What is LFA?
• LFA is a systematic planning
procedure for complete project
cycle management
• It is a problem solving approach
which takes into account the
views of all stakeholders
• It also agrees on the criteria for
project success and lists the
major assumptions
History of LFA
• Developed in response to poor
planning and monitoring of
Development projects
• The first logical framework developed
for USAID at the end of 1960’s
• GTZ was responsible for the
development of ZOPP or
Zielorientierte Projekt Planung
• NORAD made a significant
contribution in 1990 with their
handbook
LOGICAL FRAMEWORK MATRIX
Narrative
Summary
Verifiable
Indicators
(OVI)
Means of
Verification
(MOV)
Important
Assumptions
GOAL
PURPOSE
OUTPUTS
ACTIVITIES Inputs
KEY FEATURES OF
LOGFRAME MATRIX
The LOGFRAME MATRIX is a
participatory Planning, Monitoring &
Evaluation tool whose power depends
on the degree to which it incorporates
the full range of views of intended
beneficiaries and others who have a
stake in the programme design. It is
a tool for summarizing the key
features of a programme and is best
used to help programme designers
and stakeholders
Summary of the logical framework
• Goal
– The higher level objective towards which the
project is expected to contribute (mention
target groups)
• Purpose
– The effect which is expected to be achieved
as the result of the project.
• Outputs
– The results that the project management
should be able to guarantee (mention target
groups)
• Activities
– The activities that have to be undertaken by
the project in order to produce outputs.
Intervention Logic
Cause-effect relationship among
objectives at several levels
Inputs
Activities
Outputs
Purpose
Goal
under full control of
project management
beyond control of
project management
Summary of the logical framework
• Assumptions
– Important events, conditions or decisions
outside the control of the project which must
prevail the goal.
– Important events, conditions or decisions
outside control of the project management
necessary for the achievement of the
purpose.
– Important events, conditions or decisions
outside control of the project management
necessary for the production of outputs.
– Important events, conditions, decisions
outside control of the project management
necessary for the start of the project.
Assumptions and Preconditions
Summary of the logical framework
• Goal
– Measures (direct or indirect) to verify to what
extent the goal is fulfilled.
• Purpose
– Measures (direct or indirect) to verify to what
extent the purpose is fulfilled.
• Outputs
– Measures (direct or indirect) to verify to what
extent the outputs are produced.
Objectively Verifiable Indicators (OVI)
• Activities (Inputs)
– Goods, people and services necessary to
undertake the activities
Summary of the logical framework
• Goal
– The sources of data necessary to verify
status of goal level indicators.
• Purpose
– The sources of data necessary to verify
status of purpose level indicators.
• Outputs
– The sources of data necessary to verify
status of output level indicators.
• Activities
– The sources of data necessary to verify
status of activity level indicators.
Means of verification (MOV)
Objectively Verifiable Indicators
• Indicators must be valid, reliable, precise,
cost-effective and stated independently
from other levels.
• Indicators should make clear how the
target group will benefit from the
realisation of outputs.
• Indicators should be specific in terms of:
– Quality (what?) - Q
– Quantity (how much?) - Q
– Time (when, how long?) - T
– Target Group (who?) - T
– Place (where?) - P
Objectively Verifiable Indicators
• The process of defining indicators forces us to
clarify our objectives. A good indicator at this
level is,
a. Plausible measuring what is important in
the project
b. Attributable measuring changes caused by
the project
c. Cost-effective involving data that may be
collected and analyzed inexpensively
d. Independent not inherent to the project
e. Targeted how much.., what kind of.., by
when
f. Verifiable to reach agreement
Key Features of Logframe
Matrix (cont’d)
• Develop a common understanding of
the expectations of a programme by
delineating a hierarchy of aims;
• Define indicators of success and
establish criteria for monitoring and
evaluation;
• Define critical assumptions on which
the programme is based; and
• Identify means of verifying
programme accomplishments
CORE CONCEPT OF
LOGFRAME MATRIX:
MEANS AND END LOGIC
The main concept underlying the
Logical Framework is means and end.
The better the means and end
linkages between each level of aims,
the better the programme design.
By definition, each programme has a
“if-then” or “means-and-end” logic
embedded in it. If we produce certain
results under certain conditions, then
we can expect to achieve certain
other outcomes.
LogFrame-Horizontal logic
Aims measured by indicators
through information collected
and presented in specified
means of verification
THE LOGIC OF A PROGRAMME:
A SET OF LINKED HYPOTHESES
GOAL
PURPOSE
ACTIVITIES
OUTPUTS
if
then
if
then
then
if
PLAN DOWNWARDS
PLAN DOWNWARDS
Goal
Assumptions
Purpose
Assumptions
Outputs
Assumptions
Activities
Assumptions
Inputs
AND THEN
THINK UPWARDS
THE LOGICAL FRAMEWORK
MATRIX
Clear statement of:
What we can accomplish
(outputs) and
The important results we expect
in the short to medium-term
(purpose) and in the long term
(goal)
Means of verification
The specific sources from which
the status of each of the
indicators can be ascertained
ASSUMPTIONS AND RISKS
Assumptions and risks are external
conditions that are outside the control
of the programme. The achievement
of aims depends on whether or not
assumptions hold true and the risks do
not materialize.
If cause and effect is the core concept
of good programme design, necessary
and sufficient conditions are the
corollary. The sufficient conditions
between the levels in the hierarchy of
aims are the Assumptions. This is the
external logic of the programme.
Assumptions and Risks
(cont’d)
When working on a programme, we
make assumptions about the degree
of uncertainty between different
levels of aims. The lower the
uncertainty that certain assumptions
will hold true, the stronger the
programme design. Any experienced
manager will agree that the
assumptions - the failing assumptions
- can derail a programme as often as
poorly executed outputs.
Assumptions and Risks
(cont’d)
Logframe demands that all hypotheses,
assumptions and risks relevant to a
programme are made explicit.
By implication, this then further
demands that the appropriate action is
considered (and if necessary taken)
before problems materialise.
– How important are the assumptions
– How big are the risks
– Should the programme be redesigned?
– Should elements of the proposed
programme be abandoned?
ALGORITHM TO ASSESS EXTERNAL FACTORS
Is the external factor important?
Yes No
Will it be realised?
(e.g. as the result of another project by external donor)
Almost certainly Do not include in logical framework
Likely Include in logical framework as Assumption
(fourth column)
Unlikely Is it possible to redesign the country
Programme to influence the external factor?
Do not include in logical framework
yes No
Redesign the programme :
•add activities and/or results
•change programme purpose
The assumption is a “killer”
assumption. From a technical point of
view the programme is not feasible,
unless the political authority finds a
solution to get around the assumption or
transform it into an acceptable
LOGFRAME MATRIX SERVES THE
FOLLOWING FUNCTIONS
• A tool for planning a logical set of
interventions
• A tool for appraising a Programme
document
• A concise summary of the Programme
• A tool for monitoring progress made
with regard to delivery of outputs and
activities
• A tool for evaluating impact of
Programme outputs, e.e. progress in
achieving purpose and goal.
Thank you.

