Submit Search
Upload
IRJET- Flexible Pavement
•
0 likes
•
15 views
IRJET Journal
Follow
https://www.irjet.net/archives/V6/i11/IRJET-V6I11321.pdf
Read less
Read more
Engineering
Report
Share
Report
Share
1 of 5
Download now
Download to read offline
Recommended
Evaluation and strengthening of reconstructed roads excavated for utilities u...
Evaluation and strengthening of reconstructed roads excavated for utilities u...
IAEME Publication
widening of flexible pavement AND construction of drainage system
widening of flexible pavement AND construction of drainage system
eakram akhtar
Training project report BSRDCL by Amit Kumar
Training project report BSRDCL by Amit Kumar
AmitKumar7069
Highway construction or Road work report
Highway construction or Road work report
Abdul rahman kureshi
railway
railway
Chanchal Prakash
Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Rubnawaz Bhatti
TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)
TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)
vishal prakash
Flexible pavement
Flexible pavement
AmitKumar8089
Recommended
Evaluation and strengthening of reconstructed roads excavated for utilities u...
Evaluation and strengthening of reconstructed roads excavated for utilities u...
IAEME Publication
widening of flexible pavement AND construction of drainage system
widening of flexible pavement AND construction of drainage system
eakram akhtar
Training project report BSRDCL by Amit Kumar
Training project report BSRDCL by Amit Kumar
AmitKumar7069
Highway construction or Road work report
Highway construction or Road work report
Abdul rahman kureshi
railway
railway
Chanchal Prakash
Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Presentation on Flyover at Aziz Cross on GT Road Gujranwala
Rubnawaz Bhatti
TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)
TRAINING REPORT ON COSTRUCTION OF FLYOVER FROM MITHAPUR TO CHIRIYATAND (BIHAR)
vishal prakash
Flexible pavement
Flexible pavement
AmitKumar8089
ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavement
NIWASHISH VISWAS
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
Satyam Anand
IRJET- Study on Flexible Pavement Failures and it’s Remedial Measures
IRJET- Study on Flexible Pavement Failures and it’s Remedial Measures
IRJET Journal
Design of highway (Flexible pavement)
Design of highway (Flexible pavement)
Raz Gupta
Concrete Road Pavement
Concrete Road Pavement
Awinash Tiwari
SUMMER TRAINING FROM PWD
SUMMER TRAINING FROM PWD
Ratnesh Kushwaha
Road construction
Road construction
JASIM ASHRAF
Gangaram yadav ppt road con....
Gangaram yadav ppt road con....
RaazYadav6
Road pavements-of-cement-concrete
Road pavements-of-cement-concrete
Mylene Delmoro
Flexible pavement
Flexible pavement
RajeshChoudhary147
ROAD REPAIR CIVIL ENGINEERING
ROAD REPAIR CIVIL ENGINEERING
RanBir ShaRma
Overseas road note 31
Overseas road note 31
Kali Bahadur Shahi
Design of rigit pavement
Design of rigit pavement
TAHIR HUSEN
Bituminous Road
Bituminous Road
shubham paliwal
(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...
(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...
Bharat Badre
Training report done on Bridge Construction
Training report done on Bridge Construction
Sukhdeep Jat
Training project report NHAI by Amit Kumar
Training project report NHAI by Amit Kumar
AmitKumar7069
Highway engineering at high altitudes
Highway engineering at high altitudes
Prashant Shekhar
Road construction
Road construction
Mohideen Al-haseb
IRJET- Optimization of Process Parameters of Submerged ARC Welding
IRJET- Optimization of Process Parameters of Submerged ARC Welding
IRJET Journal
IRJET- A Review on Box Pushing Technique
IRJET- A Review on Box Pushing Technique
IRJET Journal
IRJET- Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
IRJET- Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
IRJET Journal
More Related Content
What's hot
ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavement
NIWASHISH VISWAS
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
Satyam Anand
IRJET- Study on Flexible Pavement Failures and it’s Remedial Measures
IRJET- Study on Flexible Pavement Failures and it’s Remedial Measures
IRJET Journal
Design of highway (Flexible pavement)
Design of highway (Flexible pavement)
Raz Gupta
Concrete Road Pavement
Concrete Road Pavement
Awinash Tiwari
SUMMER TRAINING FROM PWD
SUMMER TRAINING FROM PWD
Ratnesh Kushwaha
Road construction
Road construction
JASIM ASHRAF
Gangaram yadav ppt road con....
Gangaram yadav ppt road con....
