PROJECT
IMPLEMENTATION
MPA 207 – PLANNING PROCESS
Engr. Truman T. Tesoro
What is Project
Implementation? • This is the logical conclusion, after
evaluating, deciding, visioning,
planning, applying for finances, and
finding the monetary resources of
a challenge.
• A task has to be implemented
successfully while the allocation of
undertaking obligations to the
assignment team in the
organization.
• Project implementation is the segment
wherein visions and plans come to be a
reality.
• The implementation degree of the
project cycle is in many approaches the
most critical, as it’s miles in the course of
this stage that planned advantages are
delivered.
2
WHY?
PURPOSE OF PROJECT
IMPLEMENTATION
3
PURPOSE of
Project
Implementation
• To put the action plan into operation;
• To deliver the results, achieve the purpose(s) and
contribute effectively to the overall objective of
the project;
• To manage the available resources efficiently; and
• To monitor and report on progress
4
Things we must do
during Project
Implementation
• Update the
stakeholder
analysis to ensure
that all the
needful
stakeholders
(primary and
secondary) are
invited
• Reassess the risks
to the project. • Monitor and
review the
progress that the
project is making
towards achieving
its objectives.
5
• Feed the learning
from monitoring
and reviewing
returned into the
project design.
PROJECT
IMPLEMETATION PLAN
An implementation plan for a
project refers to a detailed
description of actions that
demonstrate a way to enforce an
activity in the project inside the
context of achieving project
objectives, addressing
requirements, and meeting
expectations.
What is Project
Implementation Plan?
The motive of the project
implementation plan is to provide
stakeholders with the self-belief
that accomplishment of a modern-
day challenge has been properly
considered and to list the tasks,
activities, and processes worried in
producing deliverable.
.
7
Steps in Project
Implementation
8
Creating the list of
outcome required
Set up a tracking
sheet to monitor
progress
1.Allocate the
champion for each
outcome
Establish roles,
budgets, and
accountability
Follow a project
management
methodology
Schedule and
undertake a
review in six
months
Determine what
action need to be
taken for outcomes
to be achieved
CREATING LIST OF
OUTCOME REQUIRED
• First of all, a project implementation plan must ensure what
we want to achieve by the end of the project.
• To decide the actions and the priorities of tasks, we need to
list the outcomes that we want to reap via this
implementation exercise.
9
ALLOCATE THE
CHAMPION FOR EACH
OUTCOME
• We need to allocate a champion to head everyone, a champion who could be
encouraged to attain the outcome and hold the entire undertaking team
responsible for accomplishing it.
• Look for those contributors of a team who have a vested interest in attaining
these final results, or whose passionate and devoted to a successful
implementation.
• Share those roles around the team (give chance to every team member) so
that the responsibility is not limited to a single person.
10
DETERMINE WHAT ACTION
NEED TO BE TAKEN FOR
OUTCOMES TO BE ACHIEVED
• In this phase of the implementation plan, we need to write down all the
actions that will help the team to successfully achieve the outcomes. For this,
we can discuss ‘what are the steps needed to do to reap this outcome?’
• Make sure that these actions are doable, feasible and relevant as per your
available resources and goals
11
ESTABLISH ROLES, BUDGETS
AND ACCOUNTABILITY
• Once we’ve got the listing of actions that will make certain of the entirety of
implementation activities, we need to decide the jobs and obligations of the
implementation team.
• We may also want to define:
• When do we want each action to be carried out?
• What is the budget is required?
