Summer internship at
patel infrastructure
Duration: 2/6/2019 to 15/6/2019
Site Location :- sathana (kgbot 2)
ajmer rajasthan
Base camp
Date 3rd to 7th June
• 5 days were allocated for understanding laboratory
experiment.
• Ongoing experiment were explained by engineers in
working hours.
• Mainly for concrete, aggregate, soil, and bitumen
Soil tests
• Grain size analysis text
• Proctor compaction test
• California bearing ratio test
• As property of soil changes by different locations tests
were carried for that portion
• And for each location optimum moisture content and
maximum dry density is find out
Concrete and aggregate test
• For concrete : compression test were carried out and for
aggregate impact test is carried out
• Cubes were casted at working site and bring to laboratory for
curing and to test at 3, 7, & 28 days
• At time of testing senior engineers come for verification of
strength of cube
Bitumen test
• At time of internship we learned DBM (Dense bitumen
macadam) test and grain size analysis test for bitumen
• From DBM test we can find out optimum bitumen content
From 8th to 12th June
• Next 5 days we went for on site road construction it was
of widening of existing road
• At site leveling of original ground level is done by auto
level instrument
• Site engineer explained how to do surveying and
levelling and to how to use the instrument .
• And earthwork is carried out
GSB layer
• After the Earth Work the Sub-Base of the road is
constructed with Granular sub-base (GSB) and
compacted in layers not exceeding 100mm.
WBM Base-Course
• Once the Sub-Base is prepared, the base course is required to
provide the strength to the road.
• Generally, the base course is constructed with the help of stone
metal and other suitable materials.
WBM Base-Course
Water Bound Macadam (WBM) base course is constructed with graded aggregate
in two or three layers as per the design. Thereafter, binding material is applied
and sprinkling of water is repeated
From 13th to 15th june
• Last 3 days we went for observation of bridge construction
• At site construction of bridge girder is done.
• Placing of reinforcement and form work was carried out that
time.
Summer internship at patel infrastructure

More Related Content

What's hot

Comparison between different method of under water canal
Comparison between different method of under water canalComparison between different method of under water canal
Comparison between different method of under water canal
Shivam Mittal
 
He unit iii 3d0f5751f8e65e10a1c08bba8255d4bc
He unit  iii 3d0f5751f8e65e10a1c08bba8255d4bcHe unit  iii 3d0f5751f8e65e10a1c08bba8255d4bc
He unit iii 3d0f5751f8e65e10a1c08bba8255d4bc
saibabu48
 
Predicting the Workability of Fresh Concrete Using Simple Pull-out Test
Predicting the Workability of Fresh Concrete Using Simple Pull-out TestPredicting the Workability of Fresh Concrete Using Simple Pull-out Test
Predicting the Workability of Fresh Concrete Using Simple Pull-out Test
IJRESJOURNAL
 

What's hot (20)

Comparison between different method of under water canal
Comparison between different method of under water canalComparison between different method of under water canal
Comparison between different method of under water canal
 
He unit iii 3d0f5751f8e65e10a1c08bba8255d4bc
He unit  iii 3d0f5751f8e65e10a1c08bba8255d4bcHe unit  iii 3d0f5751f8e65e10a1c08bba8255d4bc
He unit iii 3d0f5751f8e65e10a1c08bba8255d4bc
 
SUBGRADE SOIL STRENGTH AND ITS EVALUTION
SUBGRADE SOIL STRENGTH AND ITS EVALUTION SUBGRADE SOIL STRENGTH AND ITS EVALUTION
SUBGRADE SOIL STRENGTH AND ITS EVALUTION
 
Design pavement
Design pavementDesign pavement
Design pavement
 
Soil Stabilisation using cement
Soil Stabilisation using cement Soil Stabilisation using cement
Soil Stabilisation using cement
 
Overview of Soil Stabilization :Cement / Lime :PPT
Overview of Soil Stabilization :Cement / Lime :PPTOverview of Soil Stabilization :Cement / Lime :PPT
Overview of Soil Stabilization :Cement / Lime :PPT
 
Highway materials - soil
Highway materials - soil Highway materials - soil
Highway materials - soil
 
CONFLEX PAVE
CONFLEX PAVECONFLEX PAVE
CONFLEX PAVE
 
Transportation engineering various experiments
Transportation engineering various experimentsTransportation engineering various experiments
Transportation engineering various experiments
 
soil stabilization using lime and polypropylene
soil stabilization using lime and polypropylenesoil stabilization using lime and polypropylene
soil stabilization using lime and polypropylene
 
