OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN
MANUFACTURING INDUSTRIES – A PRACTICAL ANALYSIS
B.C. Ashok1
, Dr. T.R. Srinivas2
1
(Department of Mechanical Engineering, Vidyavardhaka College of Engineering, Mysore, Karnataka, India)
2
(Department of Industrial Production & Engineering, Sri Jayachamarajendra College of Engineering, Mysore,
Karnataka, India)
ABSTRACT
Overall Equipment Effectiveness (OEE) is a measure used in Total Productive Maintenance (TPM), a
maintenance program which involves a newly defined concept for maintaining plants and equipment, to calculate the
percentage of actual effectiveness of the equipment, taking into consideration the availability of the equipment, the
performance rate when running and the quality rate of the manufactured product measured over a period of time (days,
weeks or months). The equipment criticality is decided by considering how and how much the equipment affects the
production volume and quality. The scale of damage incurred by breakdowns of the equipment is also considered. The
purpose of this paper is to assess the application of OEE to evaluate the performance of critical machines and to
determine to what extent the TPM implementation affects the OEE. The procedure to estimate OEE has also been
presented through numerical examples. A case study was carried out in two large scale industries, one that manufactures
Tyres for heavy vehicles and the second an automobile industry that manufactures heavy-duty drive axle assemblies. The
data collected for two critical machines over a period of one year are statistically analysed to identify the influence of
major losses on OEE.
Keywords: Total Productive Maintenance (TPM), Effectiveness, Equipment, Performance
1. INTRODUCTION
Overall Equipment Effectiveness (OEE) being performance measure of Total Productive Maintenance (TPM)
could be used to evaluate the performance of critical/key equipments of the manufacturing industry. It reflects the
performance of all the equipments in the manufacture line. The goal of TPM is to increase equipment effectiveness so
each piece of equipment can be operated to its full potential and maintained at that level. The OEE is a measure of the
value added to production through equipment, which is a function of machine availability, performance efficiency and
the rate of quality.
Overall Equipment Effectiveness is a very simple metric that immediately indicates the current status of a
manufacturing process. Somehow it also becomes a multifaceted tool allowing one to understand the effect of the various
issues in the manufacturing process and their effect on the entire process. The biggest advantage of OEE is that it allows
companies to have separate business functions by applying/using a single, easy-to-understand formula. OEE is by far the
most effective benchmarking tool in making sound management decisions.
Overall Equipment Effectiveness depends on three parameters: Availability of the equipment, Performance of
the equipment and the Quality of the product. It is given by;
OEE = Availability Ratio x Performance Ratio x Quality Ratio
INTERNATIONAL JOURNAL OF MECHANICAL ENGINEERING
AND TECHNOLOGY (IJMET)
ISSN 0976 – 6340 (Print)
ISSN 0976 – 6359 (Online)
Volume 5, Issue 9, September (2014), pp. 145-150
© IAEME: www.iaeme.com/IJMET.asp
Journal Impact Factor (2014): 7.5377 (Calculated by GISI)
www.jifactor.com
IJMET
© I A E M E
Proceedings of the 2nd
International Conference on Current Trends in Engineering and Management ICCTEM
• Availability Ratio - the share of the actual production time and the planned production time. All planned stops and
breakdowns will reduce the availability ratio, including setup times, preventive maintenance, breakdowns and lack
of operators. The only time that one may choose to deduct from the availability ratio is lack of orders.
• Performance Ratio - Loss of production due to underutilization of the ma
when the equipment is not run with full speed. Short, unregistered, stops may affect the performance ratio as well.
• Quality Ratio - the amount of the production that has to be discharged or scrapped.
A large scale Tyre manufacturing industry which has implemented TPM to full extent and heavy
assemblies automobile industry which has partially implemented TPM were selected as case studies and two critical
equipments from different sectors of the indust
Banbury, 4 Roll Calender Machine in Tyre industry and Straddle Facing, Centerless Grinding Machine in Automobile
industry by taking readings directly and hence the performance of equi
2. RELATED WORKS
OEE was proposed by Nakajima [1] as an approach to evaluate the progress achieved through the improvement
initiatives carried out as part of his proposed total productive maintenance (TPM) philosophy. He defines OEE as
metric or measure for the evaluation of equipment effectiveness. In considering OEE, Nakajima defines six big
equipment losses, which include equipment downtime loss, performance loss, and defect loss as shown in Fig
Fig. 1: Major
• Equipment failure or breakdown losses
and quality losses caused by defective products.
• Set-up and adjustment time losses:
production of one item ends and the equipment is adjusted to meet the requirements of another item.
• Idling/minor stop losses: These losses occur when the production is interrupted by a temporary malfunction or
when a machine is idling.
• Reduced speed losses: These losses refer to the difference between equipment design speed and actual operating
speed.
• Quality defects and rework: Defect/rework losses are defined as volume losses due to defects and rework.
• Reduced yield or Start-up: Reduced yield/Start
An increase in overall equipment effectiveness, which is a function of down time and other production losses
can significantly reduce random machine breakdowns, in turn
Jayant Rajgopal [2] states that machine breakdowns and minor stoppages account for 20
International Conference on Current Trends in Engineering and Management ICCTEM
17 – 19, July 2014, Mysore, Karnataka, India
146
the share of the actual production time and the planned production time. All planned stops and
ity ratio, including setup times, preventive maintenance, breakdowns and lack
of operators. The only time that one may choose to deduct from the availability ratio is lack of orders.
Loss of production due to underutilization of the machinery. In other words, losses are incurred
when the equipment is not run with full speed. Short, unregistered, stops may affect the performance ratio as well.
the amount of the production that has to be discharged or scrapped.
scale Tyre manufacturing industry which has implemented TPM to full extent and heavy
assemblies automobile industry which has partially implemented TPM were selected as case studies and two critical
equipments from different sectors of the industry were chosen for the study. This paper investigates OEE calculation of
Banbury, 4 Roll Calender Machine in Tyre industry and Straddle Facing, Centerless Grinding Machine in Automobile
industry by taking readings directly and hence the performance of equipments is analysed.
OEE was proposed by Nakajima [1] as an approach to evaluate the progress achieved through the improvement
initiatives carried out as part of his proposed total productive maintenance (TPM) philosophy. He defines OEE as
metric or measure for the evaluation of equipment effectiveness. In considering OEE, Nakajima defines six big
equipment losses, which include equipment downtime loss, performance loss, and defect loss as shown in Fig
Major losses limiting equipment efficiency
failure or breakdown losses: These losses are categorized as time losses when productivity is reduced,
and quality losses caused by defective products.
: These losses result from downtime and defective products that occur when
production of one item ends and the equipment is adjusted to meet the requirements of another item.
losses occur when the production is interrupted by a temporary malfunction or
These losses refer to the difference between equipment design speed and actual operating
Defect/rework losses are defined as volume losses due to defects and rework.
Reduced yield/Start-up losses are defined as time losses (output decline).
An increase in overall equipment effectiveness, which is a function of down time and other production losses
can significantly reduce random machine breakdowns, in turn, inventory, and lead time. Fawaz A. Abdulmalek and
Jayant Rajgopal [2] states that machine breakdowns and minor stoppages account for 20–30% of loss in OEE.
International Conference on Current Trends in Engineering and Management ICCTEM -2014
19, July 2014, Mysore, Karnataka, India
the share of the actual production time and the planned production time. All planned stops and
ity ratio, including setup times, preventive maintenance, breakdowns and lack
of operators. The only time that one may choose to deduct from the availability ratio is lack of orders.
chinery. In other words, losses are incurred
when the equipment is not run with full speed. Short, unregistered, stops may affect the performance ratio as well.
scale Tyre manufacturing industry which has implemented TPM to full extent and heavy-duty Axle
assemblies automobile industry which has partially implemented TPM were selected as case studies and two critical
ry were chosen for the study. This paper investigates OEE calculation of
Banbury, 4 Roll Calender Machine in Tyre industry and Straddle Facing, Centerless Grinding Machine in Automobile
OEE was proposed by Nakajima [1] as an approach to evaluate the progress achieved through the improvement
initiatives carried out as part of his proposed total productive maintenance (TPM) philosophy. He defines OEE as a
metric or measure for the evaluation of equipment effectiveness. In considering OEE, Nakajima defines six big
equipment losses, which include equipment downtime loss, performance loss, and defect loss as shown in Fig. 1.
These losses are categorized as time losses when productivity is reduced,
d defective products that occur when
production of one item ends and the equipment is adjusted to meet the requirements of another item.
losses occur when the production is interrupted by a temporary malfunction or
These losses refer to the difference between equipment design speed and actual operating
Defect/rework losses are defined as volume losses due to defects and rework.
up losses are defined as time losses (output decline).
An increase in overall equipment effectiveness, which is a function of down time and other production losses
, inventory, and lead time. Fawaz A. Abdulmalek and
30% of loss in OEE.
Proceedings of the 2nd
International Conference on Current Trends in Engineering and Management ICCTEM -2014
17 – 19, July 2014, Mysore, Karnataka, India
147