• Who is accountable and responsible for it (each action)?
12
SET UP A TRACKING SHEET TO
MONITOR PROGRESS
• A tracking sheet will provide you with a quick at-a-glance replacement of
where implementation plan is and what moves are complete, in
development, or late.
• This allows us to quickly address any issues to get the project back on track.
13
FOLLOW A PROJECT
MANAGEMENT METHODOLOGY
• A project management method is a series of various governance controls,
shape, and processes which are designed to help you manage your activities,
time, and sources more efficaciously and handle problems proactively once
they arise.
• While there are many existing project management methodologies you could
implement, different mission control methodologies, combining the right
amount of documentation, communication, governance, and control, is one
of the highly used methods to complete projects on time and budget whilst
creating effective outcomes even in challenging environments.
14
SCHEDULE AND UNDERTAKE A
REVIEW IN SIX MONTHS
• Every time you enforce a project in your organization, it must be regularly
reviewed.
• Through the evaluation process, it’s critical to take a look at what labored and
what didn’t to identify areas for improvement.
• It is also important to take a look at the setbacks you encountered along the
way and how they may have potentially been avoided or reduced to take this
understanding into your subsequent set of implementation activities.
• This review will also help you to plan the activities better next time.
15
PHASES OF PROJECT
IMPLEMENTATION
16
1
2
APPROACHES TO
PROJECT
IMPLEMENTATION
The top-down approach to
management is when company-wide
decisions are made solely by
leadership at the top, while the
bottom-up approach gives all teams a
voice in these types of decisions.
17
TOP DOWN AND BOTTOM UP
APPROACH
METHODS
to TRACK / PLAN Project Implementation
18
GANTT chart
19
•GANTT chart is also known as the development chart.
•It is a simple chart showing the timing allocated for each
project activity.
•It displays the frequency and period for implementation.
WAYS TO CONSTRUCT
A GANTT CHART
1
List the activities that to be
executed/implemented
2
Determine the associated
activities that can be carried
out at the same time and
identify those to be carried
out sequentially
3
Estimate the quantity of time
required for each activity
20
4
Keep the time represented
on the horizontal axis, and
activities on the vertical axis.
5
Highlight or color-code the
time required for each
activity
21
CRITICAL PATH METHOD OR
NETWORK ANALYSIS
• This approach is an algorithm for scheduling and planning project works.
• This is regularly used alongside the Program Evaluation and Review Technique (PERT).
• This approach involves detecting the longest path (sequence of duties) from the start to
the end of a project and defining the critical responsibilities.
• Critical are tasks that impact the cut-off dates of the entire project and require closer
attention and thorough control.
• Critical Path approach is used for complex projects where delivery terms and deadlines
are vital, in such regions as construction, defense, software development, and others.
22
PROJECT EVALUATION AND REVIEW
TECHNIQUES (PERT)
• Program Evaluation and Review Technique (PERT) is one in every of the broadly used approaches in
diverse areas.
• It involves complicated and specific planning and visual tracking of labor effects on PERT charts.
• Its core element is the evaluation of tasks performed within the project.
• Originally, this approach was developed by using the USA Navy for the duration of the Cold War to
boom the performance of labor on new technologies.
• This method suits exceptionally for large and long-time period initiatives with non-ordinary obligations
and tough requirements.
23
24
SIMPLE FORMAT
25
26
Thank
You!