More Related Content

What's hot

Monitoring And Evaluation Presentation
Monitoring And Evaluation PresentationMonitoring And Evaluation Presentation
Monitoring And Evaluation PresentationEquiGov Institute
 
Monitoring and Evaluation for Project management.
Monitoring and Evaluation for Project management.Monitoring and Evaluation for Project management.
Monitoring and Evaluation for Project management.Muthuraj K
 
Monotoring and evaluation principles and theories
Monotoring and evaluation  principles and theoriesMonotoring and evaluation  principles and theories
Monotoring and evaluation principles and theoriescommochally
 
Components of a monitoring and evaluation system
Components of a monitoring and evaluation system  Components of a monitoring and evaluation system
Components of a monitoring and evaluation system Preston Healthcare Consulting
 
Theory of Change
Theory of ChangeTheory of Change
Theory of Changeclearsateam
 
Project management cycle
Project management  cycleProject management  cycle
Project management cycleMegha BHardwaj
 
6 M&E - Monitoring and Evaluation of Aid Projects
6 M&E - Monitoring and Evaluation of Aid Projects6 M&E - Monitoring and Evaluation of Aid Projects
6 M&E - Monitoring and Evaluation of Aid ProjectsTony
 
Project Planning and Management
Project Planning and Management Project Planning and Management
Project Planning and Management PiyushKumar621
 
Monitoring And Evaluation
Monitoring And EvaluationMonitoring And Evaluation
Monitoring And EvaluationNick Nyamapfeni
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project ManagementAshish Mittal
 
Lfa problem tree analysis
Lfa   problem tree analysisLfa   problem tree analysis
Lfa problem tree analysisLiris Thomas
 