I.P.S. Ahuja and J.S. Khamba [3] have suggested that OEE is an all-inclusive benchmarking tool that serves to
gauge the various subcomponents of the manufacturing process (i.e., availability, performance and quality) and used to
measure actual improvements on 5S, Lean Manufacturing, TPM, Kaizen and Six Sigma. Benchmarking overall
equipment effectiveness can facilitate an organization to realization of zero breakdown, zero defect, zero machine
stoppage, zero accidents, zero pollution, which serve as the ultimate objective of TPM. When using OEE with these
management systems the benefits become tangible and noteworthy.
A.J.de Ron and J.E. Rooda [4] have stated that, manufactured goods are a result of a complex production
process and without the proper measuring tools and formula, the business can be expected to run blindly even in the light
of day. Having the right metrics, OEE provides a window to analyse out-of-the-ordinary issues and gives an established
framework for improving the entire manufacturing process. They further announce that a key performance measure in
mass production environments is OEE.
Bulent Dal et al. [5], suggest that the OEE measure can be applied at several different levels within a
manufacturing environment. Firstly, OEE can be used as a “benchmark”' for measuring the initial performance of a
manufacturing plant in its entirety. In this manner the initial OEE measure can be compared with future OEE values, thus
quantifying the level of improvement made. Secondly, an OEE value, calculated for one manufacturing line, can be used
to compare line performance across the factory, thereby highlighting any poor line performance. Thirdly, if the machines
process work individually, an OEE measure can identify which machine performance is worst, and therefore indicate
where to focus TPM resources.
Christian N. Madu [6] shows that equipment maintenance and reliability management are importantly associated
with an organization’s competitiveness and must be given adequate attention in the organization's strategic planning.
OEE is an effective way of analysing the efficiency of a single machine or an integrated machinery system. However,
Alok Mathur et al. [7] implies that the most important objective of OEE is not to get an optimum measure, but to get a
simple measure that tells production personnel where to spend their improvement resources. The greatest contribution of
OEE is that it is a simple, but still comprehensive, measure of internal efficiency and that it can work as an important
indicator of the continuous improvement process.
3. OVERALL EQUIPMENT EFFECTIVENESS (OEE) MEASUREMENT
In this section, the measurement of OEE for the selected critical equipments is presented.
OEE combines the operation, maintenance and management of manufacturing equipment and resources. It takes
the most common and important sources of productivity loss, which are called six big losses, shown in Fig. 1. These
losses are quantified as Availability (A), Performance (P) and Quality (Q) in order to estimate OEE and OEE calculation
is given by:
OEE = Availability × Performance × Quality
According to Nakajima [1] the ideal conditions are: Availability…..greater than 90%, Performance
Efficiency…… greater than 95%, Rate of Quality products …… greater than 99%. Therefore, the ideal OEE should be
85+ %. However, literature survey indicates that the exact definition of OEE differs between applications and various
authors. For an organization, wishing to measure their OEE, the differences in various approaches of calculating OEE
parameters (A, P, Q) could be significant in terms of OEE resultant figures.
3.1 Tyre industry
3.1.1 Banbury
Failure Loss (in %): 1.782931 (1)
Set up & Adjustment Loss (in %): 1.59 (2)
Shut down Loss (in %): 0.638346123 (3)
Minor stoppage & Idle Loss (in %): 0.02329558 (4)
Management Loss (in %): 0.07 (5)
17909.99
5
)5()4()3()2()1(
100 =
++++
−=tyAvailabili
Line Organization Loss (in %): 0.71 (6)
Measurement Loss (in %): 0.098141 (7)
594.99
2
)7()6(
100 =
+
−=ePerformanc
Defect & Rework Loss (in %): 6.18 (8)
Quality = 100 – (8) = 93.82
OEE ൌ 100 െ
ଽଽ.ଵ଻ଽ଴ଽ
ଵ଴଴
X
ଽଽ.ହଽସ
ଵ଴଴
X
ଽଷ.଼ଶ
ଵ଴଴
ൌ 90.737%
Proceedings of the 2nd
International Conference on Current Trends in Engineering and Management ICCTEM -2014
17 – 19, July 2014, Mysore, Karnataka, India
148
3.1.2 4 Roll Calender Machine
Failure Loss (in %): 1.729443 (1)
Set up & Adjustment Loss (in %): 0.7791 (2)
Shut down Loss (in %): 0.31279 (3)
Minor stoppage & Idle Loss (in %): 0.046358 (4)
Management Loss (in %): 0.0343 (5)
41926.99
5
)5()4()3()2()1(
100 =
++++
−=tyAvailabili
Measurement Loss (in %): 0.0481 (6)
Performance = 100 – (6) = 99.95
Defect & Rework Loss (in %): 4.4344 (7)
Quality = 100 – (7) = 95.57
ܱ‫ܧܧ‬ ൌ 100 െ
ଽଽ.ସଵଽ଺
ଵ଴଴
ܺ
ଽଽ.ଽହ
ଵ଴଴
ܺ
ଽହ.ହ଻
ଵ଴଴
ൌ 90.50%
3.2 Automobile industry
3.2.1 Straddle Facing
Setup Time (in Hours): 15.1
Breakdown (in Hours): 2.00
SetupTime
BreakdownsetupTime
tyAvailabili
−
= 86.0
1.15
21.15
=
−
=
Run Rate (in Hours): 2688
Ideal Run Rate (in Hours): 3262.5
82.0
5.3262
2688
===
SetupTime
Runrate
ePerformanc
Production Output (actual): 155
Production Output (Target): 180
86.0
180
155
)arg(
)(
===
etTsTotalPiece
ActualGoodPieces
Quality
OEE = 0.86 X 0.82 X 0.86 X 100 = 60.64%
3.2.2 Centerless Grinding
Setup Time (in Hours): 35
Breakdown (in Hours): 4.00
SetupTime
BreakdownsetupTime
tyAvailabili
−
= 88.0
35
435
=
−
=
Run Rate (in Hours): 2368
Ideal Run Rate (in Hours): 2880
82.0
2880
2368
===
SetupTime
Runrate
ePerformanc
Production Output (actual): 138
Production Output (Target): 160
86.0
160
138
)arg(
)(
===
etTsTotalPiece
ActualGoodPieces
Quality
OEE = 0.88 X 0.82 X 0.86 X 100 = 62.05%
4. ANALYSIS OF RESULTS FOR OEE
This section presents the overall profile of the samples, descriptive statistics and frequency distribution. The
results of statistical methods of descriptive statistics, One way Anova, Scheffe’s post hoc test are tabulated in Table 1.
Here we have grouped the machines with similar criticality as Machine 1 and Machine 2. Hence Banbury of
Tyre industry and Straddle Facing of Automobile industry fall under Machine 1 and 4 Roll Calender Machine of Tyre
industry and Centerless Grinding of Automobile industry fall under Machine 2.
Proceedings of the 2nd
International Conference on Current Trends in Engineering and Management ICCTEM -2014
17 – 19, July 2014, Mysore, Karnataka, India
149
Table 1: Descriptive statistics and results of one-way Anova for critical machines to Overall Equipment
Effectiveness (OEE) in two industries
Machine Industry Mean S.D F value P
1 Tyre 90.68 0.00 368062E+14 0.0
Automobile 60.66 0.00
Total 75.67 13.87
2 Tyre 90.40 0.00 355597E+14 0.0
Automobile 60.70 0.00
Total 75.55 12.18
Overall equipment effectiveness of Machine 1
One way ANOVA revealed a highly significant difference between 2 companies in their mean overall
equipment effectiveness scores with F value of 368062E+14 and significance (P) of .000. Further, Scheffe’s Post hoc test
indicated that Tyre industry has maximum overall equipment effectiveness (mean 90.68%), followed by Automobile
industry (mean 60.66%).
Overall equipment effectiveness of Machine 2
One way ANOVA revealed a highly significant difference between 2 companies in their mean overall
equipment effectiveness scores with F value of 355597E+14 and significance (P) of .000. Further, Scheffe’s Post hoc test
indicated that Tyre industry has maximum overall equipment effectiveness (mean 90.4%) and overall equipment
effectiveness for Automobile industry is found to be less (mean 60.7%).
5. CONCLUSION
The study highlights the accurate estimation of equipment effectiveness that affects the productivity of the
organization. As seen from the OEE computation of the equipments, accurate performance measure of the equipment was
obtained if all six major losses were considered while computing the three OEE elements Viz., Availability, Performance
and Quality Rate. Since Total Productive Maintenance tries to reduce the losses, OEE of critical machines was found to
be high in Tyre industry which has implemented TPM to full extent and less in Automobile industry which has partially
implemented TPM. It is also found that there are many differing methods of collecting data for the six big losses, and
therefore computation of OEE also varies from one organization to another. However, the quality of data collection
determines the accuracy of OEE.
6. REFERENCES
1. Nakajima, S., Introduction to total productive maintenance (Cambridge, MA, Productivity Press, 1988).
2. Fawaz A. Abdulmaleka, Jayant Rajgopal, Analyzing the benefits of lean manufacturing and value stream
mapping via simulation: A process sector case study, International Journal, Production Economics, 2006.
3. I.P.S. Ahuja, J.S. Khamba, Assessment of contributions of successful TPM initiatives towards competitive
manufacturing, Journal of Quality in Maintenance Engineering, Vol. 14 Iss: 4, 2008, 356 – 374.
4. A.J. de Ron and J.E. Rooda, OEE and equipment effectiveness: an evaluation, International Journal of
Production Research, 3rd November 2005, 1-17.
5. Bulent Dal, Phil Tugwell, Richard Greatbanks, Overall equipment effectiveness as a measure of operational
improvement - A practical analysis, Vol. 20 Iss: 12, 2000, 1488 – 1502.
6. Christian N. Madu, Competing through maintenance strategies, International Journal of Quality & Reliability
Management, Vol. 17 No. 9, 2000, 937-948.
7. Alok Mathur, G.S. Dangayach, M.L. Mittal, Milind K. Sharma, Performance measurement in automated
manufacturing, Measuring Business Excellence, Vol. 15 Iss: 1, 2011, 77 – 91.
Proceedings of the 2nd
International Conference on Current Trends in Engineering and Management ICCTEM -2014
17 – 19, July 2014, Mysore, Karnataka, India
150
APPENDIX
Average OEE for One Year in Tyre Industry
Description Unit of
Measurement
(UOM)
Average Average
Banbury 4 Roll
Calender
Failure Loss % 1.6201 1.5715
Set up & Adjustment
Loss
% 1.3981
0.6851
Shut Down Loss % 0.7317 0.3585
Minor stoppage & Idle
Loss
% 0.0233
0.0464
Management Loss % 0.0696 0.0341
A-Availability Factor % 99.231 99.461
Line Organization Loss % 0.7322 ---
Measurement Loss % 0.1492 0.0731
B-Performance Factor % 99.559 99.927
Defect & Rework Loss % 5.7486 2.4737
C-Rate of quality % 94.251 97.526
OEE =AXBXC * 100 90.689 90.307
Average OEE for One Year in Automobile Industry
Description
UOM Average Average
Straddle
Facing
Centerless
Grinding
Production Output Nos. Actual 158 145
Target 184 170
Quality(Q) Hrs 0.85 0.85
Breakdown Occurrence Nos. Actual 2 2.7
Breakdown Hours Hrs Actual 1.25 4.44
Setup Time Hrs Actual 9.15 34
Availability (A) 0.85 0.86
Element wise setup Remove 3.53 9.78
Detail Fix 4.92 9.28
Adjust 0.94 14.9
Performance rate (P) Hrs Actual 2889 2430
Target 3478 2940
0.83 0.82
OEE = A*P*Q Target 85 85
Actual 60.66 60.7
Abnormality Correction Nos. Attached 169 73
Removed 162 63

