CAPACITY UTILIZATION FOR PRODUCT MIX USING OPERATION
BASED TIME STANDARD EVALUATION
Sandeep A. Chowriwar1
, Ishan P. Lade2
, Pranay B. Sawaitul3
, Sachin M. Kamble4
1
Department of Mechanical Engineering, G. H. Raisoni Academy of Engineering & Technology, Nagpur (MH), India
2, 4
Department of Mechanical Engineering, Datta Meghe Institute of Engineering, Technology & Research, Wardha (MH)
3
Department of Mechanical Engineering, Anjuman College of Engineering & Technology, Nagpur (MH), India
Abstract
In this paper, a systematic and quantitative view is presented for the application of time study in woodworking furniture industry. The
study is done in panel conversion plant on five CNC machines for various operations. For the calculation of cycle time, machining
time calculator is developed and the operation research technique of mathematical programming is used for the capacity calculation
of product mix. This makes manager to make faster decision in outsourcing problem and to improve the financial performance of the
company.
Keywords - Capacity utilization, cycle time, linear programming, manufacturing, time study.
-----------------------------------------------------------------------***----------------------------------------------------------------------
1. INTRODUCTION
In the world of competitive business every enterprise wants to
earn maximum profit with minimum inputs. Continuous
improvement in the product is required for the survival of the
industry in the global competition. Setting the time standard
for different product is vital success of any enterprise. Time
study gives the cycle time of the products on various machines
which help in the capacity utilization calculations. From the
manufacturing perspective, cycle time is one of the most
important variables in manufacturing organizations. In this
study, the woodworking organization encounters the very
often situation of surplus demand than its capacity to
manufacture. Because the company want to grab all the
market demand in order to prevent other major competitors
from penetrating the market and at the same time maintains
the company reputation for on time delivery of products. The
study is done in woodworking (modular furniture) industry
based in central India.
1.1 Capacity Planning
Capacity planning is the determination of capacity and
adjustment of capacity to changing demand. Capacity decision
has direct influence on resource productivity and customer
satisfaction. Excess capacity results in low productivity. Due
to under-utilization of resource while inadequate capacity
results in poor customer service through delayed delivery
goods. Capacity planning is basically matching the resource to
demand. In case of stable demand, capacity planning becomes
simple. But fluctuation in demand creates problems of
acquisition of resources to match the demand. Creation of
capacity involves substantial investment. For manufacturing
firm, creation of capacity means investment in resources like
labor, machines and equipment etc. while for service
organization, it means creation of more space, furniture, other
accessories and equipments.
2. CASE STUDY
Central India based company having panel conversion plant
(PCP) which manufactures five different types of product on
five CNC rover machines at different prices. The company’s
present production process have job order production of
various products which having product wise routing in which
various operation are done with respect to product
specification. The product wise routing is time consuming
because one product gets lot of time due to various
components and it is very difficult to take the timings. The
system of the company has standard norms for standard
products. If the products gets changes, then ultimately the
norms also changes and thus the cycle time of the product also
changes. Therefore there is loss in efficiency, utilization of
man and machine.
In this study all the information related to raw material cost,
hourly rate, selling price, demand, operation time, etc were
collected. We have choose the five product given them name
as A = prelamstorage@702, B = prelamstorage@1275, C =
cabinet@1200, D = credenza@1350, E = pedestal on five
CNC rover machine namely rover-20, rover B3, rover30,
rover35, morby.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 140
Table 1: Time study sheet of the company’ product
ELE.
NO.
ELEMENT DESCRIPTION RATING
N. TIME
(SEC.)
NO OF
READIN
GS
AVG.
TIME
(SEC)
OCC.
NORM.T
IME
(SEC.)
1 Load panel on CNC & reverse 100 125.0 10.0 12.5 1:1 12.5
2
Reset against stopper, insure
clamping ,operate start button
100 108.0 10.0 10.8 1:1 10.8
3 Auto cycle LH 100 88.0 1.0 88.0 1:1 88.0
4 Clean dust by air 100 87.0 9.0 9.7 1:1 9.7
5
Operate clamping switch, reverse
panel & unload the panel
100 112.0 9.0 12.4 1:1 12.4
6 Load panel on CNC & reverse 100 90.0 7.0 12.9 1:1 12.9
7
Reset against stopper, insure
clamping ,operate start button
100 94.0 7.0 13.4 1:1 13.4
8 Auto cycle RH 100 88.0 1.0 88.0 1:1 88.0
9 Clean dust by air 100 80.0 8.0 10.0 1:1 10.0
10
Operate clamping switch, reverse
panel & unload panel
100 78.0 8.0 9.8 1:1 9.8
STD time = Normal time + (Normal time x allowance) =
176+176 X (0.13) = 198.9
As the time study sheet shows the auto cycle readings(cycle
time) of CNC machine for particular product, this cycle time
readings has to be noted from time to time for particular
product. It is very difficult to note the cycle time again and
again. To avoid this we have develop small software
MACHINING TIME CALCULATOR in ms excel sheet for
calculation of operation (element) wise timing. The element
wise time reading is taken for various sizes of drill, face drill,
KD/counter, grooving, hafle hole, routing and sizing, hinge
etc. The time is taken for various element machines wise. The
data like feed rate, speed of machine is entered in the software.
2.1 Advantages
ο‚· There is no need to take the cycle time (Autocycle)
again and again
ο‚· The operations having same cycle time are defined
ο‚· The output will get as the total machining time on
each rover machine
ο‚· If new product comes, then it is useful to find out the
new product lead time
ο‚· This helps in improving the efficiency of machine
ο‚· To know the capacity and resource calculation
ο‚· Meeting the delivery commitments of the customers
Fig 1 Image of Machining Time Calculator software
3. ANALYSIS & CALCULATION OF TIME
3.1 Calculation of Machining Time:
The machining time for the five products is calculated on the
Machining Time Calculator with the help of drawing sheet on
various CNC ROVER machines. The five machines will give
the different machining time for above products. The
machining time is calculated for different components of the
respective products. The components wise machining time is
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 141
obtain and output time will get in seconds. The machining
time calculator gives the graph which shows the lead time of
product on various machines. For example the graph for
product A is shown in figure.
Fig 2 Machining Time in Sec for Product A
3.2 Calculation of Weekly Capacity
The weekly capacity of work centre is shown in table 2.
There are 5 machines, they run daily for 2 shifts (each of 8
hour shift) and 6 working days in a week i.e. (16x6x60 =5760
min). The setup time to be booked with small setup =
5min/setup and big setup = 10 min/setup. Therefore
(45x5+0x10 = 225). The data of setup time is taken from
company. Weekly capacity is calculated as (total weekly time
– time lost due to setups). ie (5760-225) = 5535 min = 332100
sec.
Table 2: shows weekly capacity of various machines
Machine Weekly time Small setup
Big
setup
Total
Weekly
capacity (min)
Weekly capacity
(sec)
R20 (M1) 5760 45 0 225 5535 332100
B3 (M2) 5760 15.75 3 108.75 5651.25 339075
R30 (M3) 5760 15.12 24.5 318.12 5441.88 326512.8
R35 (M4) 5760 57.62 6.125 349.35 5410.65 324639
