International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4247
Improvement of Availability and Maintainability through Actions
Based on Root Cause Analysis of Failures: A Case Study of a Critical
Machine
Vikash kumar sah1, Dr. Pradeep kumar soni2
1M.Tech Scholar, Department of Mechanical Engineering, M.A.N.I.T. Bhopal (M.P.), India-462003
2Assistant Professor, Department of Mechanical Engineering, M.A.N.I.T. Bhopal (M.P.), India-462003
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - Availabilityandmaintainabilityofmachinescanbe
increased by reducing the downtime or breakdowns of the
machines. Main objective is to improve the machine
performance by finding out the major breakdowns causing
production losses to the company andarriving&executing the
counter measures by which these problems can be reduced.
Availability and breakdown reduction methodology are
adopted to improve the machine performance. Root cause
analysis is conducted to find the root causeofbreakdowns and
some parallel improvement opportunities were also identified
for implementation so as to reduce the downtime. The project
thus aims to minimize downtime, maximize availability,
minimize maintenance cost and maximize profit. The project
work concludes that this will help the maintenance
department to increase equipment availability. Data was
collected from Steel Plant breakdown details of Housing less
mill stand machine and Slitting machine i.e. thedataissuchas
breakdown hours, breakdown occurrence, MTBF & MTTR 4
months before overhauling was done for corrective counter
measures of machine. Then after corrective counter measures
were done by Breakdown reduction methodology and
operation parameter was collected from 4 months after
implementation of corrective counter measures for each
method. From this data performance parameters were
calculated and compared with each other. After calculation it
was found that Availability and MTBF of Housing less mill
stand & Slitting machine is increasedorMTTRisdeceased. The
Effectiveness of corrective counter measures of Housing less
mill stand & Slitting Machine is improved.
Key Words: Availability, Maintainability, root cause
analysis downtime, MTTF, MTTR.
1. INTRODUCTION
Equipment breakdown has always contributed towards
machine downtime. Industrial Engineers have always tried
to reduce downtime and increase the availability of
machineries.
Availability- It is the probability that the system will
perform available time atoperatingconditionatonlyinstant.
Availability is the total time of utilization of a machine.
Availability is the ratio of the difference between the total
available hours and total breakdown hours to the total
available hours.
Total available hours- Total breakdown
hours
Availability =
Total available hours
Maintainability- It is probability that a failure system will
be restored at operating condition
Maintainability is defined as the probability of performinga
successful repair action within a given time.
MTBF (mean time between failures) - Meantimebetween
failure is a concern the average time elapsed between a
failure and the next time it occurred.
Total available time – total breakdown hours
MTBF =
Total available time
MTTR (mean time to repairs)- Mean time to
repair is the time to run after the occurrence of
the failures.
Total breakdown hours
MTTR =
No of breakdown
Root cause analysis through why- why analysis -It is
method of problem solving used for identifying the root
cause of faults or problem. A factor is considered a root
cause analysis if removal there from the problem fault
prevents the final undesirable event from recurring.
1.1 Advantages of availability & maintainability
 To reduce emergencies and optimize costs.
 To reduce life cycle costs.
 To improve customer service.
 Increase efficiency of equipment.
 To maintain plant and equipment.
 Reduce downtime and increase uptime of machine.
 To ensure safety of plant.
 High efficiency in plant.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4248
 Improve the useful life of production equipment.
 Improve system reliability.
 Decrease cost of replacement.
 Decreases system downtime.
 Reduce injury.
2. Work of methodology
The initial data collection of the breakdown details of the
machine i.e. the data’s such as breakdownhours,breakdown
occurrence, MTTR, MTBF are collected & studied.
• Selecting the critical machine “Slitting machine”
for the analysis.
• Studying the type of failures occurred & frequently
repeating failures.
• Following the breakdown reduction methodology.
• Performing root cause analysis to reduce the
recurrence of failures.
• Performing “WHY-WHY” analysis.
• Replace the defective parts of the machine.
• Implementing the corrective steps.
• Monitoring and verifying the results.
2. Implementation and root cause analysis
2.1 Break down Description – “Slittingmachine”isnot
working
Root cause – Some fire cracks present in the reel