TTIPEC: Monitoring and Evaluation (Session 2)
TTIPEC: Monitoring and Evaluation (Session 2)TTIPEC: Monitoring and Evaluation (Session 2)
TTIPEC: Monitoring and Evaluation (Session 2)Research to Action
 
Problem & Objective Tree.pptx
Problem & Objective Tree.pptxProblem & Objective Tree.pptx
Problem & Objective Tree.pptxNimra zaman
 
Results Based Monitoring and Evaluation
Results Based Monitoring and EvaluationResults Based Monitoring and Evaluation
Results Based Monitoring and EvaluationMadhawa Waidyaratna
 

What's hot (20)

Monitoring And Evaluation Presentation
Monitoring And Evaluation PresentationMonitoring And Evaluation Presentation
Monitoring And Evaluation Presentation
 
Monitoring and Evaluation for Project management.
Monitoring and Evaluation for Project management.Monitoring and Evaluation for Project management.
Monitoring and Evaluation for Project management.
 
Project planning
Project planning Project planning
Project planning
 
Monotoring and evaluation principles and theories
Monotoring and evaluation  principles and theoriesMonotoring and evaluation  principles and theories
Monotoring and evaluation principles and theories
 
Components of a monitoring and evaluation system
Components of a monitoring and evaluation system  Components of a monitoring and evaluation system
Components of a monitoring and evaluation system
 
Theory of Change
Theory of ChangeTheory of Change
Theory of Change
 
Project management cycle
Project management  cycleProject management  cycle
Project management cycle
 
6 M&E - Monitoring and Evaluation of Aid Projects
6 M&E - Monitoring and Evaluation of Aid Projects6 M&E - Monitoring and Evaluation of Aid Projects
6 M&E - Monitoring and Evaluation of Aid Projects
 
Project Planning and Management
Project Planning and Management Project Planning and Management
Project Planning and Management
 
Monitoring And Evaluation
Monitoring And EvaluationMonitoring And Evaluation
Monitoring And Evaluation
 
Basics of Monitoring & Evaluation
Basics of Monitoring & EvaluationBasics of Monitoring & Evaluation
Basics of Monitoring & Evaluation
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project Management
 
Lfa problem tree analysis
Lfa   problem tree analysisLfa   problem tree analysis
Lfa problem tree analysis
 
TTIPEC: Monitoring and Evaluation (Session 2)
TTIPEC: Monitoring and Evaluation (Session 2)TTIPEC: Monitoring and Evaluation (Session 2)
TTIPEC: Monitoring and Evaluation (Session 2)
 
Problem & Objective Tree.pptx
Problem & Objective Tree.pptxProblem & Objective Tree.pptx
Problem & Objective Tree.pptx
 
Monitoring and Evaluation
Monitoring and EvaluationMonitoring and Evaluation
Monitoring and Evaluation
 
Logical framework analysis
Logical framework analysisLogical framework analysis
Logical framework analysis
 
Monitoring indicators
Monitoring indicatorsMonitoring indicators
Monitoring indicators
 
Project Planning
Project PlanningProject Planning
Project Planning
 
Results Based Monitoring and Evaluation
Results Based Monitoring and EvaluationResults Based Monitoring and Evaluation
Results Based Monitoring and Evaluation
 

Viewers also liked

Preparing a logical framework for your project
Preparing a logical framework for your projectPreparing a logical framework for your project
Preparing a logical framework for your projectKarzen & Karzen d.o.o.
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposalrexcris
 
5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOs5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOsTony
 
A Guide to Logical Framework Analysis
A Guide to Logical Framework AnalysisA Guide to Logical Framework Analysis
A Guide to Logical Framework AnalysisTony
 
Logframework and swort thursday
Logframework and swort thursdayLogframework and swort thursday
Logframework and swort thursdayDavid mbwiga
 
LOG FRAME, THE PROJECT SUMMARY
LOG FRAME, THE PROJECT SUMMARYLOG FRAME, THE PROJECT SUMMARY
LOG FRAME, THE PROJECT SUMMARYJacob Anyieth
 
KB ZOPP charts-r1
KB ZOPP charts-r1KB ZOPP charts-r1
KB ZOPP charts-r1PUPUK
 
Assessing Renewable Energy Potential Using the Geospatial Toolkit (GsT): Appl...
Assessing Renewable Energy Potential Using the Geospatial Toolkit (GsT): Appl...Assessing Renewable Energy Potential Using the Geospatial Toolkit (GsT): Appl...
Assessing Renewable Energy Potential Using the Geospatial Toolkit (GsT): Appl...Worldwatch Institute
 