MORBY(M5) 5760 27.125 0 135.625 5624.38 337462.8
Table 3: shows the cycle time and capacity utilization
Machine Time/product at various work centers, in sec
Weekly capacity
of machine
A B C D E
R20 569.17 525.76 522.93 682.69 347.21 332100
B3 670.11 641.51 620.91 768.05 400.09 339075
R30 709.37 650.52 620.18 795.27 400.36 326512.8
R35 749.74 639.01 610.39 798.58 390.28 324639
Morby 794.39 733.68 826.65 1074.2 396.1 337462.8
569.177
670.11
709.371
749.735
794.39
0
100
200
300
400
500
600
700
800
900
MACHINES
ROV
ER-
20
B-03
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 142
4. FOMULATION OF MATHEMATICAL
PROBLEM (LP)
Let the company with m resources (1,2,…m) and n product
(1,2,….n).
Let the π‘˜π‘– is the capacity per week in sec for particular
machine.
Let π‘Ž 𝑛 is the processing time in sec to process a product say A
Raw material price = 𝑅 𝐴
Market price = 𝑀𝐴
Market demand = 𝐷𝐴
Cycle time = π‘Ž1,𝑏1,𝑐1,𝑑1,𝑒1 Products = A,B,C,D,E
No. of products manufactured in company = 𝑍𝑖
Outsource price = 𝑆𝑖
Due to capacity constraints company can manufacture𝑍𝑖.
𝑍𝑖≀𝐷𝑖
The LP objective function as follows
𝑍 π‘šπ‘Žπ‘₯ = (𝑀𝐴-𝑅 𝐴) A+ (𝑀 𝐡-𝑅 𝐡) B + (𝑀 𝐢-𝑅 𝐢) C + (𝑀 𝐷-𝑅 𝐷) +
(𝑀 𝐸-𝑅 𝐸) E
Subject to
M1 π‘Ž1A+𝑏1B+𝑐1C+𝑑1D+𝑒1E β‰€π‘˜π‘–1
M2 π‘Ž2A+𝑏2B+𝑐2C+𝑑2D+𝑒2E β‰€π‘˜π‘–2
M3 π‘Ž3A+𝑏3B+𝑐3C+𝑑3D+𝑒3E β‰€π‘˜π‘–3
M4 π‘Ž4A+𝑏4B+𝑐4C+𝑑4D+𝑒4E β‰€π‘˜π‘–4
M5 π‘Ž5A+𝑏5B+𝑐5C+𝑑5D+𝑒5E β‰€π‘˜π‘–5
4.1 Formulation of a Problem by using Simplex
Technique:
𝑍 π‘šπ‘Žπ‘₯ = (𝑀𝐴-𝑅 𝐴) A+ (𝑀 𝐡-𝑅 𝐡) B + (𝑀 𝐢-𝑅 𝐢) C + (𝑀 𝐷-𝑅 𝐷) +
(𝑀 𝐸-𝑅 𝐸) E
Maximize Z = 1166.67A + 1166.67B + 1666.67C + 1083.34D
+ 833.34E
subject to
569.17A + 525.76B + 522.93C + 682.688D + 347.208E
<=332100
670.11A + 641.506B + 620.91C + 768.045D + 400.091E <=
339075
709.371A+650.517B+620.18C+795.271D+400.362E<=32651
2.8
749.735A
+639.005B+610.394C+798.577D+390.278E<=324639
794.39A + 733.678B + 826.645C + 1074.229D + 396.101E
<= 337462.8
Market Constraints
A<= 80, B<= 100, C<= 100, D<= 70, E<= 400
The resulting optimum product mix is to manufacture 29, 100,
100, 0,400 of A, B, C, D, E respectively.
5. METHODOLOGY FOR LINEAR
PROGRAMMING ANALYSIS
The market selling price of product A is 7000. The raw
material cost for product A is 7000/1.2=5833.33=𝑅 𝐴 .
Considering the 20% profit. The (𝑀𝐴-𝑅 𝐴) = 1166.67, from the
table 5 the contractor price for all the products A,B,C,D,E, are
6200,6500,7500,6000,4800 respectively. The throughput per
manufacturing unit of A can be calculated as (market price x
(company profit% /100). The throughput per contracted unit is
calculated as contractor price minus raw material cost i.e.
(6200-5600=600). All the calculations are done in Indian
currency.
Table 4: shows the machine hr rate and cost for product
Machine R20 B3 R30 R35 MORBY
Cost/hr 364 520 520 401 548
Product A B C D E
Machine time 569.177 641.506 620.18 798.577 396.101
Machine time hr 0.158105 0.178196 0.172272 0.221827 0.110028
Cost for product 57.55012 92.66198 89.58156 88.9526 60.29537
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 143
The total throughput manufactured in company is equal to the
throughput per manufactured unit x units to manufacture.
Units contracted outside = market demand – units to
manufacture. The total throughput contract is calculated as
(throughput per contracted unit x units contracted outside). i.e
(600 x 51=30600).
The product throughput is the sum of total throughput
manufactured in company and total throughput contract.
Overall throughput is the summation of total product
throughput for all the products. Similarly throughputs for other
products are calculated.
From the table 4 the cost for product is calculated as cost/hr x
machine time hr. The cost for product is also called as
operating expenses (OE). Similarly OE for other products is
calculated. The product OE in company mfg is the product of
OE and units to manufacture. The summation of product OE
in company mfg for all the products is calculated. The
highlighted portion shows the input variables.
Table 5: shows the LP analysis result
Details
Product
A B C D E
Contractor Price 6200 6500 9500 6000 4800
Market price 7000 7000 10000 6500 5000
Company Profit % 20 20 20 20 20
Raw material cost/Unit 5600 5600 8000 5200 4000
Contractor profit 600 900 1500 800 800
Company Profit 1400 1400 2000 1300 1000
Market Demand 80 100 100 70 400
Units to manufacture 29 100 100 0 400
Throughput/ mf. Unit 1400 1400 2000 1300 1000
Total throughput mfg in
company
40600 140000 200000 0 400000
Units contracted outside 51 0 0 70 0
Throughput/ contracted
Unit
600 900 1500 800 800
Total throughput
contract
30600 0 0 56000 0
Total product
throughput
71200 140000 200000 56000 400000
Overall throughput (I) 867200
Operating expenses OE 44011.46
Net profit (I-OE) 823188.5
Product
A B C D E
OE 57.55012 92.66198 89.58156 88.9526 60.29537
Product OE in company
mfg.
1668.953 9266.198 8958.156 0 24118.15
Total OE company mfg. 44011.46
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
__________________________________________________________________________________________
Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 144
Fig 3: units to be manufactured and outsourced
6. RESULTS
ο‚· In LP analysis, net profit obtain is Rs 823188.5
ο‚· The resulting optimum product mix that is to
manufacture 29, 100, 100, 0,400 of A, B, C, D, E
respectively
ο‚· To outsource 51 of A and 70 of D
ο‚· Operating expenses is Rs 44011.46
7. CONCLUSION
The setting of time standards helps in the achievement of
production targets of the company. Application of machining
time calculator helps in calculation of auto cycle reading with
the help of drawing sheet. When new product comes then we
can decide the cycle time with help of machining time
calculator. Due to this there is no need to study the timing of
operation again and again. In capacity utilization for the
product mix, the LP model is simple and helps the manager to
make faster decision in outsourcing problem with maximum
throughput. When demand exceeds the capacity, the suggested
model guides the exact quantity to be manufactured as well as
the quantity to be outsourced. The model is simple to use and
requires only two variables to compute, one is contractor’s
profit and another is work time in resource. It is also requested
to consider setup time during study as this having significant
impact.
REFERENCES
[1]. Carl R Lindenmeyer 2001, How to design and conduct a
computer integrated time study with active element
performance rating(CITS APR).
[2]. Dr.C.K Jain,Bharat Chede, Aparna Soni,2007 Quantitative
analysis of capacity constrained resources for theory of
constraints in manufacturing. ICRTME (2007) IP26-IP34.
[3]. P S Chakraborty, G Majumdar, B Sarkar, 2006,
Constraints resource management and production related
decision-a case study. IE (I) Journal-PR Vol86, 2006, 48-53.
[4]. Edverd J. Williams and Cilia Ortiz, 1996, Steel production
method improvement study, Advances in Industrial
engineering applications and practice.324-329.
[5]. S.A.Oke, 2006, A case study application of time study
model in an aluminum company. The pacific journal of
science and technology volume (7) number (2). 153-162.
[6]. Iain S. MacLeod, 2003, Real world effectiveness of
ergonomic methods. Applied Ergonomics 34 (2003) 465-477.
[7]. Jason J. Saleem, Brian M. Kleiner, Maury A. Nussbaum,
2003, Emperical evaluation of training and work analysis tool
for participatory ergonomics, International Journal of
industrial ergonomics, 31(2003)387-396.
[8]. Stefano Apolloni, Marcello Lando, Matteo Savino,1984,
Advanced techniques of theory of constraints and activity
based costing for scheduling of high technology production
lines. North river press Inc 1984.
[9]. Industrial Engineering and Production Management by
Martand Telsang.
[10]. Industrial Engineering and Management by O. P.
Khanna.
0
50
100
150
200
250
300
350
400
450
A B C D E
units to be
manufactured
in company
units to be
outsourced