More Related Content

What's hot

PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluationrexcris
 
Monitoring and Evaluation Lesson 2.pptx
Monitoring and Evaluation Lesson 2.pptxMonitoring and Evaluation Lesson 2.pptx
Monitoring and Evaluation Lesson 2.pptxVallentine Okumu
 
Presintation on Project constraint
Presintation on Project constraint Presintation on Project constraint
Presintation on Project constraint university(kust)
 
Monitoring and Evaluation for Project management.
Monitoring and Evaluation for Project management.Monitoring and Evaluation for Project management.
Monitoring and Evaluation for Project management.Muthuraj K
 
2.project lifecycle
2.project lifecycle2.project lifecycle
2.project lifecyclerlabsza
 
project monitoring and evaluation
 project monitoring and evaluation project monitoring and evaluation
project monitoring and evaluationMir Mosharraf Hosain
 
Project Management and Process
Project Management and ProcessProject Management and Process
Project Management and ProcessMuhammad Rehman
 
Capacity Development For Monitoring And Evaluation
Capacity Development For Monitoring And EvaluationCapacity Development For Monitoring And Evaluation
Capacity Development For Monitoring And EvaluationKnowledge Management Center
 
Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]skzarif
 
Project management cycle
Project management  cycleProject management  cycle
Project management cycleMegha BHardwaj
 
TTIPEC: Monitoring and Evaluation (Session 2)
TTIPEC: Monitoring and Evaluation (Session 2)TTIPEC: Monitoring and Evaluation (Session 2)
TTIPEC: Monitoring and Evaluation (Session 2)Research to Action
 
Monitoring and evaluation Learning and Development
Monitoring and evaluation Learning and DevelopmentMonitoring and evaluation Learning and Development
Monitoring and evaluation Learning and DevelopmentSESH SUKHDEO
 

What's hot (20)

Stages of Project Development
Stages of Project Development Stages of Project Development
Stages of Project Development
 
PCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on EvaluationPCM - Project Cycle Management, Training on Evaluation
PCM - Project Cycle Management, Training on Evaluation
 
Monitoring and Evaluation Lesson 2.pptx
Monitoring and Evaluation Lesson 2.pptxMonitoring and Evaluation Lesson 2.pptx
Monitoring and Evaluation Lesson 2.pptx
 
Presintation on Project constraint
Presintation on Project constraint Presintation on Project constraint
Presintation on Project constraint
 
Project Monitoring & Evaluation
Project Monitoring & EvaluationProject Monitoring & Evaluation
Project Monitoring & Evaluation
 
Monitoring and Evaluation for Project management.
Monitoring and Evaluation for Project management.Monitoring and Evaluation for Project management.
Monitoring and Evaluation for Project management.
 
2.project lifecycle
2.project lifecycle2.project lifecycle
2.project lifecycle
 
Project Implementation
Project ImplementationProject Implementation
Project Implementation
 
project monitoring and evaluation
 project monitoring and evaluation project monitoring and evaluation
project monitoring and evaluation
 
Project Management and Process
Project Management and ProcessProject Management and Process
Project Management and Process
 
Project monitoring
Project monitoringProject monitoring
Project monitoring
 
Project Design and Management
Project Design and Management Project Design and Management
Project Design and Management
 
Capacity Development For Monitoring And Evaluation
Capacity Development For Monitoring And EvaluationCapacity Development For Monitoring And Evaluation
Capacity Development For Monitoring And Evaluation
 
Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]Monitoring & evaluation presentation[1]
Monitoring & evaluation presentation[1]
 
Project management cycle
Project management  cycleProject management  cycle
Project management cycle
 
TTIPEC: Monitoring and Evaluation (Session 2)
TTIPEC: Monitoring and Evaluation (Session 2)TTIPEC: Monitoring and Evaluation (Session 2)
TTIPEC: Monitoring and Evaluation (Session 2)
 
Logical framework
Logical frameworkLogical framework
Logical framework
 
Project Monitoring and Evaluation
Project Monitoring and Evaluation Project Monitoring and Evaluation
Project Monitoring and Evaluation
 
Project Management Tools and Techniques
Project Management Tools and TechniquesProject Management Tools and Techniques
Project Management Tools and Techniques
 
Monitoring and evaluation Learning and Development
Monitoring and evaluation Learning and DevelopmentMonitoring and evaluation Learning and Development
Monitoring and evaluation Learning and Development
 

Similar to Project Implementation.pptx

Project Management Process
Project Management ProcessProject Management Process
Project Management ProcessSaqib Raza
 
Project Management Ch 14.ppt
Project Management Ch 14.pptProject Management Ch 14.ppt
Project Management Ch 14.pptUjalaBatool7
 
Project management
Project managementProject management
Project managementMohitJaggi1
 
MODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMdAliMujawar1
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptxHarsimratDeo1
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptxHarsimratDeo1
 
Project Planning and Control
Project Planning and Control Project Planning and Control
Project Planning and Control drpvkhatrissn
 
schedule Management v4
 schedule Management v4 schedule Management v4
schedule Management v4Qussay Karam
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptxGagan331641
 
