•UNIT I INTRODUCTION TO PROCESS PLANNING
•UNIT II PROCESS PLANNING ACTIVITIES
•UNIT III INTRODUCTION TO COST ESTIMATION
•UNIT IV PRODUCTION COST ESTIMATION
•UNIT V MACHINING TIME CALCULATION
UNIT V
MACHINING TIME CALCULATION
• Estimation of machining time
• Importance of machine time calculation
• Calculation of machining time for different lathe operations,
Drilling and Boring
• Machining time calculation for Milling, Shaping and Planning
• Machining time calculation for grinding
Introduction
• To estimate the total cost of any product involving machining
operations, the machining cost is to be estimated primarily.
• In order to estimate the machining cost, one has to calculate
the machining time required for these machining operations.
• After knowing the machining time and rate of machining, the
total machining cost can be calculated.
• Therefore the estimation of machining time for various
operations such as lathe, drilling. boring, shaping, planning,
milling and grinding operations are very essential in the cost
estimation activity.
What is meant by Machining Time?
• It is time for which the machine works on the component
• From the time when the tool touches the work to when the
tool leaves the component after completion of operation
• The machining time depends on die type and extent of
machining required, material being machined, speed, feed,
depth of cut and number of cuts required
• In addition to the actual machining time, an estimator bas to
consider other time elements such as set-up time, handling
time, tear down time, down time and allowances to the
workers.
FACTORS TO BE CONSIDERED FOR
MACHINE TIME CALCULATION
•Set up time
•Operation time
•Tear down time
•Personal allowance
•Fatigue allowance
•Checking allowance
•Miscellaneous allowance
SETUPTIME
• This takes into account the time required to prepare the
machine for doing the job with the time taken to study the
blue print.
• The time to prepare the machine, in turn
• The time to install and adjust the tools in the machine, as well
as to make the machine ready to start the work.
OPERATION TIME
• The sum of handling time and machining time for a job is
called operation time.
• It is the duration of time that elapses between output of two
consecutive units of production.
TEAR DOWN TIME
• Tear down time takes into account the time necessary to
remove from the machine all tools and accessories, such as
jigs and fixtures, gauges and instruments etc.
• The time required for clearing operational chips from the
machine table and clearing of the machine itself are included
on this.
• Tear down time is generally 10 minute per shift of 8 hrs.
PERSONALALLOWANCE
• The time allowed for workers to meet their personal needs,
such as going to the urinal, drinking water, smoking, washing
their hands, etc is known as personal allowance.
• It is generally 5 to 10 minutes
FATIGUE ALLOWANCE
• The long working hours and poor working conditions such as
poor lighting, poor ventilation etc., cause fatigue
• Fatigue effect the efficiency of worker
• Fatigue decreases the worker capacity to work.
• The allowance for fatigue is taken depending upon the type
of work.
IMPORTANCE OF MACHINING TIME
CALCULATION
•To find the manufacturing cost of a particular job the
calculation of machining time is important, this
requires one or more machining operations.
•After determining the total time for machining, and
knowing the machining cost per unit time, the total
cost of machining can be worked out.
•Machining time is calculated by applying certain
basic formulae, tables of variables and constants.
• The basic formula used is
TRAVEL OF THE TOOL
• This is determined from the dimensions in the actual drawing of the part to be
manufactured.
• The necessary allowances for the tool approach and over-run for clearing the
tool off the job are taken into account with the actual length of the work, to
find the travel of the tool.
FEED
• Feed is the distance that the tool travels into the job in one revolution
• If the work or the distance that the table holding the work travels is
one stroke of the tool. In metric units, feed is usually expressed in
mm/revolution or mm/stroke.
• Feed depends on the depth of cut, fitness of the work desired, rpm of
the job, etc.
DEPTH OF CUT
• It is the penetration of the cutting tool into the job in a single cut.
• In metric units, the depth of cut is expressed in mm.
• The depth of cut depends upon the fitness of the job required, such as
higher depth of cut for rough cut and smaller depth of cut for finish
cut.
RPM
• It represents the number of revolutions of the m/c spindle in one
minute.
• Thus it is the number of revolutions per minute of the job or of tool.
CUTTING SPEED
• The cutting speed can be defined as the relative surface speed
between the tool and the job.
• It is expressed in meters per minute (mpm)
• For example if a job of diameter D mm is revolving at a speed of N
rpm
CALCULATION OF MACHINING TIME FOR
DIFFERENT LATHE
OPERATIONS
Where D = Diameter of given blank,
d = diameter of blank after turning.
• In turning operation, the depth of cut should not exceed 3 mm for
rough cuts and 0.7 5 mm for finishing cuts.
FACING OPERATION
KNURLING
Continued…
REAMING
EXTERNAL RELIEF TURNING
TAPPING
THREADING
DRILLING
BORING
CHAMFERING
Calculate the machining time to drill four 10 mm
diameter holes and 50 mm diameter hole in the
flange as shown in Fig. 25 mm diameter hole
is drilled first, and then it is enlarged to 50
mm diameter hole. Take cutting speed 12
m/min. feed for 10 mm drill 0.15 mm/rev, for
25 mm drill feed is 0.17 mm/rev and for 50 mm
diameter drill feed is 0.3 mm/rev.
MACHINING TIME FOR SHAPING AND PLANING
SLOTTING OPERATIONS
• Shaping, planning and slotting operations are carried out on
reciprocating machines with a single point cutting tool.
Formula used
Estimation of time for milling operation
The approach is the distance the cutter must be engaged
before the full depth of cut is reached.
When cutter diameter is less than the width of the work.
(b) When cutter diameter is greater than the width of the
work.
Slab milling operation:
• A T-slot is to be cut in a Cast Iron slab as shown in figure. Estimate
the machining time. Take cutting speed 25 m/min, feed is 0.25
mm/rev. Diameter of cutter for channel milling is 80 mm.
Estimation of time for Grinding operation
Formula used
MACHINING TIME CALCULATION
MACHINING TIME CALCULATION
MACHINING TIME CALCULATION
MACHINING TIME CALCULATION
MACHINING TIME CALCULATION
MACHINING TIME CALCULATION