More Related Content

What's hot

IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...IRJET Journal
Β 
IRJET- Studies on Manual Paddy Transplanter Machine for Agriculture Appli...
IRJET-  	  Studies on Manual Paddy Transplanter Machine for Agriculture Appli...IRJET-  	  Studies on Manual Paddy Transplanter Machine for Agriculture Appli...
IRJET- Studies on Manual Paddy Transplanter Machine for Agriculture Appli...IRJET Journal
Β 
Performance Analysis using OEE
Performance Analysis using OEEPerformance Analysis using OEE
Performance Analysis using OEEijsrd.com
Β 
Internship Report_Jyoti CNC Automation Pvt Ltd
Internship Report_Jyoti CNC Automation Pvt LtdInternship Report_Jyoti CNC Automation Pvt Ltd
Internship Report_Jyoti CNC Automation Pvt LtdMalay Nasit
Β 
IRJET- Experimental Review of Machining Time Cycles between Manual Programmin...
IRJET- Experimental Review of Machining Time Cycles between Manual Programmin...IRJET- Experimental Review of Machining Time Cycles between Manual Programmin...
IRJET- Experimental Review of Machining Time Cycles between Manual Programmin...IRJET Journal
Β 
IRJET- N.C. Drilling Machine
IRJET-  	  N.C. Drilling MachineIRJET-  	  N.C. Drilling Machine
IRJET- N.C. Drilling MachineIRJET Journal
Β 
IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...
IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...
IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...IRJET Journal
Β 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET Journal
Β 
IRJET - Study of Material Characteristics for Efficient Design of Spray P...
IRJET -  	  Study of Material Characteristics for Efficient Design of Spray P...IRJET -  	  Study of Material Characteristics for Efficient Design of Spray P...
IRJET - Study of Material Characteristics for Efficient Design of Spray P...IRJET Journal
Β 
HMC internship report
 HMC internship report HMC internship report
HMC internship reportZia ur rahman
Β 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET Journal
Β 
IRJET- Design and Development of Corn Chaff Peeling Machine
IRJET- Design and Development of Corn Chaff Peeling MachineIRJET- Design and Development of Corn Chaff Peeling Machine
IRJET- Design and Development of Corn Chaff Peeling MachineIRJET Journal
Β 
Analysis of problems of biomass grinder integrated with briquetting plant
Analysis of problems of biomass grinder integrated with briquetting plantAnalysis of problems of biomass grinder integrated with briquetting plant
Analysis of problems of biomass grinder integrated with briquetting planteSAT Journals
Β 
Design and Manufacturing of Gun Drilling Fixture for Steering Arm
Design and Manufacturing of Gun Drilling Fixture for Steering ArmDesign and Manufacturing of Gun Drilling Fixture for Steering Arm
Design and Manufacturing of Gun Drilling Fixture for Steering ArmIRJET Journal
Β 
IRJET- Design and Fabrication of Abrasive Jet Machining
IRJET- Design and Fabrication of Abrasive Jet MachiningIRJET- Design and Fabrication of Abrasive Jet Machining
IRJET- Design and Fabrication of Abrasive Jet MachiningIRJET Journal
Β 
Design and Analysis of Chute System to obtain World Class OEE
Design and Analysis of Chute System to obtain World Class OEEDesign and Analysis of Chute System to obtain World Class OEE
Design and Analysis of Chute System to obtain World Class OEEijsrd.com
Β 

What's hot (19)

IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...IRJET- Improvement of Availability and Maintainability through Actions based ...
IRJET- Improvement of Availability and Maintainability through Actions based ...
Β 
IRJET- Studies on Manual Paddy Transplanter Machine for Agriculture Appli...
IRJET-  	  Studies on Manual Paddy Transplanter Machine for Agriculture Appli...IRJET-  	  Studies on Manual Paddy Transplanter Machine for Agriculture Appli...
IRJET- Studies on Manual Paddy Transplanter Machine for Agriculture Appli...
Β 
Performance Analysis using OEE
Performance Analysis using OEEPerformance Analysis using OEE
Performance Analysis using OEE
Β 
3 AXIS CNC
3 AXIS CNC3 AXIS CNC
3 AXIS CNC
Β 
Internship Report_Jyoti CNC Automation Pvt Ltd
Internship Report_Jyoti CNC Automation Pvt LtdInternship Report_Jyoti CNC Automation Pvt Ltd
Internship Report_Jyoti CNC Automation Pvt Ltd
Β 
IRJET- Experimental Review of Machining Time Cycles between Manual Programmin...
IRJET- Experimental Review of Machining Time Cycles between Manual Programmin...IRJET- Experimental Review of Machining Time Cycles between Manual Programmin...
IRJET- Experimental Review of Machining Time Cycles between Manual Programmin...
Β 
IRJET- N.C. Drilling Machine
IRJET-  	  N.C. Drilling MachineIRJET-  	  N.C. Drilling Machine
IRJET- N.C. Drilling Machine
Β 
SIDDHARTH CV
SIDDHARTH CV  SIDDHARTH CV
SIDDHARTH CV
Β 
A012430106
A012430106A012430106
A012430106
Β 
IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...
IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...
IRJET- Design and Development of Conveyor System for Scrap Collection of Tab ...
Β 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
Β 
IRJET - Study of Material Characteristics for Efficient Design of Spray P...
IRJET -  	  Study of Material Characteristics for Efficient Design of Spray P...IRJET -  	  Study of Material Characteristics for Efficient Design of Spray P...
IRJET - Study of Material Characteristics for Efficient Design of Spray P...
Β 
HMC internship report
 HMC internship report HMC internship report
HMC internship report
Β 
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
IRJET- Production Line Optimization using Lean Tools: A Case Study of Automot...
Β 
IRJET- Design and Development of Corn Chaff Peeling Machine
IRJET- Design and Development of Corn Chaff Peeling MachineIRJET- Design and Development of Corn Chaff Peeling Machine
IRJET- Design and Development of Corn Chaff Peeling Machine
Β 
Analysis of problems of biomass grinder integrated with briquetting plant
Analysis of problems of biomass grinder integrated with briquetting plantAnalysis of problems of biomass grinder integrated with briquetting plant
Analysis of problems of biomass grinder integrated with briquetting plant
Β 
Design and Manufacturing of Gun Drilling Fixture for Steering Arm
Design and Manufacturing of Gun Drilling Fixture for Steering ArmDesign and Manufacturing of Gun Drilling Fixture for Steering Arm
Design and Manufacturing of Gun Drilling Fixture for Steering Arm
Β 
IRJET- Design and Fabrication of Abrasive Jet Machining
IRJET- Design and Fabrication of Abrasive Jet MachiningIRJET- Design and Fabrication of Abrasive Jet Machining
IRJET- Design and Fabrication of Abrasive Jet Machining
Β 
Design and Analysis of Chute System to obtain World Class OEE
Design and Analysis of Chute System to obtain World Class OEEDesign and Analysis of Chute System to obtain World Class OEE
Design and Analysis of Chute System to obtain World Class OEE
Β 