More Related Content

What's hot

Report of vocational training in jspl
Report of vocational training in jsplReport of vocational training in jspl
Report of vocational training in jsplAashish Chaudhary
 
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...IRJET Journal
 
Improving maintenance management: Case Study of a Local Textile Company
Improving maintenance management: Case Study of a Local Textile CompanyImproving maintenance management: Case Study of a Local Textile Company
Improving maintenance management: Case Study of a Local Textile CompanyIJMREMJournal
 
IRJET- A General Framework of Computerized Maintenance Management System ...
IRJET-  	  A General Framework of Computerized Maintenance Management System ...IRJET-  	  A General Framework of Computerized Maintenance Management System ...
IRJET- A General Framework of Computerized Maintenance Management System ...IRJET Journal
 
Development Of An Effective Industrial Maintenance Practice For Plant Optimum...
Development Of An Effective Industrial Maintenance Practice For Plant Optimum...Development Of An Effective Industrial Maintenance Practice For Plant Optimum...
Development Of An Effective Industrial Maintenance Practice For Plant Optimum...IJERA Editor
 
Condition Monitoring and Maintenance Management for Precision Component Manuf...
Condition Monitoring and Maintenance Management for Precision Component Manuf...Condition Monitoring and Maintenance Management for Precision Component Manuf...
Condition Monitoring and Maintenance Management for Precision Component Manuf...IRJET Journal
 
IRJET- Plant Evaluation using OEE & ORE
IRJET-  	  Plant Evaluation using OEE & OREIRJET-  	  Plant Evaluation using OEE & ORE
IRJET- Plant Evaluation using OEE & OREIRJET Journal
 
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET-  	  Maintenance Management of Construction Equipment on Construction P...IRJET-  	  Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...IRJET Journal
 