KB greenbook-3-ind-06
KB greenbook-3-ind-06KB greenbook-3-ind-06
KB greenbook-3-ind-06PUPUK
 
Low Emission Vehicles : Tesla Motors
Low Emission Vehicles : Tesla MotorsLow Emission Vehicles : Tesla Motors
Low Emission Vehicles : Tesla MotorsAndyStunner
 
Land Use Strategic Master Plans
Land Use Strategic Master Plans Land Use Strategic Master Plans
Land Use Strategic Master Plans Carlos Jimenez
 
How the National Land Use Policy Promotes Use of Publicly Accessible Land Inf...
How the National Land Use Policy Promotes Use of Publicly Accessible Land Inf...How the National Land Use Policy Promotes Use of Publicly Accessible Land Inf...
How the National Land Use Policy Promotes Use of Publicly Accessible Land Inf...Neil Sorensen
 
Land use plan and land management eng
Land use plan and land management engLand use plan and land management eng
Land use plan and land management engBayar Tsend
 
Vietnam’s Land Data
Vietnam’s Land DataVietnam’s Land Data
Vietnam’s Land DataNeil Sorensen
 
Energy Low Emission Development Strategies in Asia: A Regional Overview and E...
Energy Low Emission Development Strategies in Asia: A Regional Overview and E...Energy Low Emission Development Strategies in Asia: A Regional Overview and E...
Energy Low Emission Development Strategies in Asia: A Regional Overview and E...Worldwatch Institute
 
Proposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposalProposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposalnooone
 
Clean Development Mechanism
Clean Development MechanismClean Development Mechanism
Clean Development MechanismNayan Bhatia
 
Preparation of master plan
Preparation of master planPreparation of master plan
Preparation of master planSiva Nanda Reddy
 

Viewers also liked (20)

Preparing a logical framework for your project
Preparing a logical framework for your projectPreparing a logical framework for your project
Preparing a logical framework for your project
 
Logical Framework And Project Proposal
Logical Framework And Project ProposalLogical Framework And Project Proposal
Logical Framework And Project Proposal
 
5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOs5 The Logical Framework - a short course for NGOs
5 The Logical Framework - a short course for NGOs
 
A Guide to Logical Framework Analysis
A Guide to Logical Framework AnalysisA Guide to Logical Framework Analysis
A Guide to Logical Framework Analysis
 
Logframework and swort thursday
Logframework and swort thursdayLogframework and swort thursday
Logframework and swort thursday
 
LOG FRAME, THE PROJECT SUMMARY
LOG FRAME, THE PROJECT SUMMARYLOG FRAME, THE PROJECT SUMMARY
LOG FRAME, THE PROJECT SUMMARY
 
KB ZOPP charts-r1
KB ZOPP charts-r1KB ZOPP charts-r1
KB ZOPP charts-r1
 
Assessing Renewable Energy Potential Using the Geospatial Toolkit (GsT): Appl...
Assessing Renewable Energy Potential Using the Geospatial Toolkit (GsT): Appl...Assessing Renewable Energy Potential Using the Geospatial Toolkit (GsT): Appl...
Assessing Renewable Energy Potential Using the Geospatial Toolkit (GsT): Appl...
 
KB greenbook-3-ind-06
KB greenbook-3-ind-06KB greenbook-3-ind-06
KB greenbook-3-ind-06
 
Low Emission Vehicles : Tesla Motors
Low Emission Vehicles : Tesla MotorsLow Emission Vehicles : Tesla Motors
Low Emission Vehicles : Tesla Motors
 
Land Use Strategic Master Plans
Land Use Strategic Master Plans Land Use Strategic Master Plans
Land Use Strategic Master Plans
 
How the National Land Use Policy Promotes Use of Publicly Accessible Land Inf...
How the National Land Use Policy Promotes Use of Publicly Accessible Land Inf...How the National Land Use Policy Promotes Use of Publicly Accessible Land Inf...
How the National Land Use Policy Promotes Use of Publicly Accessible Land Inf...
 
Land use plan and land management eng
Land use plan and land management engLand use plan and land management eng
Land use plan and land management eng
 
Vietnam’s Land Data
Vietnam’s Land DataVietnam’s Land Data
Vietnam’s Land Data
 
Energy Low Emission Development Strategies in Asia: A Regional Overview and E...
Energy Low Emission Development Strategies in Asia: A Regional Overview and E...Energy Low Emission Development Strategies in Asia: A Regional Overview and E...
Energy Low Emission Development Strategies in Asia: A Regional Overview and E...
 
Proposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposalProposal Development: Logical framework and project proposal
Proposal Development: Logical framework and project proposal
 
Process outcomes vs outputs
Process outcomes vs outputsProcess outcomes vs outputs
Process outcomes vs outputs
 
Clean Development Mechanism
Clean Development MechanismClean Development Mechanism
Clean Development Mechanism
 
Planning the training session
Planning the training sessionPlanning the training session
Planning the training session
 
Preparation of master plan
Preparation of master planPreparation of master plan
Preparation of master plan
 

Similar to Logical framework

M3_S5_logframe_KSD_180916.pptx
M3_S5_logframe_KSD_180916.pptxM3_S5_logframe_KSD_180916.pptx
M3_S5_logframe_KSD_180916.pptxbipuait
 
Monitoring and Evaluation Plan (Theory of change, results framework, Logframe...
Monitoring and Evaluation Plan (Theory of change, results framework, Logframe...Monitoring and Evaluation Plan (Theory of change, results framework, Logframe...
Monitoring and Evaluation Plan (Theory of change, results framework, Logframe...Scoffy Wangang
 
Logical Framework Analysis.pptx
Logical Framework Analysis.pptxLogical Framework Analysis.pptx
Logical Framework Analysis.pptxDrAsifMohammad
 
Elico Solutions' Odoo ERP Project Management Implementation Approach
Elico Solutions' Odoo ERP Project Management Implementation ApproachElico Solutions' Odoo ERP Project Management Implementation Approach
Elico Solutions' Odoo ERP Project Management Implementation ApproachElico Solutions Singapore
 
Working with Logic Models
Working with Logic ModelsWorking with Logic Models
Working with Logic ModelsOlivier Serrat
 
Developing indicators-and-mo vs-sanidad
Developing indicators-and-mo vs-sanidadDeveloping indicators-and-mo vs-sanidad
Developing indicators-and-mo vs-sanidadAlo Lacsamana
 
UNIT - I - ppe.pptx
UNIT - I - ppe.pptxUNIT - I - ppe.pptx
UNIT - I - ppe.pptxmichael191017
 
Program management scope management
Program management   scope managementProgram management   scope management
Program management scope managementJulen Mohanty
 
Software Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementSoftware Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementAhsan Rahim
 
Impact evaluation
Impact evaluationImpact evaluation
Impact evaluationCarlo Magno
 
223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.pptDeepgaichor1
 
Global strategy execution and it accountability an accelerator approach
Global strategy execution and it accountability   an accelerator approachGlobal strategy execution and it accountability   an accelerator approach
Global strategy execution and it accountability an accelerator approachReddappa Gowd Bandi
 
Software project planning and monitoring
Software project planning and monitoringSoftware project planning and monitoring
Software project planning and monitoringYb Yar
 
Monitoring and Evaluation Policy
Monitoring and Evaluation PolicyMonitoring and Evaluation Policy
Monitoring and Evaluation PolicyKomal Zahra
 
Project Management Ch 14.ppt
Project Management Ch 14.pptProject Management Ch 14.ppt
Project Management Ch 14.pptUjalaBatool7
 

Similar to Logical framework (20)

Lfa
LfaLfa
Lfa
 
M3_S5_logframe_KSD_180916.pptx
M3_S5_logframe_KSD_180916.pptxM3_S5_logframe_KSD_180916.pptx
M3_S5_logframe_KSD_180916.pptx
 
Monitoring and Evaluation Plan (Theory of change, results framework, Logframe...
Monitoring and Evaluation Plan (Theory of change, results framework, Logframe...Monitoring and Evaluation Plan (Theory of change, results framework, Logframe...
Monitoring and Evaluation Plan (Theory of change, results framework, Logframe...
 