Viewers also liked

Ntioxidant study of usnic acid and its derivative usnic acid diacetate
Ntioxidant study of usnic acid and its derivative usnic acid diacetateNtioxidant study of usnic acid and its derivative usnic acid diacetate
Ntioxidant study of usnic acid and its derivative usnic acid diacetateeSAT Journals
Β 
Automatic wiper using piezoelectric material
Automatic wiper using piezoelectric materialAutomatic wiper using piezoelectric material
Automatic wiper using piezoelectric materialeSAT Journals
Β 
Impact of industries on ground water quality by comparison between hoshangaba...
Impact of industries on ground water quality by comparison between hoshangaba...Impact of industries on ground water quality by comparison between hoshangaba...
Impact of industries on ground water quality by comparison between hoshangaba...eSAT Journals
Β 
Enhanced equally distributed load balancing algorithm for cloud computing
Enhanced equally distributed load balancing algorithm for cloud computingEnhanced equally distributed load balancing algorithm for cloud computing
Enhanced equally distributed load balancing algorithm for cloud computingeSAT Journals
Β 
Investigation on the behaviour of alfa composite in pre and post heat treated...
Investigation on the behaviour of alfa composite in pre and post heat treated...Investigation on the behaviour of alfa composite in pre and post heat treated...
Investigation on the behaviour of alfa composite in pre and post heat treated...eSAT Journals
Β 
A low noise band pass filter using an x-band injection-locked gunn oscillator
A low noise band pass filter using an x-band injection-locked gunn oscillatorA low noise band pass filter using an x-band injection-locked gunn oscillator
A low noise band pass filter using an x-band injection-locked gunn oscillatoreSAT Journals
Β 
Delay measurement technique using signature register for small delay defect d...
Delay measurement technique using signature register for small delay defect d...Delay measurement technique using signature register for small delay defect d...
Delay measurement technique using signature register for small delay defect d...eSAT Journals
Β 
A concept based model for product development in the emerging market
A concept based model for product development in the emerging marketA concept based model for product development in the emerging market
A concept based model for product development in the emerging marketeSAT Journals
Β 
Image detective efficient image retrieval system
Image detective    efficient image retrieval systemImage detective    efficient image retrieval system
Image detective efficient image retrieval systemeSAT Journals
Β 
Comparison of the performance of trsaodv with aodv under blackhole attack in ...
Comparison of the performance of trsaodv with aodv under blackhole attack in ...Comparison of the performance of trsaodv with aodv under blackhole attack in ...
Comparison of the performance of trsaodv with aodv under blackhole attack in ...eSAT Journals
Β 
Friction and wear behavior of disc brake pad material using banana peel powder
Friction and wear behavior of disc brake pad material using banana peel powderFriction and wear behavior of disc brake pad material using banana peel powder
Friction and wear behavior of disc brake pad material using banana peel powdereSAT Journals
Β 
Design and implementation of path planning algorithm for wheeled mobile robot...
Design and implementation of path planning algorithm for wheeled mobile robot...Design and implementation of path planning algorithm for wheeled mobile robot...
Design and implementation of path planning algorithm for wheeled mobile robot...eSAT Journals
Β 
Simulation and experimental studies for lateral extrusion of square and penta...
Simulation and experimental studies for lateral extrusion of square and penta...Simulation and experimental studies for lateral extrusion of square and penta...
Simulation and experimental studies for lateral extrusion of square and penta...eSAT Journals
Β 
Study effects of various dosage of polypropylene fiber and different dosage o...
Study effects of various dosage of polypropylene fiber and different dosage o...Study effects of various dosage of polypropylene fiber and different dosage o...
Study effects of various dosage of polypropylene fiber and different dosage o...eSAT Journals
Β 
Design and analysis of a tubular space frame chassis of a high performance ra...
Design and analysis of a tubular space frame chassis of a high performance ra...Design and analysis of a tubular space frame chassis of a high performance ra...
Design and analysis of a tubular space frame chassis of a high performance ra...eSAT Journals
Β 
Design and analysis of drive shaft for heavy duty truck
Design and analysis of drive shaft for heavy duty truckDesign and analysis of drive shaft for heavy duty truck
Design and analysis of drive shaft for heavy duty truckeSAT Journals
Β 
Utilization of pulverized plastic in cement concrete as fine aggregate
Utilization of pulverized plastic in cement concrete as fine aggregateUtilization of pulverized plastic in cement concrete as fine aggregate
Utilization of pulverized plastic in cement concrete as fine aggregateeSAT Journals
Β 

Viewers also liked (17)