Overall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction EquipmentsOverall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction EquipmentsIRJET Journal
 
A CASE STUDY ON RELIABLITY MAINTENANCE
A CASE STUDY ON RELIABLITY MAINTENANCEA CASE STUDY ON RELIABLITY MAINTENANCE
A CASE STUDY ON RELIABLITY MAINTENANCEZubair Ali ali
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
Evaluation of Total Productive Maintenance Implementation in a Selected Semi-...
Evaluation of Total Productive Maintenance Implementation in a Selected Semi-...Evaluation of Total Productive Maintenance Implementation in a Selected Semi-...
Evaluation of Total Productive Maintenance Implementation in a Selected Semi-...IJMER
 
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...IRJET Journal
 
Impact of total productive maintenance methodology on the performance
Impact of total productive maintenance methodology on the performanceImpact of total productive maintenance methodology on the performance
Impact of total productive maintenance methodology on the performanceeSAT Journals
 

What's hot (19)

Report of vocational training in jspl
Report of vocational training in jsplReport of vocational training in jspl
Report of vocational training in jspl
 
I012536474
I012536474I012536474
I012536474
 
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
 
Improving maintenance management: Case Study of a Local Textile Company
Improving maintenance management: Case Study of a Local Textile CompanyImproving maintenance management: Case Study of a Local Textile Company
Improving maintenance management: Case Study of a Local Textile Company
 
IRJET- A General Framework of Computerized Maintenance Management System ...
IRJET-  	  A General Framework of Computerized Maintenance Management System ...IRJET-  	  A General Framework of Computerized Maintenance Management System ...
IRJET- A General Framework of Computerized Maintenance Management System ...
 
Development Of An Effective Industrial Maintenance Practice For Plant Optimum...
Development Of An Effective Industrial Maintenance Practice For Plant Optimum...Development Of An Effective Industrial Maintenance Practice For Plant Optimum...
Development Of An Effective Industrial Maintenance Practice For Plant Optimum...
 
H012535263
H012535263H012535263
H012535263
 
Condition Monitoring and Maintenance Management for Precision Component Manuf...
Condition Monitoring and Maintenance Management for Precision Component Manuf...Condition Monitoring and Maintenance Management for Precision Component Manuf...
Condition Monitoring and Maintenance Management for Precision Component Manuf...
 
IRJET- Plant Evaluation using OEE & ORE
IRJET-  	  Plant Evaluation using OEE & OREIRJET-  	  Plant Evaluation using OEE & ORE
IRJET- Plant Evaluation using OEE & ORE
 
Unit 2
Unit 2Unit 2
Unit 2
 
IRJET- Maintenance Management of Construction Equipment on Construction P...
IRJET-  	  Maintenance Management of Construction Equipment on Construction P...IRJET-  	  Maintenance Management of Construction Equipment on Construction P...
IRJET- Maintenance Management of Construction Equipment on Construction P...
 
Overall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction EquipmentsOverall Equipment Effectiveness in Construction Equipments
Overall Equipment Effectiveness in Construction Equipments
 
A CASE STUDY ON RELIABLITY MAINTENANCE
A CASE STUDY ON RELIABLITY MAINTENANCEA CASE STUDY ON RELIABLITY MAINTENANCE
A CASE STUDY ON RELIABLITY MAINTENANCE
 
Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)Welcome to International Journal of Engineering Research and Development (IJERD)
Welcome to International Journal of Engineering Research and Development (IJERD)
 
Evaluation of Total Productive Maintenance Implementation in a Selected Semi-...
Evaluation of Total Productive Maintenance Implementation in a Selected Semi-...Evaluation of Total Productive Maintenance Implementation in a Selected Semi-...
Evaluation of Total Productive Maintenance Implementation in a Selected Semi-...
 
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
IRJET- Comparative Performance Study of Mine Trucks by Overall Equipment Effe...
 
Tpm intro
Tpm introTpm intro
Tpm intro
 
Impact of total productive maintenance methodology on the performance
Impact of total productive maintenance methodology on the performanceImpact of total productive maintenance methodology on the performance
Impact of total productive maintenance methodology on the performance
 
On concept of Total Productive Maintenance
On concept of Total Productive MaintenanceOn concept of Total Productive Maintenance
On concept of Total Productive Maintenance
 

Viewers also liked

002 Maintenance M Overview 20 06 06[1]
002 Maintenance M Overview 20 06 06[1]002 Maintenance M Overview 20 06 06[1]
002 Maintenance M Overview 20 06 06[1]lcgg59
 
Sperry Electricity Basics
Sperry Electricity BasicsSperry Electricity Basics
Sperry Electricity Basicsdartboard
 
Analog multimeter and ohmmeter
Analog multimeter and ohmmeterAnalog multimeter and ohmmeter
Analog multimeter and ohmmeterRahul Ranjan
 
Digital Multimeters- Basic Guide
Digital Multimeters- Basic GuideDigital Multimeters- Basic Guide
Digital Multimeters- Basic GuideMithila6190
 
Preventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
Preventive Maintenance Strategies for Power Distribution Systems- Charles AlvisPreventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
Preventive Maintenance Strategies for Power Distribution Systems- Charles AlvisSchneider Electric
 
Electrical maintenance-1
Electrical maintenance-1Electrical maintenance-1
Electrical maintenance-1Vijay Raskar
 
Introduction to measuring instruments (ALIV - Bangladesh)
Introduction to measuring instruments (ALIV - Bangladesh)Introduction to measuring instruments (ALIV - Bangladesh)
Introduction to measuring instruments (ALIV - Bangladesh)Md Abu Jauad Khan Aliv
 
Measuring instruments
Measuring instrumentsMeasuring instruments
Measuring instrumentsSayyed Raza
 
Measuring instruments ppt
Measuring instruments pptMeasuring instruments ppt
Measuring instruments pptpakidoctors
 

Viewers also liked (9)

002 Maintenance M Overview 20 06 06[1]
002 Maintenance M Overview 20 06 06[1]002 Maintenance M Overview 20 06 06[1]
002 Maintenance M Overview 20 06 06[1]
 
Sperry Electricity Basics
Sperry Electricity BasicsSperry Electricity Basics
Sperry Electricity Basics
 
Analog multimeter and ohmmeter
Analog multimeter and ohmmeterAnalog multimeter and ohmmeter
Analog multimeter and ohmmeter
 
Digital Multimeters- Basic Guide
Digital Multimeters- Basic GuideDigital Multimeters- Basic Guide
Digital Multimeters- Basic Guide
 
Preventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
Preventive Maintenance Strategies for Power Distribution Systems- Charles AlvisPreventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
Preventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
 
Electrical maintenance-1
Electrical maintenance-1Electrical maintenance-1
Electrical maintenance-1
 
Introduction to measuring instruments (ALIV - Bangladesh)
Introduction to measuring instruments (ALIV - Bangladesh)Introduction to measuring instruments (ALIV - Bangladesh)
Introduction to measuring instruments (ALIV - Bangladesh)
 
Measuring instruments
Measuring instrumentsMeasuring instruments
Measuring instruments
 
Measuring instruments ppt
Measuring instruments pptMeasuring instruments ppt
Measuring instruments ppt
 

Similar to OEE Analysis of Critical Machines in Manufacturing Industries

A Total Productive Maintenance (TPM) Approach To Improve Overall Equipment Ef...
A Total Productive Maintenance (TPM) Approach To Improve Overall Equipment Ef...A Total Productive Maintenance (TPM) Approach To Improve Overall Equipment Ef...
A Total Productive Maintenance (TPM) Approach To Improve Overall Equipment Ef...IJMER
 