Logical Framework Analysis.pptx
Logical Framework Analysis.pptxLogical Framework Analysis.pptx
Logical Framework Analysis.pptx
 
Elico Solutions' Odoo ERP Project Management Implementation Approach
Elico Solutions' Odoo ERP Project Management Implementation ApproachElico Solutions' Odoo ERP Project Management Implementation Approach
Elico Solutions' Odoo ERP Project Management Implementation Approach
 
Working with Logic Models
Working with Logic ModelsWorking with Logic Models
Working with Logic Models
 
Developing indicators-and-mo vs-sanidad
Developing indicators-and-mo vs-sanidadDeveloping indicators-and-mo vs-sanidad
Developing indicators-and-mo vs-sanidad
 
UNIT - I - ppe.pptx
UNIT - I - ppe.pptxUNIT - I - ppe.pptx
UNIT - I - ppe.pptx
 
Program management scope management
Program management   scope managementProgram management   scope management
Program management scope management
 
Software Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project ManagementSoftware Project Management | An Overview of the Software Project Management
Software Project Management | An Overview of the Software Project Management
 
Impact evaluation
Impact evaluationImpact evaluation
Impact evaluation
 
223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt223417 Diploma_Sem4_software_engg-chap-05.ppt
223417 Diploma_Sem4_software_engg-chap-05.ppt
 
Global strategy execution and it accountability an accelerator approach
Global strategy execution and it accountability   an accelerator approachGlobal strategy execution and it accountability   an accelerator approach
Global strategy execution and it accountability an accelerator approach
 
Software project planning and monitoring
Software project planning and monitoringSoftware project planning and monitoring
Software project planning and monitoring
 
INTRO.pptx
INTRO.pptxINTRO.pptx
INTRO.pptx
 
Monitoring and Evaluation Policy
Monitoring and Evaluation PolicyMonitoring and Evaluation Policy
Monitoring and Evaluation Policy
 
Project Management Ch 14.ppt
Project Management Ch 14.pptProject Management Ch 14.ppt
Project Management Ch 14.ppt
 
041006-Program Management PMI NB - PMI Logo
041006-Program Management PMI NB - PMI Logo041006-Program Management PMI NB - PMI Logo
041006-Program Management PMI NB - PMI Logo
 
Logframe brainstormers
Logframe brainstormersLogframe brainstormers
Logframe brainstormers
 
Unit 1 spm
Unit 1  spmUnit 1  spm
Unit 1 spm
 

More from Ermete Mariani

Mariani portfolio
Mariani portfolioMariani portfolio
Mariani portfolioErmete Mariani
 
Crossing conflicts in Syria Street - Tripoli, Lebanon
Crossing conflicts in Syria Street - Tripoli, LebanonCrossing conflicts in Syria Street - Tripoli, Lebanon
Crossing conflicts in Syria Street - Tripoli, LebanonErmete Mariani
 
Crossing conflicts in Syria Street: the format
Crossing conflicts in Syria Street: the formatCrossing conflicts in Syria Street: the format
Crossing conflicts in Syria Street: the formatErmete Mariani
 
Crossing conflicts in Syria Street: the story
Crossing conflicts in Syria Street: the story Crossing conflicts in Syria Street: the story
Crossing conflicts in Syria Street: the story Ermete Mariani
 
Crossing conflicts in Syria Street: why?
Crossing conflicts in Syria Street: why?Crossing conflicts in Syria Street: why?
Crossing conflicts in Syria Street: why?Ermete Mariani
 
Contexte et solutions juridiques de la crise en France et en Italie
Contexte et solutions juridiques de la crise en France et en ItalieContexte et solutions juridiques de la crise en France et en Italie
Contexte et solutions juridiques de la crise en France et en ItalieErmete Mariani
 
Yves Bardon "Ipsos Flair France 2014:
Yves Bardon "Ipsos Flair France 2014:Yves Bardon "Ipsos Flair France 2014:
Yves Bardon "Ipsos Flair France 2014:Ermete Mariani
 
Ipsos Italia "Italie 2014: le climat du pays"
Ipsos Italia "Italie 2014: le climat du pays"Ipsos Italia "Italie 2014: le climat du pays"
Ipsos Italia "Italie 2014: le climat du pays"Ermete Mariani
 
France-Italie: kit de survie - perceptions et solutions face Ă  la crise
France-Italie: kit de survie - perceptions et solutions face Ă  la criseFrance-Italie: kit de survie - perceptions et solutions face Ă  la crise
France-Italie: kit de survie - perceptions et solutions face Ă  la criseErmete Mariani
 
Geopolitics of human security
Geopolitics of human securityGeopolitics of human security
Geopolitics of human securityErmete Mariani
 
Worldbank facebook revolution
Worldbank facebook revolutionWorldbank facebook revolution
Worldbank facebook revolutionErmete Mariani
 

More from Ermete Mariani (11)