Ntioxidant study of usnic acid and its derivative usnic acid diacetate
Ntioxidant study of usnic acid and its derivative usnic acid diacetateNtioxidant study of usnic acid and its derivative usnic acid diacetate
Ntioxidant study of usnic acid and its derivative usnic acid diacetate
Β 
Automatic wiper using piezoelectric material
Automatic wiper using piezoelectric materialAutomatic wiper using piezoelectric material
Automatic wiper using piezoelectric material
Β 
Impact of industries on ground water quality by comparison between hoshangaba...
Impact of industries on ground water quality by comparison between hoshangaba...Impact of industries on ground water quality by comparison between hoshangaba...
Impact of industries on ground water quality by comparison between hoshangaba...
Β 
Enhanced equally distributed load balancing algorithm for cloud computing
Enhanced equally distributed load balancing algorithm for cloud computingEnhanced equally distributed load balancing algorithm for cloud computing
Enhanced equally distributed load balancing algorithm for cloud computing
Β 
Investigation on the behaviour of alfa composite in pre and post heat treated...
Investigation on the behaviour of alfa composite in pre and post heat treated...Investigation on the behaviour of alfa composite in pre and post heat treated...
Investigation on the behaviour of alfa composite in pre and post heat treated...
Β 
A low noise band pass filter using an x-band injection-locked gunn oscillator
A low noise band pass filter using an x-band injection-locked gunn oscillatorA low noise band pass filter using an x-band injection-locked gunn oscillator
A low noise band pass filter using an x-band injection-locked gunn oscillator
Β 
Delay measurement technique using signature register for small delay defect d...
Delay measurement technique using signature register for small delay defect d...Delay measurement technique using signature register for small delay defect d...
Delay measurement technique using signature register for small delay defect d...
Β 
A concept based model for product development in the emerging market
A concept based model for product development in the emerging marketA concept based model for product development in the emerging market
A concept based model for product development in the emerging market
Β 
Image detective efficient image retrieval system
Image detective    efficient image retrieval systemImage detective    efficient image retrieval system
Image detective efficient image retrieval system
Β 
Comparison of the performance of trsaodv with aodv under blackhole attack in ...
Comparison of the performance of trsaodv with aodv under blackhole attack in ...Comparison of the performance of trsaodv with aodv under blackhole attack in ...
Comparison of the performance of trsaodv with aodv under blackhole attack in ...
Β 
Friction and wear behavior of disc brake pad material using banana peel powder
Friction and wear behavior of disc brake pad material using banana peel powderFriction and wear behavior of disc brake pad material using banana peel powder
Friction and wear behavior of disc brake pad material using banana peel powder
Β 
Design and implementation of path planning algorithm for wheeled mobile robot...
Design and implementation of path planning algorithm for wheeled mobile robot...Design and implementation of path planning algorithm for wheeled mobile robot...
Design and implementation of path planning algorithm for wheeled mobile robot...
Β 
Simulation and experimental studies for lateral extrusion of square and penta...
Simulation and experimental studies for lateral extrusion of square and penta...Simulation and experimental studies for lateral extrusion of square and penta...
Simulation and experimental studies for lateral extrusion of square and penta...
Β 
Study effects of various dosage of polypropylene fiber and different dosage o...
Study effects of various dosage of polypropylene fiber and different dosage o...Study effects of various dosage of polypropylene fiber and different dosage o...
Study effects of various dosage of polypropylene fiber and different dosage o...
Β 
Design and analysis of a tubular space frame chassis of a high performance ra...
Design and analysis of a tubular space frame chassis of a high performance ra...Design and analysis of a tubular space frame chassis of a high performance ra...
Design and analysis of a tubular space frame chassis of a high performance ra...
Β 
Design and analysis of drive shaft for heavy duty truck
Design and analysis of drive shaft for heavy duty truckDesign and analysis of drive shaft for heavy duty truck
Design and analysis of drive shaft for heavy duty truck
Β 
Utilization of pulverized plastic in cement concrete as fine aggregate
Utilization of pulverized plastic in cement concrete as fine aggregateUtilization of pulverized plastic in cement concrete as fine aggregate
Utilization of pulverized plastic in cement concrete as fine aggregate
Β 

Similar to Capacity Utilization and Product Mix Optimization in Woodworking Industry

Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...
Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...
Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...IJERA Editor
Β 
Simulation and analysis of low cost weeder
Simulation and analysis of low cost weederSimulation and analysis of low cost weeder
Simulation and analysis of low cost weedereSAT Publishing House
Β 
Balancing the line by using heuristic method based on cpm in salbp –a case study
Balancing the line by using heuristic method based on cpm in salbp –a case studyBalancing the line by using heuristic method based on cpm in salbp –a case study
Balancing the line by using heuristic method based on cpm in salbp –a case studyeSAT Journals
Β 
K012556370
K012556370K012556370
K012556370vijay lahri
Β 
Design and fabrication of modular fixture for cmm inspection
Design and fabrication of modular fixture for cmm inspectionDesign and fabrication of modular fixture for cmm inspection
Design and fabrication of modular fixture for cmm inspectioneSAT Journals
Β 
Experimental Study of Setup Time Reduction in CNC Machine Shop
Experimental Study of Setup Time Reduction in CNC Machine ShopExperimental Study of Setup Time Reduction in CNC Machine Shop
Experimental Study of Setup Time Reduction in CNC Machine Shopijtsrd
Β 
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...IRJET Journal
Β 
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...ijsrd.com
Β 
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVANIMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVANIRJET Journal
Β 
Design of special purpose machine head to improve the production of engine block
Design of special purpose machine head to improve the production of engine blockDesign of special purpose machine head to improve the production of engine block
Design of special purpose machine head to improve the production of engine blockIAEME Publication
Β 
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...IRJET Journal
Β 
Value stream mapping a case study of automotive
Value stream mapping a case study of automotiveValue stream mapping a case study of automotive
Value stream mapping a case study of automotiveeSAT Publishing House
Β 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mappingeSAT Journals
Β 
Iss 9
Iss 9Iss 9
Iss 9ijmvsc
Β 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET Journal
Β 
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machineDevelopment of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machineLaukik Raut
Β 
Process Design and Development of Engine Block
Process Design and Development of Engine BlockProcess Design and Development of Engine Block
Process Design and Development of Engine Blockpaperpublications3
Β 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...PERUMALSAMY M
Β 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryManufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryIRJET Journal
Β 

Similar to Capacity Utilization and Product Mix Optimization in Woodworking Industry (20)

Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...
Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...
Implementation of a Cellular Manufacturing Tool for Minimization of Non Value...
Β 
Simulation and analysis of low cost weeder
Simulation and analysis of low cost weederSimulation and analysis of low cost weeder
Simulation and analysis of low cost weeder
Β 
Balancing the line by using heuristic method based on cpm in salbp –a case study
Balancing the line by using heuristic method based on cpm in salbp –a case studyBalancing the line by using heuristic method based on cpm in salbp –a case study
Balancing the line by using heuristic method based on cpm in salbp –a case study
Β 
K012556370
K012556370K012556370
K012556370
Β 
K012556370
K012556370K012556370
K012556370
Β 
Design and fabrication of modular fixture for cmm inspection
Design and fabrication of modular fixture for cmm inspectionDesign and fabrication of modular fixture for cmm inspection
Design and fabrication of modular fixture for cmm inspection
Β 
Experimental Study of Setup Time Reduction in CNC Machine Shop
Experimental Study of Setup Time Reduction in CNC Machine ShopExperimental Study of Setup Time Reduction in CNC Machine Shop
Experimental Study of Setup Time Reduction in CNC Machine Shop
Β 
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
IRJET-Production of Hybrid Aluminium Matrix Composite with Welding Slag and F...
Β 
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
The Impact of Lean Production on the Cycle Time: A Case Study of a Welding As...
Β 
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVANIMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
IMPLEMENTATION OF LEAN TOOLS AND EGONOMIC ASPECTS IN THE DESIGN OF A CARAVAN
Β 
Design of special purpose machine head to improve the production of engine block
Design of special purpose machine head to improve the production of engine blockDesign of special purpose machine head to improve the production of engine block
Design of special purpose machine head to improve the production of engine block
Β 
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Β 
Value stream mapping a case study of automotive
Value stream mapping a case study of automotiveValue stream mapping a case study of automotive
Value stream mapping a case study of automotive
Β 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mapping
Β 
Iss 9
Iss 9Iss 9
Iss 9
Β 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion Study
Β 
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machineDevelopment of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Development of fixture_to_reduce_the_cycle_time_of_c_8_griding_machine
Β 
Process Design and Development of Engine Block
Process Design and Development of Engine BlockProcess Design and Development of Engine Block
Process Design and Development of Engine Block
Β 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Β 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryManufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Β 