Widening of roads
Widening of roadsWidening of roads
Widening of roads
 
cement road construction in the rural areas
cement road construction in the rural areas cement road construction in the rural areas
cement road construction in the rural areas
 
Geotextile fo soil stabilization
Geotextile fo soil stabilizationGeotextile fo soil stabilization
Geotextile fo soil stabilization
 
Predicting the Workability of Fresh Concrete Using Simple Pull-out Test
Predicting the Workability of Fresh Concrete Using Simple Pull-out TestPredicting the Workability of Fresh Concrete Using Simple Pull-out Test
Predicting the Workability of Fresh Concrete Using Simple Pull-out Test
 
Soil Properties and Foundation
Soil Properties and FoundationSoil Properties and Foundation
Soil Properties and Foundation
 
Naresh kumar ppt
Naresh kumar  pptNaresh kumar  ppt
Naresh kumar ppt
 
Comparative studies on properties mould sands of different mesh sizes
Comparative studies on properties mould sands  of different mesh sizesComparative studies on properties mould sands  of different mesh sizes
Comparative studies on properties mould sands of different mesh sizes
 
Soil testing
Soil testingSoil testing
Soil testing
 
Pavement materials and testing
Pavement materials and testingPavement materials and testing
Pavement materials and testing
 
Bituminous road construction
Bituminous road constructionBituminous road construction
Bituminous road construction
 

Similar to Summer internship at patel infrastructure

Summer training ppt on cc road construction
Summer training ppt on cc road constructionSummer training ppt on cc road construction
Summer training ppt on cc road construction
Vijaypal Bagariya
 

Similar to Summer internship at patel infrastructure (20)

Summer training ppt on cc road construction
Summer training ppt on cc road constructionSummer training ppt on cc road construction
Summer training ppt on cc road construction
 
TRANSPORTATION_ENGINEERING_M3.pdf
TRANSPORTATION_ENGINEERING_M3.pdfTRANSPORTATION_ENGINEERING_M3.pdf
TRANSPORTATION_ENGINEERING_M3.pdf
 
water bound macadam road
water bound macadam roadwater bound macadam road
water bound macadam road
 
Steps Involves in Building Construction
Steps Involves in Building ConstructionSteps Involves in Building Construction
Steps Involves in Building Construction
 
Precast Six lane flyover project
Precast Six lane flyover projectPrecast Six lane flyover project
Precast Six lane flyover project
 
Siol cement ppt
Siol cement pptSiol cement ppt
Siol cement ppt
 
PROJECTT MAIN PPT.pptx
PROJECTT MAIN PPT.pptxPROJECTT MAIN PPT.pptx
PROJECTT MAIN PPT.pptx
 
Self compacting concrete (scc)
Self compacting concrete (scc)Self compacting concrete (scc)
Self compacting concrete (scc)
 
green Concrete
green Concrete green Concrete
green Concrete
 
Concrete,Electrically conductive concrete IDM13
Concrete,Electrically conductive concrete IDM13Concrete,Electrically conductive concrete IDM13
Concrete,Electrically conductive concrete IDM13
 
Construction of Water Bound Macadam (WBM) roads
Construction of Water Bound Macadam (WBM) roadsConstruction of Water Bound Macadam (WBM) roads
Construction of Water Bound Macadam (WBM) roads
 
soilexplorationpartion-02.pdf
soilexplorationpartion-02.pdfsoilexplorationpartion-02.pdf
soilexplorationpartion-02.pdf
 
Soil exploration part i
Soil exploration part  iSoil exploration part  i
Soil exploration part i
 
Presentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,deptPresentation of 5_weeks_summer_training_,dept
Presentation of 5_weeks_summer_training_,dept
 
Introduction of Concrete.pdf
Introduction of Concrete.pdfIntroduction of Concrete.pdf
Introduction of Concrete.pdf
 
Building Better Roads - An idea requiring validation
Building Better Roads - An idea requiring validationBuilding Better Roads - An idea requiring validation
Building Better Roads - An idea requiring validation
 
Ppt on cement grade project
Ppt on cement grade projectPpt on cement grade project
Ppt on cement grade project
 
Concrete, A strong and waterproof concrete
Concrete, A strong and waterproof concrete Concrete, A strong and waterproof concrete
Concrete, A strong and waterproof concrete
 
self-compacting concrete
self-compacting concrete self-compacting concrete
self-compacting concrete
 
Building Cons Report .pdf
 Building Cons Report .pdf Building Cons Report .pdf
Building Cons Report .pdf
 

Recently uploaded

Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
drjose256
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
Kira Dess
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
rahulmanepalli02
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
IJECEIAES
 

Recently uploaded (20)

Adsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) pptAdsorption (mass transfer operations 2) ppt
Adsorption (mass transfer operations 2) ppt
 
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
Tembisa Central Terminating Pills +27838792658 PHOMOLONG Top Abortion Pills F...
 