Mariani portfolio
Mariani portfolioMariani portfolio
Mariani portfolio
 
Crossing conflicts in Syria Street - Tripoli, Lebanon
Crossing conflicts in Syria Street - Tripoli, LebanonCrossing conflicts in Syria Street - Tripoli, Lebanon
Crossing conflicts in Syria Street - Tripoli, Lebanon
 
Crossing conflicts in Syria Street: the format
Crossing conflicts in Syria Street: the formatCrossing conflicts in Syria Street: the format
Crossing conflicts in Syria Street: the format
 
Crossing conflicts in Syria Street: the story
Crossing conflicts in Syria Street: the story Crossing conflicts in Syria Street: the story
Crossing conflicts in Syria Street: the story
 
Crossing conflicts in Syria Street: why?
Crossing conflicts in Syria Street: why?Crossing conflicts in Syria Street: why?
Crossing conflicts in Syria Street: why?
 
Contexte et solutions juridiques de la crise en France et en Italie
Contexte et solutions juridiques de la crise en France et en ItalieContexte et solutions juridiques de la crise en France et en Italie
Contexte et solutions juridiques de la crise en France et en Italie
 
Yves Bardon "Ipsos Flair France 2014:
Yves Bardon "Ipsos Flair France 2014:Yves Bardon "Ipsos Flair France 2014:
Yves Bardon "Ipsos Flair France 2014:
 
Ipsos Italia "Italie 2014: le climat du pays"
Ipsos Italia "Italie 2014: le climat du pays"Ipsos Italia "Italie 2014: le climat du pays"
Ipsos Italia "Italie 2014: le climat du pays"
 
France-Italie: kit de survie - perceptions et solutions face Ă  la crise
France-Italie: kit de survie - perceptions et solutions face Ă  la criseFrance-Italie: kit de survie - perceptions et solutions face Ă  la crise
France-Italie: kit de survie - perceptions et solutions face Ă  la crise
 
Geopolitics of human security
Geopolitics of human securityGeopolitics of human security
Geopolitics of human security
 
Worldbank facebook revolution
Worldbank facebook revolutionWorldbank facebook revolution
Worldbank facebook revolution
 