Improving overall equipment effectiveness by Implementing Total Productive Ma...
Improving overall equipment effectiveness by Implementing Total Productive Ma...Improving overall equipment effectiveness by Implementing Total Productive Ma...
Improving overall equipment effectiveness by Implementing Total Productive Ma...IJMER
 
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...IRJET Journal
 
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...IRJET Journal
 
Investigation for development of new tool in dfx shell through literature
Investigation for development of new tool in dfx shell through literatureInvestigation for development of new tool in dfx shell through literature
Investigation for development of new tool in dfx shell through literatureIAEME Publication
 
A Review on Implementation of TPM in Manufacturing Industry
A Review on Implementation of TPM in Manufacturing IndustryA Review on Implementation of TPM in Manufacturing Industry
A Review on Implementation of TPM in Manufacturing IndustryIJMER
 
A Review on Implementation of TPM in Manufacturing Industry
A Review on Implementation of TPM in Manufacturing IndustryA Review on Implementation of TPM in Manufacturing Industry
A Review on Implementation of TPM in Manufacturing IndustryIJMER
 
Relative loss analysis in small scale industries within the proposed
Relative loss analysis in small scale industries within the proposedRelative loss analysis in small scale industries within the proposed
Relative loss analysis in small scale industries within the proposedIAEME Publication
 
Relative loss analysis in small scale industries within the proposed
Relative loss analysis in small scale industries within the proposedRelative loss analysis in small scale industries within the proposed
Relative loss analysis in small scale industries within the proposedIAEME Publication
 
Relative loss analysis in small scale industries within the proposed
Relative loss analysis in small scale industries within the proposedRelative loss analysis in small scale industries within the proposed
Relative loss analysis in small scale industries within the proposedIAEME Publication
 
Relative loss analysis in small scale industries within the proposed
Relative loss analysis in small scale industries within the proposedRelative loss analysis in small scale industries within the proposed
Relative loss analysis in small scale industries within the proposedIAEME Publication
 
Relative loss analysis in small scale industries within the proposed
Relative loss analysis in small scale industries within the proposedRelative loss analysis in small scale industries within the proposed
Relative loss analysis in small scale industries within the proposedIAEME Publication
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET Journal
 
Methodology used for improving overall equipment effectiveness by Implementi...
Methodology used for improving overall equipment effectiveness  by Implementi...Methodology used for improving overall equipment effectiveness  by Implementi...
Methodology used for improving overall equipment effectiveness by Implementi...IJMER
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)IJERD Editor
 
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET Journal
 
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET Journal
 
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEWSTUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEWIAEME Publication
 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET Journal
 

Similar to OEE Analysis of Critical Machines in Manufacturing Industries (20)

A Total Productive Maintenance (TPM) Approach To Improve Overall Equipment Ef...
A Total Productive Maintenance (TPM) Approach To Improve Overall Equipment Ef...A Total Productive Maintenance (TPM) Approach To Improve Overall Equipment Ef...
A Total Productive Maintenance (TPM) Approach To Improve Overall Equipment Ef...
 
Improving overall equipment effectiveness by Implementing Total Productive Ma...
Improving overall equipment effectiveness by Implementing Total Productive Ma...Improving overall equipment effectiveness by Implementing Total Productive Ma...
Improving overall equipment effectiveness by Implementing Total Productive Ma...
 
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
Challenges in implementing Total Productive Maintenance in Indian Manufacturi...
 
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
Study of Total Productive Maintenance & It’s Implementation Approach in Steel...
 
Investigation for development of new tool in dfx shell through literature
Investigation for development of new tool in dfx shell through literatureInvestigation for development of new tool in dfx shell through literature
Investigation for development of new tool in dfx shell through literature
 
A Review on Implementation of TPM in Manufacturing Industry
A Review on Implementation of TPM in Manufacturing IndustryA Review on Implementation of TPM in Manufacturing Industry
A Review on Implementation of TPM in Manufacturing Industry
 
A Review on Implementation of TPM in Manufacturing Industry
A Review on Implementation of TPM in Manufacturing IndustryA Review on Implementation of TPM in Manufacturing Industry
A Review on Implementation of TPM in Manufacturing Industry
 
Relative loss analysis in small scale industries within the proposed
Relative loss analysis in small scale industries within the proposedRelative loss analysis in small scale industries within the proposed
Relative loss analysis in small scale industries within the proposed
 
Relative loss analysis in small scale industries within the proposed
Relative loss analysis in small scale industries within the proposedRelative loss analysis in small scale industries within the proposed
Relative loss analysis in small scale industries within the proposed
 
Relative loss analysis in small scale industries within the proposed
Relative loss analysis in small scale industries within the proposedRelative loss analysis in small scale industries within the proposed
Relative loss analysis in small scale industries within the proposed
 
Relative loss analysis in small scale industries within the proposed
Relative loss analysis in small scale industries within the proposedRelative loss analysis in small scale industries within the proposed
Relative loss analysis in small scale industries within the proposed
 
Relative loss analysis in small scale industries within the proposed
Relative loss analysis in small scale industries within the proposedRelative loss analysis in small scale industries within the proposed
Relative loss analysis in small scale industries within the proposed
 
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop MachineIRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
IRJET - Implementation of TPM Philosophy on Critical Paint Shop Machine
 
Methodology used for improving overall equipment effectiveness by Implementi...
Methodology used for improving overall equipment effectiveness  by Implementi...Methodology used for improving overall equipment effectiveness  by Implementi...
Methodology used for improving overall equipment effectiveness by Implementi...
 
International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)International Journal of Engineering Research and Development (IJERD)
International Journal of Engineering Research and Development (IJERD)
 
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
 
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
 
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEWSTUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW
STUDIES ON AVAILABILITY AND UTILISATION OF MINING EQUIPMENT- AN OVERVIEW
 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
 
Overall Equipment Effectiveness (OEE) Measurement Analysis for Optimizing Sme...
Overall Equipment Effectiveness (OEE) Measurement Analysis for Optimizing Sme...Overall Equipment Effectiveness (OEE) Measurement Analysis for Optimizing Sme...
Overall Equipment Effectiveness (OEE) Measurement Analysis for Optimizing Sme...
 

More from IAEME Publication

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME Publication
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...IAEME Publication
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSIAEME Publication
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSIAEME Publication
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSIAEME Publication
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSIAEME Publication
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOIAEME Publication
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IAEME Publication
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYIAEME Publication
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...IAEME Publication
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEIAEME Publication
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...IAEME Publication
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...IAEME Publication
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...IAEME Publication
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...IAEME Publication
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...IAEME Publication
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...IAEME Publication
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...IAEME Publication
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...IAEME Publication
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTIAEME Publication
 

More from IAEME Publication (20)

IAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdfIAEME_Publication_Call_for_Paper_September_2022.pdf
IAEME_Publication_Call_for_Paper_September_2022.pdf
 
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
MODELING AND ANALYSIS OF SURFACE ROUGHNESS AND WHITE LATER THICKNESS IN WIRE-...
 
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURSA STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
A STUDY ON THE REASONS FOR TRANSGENDER TO BECOME ENTREPRENEURS
 
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURSBROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
BROAD UNEXPOSED SKILLS OF TRANSGENDER ENTREPRENEURS
 
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONSDETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
DETERMINANTS AFFECTING THE USER'S INTENTION TO USE MOBILE BANKING APPLICATIONS
 
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONSANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
ANALYSE THE USER PREDILECTION ON GPAY AND PHONEPE FOR DIGITAL TRANSACTIONS
 
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINOVOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
VOICE BASED ATM FOR VISUALLY IMPAIRED USING ARDUINO
 
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
IMPACT OF EMOTIONAL INTELLIGENCE ON HUMAN RESOURCE MANAGEMENT PRACTICES AMONG...
 