Physical phenomenon – Slitter reel pointbreak Root
Cause from Why-Why Analysis.
Corrective counter measure
• Proper cooling must be provided on down sidereel.
• Time to time greasing
• Connection of water regular of blade
• Provide water pressure should be high upside &
downside.
• Check to stuck size of metal per hour by fitter.
• Inspection of hardness of metal by operator (50
HRC- 53HRC)
Fig -1 Slitter Guide box
Benefits– After provided cooling and proper adjustment of
slitter box on rest bar nowworkinghencetheslittermachine
problem is eliminated & Slitter machine operation is further
preceded.
 RESULTS AND DISCUSSION
 Process Parameters of Slitting Machine before
the Implementation of Counter Measures.
 Total downtime of Slitting machine in the period
Oct-2015 to feb-2016 = 146 hours.
 Total available time for Slitting machine in the
period Oct-2015 to feb-2016 = 2860 hours.
 (22hours×26 Days, 26Days×5Months =
572×5=2860) Excluding Sundays, holidays,&lunch
time.
 3. Total number of breakdowns in the period Oct-
2015to Jan-2016= 46
Total available hours- Total
breakdown hours
 Availability= Total available hours
 Availability = 2860-146 = 0.9489
 2860
 Availability = 94.89%
 Loss of availability = 1- 0.9489 = 0.0511
 = 5.11%
 total available hours – breakdownhours
 MTBF =
no. of breakdown
 = 2860-146 = 59 hours
 46
 = 59.00 hours.
Problem Slitter reel point break
Why? Some fire cracks present in reel
initially.
Why? Not proper adjustment of slitter
box on rest bar stand.
Why? Due to oversize material.
Why? Cooling provided on Time Based
Maintenance
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4249
 total breakdown hours
 MTTR =
 no. of breakdowns
 = 146 = 3.17
 46
 = 3.17 hours
 Process Parameters of SlittingMachine afterthe
Implementation of Counter Measures
 Total downtime of Slitting machine in the period
march-2016 to june-2016 = 52 hours
 Total available time for Slitting machine in the
period march-2016 to june-2016 = 2288 hours
 (22hours×26Days,26Days×3Months=572×4=Exclud
ing Sundays, holidays, & lunch time.
 Total number of breakdowns in the period march-
2016 to june-2016= 27
Total available hours- Total
breakdown hours
 Availability =
Total available hours
 Availability = 2288-52 = 0.9772
2288
= 97.72 %
 Loss of availability = 1- 0.9772 = 0.0227
= 2.27%
total available hours – breakdown hours
 MTBF =
no. of breakdown
= 2288-52 = 82.81 hours
27
= 82.81 hours.
total breakdown hours
 MTTR =
no. of breakdowns
= 52 = 1.925
27
 Comparison of results before and after
implementation of counter measures ofSlitting
machine.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4250
CONCLUSIONS
The process measurable such as Availability, MTBF, and
MTTR are calculated before and after the implementation of
counter measures.
 The Breakdowns such as slitter reel point and
due to some fire cracks damage on bearing and
bearing pin is completely eliminated.
 The availability of Slitting Machine is increased
from 94.89% to 97.72%.
 The MTBF of Slitting Machine is increased
from 59.00 hours to 82.81 hours.
 The MTTR of Slitting Machine is decreased
from 3.17 hours to 1.93 hours.
 The Effectiveness of corrective counter
measures of Slitting Machine is improved.
REFERENCES
[1] yuo-tern et.al (2001) optimization PM for mechanical
components using genetic algorithms, International
Journal of Modern Engineering Research (IJMER) 2001.
[2] paul laks et.al,(2017), Identification of optimal
preventive maintenance decisions for composite
components, International Journal of Innovative
Research in Science, Engineering and Technology
Volume 3, Special Issue 3, March 2017
[3] Sandria vilarino, 2Muhammed Rifat Hossain , 3Md.
Asrafuzzaman (2017), Preventive maintenance
decisions through maintenance optimization models.
Journal of Science and Technology 2017
[4] Nani kurniati, R., & Ward, P.T. (2016). PREVENTIVE
MAINTENANCE STRATEGIES. Journal of Operations
Management, 25, 785-805.
[5] jianshe kang, Mushtaq Patel, Dr. Vivek Bansod , An
Enhanced Preventive Maintenance Optimization Model
Based on a Three-Stage Failure Process. IJRAME
[6] jiao yuting1, Gajendran2 (2014), Preventive
Maintenance Strategy Optimization BasedonReliability
Threshold, IOSR Journal of Mechanical and Civil
Engineering (IOSR-JMCE), 2014
[7] Ravi sankar, Wong, K.Y., & Ali, A. (2015).Optimizationof
Preventive Maintenance .European Journal of Scientific
Research, 38(4), 521-535
[8] 8]Erwin widodo, F.E. Ciarapica, G. Giacchetta, 2013.
Preventive maintenance optimization strategies for
industries, Journal of Purchasing & Supply Management
Vol.12 14–27
[9] Emil gustavssan, Xiaowei Xu and Prasanta K. Dey.,2014.
Preventive maintenanceschedulingofmulti-component
systems with interval costs: A literature review.
European Journal of Operational Research 202, pp 16–
24
[10] 10]Marco macchi., Ramiya R.A., Gautham S.G., 2017.
Orchestration of preventive maintenanceinterventions.
Expert Systems with Applications 38 (1), 272–280.