Logical framework

  • 1. THE LOGICAL FRAMEWORK APPROACH Keerti Bhusan Pradhan keerti@aravind.org
  • 2. What is LFA? • LFA is a systematic planning procedure for complete project cycle management • It is a problem solving approach which takes into account the views of all stakeholders • It also agrees on the criteria for project success and lists the major assumptions
  • 3. History of LFA • Developed in response to poor planning and monitoring of Development projects • The first logical framework developed for USAID at the end of 1960’s • GTZ was responsible for the development of ZOPP or Zielorientierte Projekt Planung • NORAD made a significant contribution in 1990 with their handbook
  • 4. LOGICAL FRAMEWORK MATRIX Narrative Summary Verifiable Indicators (OVI) Means of Verification (MOV) Important Assumptions GOAL PURPOSE OUTPUTS ACTIVITIES Inputs
  • 5. KEY FEATURES OF LOGFRAME MATRIX The LOGFRAME MATRIX is a participatory Planning, Monitoring & Evaluation tool whose power depends on the degree to which it incorporates the full range of views of intended beneficiaries and others who have a stake in the programme design. It is a tool for summarizing the key features of a programme and is best used to help programme designers and stakeholders
  • 6. Summary of the logical framework • Goal – The higher level objective towards which the project is expected to contribute (mention target groups) • Purpose – The effect which is expected to be achieved as the result of the project. • Outputs – The results that the project management should be able to guarantee (mention target groups) • Activities – The activities that have to be undertaken by the project in order to produce outputs. Intervention Logic
  • 7. Cause-effect relationship among objectives at several levels Inputs Activities Outputs Purpose Goal under full control of project management beyond control of project management
  • 8. Summary of the logical framework • Assumptions – Important events, conditions or decisions outside the control of the project which must prevail the goal. – Important events, conditions or decisions outside control of the project management necessary for the achievement of the purpose. – Important events, conditions or decisions outside control of the project management necessary for the production of outputs. – Important events, conditions, decisions outside control of the project management necessary for the start of the project. Assumptions and Preconditions
  • 9. Summary of the logical framework • Goal – Measures (direct or indirect) to verify to what extent the goal is fulfilled. • Purpose – Measures (direct or indirect) to verify to what extent the purpose is fulfilled. • Outputs – Measures (direct or indirect) to verify to what extent the outputs are produced. Objectively Verifiable Indicators (OVI) • Activities (Inputs) – Goods, people and services necessary to undertake the activities
  • 10. Summary of the logical framework • Goal – The sources of data necessary to verify status of goal level indicators. • Purpose – The sources of data necessary to verify status of purpose level indicators. • Outputs – The sources of data necessary to verify status of output level indicators. • Activities – The sources of data necessary to verify status of activity level indicators. Means of verification (MOV)
  • 11. Objectively Verifiable Indicators • Indicators must be valid, reliable, precise, cost-effective and stated independently from other levels. • Indicators should make clear how the target group will benefit from the realisation of outputs. • Indicators should be specific in terms of: – Quality (what?) - Q – Quantity (how much?) - Q – Time (when, how long?) - T – Target Group (who?) - T – Place (where?) - P
  • 12. Objectively Verifiable Indicators • The process of defining indicators forces us to clarify our objectives. A good indicator at this level is, a. Plausible measuring what is important in the project b. Attributable measuring changes caused by the project c. Cost-effective involving data that may be collected and analyzed inexpensively d. Independent not inherent to the project e. Targeted how much.., what kind of.., by when f. Verifiable to reach agreement
  • 13. Key Features of Logframe Matrix (cont’d) • Develop a common understanding of the expectations of a programme by delineating a hierarchy of aims; • Define indicators of success and establish criteria for monitoring and evaluation; • Define critical assumptions on which the programme is based; and • Identify means of verifying programme accomplishments
  • 14. CORE CONCEPT OF LOGFRAME MATRIX: MEANS AND END LOGIC The main concept underlying the Logical Framework is means and end. The better the means and end linkages between each level of aims, the better the programme design. By definition, each programme has a “if-then” or “means-and-end” logic embedded in it. If we produce certain results under certain conditions, then we can expect to achieve certain other outcomes.
  • 15. LogFrame-Horizontal logic Aims measured by indicators through information collected and presented in specified means of verification
  • 16. THE LOGIC OF A PROGRAMME: A SET OF LINKED HYPOTHESES GOAL PURPOSE ACTIVITIES OUTPUTS if then if then then if
  • 18. THE LOGICAL FRAMEWORK MATRIX Clear statement of: What we can accomplish (outputs) and The important results we expect in the short to medium-term (purpose) and in the long term (goal)
  • 19. Means of verification The specific sources from which the status of each of the indicators can be ascertained
  • 20. ASSUMPTIONS AND RISKS Assumptions and risks are external conditions that are outside the control of the programme. The achievement of aims depends on whether or not assumptions hold true and the risks do not materialize. If cause and effect is the core concept of good programme design, necessary and sufficient conditions are the corollary. The sufficient conditions between the levels in the hierarchy of aims are the Assumptions. This is the external logic of the programme.
  • 21. Assumptions and Risks (cont’d) When working on a programme, we make assumptions about the degree of uncertainty between different levels of aims. The lower the uncertainty that certain assumptions will hold true, the stronger the programme design. Any experienced manager will agree that the assumptions - the failing assumptions - can derail a programme as often as poorly executed outputs.
  • 22. Assumptions and Risks (cont’d) Logframe demands that all hypotheses, assumptions and risks relevant to a programme are made explicit. By implication, this then further demands that the appropriate action is considered (and if necessary taken) before problems materialise. – How important are the assumptions – How big are the risks – Should the programme be redesigned? – Should elements of the proposed programme be abandoned?
  • 23. ALGORITHM TO ASSESS EXTERNAL FACTORS Is the external factor important? Yes No Will it be realised? (e.g. as the result of another project by external donor) Almost certainly Do not include in logical framework Likely Include in logical framework as Assumption (fourth column) Unlikely Is it possible to redesign the country Programme to influence the external factor? Do not include in logical framework yes No Redesign the programme : •add activities and/or results •change programme purpose The assumption is a “killer” assumption. From a technical point of view the programme is not feasible, unless the political authority finds a solution to get around the assumption or transform it into an acceptable
  • 24. LOGFRAME MATRIX SERVES THE FOLLOWING FUNCTIONS • A tool for planning a logical set of interventions • A tool for appraising a Programme document • A concise summary of the Programme • A tool for monitoring progress made with regard to delivery of outputs and activities • A tool for evaluating impact of Programme outputs, e.e. progress in achieving purpose and goal.