Introduction to Project Management.pdf
Introduction to Project Management.pdfIntroduction to Project Management.pdf
Introduction to Project Management.pdfGourhariBiswas1
 
software (1).pptx
software (1).pptxsoftware (1).pptx
software (1).pptxayanadamtew
 
Project life cycle
Project life cycleProject life cycle
Project life cycleAbhishek Raj
 
10.3_Construction Management_Day 8.pptx
10.3_Construction Management_Day 8.pptx10.3_Construction Management_Day 8.pptx
10.3_Construction Management_Day 8.pptxJanak82
 
Good scheduling practice
Good scheduling practiceGood scheduling practice
Good scheduling practicekrunalchem
 
Project management master class karin rheeder
Project management master class   karin rheederProject management master class   karin rheeder
Project management master class karin rheederKarin Rheeder
 
Construction-Project-cycle-and-organization.pptx
Construction-Project-cycle-and-organization.pptxConstruction-Project-cycle-and-organization.pptx
Construction-Project-cycle-and-organization.pptxlexfred55
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800PRIYANSHU KUMAR
 
Project Management
Project ManagementProject Management
Project ManagementPrarthan P
 

Similar to Project Implementation.pptx (20)

Project Management Process
Project Management ProcessProject Management Process
Project Management Process
 
SPM Unit 1.pptx
SPM Unit 1.pptxSPM Unit 1.pptx
SPM Unit 1.pptx
 
Project Management Ch 14.ppt
Project Management Ch 14.pptProject Management Ch 14.ppt
Project Management Ch 14.ppt
 
Project management
Project managementProject management
Project management
 
MODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptxMODULE II - M.ARCH.pptx
MODULE II - M.ARCH.pptx
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
Project planning.pptx
Project planning.pptxProject planning.pptx
Project planning.pptx
 
Project Planning and Control
Project Planning and Control Project Planning and Control
Project Planning and Control
 
schedule Management v4
 schedule Management v4 schedule Management v4
schedule Management v4
 
Project Life Cycle.pptx
Project Life Cycle.pptxProject Life Cycle.pptx
Project Life Cycle.pptx
 
Introduction to Project Management.pdf
Introduction to Project Management.pdfIntroduction to Project Management.pdf
Introduction to Project Management.pdf
 
software (1).pptx
software (1).pptxsoftware (1).pptx
software (1).pptx
 
Project life cycle
Project life cycleProject life cycle
Project life cycle
 
10.3_Construction Management_Day 8.pptx
10.3_Construction Management_Day 8.pptx10.3_Construction Management_Day 8.pptx
10.3_Construction Management_Day 8.pptx
 
Good scheduling practice
Good scheduling practiceGood scheduling practice
Good scheduling practice
 
Project management master class karin rheeder
Project management master class   karin rheederProject management master class   karin rheeder
Project management master class karin rheeder
 
Construction-Project-cycle-and-organization.pptx
Construction-Project-cycle-and-organization.pptxConstruction-Project-cycle-and-organization.pptx
Construction-Project-cycle-and-organization.pptx
 
Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800Minor project by priyanshu kumar, 9608684800
Minor project by priyanshu kumar, 9608684800
 
Project Management
Project ManagementProject Management
Project Management
 
Project management and project life cycle
Project management and project life cycleProject management and project life cycle
Project management and project life cycle
 

More from Jo Balucanag - Bitonio

Defining Urban, Urbanization & Urbanism
Defining Urban, Urbanization &  UrbanismDefining Urban, Urbanization &  Urbanism
Defining Urban, Urbanization & UrbanismJo Balucanag - Bitonio
 
Lecture on Rural Development Feb 24.pptx
Lecture on Rural Development Feb 24.pptxLecture on Rural Development Feb 24.pptx
Lecture on Rural Development Feb 24.pptxJo Balucanag - Bitonio
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project ProposalJo Balucanag - Bitonio
 