More Related Content

What's hot

Effect of time and motion study
Effect of time and motion studyEffect of time and motion study
Effect of time and motion studyAnkur Shukla
 
Maintenance and Reliability
Maintenance and ReliabilityMaintenance and Reliability
Maintenance and ReliabilityEarl Tongol
 
IRJET- Use of Casting Simulation for Yield Improvement.
IRJET- Use of Casting Simulation for Yield Improvement.IRJET- Use of Casting Simulation for Yield Improvement.
IRJET- Use of Casting Simulation for Yield Improvement.IRJET Journal
 
Capacity utilization for product mix using operation based time standard eval...
Capacity utilization for product mix using operation based time standard eval...Capacity utilization for product mix using operation based time standard eval...
Capacity utilization for product mix using operation based time standard eval...eSAT Publishing House
 
Capacity utilization for product mix using operation based time standard eval...
Capacity utilization for product mix using operation based time standard eval...Capacity utilization for product mix using operation based time standard eval...
Capacity utilization for product mix using operation based time standard eval...eSAT Journals
 
Mechanical Maintenance
Mechanical MaintenanceMechanical Maintenance
Mechanical MaintenanceAshutosh Tomar
 
Performance Analysis using OEE
Performance Analysis using OEEPerformance Analysis using OEE
Performance Analysis using OEEijsrd.com
 
PRINCIPLES AND PRACTICES OF MAINTENANCE PLANNING
PRINCIPLES AND PRACTICES OF MAINTENANCE PLANNINGPRINCIPLES AND PRACTICES OF MAINTENANCE PLANNING
PRINCIPLES AND PRACTICES OF MAINTENANCE PLANNINGlaxtwinsme
 
Predictive Maintenance
Predictive MaintenancePredictive Maintenance
Predictive MaintenanceSaama
 
Preventive Maintenance for Mechanized Poultry Operations - Knowledge Day 2016
Preventive Maintenance for Mechanized Poultry Operations - Knowledge Day 2016Preventive Maintenance for Mechanized Poultry Operations - Knowledge Day 2016
Preventive Maintenance for Mechanized Poultry Operations - Knowledge Day 2016Poultry India
 
New microsoft office word document
New microsoft office word documentNew microsoft office word document
New microsoft office word documentBindu Kannan
 
IRJET- Design and Thermal Analysis of Fixture Assembly and Base Plate for...
IRJET-  	  Design and Thermal Analysis of Fixture Assembly and Base Plate for...IRJET-  	  Design and Thermal Analysis of Fixture Assembly and Base Plate for...
IRJET- Design and Thermal Analysis of Fixture Assembly and Base Plate for...IRJET Journal
 