More Related Content

What's hot

Classification and Types of Press
Classification and Types of PressClassification and Types of Press
Classification and Types of Presssanket32
 
Jigs and fixtures
Jigs and fixtures Jigs and fixtures
Jigs and fixtures Zohaib Ahmad
 
Introduction of design of machine element
Introduction of design of machine elementIntroduction of design of machine element
Introduction of design of machine elementyamini champaneri
 
Milling & Gear Cutting
Milling & Gear CuttingMilling & Gear Cutting
Milling & Gear CuttingKonal Singh
 
PPCE Unit 4
PPCE Unit 4PPCE Unit 4
PPCE Unit 4Aravind Ra
 
press tool, jigs & fixtures, gear and thread manufacturing,manufacturing pro...
 press tool, jigs & fixtures, gear and thread manufacturing,manufacturing pro... press tool, jigs & fixtures, gear and thread manufacturing,manufacturing pro...
press tool, jigs & fixtures, gear and thread manufacturing,manufacturing pro...Prof.Mayur Modi
 
Drill bushes
Drill bushesDrill bushes
Drill bushesAmruta Rane
 
Design of single point cutting tool
Design of single point cutting toolDesign of single point cutting tool
Design of single point cutting toolsonu singh
 
Comparators
ComparatorsComparators
ComparatorsNaman Dave
 
Gear manufacturing process
Gear manufacturing processGear manufacturing process
Gear manufacturing processKANNANS94
 
Manufacturing Technology-II Unit 5
Manufacturing Technology-II Unit 5Manufacturing Technology-II Unit 5
Manufacturing Technology-II Unit 5Ravi Sankar
 
PPCE Unit 5
PPCE Unit   5PPCE Unit   5
PPCE Unit 5Aravind Ra
 
Single Point Cutting Tools
Single Point Cutting ToolsSingle Point Cutting Tools
Single Point Cutting ToolsGIRISH SURVE
 
Broaching machine
Broaching machineBroaching machine
Broaching machineChintan Mehta
 
machining and machine tool (Indexing milling machine)
machining and machine tool (Indexing milling machine)machining and machine tool (Indexing milling machine)
machining and machine tool (Indexing milling machine)alakshendra pratap singh
 
Jig and fixture
Jig and fixtureJig and fixture
Jig and fixtureNaman Dave
 
Lathe machine
Lathe machineLathe machine
Lathe machineRaju D
 

What's hot (20)

Classification and Types of Press
Classification and Types of PressClassification and Types of Press
Classification and Types of Press
 
Jigs and fixtures
Jigs and fixtures Jigs and fixtures
Jigs and fixtures
 
Introduction of design of machine element
Introduction of design of machine elementIntroduction of design of machine element
Introduction of design of machine element
 