More from eSAT Journals

Mechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementsMechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementseSAT Journals
Β 
Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case studyeSAT Journals
Β 
Managing drought short term strategies in semi arid regions a case study
Managing drought    short term strategies in semi arid regions  a case studyManaging drought    short term strategies in semi arid regions  a case study
Managing drought short term strategies in semi arid regions a case studyeSAT Journals
Β 
Life cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangaloreLife cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangaloreeSAT Journals
Β 
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materialsLaboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materialseSAT Journals
Β 
Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...eSAT Journals
Β 
Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...eSAT Journals
Β 
Influence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizerInfluence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizereSAT Journals
Β 
Geographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementGeographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementeSAT Journals
Β 
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...eSAT Journals
Β 
Factors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concreteFactors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concreteeSAT Journals
Β 
Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...eSAT Journals
Β 
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...eSAT Journals
Β 
Evaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabsEvaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabseSAT Journals
Β 
Evaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in indiaEvaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in indiaeSAT Journals
Β 
Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...eSAT Journals
Β 
Estimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodEstimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodeSAT Journals
Β 
Estimation of morphometric parameters and runoff using rs &amp; gis techniques
Estimation of morphometric parameters and runoff using rs &amp; gis techniquesEstimation of morphometric parameters and runoff using rs &amp; gis techniques
Estimation of morphometric parameters and runoff using rs &amp; gis techniqueseSAT Journals
Β 
Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...eSAT Journals
Β 
Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...eSAT Journals
Β 

More from eSAT Journals (20)

Mechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavementsMechanical properties of hybrid fiber reinforced concrete for pavements
Mechanical properties of hybrid fiber reinforced concrete for pavements
Β 
Material management in construction – a case study
Material management in construction – a case studyMaterial management in construction – a case study
Material management in construction – a case study
Β 
Managing drought short term strategies in semi arid regions a case study
Managing drought    short term strategies in semi arid regions  a case studyManaging drought    short term strategies in semi arid regions  a case study
Managing drought short term strategies in semi arid regions a case study
Β 
Life cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangaloreLife cycle cost analysis of overlay for an urban road in bangalore
Life cycle cost analysis of overlay for an urban road in bangalore
Β 
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materialsLaboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Β 
Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...Laboratory investigation of expansive soil stabilized with natural inorganic ...
Laboratory investigation of expansive soil stabilized with natural inorganic ...
Β 
Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of reinforcement on the behavior of hollow concrete block masonry p...
Β 
Influence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizerInfluence of compaction energy on soil stabilized with chemical stabilizer
Influence of compaction energy on soil stabilized with chemical stabilizer
Β 
Geographical information system (gis) for water resources management
Geographical information system (gis) for water resources managementGeographical information system (gis) for water resources management
Geographical information system (gis) for water resources management
Β 
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Β 
Factors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concreteFactors influencing compressive strength of geopolymer concrete
Factors influencing compressive strength of geopolymer concrete
Β 
Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...Experimental investigation on circular hollow steel columns in filled with li...
Experimental investigation on circular hollow steel columns in filled with li...
Β 
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Β 
Evaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabsEvaluation of punching shear in flat slabs
Evaluation of punching shear in flat slabs
Β 
Evaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in indiaEvaluation of performance of intake tower dam for recent earthquake in india
Evaluation of performance of intake tower dam for recent earthquake in india
Β 
Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...Evaluation of operational efficiency of urban road network using travel time ...
Evaluation of operational efficiency of urban road network using travel time ...
Β 
Estimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn methodEstimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of surface runoff in nallur amanikere watershed using scs cn method
Β 
Estimation of morphometric parameters and runoff using rs &amp; gis techniques
Estimation of morphometric parameters and runoff using rs &amp; gis techniquesEstimation of morphometric parameters and runoff using rs &amp; gis techniques
Estimation of morphometric parameters and runoff using rs &amp; gis techniques
Β 
Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...Effect of variation of plastic hinge length on the results of non linear anal...
Effect of variation of plastic hinge length on the results of non linear anal...
Β 
Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...Effect of use of recycled materials on indirect tensile strength of asphalt c...
Effect of use of recycled materials on indirect tensile strength of asphalt c...
Β 

Recently uploaded

(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
Β 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
Β 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
Β 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
Β 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
Β 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
Β 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
Β 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
Β 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
Β 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
Β 
Model Call Girl in Narela Delhi reach out to us at πŸ”8264348440πŸ”
Model Call Girl in Narela Delhi reach out to us at πŸ”8264348440πŸ”Model Call Girl in Narela Delhi reach out to us at πŸ”8264348440πŸ”
Model Call Girl in Narela Delhi reach out to us at πŸ”8264348440πŸ”soniya singh
Β 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEslot gacor bisa pakai pulsa
Β 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
Β 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
Β 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
Β 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
Β 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
Β 

Recently uploaded (20)

(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
Β 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
Β 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
Β 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
Β 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Β 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
Β 
β˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
β˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCRβ˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
β˜… CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
Β 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
Β 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
Β 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
Β 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
Β 
Model Call Girl in Narela Delhi reach out to us at πŸ”8264348440πŸ”
Model Call Girl in Narela Delhi reach out to us at πŸ”8264348440πŸ”Model Call Girl in Narela Delhi reach out to us at πŸ”8264348440πŸ”
Model Call Girl in Narela Delhi reach out to us at πŸ”8264348440πŸ”
Β 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
Β 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
Β 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
Β 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
Β 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
Β 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Β 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Β 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
Β 