MPA Lecture on Stakeholder Analysis.pptx
MPA Lecture on Stakeholder Analysis.pptxMPA Lecture on Stakeholder Analysis.pptx
MPA Lecture on Stakeholder Analysis.pptxJo Balucanag - Bitonio
 
LEC DEVELOPMENT ISSUES AND CONCERNS.pptx
LEC DEVELOPMENT ISSUES AND CONCERNS.pptxLEC DEVELOPMENT ISSUES AND CONCERNS.pptx
LEC DEVELOPMENT ISSUES AND CONCERNS.pptxJo Balucanag - Bitonio
 
Human beings Cause & Consequence of Devt
Human beings Cause & Consequence of DevtHuman beings Cause & Consequence of Devt
Human beings Cause & Consequence of DevtJo Balucanag - Bitonio
 
MPA 212 Lec Training and Development.pdf
MPA 212 Lec Training and Development.pdfMPA 212 Lec Training and Development.pdf
MPA 212 Lec Training and Development.pdfJo Balucanag - Bitonio
 
MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.
MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.
MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.Jo Balucanag - Bitonio
 
Urban & Metro Admin and Governancges.pdf
Urban & Metro Admin and Governancges.pdfUrban & Metro Admin and Governancges.pdf
Urban & Metro Admin and Governancges.pdfJo Balucanag - Bitonio
 
MPA 210 Lecture : Planning & Budgeting
MPA 210  Lecture :  Planning & BudgetingMPA 210  Lecture :  Planning & Budgeting
MPA 210 Lecture : Planning & BudgetingJo Balucanag - Bitonio
 
SPMS LECTURE :PERFORMANCE AND EVALUATION
SPMS LECTURE :PERFORMANCE AND EVALUATIONSPMS LECTURE :PERFORMANCE AND EVALUATION
SPMS LECTURE :PERFORMANCE AND EVALUATIONJo Balucanag - Bitonio
 
Lecture Maintenance & Development of HR.
Lecture Maintenance & Development of HR.Lecture Maintenance & Development of HR.
Lecture Maintenance & Development of HR.Jo Balucanag - Bitonio
 
Job Analysis, Job Design and Evaluation
Job Analysis, Job Design and  EvaluationJob Analysis, Job Design and  Evaluation
Job Analysis, Job Design and EvaluationJo Balucanag - Bitonio
 
MPA 212 Lecture :COPING WITH STRESS.pptx
MPA 212 Lecture :COPING WITH STRESS.pptxMPA 212 Lecture :COPING WITH STRESS.pptx
MPA 212 Lecture :COPING WITH STRESS.pptxJo Balucanag - Bitonio
 
MPA 212 Lecture : COACHING AND MENTORING
MPA 212 Lecture : COACHING AND MENTORINGMPA 212 Lecture : COACHING AND MENTORING
MPA 212 Lecture : COACHING AND MENTORINGJo Balucanag - Bitonio
 
Lec Volatility, Uncertainty, Complexity
Lec  Volatility, Uncertainty, ComplexityLec  Volatility, Uncertainty, Complexity
Lec Volatility, Uncertainty, ComplexityJo Balucanag - Bitonio
 
HRMD Lec Managing Ethically and Globally
HRMD Lec Managing Ethically and GloballyHRMD Lec Managing Ethically and Globally
HRMD Lec Managing Ethically and GloballyJo Balucanag - Bitonio
 
Lec : Human Resources - Self Confidence
Lec :  Human Resources - Self ConfidenceLec :  Human Resources - Self Confidence
Lec : Human Resources - Self ConfidenceJo Balucanag - Bitonio
 
Lecture : Adaptive Organizational Design
Lecture : Adaptive Organizational DesignLecture : Adaptive Organizational Design
Lecture : Adaptive Organizational DesignJo Balucanag - Bitonio
 

More from Jo Balucanag - Bitonio (20)

Defining Urban, Urbanization & Urbanism
Defining Urban, Urbanization &  UrbanismDefining Urban, Urbanization &  Urbanism
Defining Urban, Urbanization & Urbanism
 