Milling & Gear Cutting
Milling & Gear CuttingMilling & Gear Cutting
Milling & Gear Cutting
 
Jigs and Fixture
Jigs and FixtureJigs and Fixture
Jigs and Fixture
 
Theory of Metal Cutting
Theory of Metal CuttingTheory of Metal Cutting
Theory of Metal Cutting
 
PPCE Unit 4
PPCE Unit 4PPCE Unit 4
PPCE Unit 4
 
press tool, jigs & fixtures, gear and thread manufacturing,manufacturing pro...
 press tool, jigs & fixtures, gear and thread manufacturing,manufacturing pro... press tool, jigs & fixtures, gear and thread manufacturing,manufacturing pro...
press tool, jigs & fixtures, gear and thread manufacturing,manufacturing pro...
 
Drill bushes
Drill bushesDrill bushes
Drill bushes
 
Design of single point cutting tool
Design of single point cutting toolDesign of single point cutting tool
Design of single point cutting tool
 
Comparators
ComparatorsComparators
Comparators
 
Gear manufacturing process
Gear manufacturing processGear manufacturing process
Gear manufacturing process
 
Types of jigs and fixtures
Types of jigs and fixtures Types of jigs and fixtures
Types of jigs and fixtures
 
Manufacturing Technology-II Unit 5
Manufacturing Technology-II Unit 5Manufacturing Technology-II Unit 5
Manufacturing Technology-II Unit 5
 
PPCE Unit 5
PPCE Unit   5PPCE Unit   5
PPCE Unit 5
 
Single Point Cutting Tools
Single Point Cutting ToolsSingle Point Cutting Tools
Single Point Cutting Tools
 
Broaching machine
Broaching machineBroaching machine
Broaching machine
 
machining and machine tool (Indexing milling machine)
machining and machine tool (Indexing milling machine)machining and machine tool (Indexing milling machine)
machining and machine tool (Indexing milling machine)
 
Jig and fixture
Jig and fixtureJig and fixture
Jig and fixture
 
Lathe machine
Lathe machineLathe machine
Lathe machine
 

Similar to MACHINING TIME CALCULATION

PPCE Unit-5.pptx
PPCE Unit-5.pptxPPCE Unit-5.pptx
PPCE Unit-5.pptxDr.PERIASAMY K
 
PPCE Unit-5.pptx
PPCE Unit-5.pptxPPCE Unit-5.pptx
PPCE Unit-5.pptxDJAGADEESH1
 
MACHINING TIME CALCULATION
MACHINING TIME CALCULATIONMACHINING TIME CALCULATION
MACHINING TIME CALCULATIONSIVASHANKAR N
 
MACHINING TIME CALCULATION
MACHINING TIME CALCULATIONMACHINING TIME CALCULATION
MACHINING TIME CALCULATIONSathishkumarM89
 
UNIT- 5.pptx
UNIT- 5.pptxUNIT- 5.pptx
UNIT- 5.pptxAravind Ra
 
MACHINING TIME CALCULATION
MACHINING TIME CALCULATIONMACHINING TIME CALCULATION
MACHINING TIME CALCULATIONDJAGADEESH1
 
Process planning and cost estimation unit v
Process planning and cost estimation  unit   vProcess planning and cost estimation  unit   v
Process planning and cost estimation unit vs Kumaravel
 
Product Design & Development
Product Design & DevelopmentProduct Design & Development
Product Design & DevelopmentKashifChangez
 
Drilling operation
Drilling operationDrilling operation
Drilling operationShehryarAwan3
 
unit 03 ppt MT- 2.pptx
unit 03 ppt MT- 2.pptxunit 03 ppt MT- 2.pptx
unit 03 ppt MT- 2.pptxVENKATESH676259
 
2. LATHE OPERATIONS.ppt
2. LATHE OPERATIONS.ppt2. LATHE OPERATIONS.ppt
2. LATHE OPERATIONS.pptMPIndhu
 
SNSCT
SNSCTSNSCT
SNSCTDharunCk
 
lathe operations
lathe operationslathe operations
lathe operationsRaja P
 
Introduction to Manufacturing Systemsshaping machine.pdf
Introduction to Manufacturing Systemsshaping machine.pdfIntroduction to Manufacturing Systemsshaping machine.pdf
Introduction to Manufacturing Systemsshaping machine.pdfPrabathDissanayake8
 
Process planning with an example
Process planning with an exampleProcess planning with an example
Process planning with an exampleHiran Gabriel
 