Studies on Machining Parameters of Hot Machining Process using Aisi4140 Material
Studies on Machining Parameters of Hot Machining Process using Aisi4140 MaterialStudies on Machining Parameters of Hot Machining Process using Aisi4140 Material
Studies on Machining Parameters of Hot Machining Process using Aisi4140 MaterialIRJET Journal
 

What's hot (19)

Effect of time and motion study
Effect of time and motion studyEffect of time and motion study
Effect of time and motion study
 
Mm 1 pendahuluan
Mm 1 pendahuluanMm 1 pendahuluan
Mm 1 pendahuluan
 
Tpm
Tpm  Tpm
Tpm
 
Maintenance and Reliability
Maintenance and ReliabilityMaintenance and Reliability
Maintenance and Reliability
 
IRJET- Use of Casting Simulation for Yield Improvement.
IRJET- Use of Casting Simulation for Yield Improvement.IRJET- Use of Casting Simulation for Yield Improvement.
IRJET- Use of Casting Simulation for Yield Improvement.
 
Capacity utilization for product mix using operation based time standard eval...
Capacity utilization for product mix using operation based time standard eval...Capacity utilization for product mix using operation based time standard eval...
Capacity utilization for product mix using operation based time standard eval...
 
Capacity utilization for product mix using operation based time standard eval...
Capacity utilization for product mix using operation based time standard eval...Capacity utilization for product mix using operation based time standard eval...
Capacity utilization for product mix using operation based time standard eval...
 
Mechanical Maintenance
Mechanical MaintenanceMechanical Maintenance
Mechanical Maintenance
 
Performance Analysis using OEE
Performance Analysis using OEEPerformance Analysis using OEE
Performance Analysis using OEE
 
A012430106
A012430106A012430106
A012430106
 
PRINCIPLES AND PRACTICES OF MAINTENANCE PLANNING
PRINCIPLES AND PRACTICES OF MAINTENANCE PLANNINGPRINCIPLES AND PRACTICES OF MAINTENANCE PLANNING
PRINCIPLES AND PRACTICES OF MAINTENANCE PLANNING
 
Predictive Maintenance
Predictive MaintenancePredictive Maintenance
Predictive Maintenance
 
Preventive Maintenance for Mechanized Poultry Operations - Knowledge Day 2016
Preventive Maintenance for Mechanized Poultry Operations - Knowledge Day 2016Preventive Maintenance for Mechanized Poultry Operations - Knowledge Day 2016
Preventive Maintenance for Mechanized Poultry Operations - Knowledge Day 2016
 
New microsoft office word document
New microsoft office word documentNew microsoft office word document
New microsoft office word document
 
IRJET- Design and Thermal Analysis of Fixture Assembly and Base Plate for...
IRJET-  	  Design and Thermal Analysis of Fixture Assembly and Base Plate for...IRJET-  	  Design and Thermal Analysis of Fixture Assembly and Base Plate for...
IRJET- Design and Thermal Analysis of Fixture Assembly and Base Plate for...
 
Maintenance engineering- Unit- 3
Maintenance engineering- Unit- 3Maintenance engineering- Unit- 3
Maintenance engineering- Unit- 3
 
Studies on Machining Parameters of Hot Machining Process using Aisi4140 Material
Studies on Machining Parameters of Hot Machining Process using Aisi4140 MaterialStudies on Machining Parameters of Hot Machining Process using Aisi4140 Material
Studies on Machining Parameters of Hot Machining Process using Aisi4140 Material
 
Business Case for 203CL Barrier
Business Case for 203CL BarrierBusiness Case for 203CL Barrier
Business Case for 203CL Barrier
 
EQUIPMENT AND MACHINERY MAINTENANCE
EQUIPMENT AND MACHINERY MAINTENANCEEQUIPMENT AND MACHINERY MAINTENANCE
EQUIPMENT AND MACHINERY MAINTENANCE
 

Similar to IRJET- Improvement of Availability and Maintainability through Actions based on Root Cause Analysis of Failures: A Case Study of a Critical Machine

Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...IRJET Journal
 
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...IRJET Journal
 
IRJET- Effective Implementation of Planned Maintenance in a Gas Producing Pla...
IRJET- Effective Implementation of Planned Maintenance in a Gas Producing Pla...IRJET- Effective Implementation of Planned Maintenance in a Gas Producing Pla...
IRJET- Effective Implementation of Planned Maintenance in a Gas Producing Pla...IRJET Journal
 