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMYVISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
VISUALISING AGING PARENTS & THEIR CLOSE CARERS LIFE JOURNEY IN AGING ECONOMY
 
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
A STUDY ON THE IMPACT OF ORGANIZATIONAL CULTURE ON THE EFFECTIVENESS OF PERFO...
 
GANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICEGANDHI ON NON-VIOLENT POLICE
GANDHI ON NON-VIOLENT POLICE
 
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
A STUDY ON TALENT MANAGEMENT AND ITS IMPACT ON EMPLOYEE RETENTION IN SELECTED...
 
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
ATTRITION IN THE IT INDUSTRY DURING COVID-19 PANDEMIC: LINKING EMOTIONAL INTE...
 
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
INFLUENCE OF TALENT MANAGEMENT PRACTICES ON ORGANIZATIONAL PERFORMANCE A STUD...
 
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
A STUDY OF VARIOUS TYPES OF LOANS OF SELECTED PUBLIC AND PRIVATE SECTOR BANKS...
 
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
EXPERIMENTAL STUDY OF MECHANICAL AND TRIBOLOGICAL RELATION OF NYLON/BaSO4 POL...
 
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
ROLE OF SOCIAL ENTREPRENEURSHIP IN RURAL DEVELOPMENT OF INDIA - PROBLEMS AND ...
 
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
OPTIMAL RECONFIGURATION OF POWER DISTRIBUTION RADIAL NETWORK USING HYBRID MET...
 
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
APPLICATION OF FRUGAL APPROACH FOR PRODUCTIVITY IMPROVEMENT - A CASE STUDY OF...
 
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENTA MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
A MULTIPLE – CHANNEL QUEUING MODELS ON FUZZY ENVIRONMENT
 

Recently uploaded

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 

Recently uploaded (20)