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUSTInternship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUSTHamza Nasir
 
Workshop practice ii lecture notes
Workshop practice ii lecture notesWorkshop practice ii lecture notes
Workshop practice ii lecture notesIYAKAREMYE Jean De Dieu
 

Similar to MACHINING TIME CALCULATION (20)

PPCE Unit-5.pptx
PPCE Unit-5.pptxPPCE Unit-5.pptx
PPCE Unit-5.pptx
 
PPCE Unit-5.pptx
PPCE Unit-5.pptxPPCE Unit-5.pptx
PPCE Unit-5.pptx
 
MACHINING TIME CALCULATION
MACHINING TIME CALCULATIONMACHINING TIME CALCULATION
MACHINING TIME CALCULATION
 
MACHINING TIME CALCULATION
MACHINING TIME CALCULATIONMACHINING TIME CALCULATION
MACHINING TIME CALCULATION
 
UNIT- 5.pptx
UNIT- 5.pptxUNIT- 5.pptx
UNIT- 5.pptx
 
MACHINING TIME CALCULATION
MACHINING TIME CALCULATIONMACHINING TIME CALCULATION
MACHINING TIME CALCULATION
 
Process planning and cost estimation unit v
Process planning and cost estimation  unit   vProcess planning and cost estimation  unit   v
Process planning and cost estimation unit v
 
Product Design & Development
Product Design & DevelopmentProduct Design & Development
Product Design & Development
 
Drilling operation
Drilling operationDrilling operation
Drilling operation
 
unit 03 ppt MT- 2.pptx
unit 03 ppt MT- 2.pptxunit 03 ppt MT- 2.pptx
unit 03 ppt MT- 2.pptx
 
Drilling
DrillingDrilling
Drilling
 
Drilling (1)
Drilling (1)Drilling (1)
Drilling (1)
 
2. LATHE OPERATIONS.ppt
2. LATHE OPERATIONS.ppt2. LATHE OPERATIONS.ppt
2. LATHE OPERATIONS.ppt
 
SNSCT
SNSCTSNSCT
SNSCT
 
lathe operations
lathe operationslathe operations
lathe operations
 
Introduction to Manufacturing Systemsshaping machine.pdf
Introduction to Manufacturing Systemsshaping machine.pdfIntroduction to Manufacturing Systemsshaping machine.pdf
Introduction to Manufacturing Systemsshaping machine.pdf
 
Machine operations
Machine operationsMachine operations
Machine operations
 
Process planning with an example
Process planning with an exampleProcess planning with an example
Process planning with an example
 
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUSTInternship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
 
Workshop practice ii lecture notes
Workshop practice ii lecture notesWorkshop practice ii lecture notes
Workshop practice ii lecture notes
 

More from MohanKirthik

Mechanical tests of metals
Mechanical tests of metalsMechanical tests of metals
Mechanical tests of metalsMohanKirthik
 
Mechanical properties
Mechanical propertiesMechanical properties
Mechanical propertiesMohanKirthik
 
Ceramics and composites
Ceramics and compositesCeramics and composites
Ceramics and compositesMohanKirthik
 
Non metallic materials --- polymers
Non metallic materials  --- polymersNon metallic materials  --- polymers
Non metallic materials --- polymersMohanKirthik
 
Maraging steel
Maraging steelMaraging steel
Maraging steelMohanKirthik
 
Stainless steel, tool steel
Stainless steel, tool steelStainless steel, tool steel
Stainless steel, tool steelMohanKirthik
 
Ferrous metals
Ferrous metalsFerrous metals
Ferrous metalsMohanKirthik
 
Vacuum plasma hardening
Vacuum plasma hardeningVacuum plasma hardening
Vacuum plasma hardeningMohanKirthik
 
Case hardening
Case hardeningCase hardening
Case hardeningMohanKirthik
 
phase diagram
phase diagramphase diagram
phase diagramMohanKirthik
 
iron carbon system
iron  carbon systemiron  carbon system
iron carbon systemMohanKirthik
 
heat treatment
 heat treatment heat treatment
heat treatmentMohanKirthik
 
cooling curve
cooling curvecooling curve
cooling curveMohanKirthik
 
PROCESS PLANNING ACTIVITIES
PROCESS PLANNING ACTIVITIESPROCESS PLANNING ACTIVITIES
PROCESS PLANNING ACTIVITIESMohanKirthik
 