Lecture on Rural Development Feb 24.pptx
Lecture on Rural Development Feb 24.pptxLecture on Rural Development Feb 24.pptx
Lecture on Rural Development Feb 24.pptx
 
Lecture Presentation on Project Proposal
Lecture Presentation on Project ProposalLecture Presentation on Project Proposal
Lecture Presentation on Project Proposal
 
MPA Lecture on Stakeholder Analysis.pptx
MPA Lecture on Stakeholder Analysis.pptxMPA Lecture on Stakeholder Analysis.pptx
MPA Lecture on Stakeholder Analysis.pptx
 
LEC DEVELOPMENT ISSUES AND CONCERNS.pptx
LEC DEVELOPMENT ISSUES AND CONCERNS.pptxLEC DEVELOPMENT ISSUES AND CONCERNS.pptx
LEC DEVELOPMENT ISSUES AND CONCERNS.pptx
 
Human beings Cause & Consequence of Devt
Human beings Cause & Consequence of DevtHuman beings Cause & Consequence of Devt
Human beings Cause & Consequence of Devt
 
MPA 211: Lecture on WORK ETHICS. pptx
MPA 211:  Lecture  on  WORK ETHICS. pptxMPA 211:  Lecture  on  WORK ETHICS. pptx
MPA 211: Lecture on WORK ETHICS. pptx
 
MPA 212 Lec Training and Development.pdf
MPA 212 Lec Training and Development.pdfMPA 212 Lec Training and Development.pdf
MPA 212 Lec Training and Development.pdf
 
MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.
MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.
MPA 213 : LECTURE ON SOCIAL-DEVELOPMENT.
 
Urban & Metro Admin and Governancges.pdf
Urban & Metro Admin and Governancges.pdfUrban & Metro Admin and Governancges.pdf
Urban & Metro Admin and Governancges.pdf
 
MPA 210 Lecture : Planning & Budgeting
MPA 210  Lecture :  Planning & BudgetingMPA 210  Lecture :  Planning & Budgeting
MPA 210 Lecture : Planning & Budgeting
 
SPMS LECTURE :PERFORMANCE AND EVALUATION
SPMS LECTURE :PERFORMANCE AND EVALUATIONSPMS LECTURE :PERFORMANCE AND EVALUATION
SPMS LECTURE :PERFORMANCE AND EVALUATION
 
Lecture Maintenance & Development of HR.
Lecture Maintenance & Development of HR.Lecture Maintenance & Development of HR.
Lecture Maintenance & Development of HR.
 
Job Analysis, Job Design and Evaluation
Job Analysis, Job Design and  EvaluationJob Analysis, Job Design and  Evaluation
Job Analysis, Job Design and Evaluation
 
MPA 212 Lecture :COPING WITH STRESS.pptx
MPA 212 Lecture :COPING WITH STRESS.pptxMPA 212 Lecture :COPING WITH STRESS.pptx
MPA 212 Lecture :COPING WITH STRESS.pptx
 
MPA 212 Lecture : COACHING AND MENTORING
MPA 212 Lecture : COACHING AND MENTORINGMPA 212 Lecture : COACHING AND MENTORING
MPA 212 Lecture : COACHING AND MENTORING
 
Lec Volatility, Uncertainty, Complexity
Lec  Volatility, Uncertainty, ComplexityLec  Volatility, Uncertainty, Complexity
Lec Volatility, Uncertainty, Complexity
 
HRMD Lec Managing Ethically and Globally
HRMD Lec Managing Ethically and GloballyHRMD Lec Managing Ethically and Globally
HRMD Lec Managing Ethically and Globally
 
Lec : Human Resources - Self Confidence
Lec :  Human Resources - Self ConfidenceLec :  Human Resources - Self Confidence
Lec : Human Resources - Self Confidence
 
Lecture : Adaptive Organizational Design
Lecture : Adaptive Organizational DesignLecture : Adaptive Organizational Design
Lecture : Adaptive Organizational Design
 