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...IRJET Journal
 
A038301010
A038301010A038301010
A038301010theijes
 
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET Journal
 
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...IRJET Journal
 
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...IRJET Journal
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET Journal
 
OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...
OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...
OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...IAEME Publication
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET Journal
 
“Development of automatic feeder system in cellular manufacturing to improve ...
“Development of automatic feeder system in cellular manufacturing to improve ...“Development of automatic feeder system in cellular manufacturing to improve ...
“Development of automatic feeder system in cellular manufacturing to improve ...IRJET Journal
 
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...IRJET Journal
 
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET-  	  Maintenance Management of Construction Equipment on Construction P...IRJET-  	  Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...IRJET Journal
 
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET-  	  Single Minute Exchange of Dies (SMED) ConceptIRJET-  	  Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) ConceptIRJET Journal
 
Unit 8 maintainance management pptx
Unit 8 maintainance management pptxUnit 8 maintainance management pptx
Unit 8 maintainance management pptxRASHMIPANWAR10
 
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...IRJET Journal
 
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...IRJET Journal
 

Similar to IRJET- Improvement of Availability and Maintainability through Actions based on Root Cause Analysis of Failures: A Case Study of a Critical Machine (20)

Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
 
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
 
IRJET- Effective Implementation of Planned Maintenance in a Gas Producing Pla...
IRJET- Effective Implementation of Planned Maintenance in a Gas Producing Pla...IRJET- Effective Implementation of Planned Maintenance in a Gas Producing Pla...
IRJET- Effective Implementation of Planned Maintenance in a Gas Producing Pla...
 
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
 
A038301010
A038301010A038301010
A038301010
 
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A ReviewIRJET- Optimization of Cycle Time by using Various Techniques: A Review
IRJET- Optimization of Cycle Time by using Various Techniques: A Review
 
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
 
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...IRJET-  	  Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
IRJET- Improvement of Overall Equipment Effectiveness of Valve Stem Seal ...
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
 
OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...
OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...
OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTR...
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
 
K012556370
K012556370K012556370
K012556370
 
K012556370
K012556370K012556370
K012556370
 
“Development of automatic feeder system in cellular manufacturing to improve ...
“Development of automatic feeder system in cellular manufacturing to improve ...“Development of automatic feeder system in cellular manufacturing to improve ...
“Development of automatic feeder system in cellular manufacturing to improve ...
 
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...IRJET-  	  Productivity Improvement by Time Study Analysis Moderate Scale Ind...
IRJET- Productivity Improvement by Time Study Analysis Moderate Scale Ind...
 
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET-  	  Maintenance Management of Construction Equipment on Construction P...IRJET-  	  Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...
 
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET-  	  Single Minute Exchange of Dies (SMED) ConceptIRJET-  	  Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) Concept
 
Unit 8 maintainance management pptx
Unit 8 maintainance management pptxUnit 8 maintainance management pptx
Unit 8 maintainance management pptx
 
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
 
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
Implementation of 5S and KOBETSU KAIZEN (TPM Pillar) in a Manufacturing Organ...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 

Recently uploaded (20)

INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 

IRJET- Improvement of Availability and Maintainability through Actions based on Root Cause Analysis of Failures: A Case Study of a Critical Machine