INTRODUCTION TO COST ESTIMATION
INTRODUCTION TO COST ESTIMATIONINTRODUCTION TO COST ESTIMATION
INTRODUCTION TO COST ESTIMATIONMohanKirthik
 
PRODUCTION COST ESTIMATION
PRODUCTION COST ESTIMATIONPRODUCTION COST ESTIMATION
PRODUCTION COST ESTIMATIONMohanKirthik
 
INTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNINGINTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNINGMohanKirthik
 

More from MohanKirthik (20)

Mechanical tests of metals
Mechanical tests of metalsMechanical tests of metals
Mechanical tests of metals
 
Mechanical properties
Mechanical propertiesMechanical properties
Mechanical properties
 
Ceramics and composites
Ceramics and compositesCeramics and composites
Ceramics and composites
 
Plastics
PlasticsPlastics
Plastics
 
Non metallic materials --- polymers
Non metallic materials  --- polymersNon metallic materials  --- polymers
Non metallic materials --- polymers
 
Cast iron
Cast ironCast iron
Cast iron
 
Maraging steel
Maraging steelMaraging steel
Maraging steel
 
HSLA steel
HSLA steelHSLA steel
HSLA steel
 
Stainless steel, tool steel
Stainless steel, tool steelStainless steel, tool steel
Stainless steel, tool steel
 
Ferrous metals
Ferrous metalsFerrous metals
Ferrous metals
 
Vacuum plasma hardening
Vacuum plasma hardeningVacuum plasma hardening
Vacuum plasma hardening
 
Case hardening
Case hardeningCase hardening
Case hardening
 
phase diagram
phase diagramphase diagram
phase diagram
 
iron carbon system
iron  carbon systemiron  carbon system
iron carbon system
 
heat treatment
 heat treatment heat treatment
heat treatment
 
cooling curve
cooling curvecooling curve
cooling curve
 
PROCESS PLANNING ACTIVITIES
PROCESS PLANNING ACTIVITIESPROCESS PLANNING ACTIVITIES
PROCESS PLANNING ACTIVITIES
 
INTRODUCTION TO COST ESTIMATION
INTRODUCTION TO COST ESTIMATIONINTRODUCTION TO COST ESTIMATION
INTRODUCTION TO COST ESTIMATION
 
PRODUCTION COST ESTIMATION
PRODUCTION COST ESTIMATIONPRODUCTION COST ESTIMATION
PRODUCTION COST ESTIMATION
 
INTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNINGINTRODUCTION TO PROCESS PLANNING
INTRODUCTION TO PROCESS PLANNING
 

Recently uploaded

pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture designssuser87fa0c1
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 

Recently uploaded (20)

pipeline in computer architecture design
pipeline in computer architecture  designpipeline in computer architecture  design
pipeline in computer architecture design
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 