Recently uploaded

Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxVishalSingh1417
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxVishalSingh1417
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseAnaAcapella
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docxPoojaSen20
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfSherif Taha
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSCeline George
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...pradhanghanshyam7136
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsTechSoup
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docxPoojaSen20
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxnegromaestrong
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfNirmal Dwivedi
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17Celine George
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Jisc
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...ZurliaSoop
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhikauryashika82
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxDenish Jangid
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17Celine George
 

Recently uploaded (20)

Unit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptxUnit-IV- Pharma. Marketing Channels.pptx
Unit-IV- Pharma. Marketing Channels.pptx
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
PROCESS RECORDING FORMAT.docx
PROCESS      RECORDING        FORMAT.docxPROCESS      RECORDING        FORMAT.docx
PROCESS RECORDING FORMAT.docx
 
Food safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdfFood safety_Challenges food safety laboratories_.pdf
Food safety_Challenges food safety laboratories_.pdf
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
psychiatric nursing HISTORY COLLECTION .docx
psychiatric  nursing HISTORY  COLLECTION  .docxpsychiatric  nursing HISTORY  COLLECTION  .docx
psychiatric nursing HISTORY COLLECTION .docx
 
Seal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptxSeal of Good Local Governance (SGLG) 2024Final.pptx
Seal of Good Local Governance (SGLG) 2024Final.pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17How to Create and Manage Wizard in Odoo 17
How to Create and Manage Wizard in Odoo 17
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in DelhiRussian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
Russian Escort Service in Delhi 11k Hotel Foreigner Russian Call Girls in Delhi
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 