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4247 Improvement of Availability and Maintainability through Actions Based on Root Cause Analysis of Failures: A Case Study of a Critical Machine Vikash kumar sah1, Dr. Pradeep kumar soni2 1M.Tech Scholar, Department of Mechanical Engineering, M.A.N.I.T. Bhopal (M.P.), India-462003 2Assistant Professor, Department of Mechanical Engineering, M.A.N.I.T. Bhopal (M.P.), India-462003 ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - Availabilityandmaintainabilityofmachinescanbe increased by reducing the downtime or breakdowns of the machines. Main objective is to improve the machine performance by finding out the major breakdowns causing production losses to the company andarriving&executing the counter measures by which these problems can be reduced. Availability and breakdown reduction methodology are adopted to improve the machine performance. Root cause analysis is conducted to find the root causeofbreakdowns and some parallel improvement opportunities were also identified for implementation so as to reduce the downtime. The project thus aims to minimize downtime, maximize availability, minimize maintenance cost and maximize profit. The project work concludes that this will help the maintenance department to increase equipment availability. Data was collected from Steel Plant breakdown details of Housing less mill stand machine and Slitting machine i.e. thedataissuchas breakdown hours, breakdown occurrence, MTBF & MTTR 4 months before overhauling was done for corrective counter measures of machine. Then after corrective counter measures were done by Breakdown reduction methodology and operation parameter was collected from 4 months after implementation of corrective counter measures for each method. From this data performance parameters were calculated and compared with each other. After calculation it was found that Availability and MTBF of Housing less mill stand & Slitting machine is increasedorMTTRisdeceased. The Effectiveness of corrective counter measures of Housing less mill stand & Slitting Machine is improved. Key Words: Availability, Maintainability, root cause analysis downtime, MTTF, MTTR. 1. INTRODUCTION Equipment breakdown has always contributed towards machine downtime. Industrial Engineers have always tried to reduce downtime and increase the availability of machineries. Availability- It is the probability that the system will perform available time atoperatingconditionatonlyinstant. Availability is the total time of utilization of a machine. Availability is the ratio of the difference between the total available hours and total breakdown hours to the total available hours. Total available hours- Total breakdown hours Availability = Total available hours Maintainability- It is probability that a failure system will be restored at operating condition Maintainability is defined as the probability of performinga successful repair action within a given time. MTBF (mean time between failures) - Meantimebetween failure is a concern the average time elapsed between a failure and the next time it occurred. Total available time – total breakdown hours MTBF = Total available time MTTR (mean time to repairs)- Mean time to repair is the time to run after the occurrence of the failures. Total breakdown hours MTTR = No of breakdown Root cause analysis through why- why analysis -It is method of problem solving used for identifying the root cause of faults or problem. A factor is considered a root cause analysis if removal there from the problem fault prevents the final undesirable event from recurring. 1.1 Advantages of availability & maintainability  To reduce emergencies and optimize costs.  To reduce life cycle costs.  To improve customer service.  Increase efficiency of equipment.  To maintain plant and equipment.  Reduce downtime and increase uptime of machine.  To ensure safety of plant.  High efficiency in plant.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4248  Improve the useful life of production equipment.  Improve system reliability.  Decrease cost of replacement.  Decreases system downtime.  Reduce injury. 2. Work of methodology The initial data collection of the breakdown details of the machine i.e. the data’s such as breakdownhours,breakdown occurrence, MTTR, MTBF are collected & studied. • Selecting the critical machine “Slitting machine” for the analysis. • Studying the type of failures occurred & frequently repeating failures. • Following the breakdown reduction methodology. • Performing root cause analysis to reduce the recurrence of failures. • Performing “WHY-WHY” analysis. • Replace the defective parts of the machine. • Implementing the corrective steps. • Monitoring and verifying the results. 