Software Engineering Practical File Front Pages.pdf
Software Engineering Practical File Front Pages.pdfSoftware Engineering Practical File Front Pages.pdf
Software Engineering Practical File Front Pages.pdf
 
15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon15-Minute City: A Completely New Horizon
15-Minute City: A Completely New Horizon
 
engineering chemistry power point presentation
engineering chemistry  power point presentationengineering chemistry  power point presentation
engineering chemistry power point presentation
 
Artificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdfArtificial intelligence presentation2-171219131633.pdf
Artificial intelligence presentation2-171219131633.pdf
 
What is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, FunctionsWhat is Coordinate Measuring Machine? CMM Types, Features, Functions
What is Coordinate Measuring Machine? CMM Types, Features, Functions
 
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and ToolsMaximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
Maximizing Incident Investigation Efficacy in Oil & Gas: Techniques and Tools
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdf
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
The Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptxThe Entity-Relationship Model(ER Diagram).pptx
The Entity-Relationship Model(ER Diagram).pptx
 
Filters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility ApplicationsFilters for Electromagnetic Compatibility Applications
Filters for Electromagnetic Compatibility Applications
 
Circuit Breakers for Engineering Students
Circuit Breakers for Engineering StudentsCircuit Breakers for Engineering Students
Circuit Breakers for Engineering Students
 
Independent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging StationIndependent Solar-Powered Electric Vehicle Charging Station
Independent Solar-Powered Electric Vehicle Charging Station
 
21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx21P35A0312 Internship eccccccReport.docx
21P35A0312 Internship eccccccReport.docx
 
Passive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.pptPassive Air Cooling System and Solar Water Heater.ppt
Passive Air Cooling System and Solar Water Heater.ppt
 
Seizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networksSeizure stage detection of epileptic seizure using convolutional neural networks
Seizure stage detection of epileptic seizure using convolutional neural networks
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...5G and 6G refer to generations of mobile network technology, each representin...
5G and 6G refer to generations of mobile network technology, each representin...
 

Summer internship at patel infrastructure

  • 1. Summer internship at patel infrastructure Duration: 2/6/2019 to 15/6/2019 Site Location :- sathana (kgbot 2) ajmer rajasthan
  • 3. Date 3rd to 7th June • 5 days were allocated for understanding laboratory experiment. • Ongoing experiment were explained by engineers in working hours. • Mainly for concrete, aggregate, soil, and bitumen
  • 4. Soil tests • Grain size analysis text • Proctor compaction test • California bearing ratio test • As property of soil changes by different locations tests were carried for that portion • And for each location optimum moisture content and maximum dry density is find out
  • 5.
  • 6. Concrete and aggregate test • For concrete : compression test were carried out and for aggregate impact test is carried out • Cubes were casted at working site and bring to laboratory for curing and to test at 3, 7, & 28 days • At time of testing senior engineers come for verification of strength of cube
  • 7. Bitumen test • At time of internship we learned DBM (Dense bitumen macadam) test and grain size analysis test for bitumen • From DBM test we can find out optimum bitumen content
  • 8. From 8th to 12th June • Next 5 days we went for on site road construction it was of widening of existing road • At site leveling of original ground level is done by auto level instrument • Site engineer explained how to do surveying and levelling and to how to use the instrument . • And earthwork is carried out
  • 9. GSB layer • After the Earth Work the Sub-Base of the road is constructed with Granular sub-base (GSB) and compacted in layers not exceeding 100mm.
  • 10. WBM Base-Course • Once the Sub-Base is prepared, the base course is required to provide the strength to the road. • Generally, the base course is constructed with the help of stone metal and other suitable materials.
  • 11. WBM Base-Course Water Bound Macadam (WBM) base course is constructed with graded aggregate in two or three layers as per the design. Thereafter, binding material is applied and sprinkling of water is repeated
  • 12. From 13th to 15th june • Last 3 days we went for observation of bridge construction • At site construction of bridge girder is done. • Placing of reinforcement and form work was carried out that time.