Capacity Utilization and Product Mix Optimization in Woodworking Industry

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 139 CAPACITY UTILIZATION FOR PRODUCT MIX USING OPERATION BASED TIME STANDARD EVALUATION Sandeep A. Chowriwar1 , Ishan P. Lade2 , Pranay B. Sawaitul3 , Sachin M. Kamble4 1 Department of Mechanical Engineering, G. H. Raisoni Academy of Engineering & Technology, Nagpur (MH), India 2, 4 Department of Mechanical Engineering, Datta Meghe Institute of Engineering, Technology & Research, Wardha (MH) 3 Department of Mechanical Engineering, Anjuman College of Engineering & Technology, Nagpur (MH), India Abstract In this paper, a systematic and quantitative view is presented for the application of time study in woodworking furniture industry. The study is done in panel conversion plant on five CNC machines for various operations. For the calculation of cycle time, machining time calculator is developed and the operation research technique of mathematical programming is used for the capacity calculation of product mix. This makes manager to make faster decision in outsourcing problem and to improve the financial performance of the company. Keywords - Capacity utilization, cycle time, linear programming, manufacturing, time study. -----------------------------------------------------------------------***---------------------------------------------------------------------- 1. INTRODUCTION In the world of competitive business every enterprise wants to earn maximum profit with minimum inputs. Continuous improvement in the product is required for the survival of the industry in the global competition. Setting the time standard for different product is vital success of any enterprise. Time study gives the cycle time of the products on various machines which help in the capacity utilization calculations. From the manufacturing perspective, cycle time is one of the most important variables in manufacturing organizations. In this study, the woodworking organization encounters the very often situation of surplus demand than its capacity to manufacture. Because the company want to grab all the market demand in order to prevent other major competitors from penetrating the market and at the same time maintains the company reputation for on time delivery of products. The study is done in woodworking (modular furniture) industry based in central India. 1.1 Capacity Planning Capacity planning is the determination of capacity and adjustment of capacity to changing demand. Capacity decision has direct influence on resource productivity and customer satisfaction. Excess capacity results in low productivity. Due to under-utilization of resource while inadequate capacity results in poor customer service through delayed delivery goods. Capacity planning is basically matching the resource to demand. In case of stable demand, capacity planning becomes simple. But fluctuation in demand creates problems of acquisition of resources to match the demand. Creation of capacity involves substantial investment. For manufacturing firm, creation of capacity means investment in resources like labor, machines and equipment etc. while for service organization, it means creation of more space, furniture, other accessories and equipments. 2. CASE STUDY Central India based company having panel conversion plant (PCP) which manufactures five different types of product on five CNC rover machines at different prices. The company’s present production process have job order production of various products which having product wise routing in which various operation are done with respect to product specification. The product wise routing is time consuming because one product gets lot of time due to various components and it is very difficult to take the timings. The system of the company has standard norms for standard products. If the products gets changes, then ultimately the norms also changes and thus the cycle time of the product also changes. Therefore there is loss in efficiency, utilization of man and machine. In this study all the information related to raw material cost, hourly rate, selling price, demand, operation time, etc were collected. We have choose the five product given them name as A = prelamstorage@702, B = prelamstorage@1275, C = cabinet@1200, D = credenza@1350, E = pedestal on five CNC rover machine namely rover-20, rover B3, rover30, rover35, morby.
  • 2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 140 Table 1: Time study sheet of the company’ product ELE. NO. ELEMENT DESCRIPTION RATING N. TIME (SEC.) NO OF READIN GS AVG. TIME (SEC) OCC. NORM.T IME (SEC.) 1 Load panel on CNC & reverse 100 125.0 10.0 12.5 1:1 12.5 2 Reset against stopper, insure clamping ,operate start button 100 108.0 10.0 10.8 1:1 10.8 3 Auto cycle LH 100 88.0 1.0 88.0 1:1 88.0 4 Clean dust by air 100 87.0 9.0 9.7 1:1 9.7 5 Operate clamping switch, reverse panel & unload the panel 100 112.0 9.0 12.4 1:1 12.4 6 Load panel on CNC & reverse 100 90.0 7.0 12.9 1:1 12.9 7 Reset against stopper, insure clamping ,operate start button 100 94.0 7.0 13.4 1:1 13.4 8 Auto cycle RH 100 88.0 1.0 88.0 1:1 88.0 9 Clean dust by air 100 80.0 8.0 10.0 1:1 10.0 10 Operate clamping switch, reverse panel & unload panel 100 78.0 8.0 9.8 1:1 9.8 STD time = Normal time + (Normal time x allowance) = 176+176 X (0.13) = 198.9 As the time study sheet shows the auto cycle readings(cycle time) of CNC machine for particular product, this cycle time readings has to be noted from time to time for particular product. It is very difficult to note the cycle time again and again. To avoid this we have develop small software MACHINING TIME CALCULATOR in ms excel sheet for calculation of operation (element) wise timing. The element wise time reading is taken for various sizes of drill, face drill, KD/counter, grooving, hafle hole, routing and sizing, hinge etc. The time is taken for various element machines wise. The data like feed rate, speed of machine is entered in the software. 2.1 Advantages ο‚· There is no need to take the cycle time (Autocycle) again and again ο‚· The operations having same cycle time are defined ο‚· The output will get as the total machining time on each rover machine ο‚· If new product comes, then it is useful to find out the new product lead time ο‚· This helps in improving the efficiency of machine ο‚· To know the capacity and resource calculation ο‚· Meeting the delivery commitments of the customers Fig 1 Image of Machining Time Calculator software 3. ANALYSIS & CALCULATION OF TIME 3.1 Calculation of Machining Time: The machining time for the five products is calculated on the Machining Time Calculator with the help of drawing sheet on various CNC ROVER machines. The five machines will give the different machining time for above products. The machining time is calculated for different components of the respective products. The components wise machining time is
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 141 obtain and output time will get in seconds. The machining time calculator gives the graph which shows the lead time of product on various machines. For example the graph for product A is shown in figure. Fig 2 Machining Time in Sec for Product A 3.2 Calculation of Weekly Capacity The weekly capacity of work centre is shown in table 2. There are 5 machines, they run daily for 2 shifts (each of 8 hour shift) and 6 working days in a week i.e. (16x6x60 =5760 min). The setup time to be booked with small setup = 5min/setup and big setup = 10 min/setup. Therefore (45x5+0x10 = 225). The data of setup time is taken from company. Weekly capacity is calculated as (total weekly time – time lost due to setups). ie (5760-225) = 5535 min = 332100 sec. Table 2: shows weekly capacity of various machines Machine Weekly time Small setup Big setup Total Weekly capacity (min) Weekly capacity (sec) R20 (M1) 5760 45 0 225 5535 332100 B3 (M2) 5760 15.75 3 108.75 5651.25 339075 R30 (M3) 5760 15.12 24.5 318.12 5441.88 326512.8 R35 (M4) 5760 57.62 6.125 349.35 5410.65 324639 MORBY(M5) 5760 27.125 0 135.625 5624.38 337462.8 Table 3: shows the cycle time and capacity utilization Machine Time/product at various work centers, in sec Weekly capacity of machine A B C D E R20 569.17 525.76 522.93 682.69 347.21 332100 B3 670.11 641.51 620.91 768.05 400.09 339075 R30 709.37 650.52 620.18 795.27 400.36 326512.8 R35 749.74 639.01 610.39 798.58 390.28 324639 Morby 794.39 733.68 826.65 1074.2 396.1 337462.8 569.177 670.11 709.371 749.735 794.39 0 100 200 300 400 500 600 700 800 900 MACHINES ROV ER- 20 B-03