2. Implementation and root cause analysis 2.1 Break down Description – “Slittingmachine”isnot working Root cause – Some fire cracks present in the reel Physical phenomenon – Slitter reel pointbreak Root Cause from Why-Why Analysis. Corrective counter measure • Proper cooling must be provided on down sidereel. • Time to time greasing • Connection of water regular of blade • Provide water pressure should be high upside & downside. • Check to stuck size of metal per hour by fitter. • Inspection of hardness of metal by operator (50 HRC- 53HRC) Fig -1 Slitter Guide box Benefits– After provided cooling and proper adjustment of slitter box on rest bar nowworkinghencetheslittermachine problem is eliminated & Slitter machine operation is further preceded.  RESULTS AND DISCUSSION  Process Parameters of Slitting Machine before the Implementation of Counter Measures.  Total downtime of Slitting machine in the period Oct-2015 to feb-2016 = 146 hours.  Total available time for Slitting machine in the period Oct-2015 to feb-2016 = 2860 hours.  (22hours×26 Days, 26Days×5Months = 572×5=2860) Excluding Sundays, holidays,&lunch time.  3. Total number of breakdowns in the period Oct- 2015to Jan-2016= 46 Total available hours- Total breakdown hours  Availability= Total available hours  Availability = 2860-146 = 0.9489  2860  Availability = 94.89%  Loss of availability = 1- 0.9489 = 0.0511  = 5.11%  total available hours – breakdownhours  MTBF = no. of breakdown  = 2860-146 = 59 hours  46  = 59.00 hours. Problem Slitter reel point break Why? Some fire cracks present in reel initially. Why? Not proper adjustment of slitter box on rest bar stand. Why? Due to oversize material. Why? Cooling provided on Time Based Maintenance
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4249  total breakdown hours  MTTR =  no. of breakdowns  = 146 = 3.17  46  = 3.17 hours  Process Parameters of SlittingMachine afterthe Implementation of Counter Measures  Total downtime of Slitting machine in the period march-2016 to june-2016 = 52 hours  Total available time for Slitting machine in the period march-2016 to june-2016 = 2288 hours  (22hours×26Days,26Days×3Months=572×4=Exclud ing Sundays, holidays, & lunch time.  Total number of breakdowns in the period march- 2016 to june-2016= 27 Total available hours- Total breakdown hours  Availability = Total available hours  Availability = 2288-52 = 0.9772 2288 = 97.72 %  Loss of availability = 1- 0.9772 = 0.0227 = 2.27% total available hours – breakdown hours  MTBF = no. of breakdown = 2288-52 = 82.81 hours 27 = 82.81 hours. total breakdown hours  MTTR = no. of breakdowns = 52 = 1.925 27  Comparison of results before and after implementation of counter measures ofSlitting machine.
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 04 | Apr 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 4250 CONCLUSIONS The process measurable such as Availability, MTBF, and MTTR are calculated before and after the implementation of counter measures.  The Breakdowns such as slitter reel point and due to some fire cracks damage on bearing and bearing pin is completely eliminated.  The availability of Slitting Machine is increased from 94.89% to 97.72%.  The MTBF of Slitting Machine is increased from 59.00 hours to 82.81 hours.  The MTTR of Slitting Machine is decreased from 3.17 hours to 1.93 hours.  The Effectiveness of corrective counter measures of Slitting Machine is improved. REFERENCES [1] yuo-tern et.al (2001) optimization PM for mechanical components using genetic algorithms, International Journal of Modern Engineering Research (IJMER) 2001. [2] paul laks et.al,(2017), Identification of optimal preventive maintenance decisions for composite components, International Journal of Innovative Research in Science, Engineering and Technology Volume 3, Special Issue 3, March 2017 [3] Sandria vilarino, 2Muhammed Rifat Hossain , 3Md. Asrafuzzaman (2017), Preventive maintenance decisions through maintenance optimization models. Journal of Science and Technology 2017 [4] Nani kurniati, R., & Ward, P.T. (2016). PREVENTIVE MAINTENANCE STRATEGIES. Journal of Operations Management, 25, 785-805. [5] jianshe kang, Mushtaq Patel, Dr. Vivek Bansod , An Enhanced Preventive Maintenance Optimization Model Based on a Three-Stage Failure Process. IJRAME [6] jiao yuting1, Gajendran2 (2014), Preventive Maintenance Strategy Optimization BasedonReliability Threshold, IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), 2014 [7] Ravi sankar, Wong, K.Y., & Ali, A. (2015).Optimizationof Preventive Maintenance .European Journal of Scientific Research, 38(4), 521-535 [8] 8]Erwin widodo, F.E. Ciarapica, G. Giacchetta, 2013. Preventive maintenance optimization strategies for industries, Journal of Purchasing & Supply Management Vol.12 14–27 [9] Emil gustavssan, Xiaowei Xu and Prasanta K. Dey.,2014. Preventive maintenanceschedulingofmulti-component systems with interval costs: A literature review. European Journal of Operational Research 202, pp 16– 24 [10] 10]Marco macchi., Ramiya R.A., Gautham S.G., 2017. Orchestration of preventive maintenanceinterventions. Expert Systems with Applications 38 (1), 272–280.