RaazYadav6
Road pavements-of-cement-concrete
Road pavements-of-cement-concrete
Mylene Delmoro
Flexible pavement
Flexible pavement
RajeshChoudhary147
ROAD REPAIR CIVIL ENGINEERING
ROAD REPAIR CIVIL ENGINEERING
RanBir ShaRma
Overseas road note 31
Overseas road note 31
Kali Bahadur Shahi
Design of rigit pavement
Design of rigit pavement
TAHIR HUSEN
Bituminous Road
Bituminous Road
shubham paliwal
(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...
(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...
Bharat Badre
Training report done on Bridge Construction
Training report done on Bridge Construction
Sukhdeep Jat
Training project report NHAI by Amit Kumar
Training project report NHAI by Amit Kumar
AmitKumar7069
Highway engineering at high altitudes
Highway engineering at high altitudes
Prashant Shekhar
Road construction
Road construction
Mohideen Al-haseb
IRJET- Optimization of Process Parameters of Submerged ARC Welding
IRJET- Optimization of Process Parameters of Submerged ARC Welding
IRJET Journal
What's hot
(20)
ppt on pwd cement concrete road pavement
ppt on pwd cement concrete road pavement
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT
IRJET- Study on Flexible Pavement Failures and it’s Remedial Measures
IRJET- Study on Flexible Pavement Failures and it’s Remedial Measures
Design of highway (Flexible pavement)
Design of highway (Flexible pavement)
Concrete Road Pavement
Concrete Road Pavement
SUMMER TRAINING FROM PWD
SUMMER TRAINING FROM PWD
Road construction
Road construction
Gangaram yadav ppt road con....
Gangaram yadav ppt road con....
Road pavements-of-cement-concrete
Road pavements-of-cement-concrete
Flexible pavement
Flexible pavement
ROAD REPAIR CIVIL ENGINEERING
ROAD REPAIR CIVIL ENGINEERING
Overseas road note 31
Overseas road note 31
Design of rigit pavement
Design of rigit pavement
Bituminous Road
Bituminous Road
(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...
(by mr.akash kolamkar) Rajapeth amravati rob flyover amravati presentation ps...
Training report done on Bridge Construction
Training report done on Bridge Construction
Training project report NHAI by Amit Kumar
Training project report NHAI by Amit Kumar
Highway engineering at high altitudes
Highway engineering at high altitudes
Road construction
Road construction
IRJET- Optimization of Process Parameters of Submerged ARC Welding
IRJET- Optimization of Process Parameters of Submerged ARC Welding
Similar to IRJET- Flexible Pavement
IRJET- A Review on Box Pushing Technique
IRJET- A Review on Box Pushing Technique
IRJET Journal
IRJET- Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
IRJET- Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
IRJET Journal
IRJET- Effect of Various Parameters on Performance of Rural Roads Constructed...
IRJET- Effect of Various Parameters on Performance of Rural Roads Constructed...
IRJET Journal
IRJET - Design of Improved Drainage System using Pervious Concrete
IRJET - Design of Improved Drainage System using Pervious Concrete
IRJET Journal
Village networking ppt
Village networking ppt
Patel Tapan
IRJET- A Review Paper on Study on Strengthening and Drainage of Flexible Pave...
IRJET- A Review Paper on Study on Strengthening and Drainage of Flexible Pave...
IRJET Journal
Experimental Study on Pavement Stabilization Using Geosynthetic Solution
Experimental Study on Pavement Stabilization Using Geosynthetic Solution
IRJET Journal
Design of Flexible Pavements for an Existing Road
Design of Flexible Pavements for an Existing Road
IRJET Journal
IRJET- A Review Paper on Evaluation of Flexible Pavement Failures
IRJET- A Review Paper on Evaluation of Flexible Pavement Failures
IRJET Journal
Summer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) Road
shashanksingh593
Productivity Escalation and Cost Optimisation of Equipment’s used in Pavement...
Productivity Escalation and Cost Optimisation of Equipment’s used in Pavement...
IRJET Journal
Study of design of the flexible pavements
Study of design of the flexible pavements
Shaik Asif Ahmed
Project report on CC road
Project report on CC road
vikash mishra
IRJET- A Study of Cement Treated Base and Sub Base in Flexible Pavement
IRJET- A Study of Cement Treated Base and Sub Base in Flexible Pavement
IRJET Journal
Utilization of industrial waste materials in the construction of interlocking...
Utilization of industrial waste materials in the construction of interlocking...
IRJET Journal
IRJET- A Review on a Study of Cement Treated Base and Sub-Base in Flexible Pa...
IRJET- A Review on a Study of Cement Treated Base and Sub-Base in Flexible Pa...
IRJET Journal
AVNEET TRAINING
AVNEET TRAINING
Avneet Grewall
Experimental study on strength characteristics of concrete with recycled aggr...