  • 4. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 142 4. FOMULATION OF MATHEMATICAL PROBLEM (LP) Let the company with m resources (1,2,…m) and n product (1,2,….n). Let the π‘˜π‘– is the capacity per week in sec for particular machine. Let π‘Ž 𝑛 is the processing time in sec to process a product say A Raw material price = 𝑅 𝐴 Market price = 𝑀𝐴 Market demand = 𝐷𝐴 Cycle time = π‘Ž1,𝑏1,𝑐1,𝑑1,𝑒1 Products = A,B,C,D,E No. of products manufactured in company = 𝑍𝑖 Outsource price = 𝑆𝑖 Due to capacity constraints company can manufacture𝑍𝑖. 𝑍𝑖≀𝐷𝑖 The LP objective function as follows 𝑍 π‘šπ‘Žπ‘₯ = (𝑀𝐴-𝑅 𝐴) A+ (𝑀 𝐡-𝑅 𝐡) B + (𝑀 𝐢-𝑅 𝐢) C + (𝑀 𝐷-𝑅 𝐷) + (𝑀 𝐸-𝑅 𝐸) E Subject to M1 π‘Ž1A+𝑏1B+𝑐1C+𝑑1D+𝑒1E β‰€π‘˜π‘–1 M2 π‘Ž2A+𝑏2B+𝑐2C+𝑑2D+𝑒2E β‰€π‘˜π‘–2 M3 π‘Ž3A+𝑏3B+𝑐3C+𝑑3D+𝑒3E β‰€π‘˜π‘–3 M4 π‘Ž4A+𝑏4B+𝑐4C+𝑑4D+𝑒4E β‰€π‘˜π‘–4 M5 π‘Ž5A+𝑏5B+𝑐5C+𝑑5D+𝑒5E β‰€π‘˜π‘–5 4.1 Formulation of a Problem by using Simplex Technique: 𝑍 π‘šπ‘Žπ‘₯ = (𝑀𝐴-𝑅 𝐴) A+ (𝑀 𝐡-𝑅 𝐡) B + (𝑀 𝐢-𝑅 𝐢) C + (𝑀 𝐷-𝑅 𝐷) + (𝑀 𝐸-𝑅 𝐸) E Maximize Z = 1166.67A + 1166.67B + 1666.67C + 1083.34D + 833.34E subject to 569.17A + 525.76B + 522.93C + 682.688D + 347.208E <=332100 670.11A + 641.506B + 620.91C + 768.045D + 400.091E <= 339075 709.371A+650.517B+620.18C+795.271D+400.362E<=32651 2.8 749.735A +639.005B+610.394C+798.577D+390.278E<=324639 794.39A + 733.678B + 826.645C + 1074.229D + 396.101E <= 337462.8 Market Constraints A<= 80, B<= 100, C<= 100, D<= 70, E<= 400 The resulting optimum product mix is to manufacture 29, 100, 100, 0,400 of A, B, C, D, E respectively. 5. METHODOLOGY FOR LINEAR PROGRAMMING ANALYSIS The market selling price of product A is 7000. The raw material cost for product A is 7000/1.2=5833.33=𝑅 𝐴 . Considering the 20% profit. The (𝑀𝐴-𝑅 𝐴) = 1166.67, from the table 5 the contractor price for all the products A,B,C,D,E, are 6200,6500,7500,6000,4800 respectively. The throughput per manufacturing unit of A can be calculated as (market price x (company profit% /100). The throughput per contracted unit is calculated as contractor price minus raw material cost i.e. (6200-5600=600). All the calculations are done in Indian currency. Table 4: shows the machine hr rate and cost for product Machine R20 B3 R30 R35 MORBY Cost/hr 364 520 520 401 548 Product A B C D E Machine time 569.177 641.506 620.18 798.577 396.101 Machine time hr 0.158105 0.178196 0.172272 0.221827 0.110028 Cost for product 57.55012 92.66198 89.58156 88.9526 60.29537
  • 5. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 143 The total throughput manufactured in company is equal to the throughput per manufactured unit x units to manufacture. Units contracted outside = market demand – units to manufacture. The total throughput contract is calculated as (throughput per contracted unit x units contracted outside). i.e (600 x 51=30600). The product throughput is the sum of total throughput manufactured in company and total throughput contract. Overall throughput is the summation of total product throughput for all the products. Similarly throughputs for other products are calculated. From the table 4 the cost for product is calculated as cost/hr x machine time hr. The cost for product is also called as operating expenses (OE). Similarly OE for other products is calculated. The product OE in company mfg is the product of OE and units to manufacture. The summation of product OE in company mfg for all the products is calculated. The highlighted portion shows the input variables. Table 5: shows the LP analysis result Details Product A B C D E Contractor Price 6200 6500 9500 6000 4800 Market price 7000 7000 10000 6500 5000 Company Profit % 20 20 20 20 20 Raw material cost/Unit 5600 5600 8000 5200 4000 Contractor profit 600 900 1500 800 800 Company Profit 1400 1400 2000 1300 1000 Market Demand 80 100 100 70 400 Units to manufacture 29 100 100 0 400 Throughput/ mf. Unit 1400 1400 2000 1300 1000 Total throughput mfg in company 40600 140000 200000 0 400000 Units contracted outside 51 0 0 70 0 Throughput/ contracted Unit 600 900 1500 800 800 Total throughput contract 30600 0 0 56000 0 Total product throughput 71200 140000 200000 56000 400000 Overall throughput (I) 867200 Operating expenses OE 44011.46 Net profit (I-OE) 823188.5 Product A B C D E OE 57.55012 92.66198 89.58156 88.9526 60.29537 Product OE in company mfg. 1668.953 9266.198 8958.156 0 24118.15 Total OE company mfg. 44011.46
  • 6. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 __________________________________________________________________________________________ Volume: 03 Issue: 02 | Feb-2014, Available @ http://www.ijret.org 144 Fig 3: units to be manufactured and outsourced 6. RESULTS ο‚· In LP analysis, net profit obtain is Rs 823188.5 ο‚· The resulting optimum product mix that is to manufacture 29, 100, 100, 0,400 of A, B, C, D, E respectively ο‚· To outsource 51 of A and 70 of D ο‚· Operating expenses is Rs 44011.46 7. CONCLUSION The setting of time standards helps in the achievement of production targets of the company. Application of machining time calculator helps in calculation of auto cycle reading with the help of drawing sheet. When new product comes then we can decide the cycle time with help of machining time calculator. Due to this there is no need to study the timing of operation again and again. In capacity utilization for the product mix, the LP model is simple and helps the manager to make faster decision in outsourcing problem with maximum throughput. When demand exceeds the capacity, the suggested model guides the exact quantity to be manufactured as well as the quantity to be outsourced. The model is simple to use and requires only two variables to compute, one is contractor’s profit and another is work time in resource. It is also requested to consider setup time during study as this having significant impact. REFERENCES [1]. Carl R Lindenmeyer 2001, How to design and conduct a computer integrated time study with active element performance rating(CITS APR). [2]. Dr.C.K Jain,Bharat Chede, Aparna Soni,2007 Quantitative analysis of capacity constrained resources for theory of constraints in manufacturing. ICRTME (2007) IP26-IP34. [3]. P S Chakraborty, G Majumdar, B Sarkar, 2006, Constraints resource management and production related decision-a case study. IE (I) Journal-PR Vol86, 2006, 48-53. [4]. Edverd J. Williams and Cilia Ortiz, 1996, Steel production method improvement study, Advances in Industrial engineering applications and practice.324-329. [5]. S.A.Oke, 2006, A case study application of time study model in an aluminum company. The pacific journal of science and technology volume (7) number (2). 153-162. [6]. Iain S. MacLeod, 2003, Real world effectiveness of ergonomic methods. Applied Ergonomics 34 (2003) 465-477. [7]. Jason J. Saleem, Brian M. Kleiner, Maury A. Nussbaum, 2003, Emperical evaluation of training and work analysis tool for participatory ergonomics, International Journal of industrial ergonomics, 31(2003)387-396. [8]. Stefano Apolloni, Marcello Lando, Matteo Savino,1984, Advanced techniques of theory of constraints and activity based costing for scheduling of high technology production lines. North river press Inc 1984. [9]. Industrial Engineering and Production Management by Martand Telsang. [10]. Industrial Engineering and Management by O. P. Khanna. 0 50 100 150 200 250 300 350 400 450 A B C D E units to be manufactured in company units to be outsourced