9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 

OEE Analysis of Critical Machines in Manufacturing Industries

  • 1. Proceedings of the 2nd International Conference on Current Trends in Engineering and Management ICCTEM -2014 17 – 19, July 2014, Mysore, Karnataka, India 145 OVERALL EQUIPMENT EFFECTIVENESS OF CRITICAL MACHINES IN MANUFACTURING INDUSTRIES – A PRACTICAL ANALYSIS B.C. Ashok1 , Dr. T.R. Srinivas2 1 (Department of Mechanical Engineering, Vidyavardhaka College of Engineering, Mysore, Karnataka, India) 2 (Department of Industrial Production & Engineering, Sri Jayachamarajendra College of Engineering, Mysore, Karnataka, India) ABSTRACT Overall Equipment Effectiveness (OEE) is a measure used in Total Productive Maintenance (TPM), a maintenance program which involves a newly defined concept for maintaining plants and equipment, to calculate the percentage of actual effectiveness of the equipment, taking into consideration the availability of the equipment, the performance rate when running and the quality rate of the manufactured product measured over a period of time (days, weeks or months). The equipment criticality is decided by considering how and how much the equipment affects the production volume and quality. The scale of damage incurred by breakdowns of the equipment is also considered. The purpose of this paper is to assess the application of OEE to evaluate the performance of critical machines and to determine to what extent the TPM implementation affects the OEE. The procedure to estimate OEE has also been presented through numerical examples. A case study was carried out in two large scale industries, one that manufactures Tyres for heavy vehicles and the second an automobile industry that manufactures heavy-duty drive axle assemblies. The data collected for two critical machines over a period of one year are statistically analysed to identify the influence of major losses on OEE. Keywords: Total Productive Maintenance (TPM), Effectiveness, Equipment, Performance 1. INTRODUCTION Overall Equipment Effectiveness (OEE) being performance measure of Total Productive Maintenance (TPM) could be used to evaluate the performance of critical/key equipments of the manufacturing industry. It reflects the performance of all the equipments in the manufacture line. The goal of TPM is to increase equipment effectiveness so each piece of equipment can be operated to its full potential and maintained at that level. The OEE is a measure of the value added to production through equipment, which is a function of machine availability, performance efficiency and the rate of quality. Overall Equipment Effectiveness is a very simple metric that immediately indicates the current status of a manufacturing process. Somehow it also becomes a multifaceted tool allowing one to understand the effect of the various issues in the manufacturing process and their effect on the entire process. The biggest advantage of OEE is that it allows companies to have separate business functions by applying/using a single, easy-to-understand formula. OEE is by far the most effective benchmarking tool in making sound management decisions. Overall Equipment Effectiveness depends on three parameters: Availability of the equipment, Performance of the equipment and the Quality of the product. It is given by; OEE = Availability Ratio x Performance Ratio x Quality Ratio INTERNATIONAL JOURNAL OF MECHANICAL ENGINEERING AND TECHNOLOGY (IJMET) ISSN 0976 – 6340 (Print) ISSN 0976 – 6359 (Online) Volume 5, Issue 9, September (2014), pp. 145-150 © IAEME: www.iaeme.com/IJMET.asp Journal Impact Factor (2014): 7.5377 (Calculated by GISI) www.jifactor.com IJMET © I A E M E
  • 2. Proceedings of the 2nd International Conference on Current Trends in Engineering and Management ICCTEM • Availability Ratio - the share of the actual production time and the planned production time. All planned stops and breakdowns will reduce the availability ratio, including setup times, preventive maintenance, breakdowns and lack of operators. The only time that one may choose to deduct from the availability ratio is lack of orders. • Performance Ratio - Loss of production due to underutilization of the ma when the equipment is not run with full speed. Short, unregistered, stops may affect the performance ratio as well. • Quality Ratio - the amount of the production that has to be discharged or scrapped. A large scale Tyre manufacturing industry which has implemented TPM to full extent and heavy assemblies automobile industry which has partially implemented TPM were selected as case studies and two critical equipments from different sectors of the indust Banbury, 4 Roll Calender Machine in Tyre industry and Straddle Facing, Centerless Grinding Machine in Automobile industry by taking readings directly and hence the performance of equi 2. RELATED WORKS OEE was proposed by Nakajima [1] as an approach to evaluate the progress achieved through the improvement initiatives carried out as part of his proposed total productive maintenance (TPM) philosophy. He defines OEE as metric or measure for the evaluation of equipment effectiveness. In considering OEE, Nakajima defines six big equipment losses, which include equipment downtime loss, performance loss, and defect loss as shown in Fig Fig. 1: Major • Equipment failure or breakdown losses and quality losses caused by defective products. • Set-up and adjustment time losses: production of one item ends and the equipment is adjusted to meet the requirements of another item. • Idling/minor stop losses: These losses occur when the production is interrupted by a temporary malfunction or when a machine is idling. • Reduced speed losses: These losses refer to the difference between equipment design speed and actual operating speed. • Quality defects and rework: Defect/rework losses are defined as volume losses due to defects and rework. • Reduced yield or Start-up: Reduced yield/Start An increase in overall equipment effectiveness, which is a function of down time and other production losses can significantly reduce random machine breakdowns, in turn Jayant Rajgopal [2] states that machine breakdowns and minor stoppages account for 20 International Conference on Current Trends in Engineering and Management ICCTEM 17 – 19, July 2014, Mysore, Karnataka, India 146 the share of the actual production time and the planned production time. All planned stops and ity ratio, including setup times, preventive maintenance, breakdowns and lack of operators. The only time that one may choose to deduct from the availability ratio is lack of orders. Loss of production due to underutilization of the machinery. In other words, losses are incurred when the equipment is not run with full speed. Short, unregistered, stops may affect the performance ratio as well. the amount of the production that has to be discharged or scrapped. scale Tyre manufacturing industry which has implemented TPM to full extent and heavy assemblies automobile industry which has partially implemented TPM were selected as case studies and two critical equipments from different sectors of the industry were chosen for the study. This paper investigates OEE calculation of Banbury, 4 Roll Calender Machine in Tyre industry and Straddle Facing, Centerless Grinding Machine in Automobile industry by taking readings directly and hence the performance of equipments is analysed. OEE was proposed by Nakajima [1] as an approach to evaluate the progress achieved through the improvement initiatives carried out as part of his proposed total productive maintenance (TPM) philosophy. He defines OEE as metric or measure for the evaluation of equipment effectiveness. In considering OEE, Nakajima defines six big equipment losses, which include equipment downtime loss, performance loss, and defect loss as shown in Fig Major losses limiting equipment efficiency failure or breakdown losses: These losses are categorized as time losses when productivity is reduced, and quality losses caused by defective products. : These losses result from downtime and defective products that occur when production of one item ends and the equipment is adjusted to meet the requirements of another item. losses occur when the production is interrupted by a temporary malfunction or These losses refer to the difference between equipment design speed and actual operating Defect/rework losses are defined as volume losses due to defects and rework. Reduced yield/Start-up losses are defined as time losses (output decline). An increase in overall equipment effectiveness, which is a function of down time and other production losses can significantly reduce random machine breakdowns, in turn, inventory, and lead time. Fawaz A. Abdulmalek and Jayant Rajgopal [2] states that machine breakdowns and minor stoppages account for 20–30% of loss in OEE. International Conference on Current Trends in Engineering and Management ICCTEM -2014 19, July 2014, Mysore, Karnataka, India the share of the actual production time and the planned production time. All planned stops and ity ratio, including setup times, preventive maintenance, breakdowns and lack of operators. The only time that one may choose to deduct from the availability ratio is lack of orders. chinery. In other words, losses are incurred when the equipment is not run with full speed. Short, unregistered, stops may affect the performance ratio as well. scale Tyre manufacturing industry which has implemented TPM to full extent and heavy-duty Axle assemblies automobile industry which has partially implemented TPM were selected as case studies and two critical ry were chosen for the study. This paper investigates OEE calculation of Banbury, 4 Roll Calender Machine in Tyre industry and Straddle Facing, Centerless Grinding Machine in Automobile OEE was proposed by Nakajima [1] as an approach to evaluate the progress achieved through the improvement initiatives carried out as part of his proposed total productive maintenance (TPM) philosophy. He defines OEE as a metric or measure for the evaluation of equipment effectiveness. In considering OEE, Nakajima defines six big equipment losses, which include equipment downtime loss, performance loss, and defect loss as shown in Fig. 1. These losses are categorized as time losses when productivity is reduced, d defective products that occur when production of one item ends and the equipment is adjusted to meet the requirements of another item. losses occur when the production is interrupted by a temporary malfunction or These losses refer to the difference between equipment design speed and actual operating Defect/rework losses are defined as volume losses due to defects and rework. up losses are defined as time losses (output decline). An increase in overall equipment effectiveness, which is a function of down time and other production losses , inventory, and lead time. Fawaz A. Abdulmalek and 30% of loss in OEE.