Project Implementation.pptx

  • 1. PROJECT IMPLEMENTATION MPA 207 – PLANNING PROCESS Engr. Truman T. Tesoro
  • 2. What is Project Implementation? • This is the logical conclusion, after evaluating, deciding, visioning, planning, applying for finances, and finding the monetary resources of a challenge. • A task has to be implemented successfully while the allocation of undertaking obligations to the assignment team in the organization. • Project implementation is the segment wherein visions and plans come to be a reality. • The implementation degree of the project cycle is in many approaches the most critical, as it’s miles in the course of this stage that planned advantages are delivered. 2
  • 4. PURPOSE of Project Implementation • To put the action plan into operation; • To deliver the results, achieve the purpose(s) and contribute effectively to the overall objective of the project; • To manage the available resources efficiently; and • To monitor and report on progress 4
  • 5. Things we must do during Project Implementation • Update the stakeholder analysis to ensure that all the needful stakeholders (primary and secondary) are invited • Reassess the risks to the project. • Monitor and review the progress that the project is making towards achieving its objectives. 5 • Feed the learning from monitoring and reviewing returned into the project design.
  • 7. An implementation plan for a project refers to a detailed description of actions that demonstrate a way to enforce an activity in the project inside the context of achieving project objectives, addressing requirements, and meeting expectations. What is Project Implementation Plan? The motive of the project implementation plan is to provide stakeholders with the self-belief that accomplishment of a modern- day challenge has been properly considered and to list the tasks, activities, and processes worried in producing deliverable. . 7
  • 8. Steps in Project Implementation 8 Creating the list of outcome required Set up a tracking sheet to monitor progress 1.Allocate the champion for each outcome Establish roles, budgets, and accountability Follow a project management methodology Schedule and undertake a review in six months Determine what action need to be taken for outcomes to be achieved
  • 9. CREATING LIST OF OUTCOME REQUIRED • First of all, a project implementation plan must ensure what we want to achieve by the end of the project. • To decide the actions and the priorities of tasks, we need to list the outcomes that we want to reap via this implementation exercise. 9
  • 10. ALLOCATE THE CHAMPION FOR EACH OUTCOME • We need to allocate a champion to head everyone, a champion who could be encouraged to attain the outcome and hold the entire undertaking team responsible for accomplishing it. • Look for those contributors of a team who have a vested interest in attaining these final results, or whose passionate and devoted to a successful implementation. • Share those roles around the team (give chance to every team member) so that the responsibility is not limited to a single person. 10
  • 11. DETERMINE WHAT ACTION NEED TO BE TAKEN FOR OUTCOMES TO BE ACHIEVED • In this phase of the implementation plan, we need to write down all the actions that will help the team to successfully achieve the outcomes. For this, we can discuss ‘what are the steps needed to do to reap this outcome?’ • Make sure that these actions are doable, feasible and relevant as per your available resources and goals 11
  • 12. ESTABLISH ROLES, BUDGETS AND ACCOUNTABILITY • Once we’ve got the listing of actions that will make certain of the entirety of implementation activities, we need to decide the jobs and obligations of the implementation team. • We may also want to define: • When do we want each action to be carried out? • What is the budget is required? • Who is accountable and responsible for it (each action)? 12
  • 13. SET UP A TRACKING SHEET TO MONITOR PROGRESS • A tracking sheet will provide you with a quick at-a-glance replacement of where implementation plan is and what moves are complete, in development, or late. • This allows us to quickly address any issues to get the project back on track. 13
  • 14. FOLLOW A PROJECT MANAGEMENT METHODOLOGY • A project management method is a series of various governance controls, shape, and processes which are designed to help you manage your activities, time, and sources more efficaciously and handle problems proactively once they arise. • While there are many existing project management methodologies you could implement, different mission control methodologies, combining the right amount of documentation, communication, governance, and control, is one of the highly used methods to complete projects on time and budget whilst creating effective outcomes even in challenging environments. 14
  • 15. SCHEDULE AND UNDERTAKE A REVIEW IN SIX MONTHS • Every time you enforce a project in your organization, it must be regularly reviewed. • Through the evaluation process, it’s critical to take a look at what labored and what didn’t to identify areas for improvement. • It is also important to take a look at the setbacks you encountered along the way and how they may have potentially been avoided or reduced to take this understanding into your subsequent set of implementation activities. • This review will also help you to plan the activities better next time. 15
  • 17. APPROACHES TO PROJECT IMPLEMENTATION The top-down approach to management is when company-wide decisions are made solely by leadership at the top, while the bottom-up approach gives all teams a voice in these types of decisions. 17 TOP DOWN AND BOTTOM UP APPROACH
  • 18. METHODS to TRACK / PLAN Project Implementation 18
  • 19. GANTT chart 19 •GANTT chart is also known as the development chart. •It is a simple chart showing the timing allocated for each project activity. •It displays the frequency and period for implementation.
  • 20. WAYS TO CONSTRUCT A GANTT CHART 1 List the activities that to be executed/implemented 2 Determine the associated activities that can be carried out at the same time and identify those to be carried out sequentially 3 Estimate the quantity of time required for each activity 20 4 Keep the time represented on the horizontal axis, and activities on the vertical axis. 5 Highlight or color-code the time required for each activity
  • 21. 21
  • 22. CRITICAL PATH METHOD OR NETWORK ANALYSIS • This approach is an algorithm for scheduling and planning project works. • This is regularly used alongside the Program Evaluation and Review Technique (PERT). • This approach involves detecting the longest path (sequence of duties) from the start to the end of a project and defining the critical responsibilities. • Critical are tasks that impact the cut-off dates of the entire project and require closer attention and thorough control. • Critical Path approach is used for complex projects where delivery terms and deadlines are vital, in such regions as construction, defense, software development, and others. 22
  • 23. PROJECT EVALUATION AND REVIEW TECHNIQUES (PERT) • Program Evaluation and Review Technique (PERT) is one in every of the broadly used approaches in diverse areas. • It involves complicated and specific planning and visual tracking of labor effects on PERT charts. • Its core element is the evaluation of tasks performed within the project. • Originally, this approach was developed by using the USA Navy for the duration of the Cold War to boom the performance of labor on new technologies. • This method suits exceptionally for large and long-time period initiatives with non-ordinary obligations and tough requirements. 23
  • 24. 24