MACHINING TIME CALCULATION

  • 1. •UNIT I INTRODUCTION TO PROCESS PLANNING •UNIT II PROCESS PLANNING ACTIVITIES •UNIT III INTRODUCTION TO COST ESTIMATION •UNIT IV PRODUCTION COST ESTIMATION •UNIT V MACHINING TIME CALCULATION
  • 2. UNIT V MACHINING TIME CALCULATION • Estimation of machining time • Importance of machine time calculation • Calculation of machining time for different lathe operations, Drilling and Boring • Machining time calculation for Milling, Shaping and Planning • Machining time calculation for grinding
  • 3. Introduction • To estimate the total cost of any product involving machining operations, the machining cost is to be estimated primarily. • In order to estimate the machining cost, one has to calculate the machining time required for these machining operations. • After knowing the machining time and rate of machining, the total machining cost can be calculated. • Therefore the estimation of machining time for various operations such as lathe, drilling. boring, shaping, planning, milling and grinding operations are very essential in the cost estimation activity.
  • 4. What is meant by Machining Time? • It is time for which the machine works on the component • From the time when the tool touches the work to when the tool leaves the component after completion of operation • The machining time depends on die type and extent of machining required, material being machined, speed, feed, depth of cut and number of cuts required • In addition to the actual machining time, an estimator bas to consider other time elements such as set-up time, handling time, tear down time, down time and allowances to the workers.
  • 5. FACTORS TO BE CONSIDERED FOR MACHINE TIME CALCULATION •Set up time •Operation time •Tear down time •Personal allowance •Fatigue allowance •Checking allowance •Miscellaneous allowance
  • 6. SETUPTIME • This takes into account the time required to prepare the machine for doing the job with the time taken to study the blue print. • The time to prepare the machine, in turn • The time to install and adjust the tools in the machine, as well as to make the machine ready to start the work.
  • 7. OPERATION TIME • The sum of handling time and machining time for a job is called operation time. • It is the duration of time that elapses between output of two consecutive units of production. TEAR DOWN TIME • Tear down time takes into account the time necessary to remove from the machine all tools and accessories, such as jigs and fixtures, gauges and instruments etc. • The time required for clearing operational chips from the machine table and clearing of the machine itself are included on this. • Tear down time is generally 10 minute per shift of 8 hrs.
  • 8. PERSONALALLOWANCE • The time allowed for workers to meet their personal needs, such as going to the urinal, drinking water, smoking, washing their hands, etc is known as personal allowance. • It is generally 5 to 10 minutes FATIGUE ALLOWANCE • The long working hours and poor working conditions such as poor lighting, poor ventilation etc., cause fatigue • Fatigue effect the efficiency of worker • Fatigue decreases the worker capacity to work. • The allowance for fatigue is taken depending upon the type of work.
  • 9. IMPORTANCE OF MACHINING TIME CALCULATION •To find the manufacturing cost of a particular job the calculation of machining time is important, this requires one or more machining operations. •After determining the total time for machining, and knowing the machining cost per unit time, the total cost of machining can be worked out. •Machining time is calculated by applying certain basic formulae, tables of variables and constants.
  • 10. • The basic formula used is TRAVEL OF THE TOOL • This is determined from the dimensions in the actual drawing of the part to be manufactured. • The necessary allowances for the tool approach and over-run for clearing the tool off the job are taken into account with the actual length of the work, to find the travel of the tool.
  • 11. FEED • Feed is the distance that the tool travels into the job in one revolution • If the work or the distance that the table holding the work travels is one stroke of the tool. In metric units, feed is usually expressed in mm/revolution or mm/stroke. • Feed depends on the depth of cut, fitness of the work desired, rpm of the job, etc. DEPTH OF CUT • It is the penetration of the cutting tool into the job in a single cut. • In metric units, the depth of cut is expressed in mm. • The depth of cut depends upon the fitness of the job required, such as higher depth of cut for rough cut and smaller depth of cut for finish cut.
  • 12. RPM • It represents the number of revolutions of the m/c spindle in one minute. • Thus it is the number of revolutions per minute of the job or of tool. CUTTING SPEED • The cutting speed can be defined as the relative surface speed between the tool and the job. • It is expressed in meters per minute (mpm) • For example if a job of diameter D mm is revolving at a speed of N rpm
  • 13. CALCULATION OF MACHINING TIME FOR DIFFERENT LATHE OPERATIONS
  • 14. Where D = Diameter of given blank, d = diameter of blank after turning. • In turning operation, the depth of cut should not exceed 3 mm for rough cuts and 0.7 5 mm for finishing cuts.
  • 15.
  • 16.
  • 17.
  • 28.
  • 29.
  • 30.
  • 31.
  • 32.
  • 33.
  • 34. Calculate the machining time to drill four 10 mm diameter holes and 50 mm diameter hole in the flange as shown in Fig. 25 mm diameter hole is drilled first, and then it is enlarged to 50 mm diameter hole. Take cutting speed 12 m/min. feed for 10 mm drill 0.15 mm/rev, for 25 mm drill feed is 0.17 mm/rev and for 50 mm diameter drill feed is 0.3 mm/rev.
  • 35.
  • 36.
  • 37.
  • 38.
  • 39.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45.
  • 46.
  • 47.
  • 48.
  • 49.
  • 50.
  • 51.
  • 52.
  • 53.
  • 54.
  • 55. MACHINING TIME FOR SHAPING AND PLANING SLOTTING OPERATIONS • Shaping, planning and slotting operations are carried out on reciprocating machines with a single point cutting tool.
  • 57.
  • 58.
  • 59.
  • 60.
  • 61. Estimation of time for milling operation
  • 62. The approach is the distance the cutter must be engaged before the full depth of cut is reached. When cutter diameter is less than the width of the work.
  • 63. (b) When cutter diameter is greater than the width of the work.
  • 65.
  • 66.
  • 67.
  • 68. • A T-slot is to be cut in a Cast Iron slab as shown in figure. Estimate the machining time. Take cutting speed 25 m/min, feed is 0.25 mm/rev. Diameter of cutter for channel milling is 80 mm.
  • 69.
  • 70.
  • 71. Estimation of time for Grinding operation
  • 72.
  • 73.