made for assembly?
  • 47. Geometrical, Dimensional tolerance, Surface finish symbols - interpretation
  • 48. Critical Processing Factors • The bearing housing shown in Fig. 3.22 below has to be manufactured and the process planner has been given the detail drawing for • the part. The drawing specifies that the part material is cast iron and the batch size is 250. The general tolerance is +/- 0.5 and the general surface finish is N9.
  • 49.
  • 50. Questions • Methods (Approaches) of Process planning – Refer Peter scallon, Pno 58 & Elanchezhian – Pno 44 • Process selection – factors, Method – Refer Peter scallon 152 • Equipment selection – factors, Procedure – Refer Peter scallon 197 • Tooling selection – factors, Procedure Refer Peter scallon 207 • Material selection & Evaluation – Aim, Process, Method – Refer peter scallon 126 • Drawing Interpretation – peter scallon – Pno: 69 & notes • Drawing Interpretation – with analysing symbols (2 Analysis type question – Symbols Interpretation – Refer Notes & Critical Processing factors – Refer Peter scallon – pno: 101) • Process Planning Procedure / Activities - Elanchezhian – Pno 39, Information reqd - Elanchezhian – Pno 38.