  • 3. Proceedings of the 2nd International Conference on Current Trends in Engineering and Management ICCTEM -2014 17 – 19, July 2014, Mysore, Karnataka, India 147 I.P.S. Ahuja and J.S. Khamba [3] have suggested that OEE is an all-inclusive benchmarking tool that serves to gauge the various subcomponents of the manufacturing process (i.e., availability, performance and quality) and used to measure actual improvements on 5S, Lean Manufacturing, TPM, Kaizen and Six Sigma. Benchmarking overall equipment effectiveness can facilitate an organization to realization of zero breakdown, zero defect, zero machine stoppage, zero accidents, zero pollution, which serve as the ultimate objective of TPM. When using OEE with these management systems the benefits become tangible and noteworthy. A.J.de Ron and J.E. Rooda [4] have stated that, manufactured goods are a result of a complex production process and without the proper measuring tools and formula, the business can be expected to run blindly even in the light of day. Having the right metrics, OEE provides a window to analyse out-of-the-ordinary issues and gives an established framework for improving the entire manufacturing process. They further announce that a key performance measure in mass production environments is OEE. Bulent Dal et al. [5], suggest that the OEE measure can be applied at several different levels within a manufacturing environment. Firstly, OEE can be used as a “benchmark”' for measuring the initial performance of a manufacturing plant in its entirety. In this manner the initial OEE measure can be compared with future OEE values, thus quantifying the level of improvement made. Secondly, an OEE value, calculated for one manufacturing line, can be used to compare line performance across the factory, thereby highlighting any poor line performance. Thirdly, if the machines process work individually, an OEE measure can identify which machine performance is worst, and therefore indicate where to focus TPM resources. Christian N. Madu [6] shows that equipment maintenance and reliability management are importantly associated with an organization’s competitiveness and must be given adequate attention in the organization's strategic planning. OEE is an effective way of analysing the efficiency of a single machine or an integrated machinery system. However, Alok Mathur et al. [7] implies that the most important objective of OEE is not to get an optimum measure, but to get a simple measure that tells production personnel where to spend their improvement resources. The greatest contribution of OEE is that it is a simple, but still comprehensive, measure of internal efficiency and that it can work as an important indicator of the continuous improvement process. 3. OVERALL EQUIPMENT EFFECTIVENESS (OEE) MEASUREMENT In this section, the measurement of OEE for the selected critical equipments is presented. OEE combines the operation, maintenance and management of manufacturing equipment and resources. It takes the most common and important sources of productivity loss, which are called six big losses, shown in Fig. 1. These losses are quantified as Availability (A), Performance (P) and Quality (Q) in order to estimate OEE and OEE calculation is given by: OEE = Availability × Performance × Quality According to Nakajima [1] the ideal conditions are: Availability…..greater than 90%, Performance Efficiency…… greater than 95%, Rate of Quality products …… greater than 99%. Therefore, the ideal OEE should be 85+ %. However, literature survey indicates that the exact definition of OEE differs between applications and various authors. For an organization, wishing to measure their OEE, the differences in various approaches of calculating OEE parameters (A, P, Q) could be significant in terms of OEE resultant figures. 3.1 Tyre industry 3.1.1 Banbury Failure Loss (in %): 1.782931 (1) Set up & Adjustment Loss (in %): 1.59 (2) Shut down Loss (in %): 0.638346123 (3) Minor stoppage & Idle Loss (in %): 0.02329558 (4) Management Loss (in %): 0.07 (5) 17909.99 5 )5()4()3()2()1( 100 = ++++ −=tyAvailabili Line Organization Loss (in %): 0.71 (6) Measurement Loss (in %): 0.098141 (7) 594.99 2 )7()6( 100 = + −=ePerformanc Defect & Rework Loss (in %): 6.18 (8) Quality = 100 – (8) = 93.82 OEE ൌ 100 െ ଽଽ.ଵ଻ଽ଴ଽ ଵ଴଴ X ଽଽ.ହଽସ ଵ଴଴ X ଽଷ.଼ଶ ଵ଴଴ ൌ 90.737%
  • 4. Proceedings of the 2nd International Conference on Current Trends in Engineering and Management ICCTEM -2014 17 – 19, July 2014, Mysore, Karnataka, India 148 3.1.2 4 Roll Calender Machine Failure Loss (in %): 1.729443 (1) Set up & Adjustment Loss (in %): 0.7791 (2) Shut down Loss (in %): 0.31279 (3) Minor stoppage & Idle Loss (in %): 0.046358 (4) Management Loss (in %): 0.0343 (5) 41926.99 5 )5()4()3()2()1( 100 = ++++ −=tyAvailabili Measurement Loss (in %): 0.0481 (6) Performance = 100 – (6) = 99.95 Defect & Rework Loss (in %): 4.4344 (7) Quality = 100 – (7) = 95.57 ܱ‫ܧܧ‬ ൌ 100 െ ଽଽ.ସଵଽ଺ ଵ଴଴ ܺ ଽଽ.ଽହ ଵ଴଴ ܺ ଽହ.ହ଻ ଵ଴଴ ൌ 90.50% 3.2 Automobile industry 3.2.1 Straddle Facing Setup Time (in Hours): 15.1 Breakdown (in Hours): 2.00 SetupTime BreakdownsetupTime tyAvailabili − = 86.0 1.15 21.15 = − = Run Rate (in Hours): 2688 Ideal Run Rate (in Hours): 3262.5 82.0 5.3262 2688 === SetupTime Runrate ePerformanc Production Output (actual): 155 Production Output (Target): 180 86.0 180 155 )arg( )( === etTsTotalPiece ActualGoodPieces Quality OEE = 0.86 X 0.82 X 0.86 X 100 = 60.64% 3.2.2 Centerless Grinding Setup Time (in Hours): 35 Breakdown (in Hours): 4.00 SetupTime BreakdownsetupTime tyAvailabili − = 88.0 35 435 = − = Run Rate (in Hours): 2368 Ideal Run Rate (in Hours): 2880 82.0 2880 2368 === SetupTime Runrate ePerformanc Production Output (actual): 138 Production Output (Target): 160 86.0 160 138 )arg( )( === etTsTotalPiece ActualGoodPieces Quality OEE = 0.88 X 0.82 X 0.86 X 100 = 62.05% 4. ANALYSIS OF RESULTS FOR OEE This section presents the overall profile of the samples, descriptive statistics and frequency distribution. The results of statistical methods of descriptive statistics, One way Anova, Scheffe’s post hoc test are tabulated in Table 1. Here we have grouped the machines with similar criticality as Machine 1 and Machine 2. Hence Banbury of Tyre industry and Straddle Facing of Automobile industry fall under Machine 1 and 4 Roll Calender Machine of Tyre industry and Centerless Grinding of Automobile industry fall under Machine 2.
  • 5. Proceedings of the 2nd International Conference on Current Trends in Engineering and Management ICCTEM -2014 17 – 19, July 2014, Mysore, Karnataka, India 149 Table 1: Descriptive statistics and results of one-way Anova for critical machines to Overall Equipment Effectiveness (OEE) in two industries Machine Industry Mean S.D F value P 1 Tyre 90.68 0.00 368062E+14 0.0 Automobile 60.66 0.00 Total 75.67 13.87 2 Tyre 90.40 0.00 355597E+14 0.0 Automobile 60.70 0.00 Total 75.55 12.18 Overall equipment effectiveness of Machine 1 One way ANOVA revealed a highly significant difference between 2 companies in their mean overall equipment effectiveness scores with F value of 368062E+14 and significance (P) of .000. Further, Scheffe’s Post hoc test indicated that Tyre industry has maximum overall equipment effectiveness (mean 90.68%), followed by Automobile industry (mean 60.66%). Overall equipment effectiveness of Machine 2 One way ANOVA revealed a highly significant difference between 2 companies in their mean overall equipment effectiveness scores with F value of 355597E+14 and significance (P) of .000. Further, Scheffe’s Post hoc test indicated that Tyre industry has maximum overall equipment effectiveness (mean 90.4%) and overall equipment effectiveness for Automobile industry is found to be less (mean 60.7%). 5. CONCLUSION The study highlights the accurate estimation of equipment effectiveness that affects the productivity of the organization. As seen from the OEE computation of the equipments, accurate performance measure of the equipment was obtained if all six major losses were considered while computing the three OEE elements Viz., Availability, Performance and Quality Rate. Since Total Productive Maintenance tries to reduce the losses, OEE of critical machines was found to be high in Tyre industry which has implemented TPM to full extent and less in Automobile industry which has partially implemented TPM. It is also found that there are many differing methods of collecting data for the six big losses, and therefore computation of OEE also varies from one organization to another. However, the quality of data collection determines the accuracy of OEE. 6. REFERENCES 1. Nakajima, S., Introduction to total productive maintenance (Cambridge, MA, Productivity Press, 1988). 2. Fawaz A. Abdulmaleka, Jayant Rajgopal, Analyzing the benefits of lean manufacturing and value stream mapping via simulation: A process sector case study, International Journal, Production Economics, 2006. 3. I.P.S. Ahuja, J.S. Khamba, Assessment of contributions of successful TPM initiatives towards competitive manufacturing, Journal of Quality in Maintenance Engineering, Vol. 14 Iss: 4, 2008, 356 – 374. 4. A.J. de Ron and J.E. Rooda, OEE and equipment effectiveness: an evaluation, International Journal of Production Research, 3rd November 2005, 1-17. 5. Bulent Dal, Phil Tugwell, Richard Greatbanks, Overall equipment effectiveness as a measure of operational improvement - A practical analysis, Vol. 20 Iss: 12, 2000, 1488 – 1502. 6. Christian N. Madu, Competing through maintenance strategies, International Journal of Quality & Reliability Management, Vol. 17 No. 9, 2000, 937-948. 7. Alok Mathur, G.S. Dangayach, M.L. Mittal, Milind K. Sharma, Performance measurement in automated manufacturing, Measuring Business Excellence, Vol. 15 Iss: 1, 2011, 77 – 91.
  • 6. Proceedings of the 2nd International Conference on Current Trends in Engineering and Management ICCTEM -2014 17 – 19, July 2014, Mysore, Karnataka, India 150 APPENDIX Average OEE for One Year in Tyre Industry Description Unit of Measurement (UOM) Average Average Banbury 4 Roll Calender Failure Loss % 1.6201 1.5715 Set up & Adjustment Loss % 1.3981 0.6851 Shut Down Loss % 0.7317 0.3585 Minor stoppage & Idle Loss % 0.0233 0.0464 Management Loss % 0.0696 0.0341 A-Availability Factor % 99.231 99.461 Line Organization Loss % 0.7322 --- Measurement Loss % 0.1492 0.0731 B-Performance Factor % 99.559 99.927 Defect & Rework Loss % 5.7486 2.4737 C-Rate of quality % 94.251 97.526 OEE =AXBXC * 100 90.689 90.307 Average OEE for One Year in Automobile Industry Description UOM Average Average Straddle Facing Centerless Grinding Production Output Nos. Actual 158 145 Target 184 170 Quality(Q) Hrs 0.85 0.85 Breakdown Occurrence Nos. Actual 2 2.7 Breakdown Hours Hrs Actual 1.25 4.44 Setup Time Hrs Actual 9.15 34 Availability (A) 0.85 0.86 Element wise setup Remove 3.53 9.78 Detail Fix 4.92 9.28 Adjust 0.94 14.9 Performance rate (P) Hrs Actual 2889 2430 Target 3478 2940 0.83 0.82 OEE = A*P*Q Target 85 85 Actual 60.66 60.7 Abnormality Correction Nos. Attached 169 73 Removed 162 63