Experimental study on strength characteristics of concrete with recycled aggr...
eSAT Journals
Analysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case study
IRJET Journal
C026010018
C026010018
theijes
Similar to IRJET- Flexible Pavement
(20)
IRJET- A Review on Box Pushing Technique
IRJET- A Review on Box Pushing Technique
IRJET- Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
IRJET- Design and Analysis of Flexible Pavement in Amaravati Governemnt C...
IRJET- Effect of Various Parameters on Performance of Rural Roads Constructed...
IRJET- Effect of Various Parameters on Performance of Rural Roads Constructed...
IRJET - Design of Improved Drainage System using Pervious Concrete
IRJET - Design of Improved Drainage System using Pervious Concrete
Village networking ppt
Village networking ppt
IRJET- A Review Paper on Study on Strengthening and Drainage of Flexible Pave...
IRJET- A Review Paper on Study on Strengthening and Drainage of Flexible Pave...
Experimental Study on Pavement Stabilization Using Geosynthetic Solution
Experimental Study on Pavement Stabilization Using Geosynthetic Solution
Design of Flexible Pavements for an Existing Road
Design of Flexible Pavements for an Existing Road
IRJET- A Review Paper on Evaluation of Flexible Pavement Failures
IRJET- A Review Paper on Evaluation of Flexible Pavement Failures
Summer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) Road
Productivity Escalation and Cost Optimisation of Equipment’s used in Pavement...
Productivity Escalation and Cost Optimisation of Equipment’s used in Pavement...
Study of design of the flexible pavements
Study of design of the flexible pavements
Project report on CC road
Project report on CC road
IRJET- A Study of Cement Treated Base and Sub Base in Flexible Pavement
IRJET- A Study of Cement Treated Base and Sub Base in Flexible Pavement
Utilization of industrial waste materials in the construction of interlocking...
Utilization of industrial waste materials in the construction of interlocking...
IRJET- A Review on a Study of Cement Treated Base and Sub-Base in Flexible Pa...
IRJET- A Review on a Study of Cement Treated Base and Sub-Base in Flexible Pa...
AVNEET TRAINING
AVNEET TRAINING
Experimental study on strength characteristics of concrete with recycled aggr...
Experimental study on strength characteristics of concrete with recycled aggr...
Analysing the role of Cable Anchor in Hydroelectric project A case study
Analysing the role of Cable Anchor in Hydroelectric project A case study
C026010018
C026010018
More from IRJET Journal
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
IRJET Journal
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
IRJET Journal
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
IRJET Journal
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
IRJET Journal
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
IRJET Journal
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
IRJET Journal
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
IRJET Journal
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
IRJET Journal
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
IRJET Journal
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
IRJET Journal
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
IRJET Journal
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
IRJET Journal
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
IRJET Journal
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
IRJET Journal
React based fullstack edtech web application
React based fullstack edtech web application
IRJET Journal
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
IRJET Journal
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
IRJET Journal
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
IRJET Journal
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
IRJET Journal
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
IRJET Journal
More from IRJET Journal
(20)
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
React based fullstack edtech web application
React based fullstack edtech web application
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Recently uploaded
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
eptoze12
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
k795866
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Low Rate Call Girls In Saket, Delhi NCR
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
rehmti665
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
Asst.prof M.Gokilavani
Past, Present and Future of Generative AI
Past, Present and Future of Generative AI
abhishek36461
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
959SahilShah
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
NikhilNagaraju
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
ROCENODodongVILLACER
Internship report on mechanical engineering
Internship report on mechanical engineering
malavadedarshan25
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes examples
Dr. Gudipudi Nageswara Rao
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
VICTOR MAESTRE RAMIREZ
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
Chandu841456
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Dr.Costas Sachpazis
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting .
Satyam Kumar
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
PoojaBan
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
asadnawaz62
Recently uploaded
(20)
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
Past, Present and Future of Generative AI
Past, Present and Future of Generative AI
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
Internship report on mechanical engineering
Internship report on mechanical engineering
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
POWER SYSTEMS-1 Complete notes examples
POWER SYSTEMS-1 Complete notes examples
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting .
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
IRJET- Flexible Pavement
1.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 11 | Nov 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 3550 Flexible Pavement Assistant Proffesor Neeraj Syal1, Sonu Kumar2 ---------------------------------------------------------------***-------------------------------------------------------------- ABSTRACT - To provide a better road network is necessary, but it is not available at some places. There are some places where the traffic is higher or enough but road network is not available for it. Research area is from Drabshala to Salana which is used by Daily traffic such as Public bus, four wheeler, two wheelers, village people etc. to. The daily traffic is required a proper road but because of lack of maintenance the road becomes damaged and pavement deterioration is taking place like potholes ,rutting, disintegration and surface defects which are studied in this research. Now it is need to be repaired with a proper design. The aim of this research to provide a road design from Drabshala to Salana which should be safe and economical. Traffic data collection soil data collection and soil testing has been carried out. INTRODUCTION 1.1 FLEXIBLE PAVEMENT A Pavement which consists of a mixture of asphaltic or bituminous material and aggregate placed on a good quality and compacted granular material is termed or flexible pavement. The water bound maccadam roads is an example of a flexible pavement. The pavement consisting of a port land cement concrete slab. The cement grounted roads may be termed as semi- rigid pavement. 1.2 SUBGRADE The essential points of flexible pavement. The flexible pavements have low or negligible strength and are rather flexible in their structural action under the loads. The strenes are not transferred from grain to grain to grain the lower layers as in The case of flexible pavement layers. The flexible pavements have self heading properties but the rigid pavements do not have any, In other words, whatever deformation occurs in a flexible due to heavier wheel loads, it is or coverable to some extent after some time but it is not so in case of rigid pavement. The temperature variation due to changes in atmospheric conditions do not produce stresses in flexible pavement induce heavy stresses in flexible pavement but induce heavey stresses in the rigid pavements. The structural capacity of the flexible pavement is influenced by the strength of the sub-grade while the strength of the sub-grade heavenly little influence upon the structural capacity of the rigid pavements. The cost of construction of flexible pavements is less as compared to rigid pavements. 1.3 STRUCTURE OF A ROAD Sub – grade:- It is the natural soil an which the pavement rests and to which the enter load of the structure as well as that of traffic plying on the surface above is altimately transferred. It is the final cood carrying part of the structure. sub-Base:- It is placed immediately above the sub- grade soil and is campoved of hard well-burnt clinker, natural gravel or any other suitable material excavated at or near the site. Base:- It forms the structure which may be either rigid as in case of concrete road or flexible composed of broken stone cemented together by materials which allow some degree of flexibility in the pavement. The function of the base is to with stand the high shearing stresses prposed by concentrated loads at the surface and to distribute these loads to under lying layers of pavement or to the sub-grade soil as the case a may be. Wearing course or surface course:- In cave of a flexible pavements. It consists of a mixture of bituminous anaterial and aggregate and forms the natural wearing coat. In concrete roads no. separate surface course may usually be provided. The principal functions of the surface cobirse are to water proof of the base against the penetration of surface water and to resist the effects of abrasion and impacts ecused by the wheel roads.
2.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 11 | Nov 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 3551 1.4 FLEXIBLE PAVEMENT DEVIGN. The following are the four universally recognized factor which must be considered in arriving at the rational design of flexible pavement. The characteristics of the natural soil which underlying the pavement. The volume and character of traffic that will use the highway. The moisture which will exist under the clrfliteed pavement and the general drainage conditions of the area. The climatio conditions. PLANNING Planning for such works would be done by field staff. Planning has to start by all the states to inventorize the network such as it is. The first step could be to start the inventory on the ground by sketching out the alignments and verifying and recording the conditions on the spot as the inventorization proceeds States may sue cadastral maps for planning. Available with capacity of the manpower important parameters for the purpose are: The start and end points of the proposed road alignment. Which may be coded from a Habitation master record (to be maintained at Gram Panchayat level and inter level and integrated for the district at Zilla panchayat level). For inter habitation roads, and listed-village roadspaths and field paths of the farm-net. The record of Road length, its condition and other relevant data including alignment and Cross Drainage works and the volume of traffic (at Gram Panchayat and Zilla Panchayat level) The Convergence Guidelines issued by Division of the ministry should be used as the starting point and the mechanisms already in place should be used for planning. Funding and management processes to the extent permissible once the panchayat level maps are made, they should be subjected to a participatory rural appraisal (PRA) in a Gram Sabha specially called for this purpose and a priontization and desired standard should be recorded for each proposed road for this purpose. “Desired standard” should be categorized into two or three alternatives (Gravel Roads Gravel sealed Roads. Cement Concrete Block or Fly Ash Block or Stone set Pavement) based on traffic and local conditions. The priority gradation of the roads would be fixed by the Gram Sabha while the desired surface/standards of these roads (based on traffic and local conditions) will be fixed by the technical agency responsible for constructing the roads in consultation with SRRDA. The roads connecting two or more habitations may be unsealed may be unsealed (or thin sealed including gravel sealed) Unsealed gravel roads may be provided with surface with gravel of thickness 40- 50 mm over and above the thicknesses of gravel base as indicated in the design charts. Thin bituminous sealing of gravel roads in cases of very poor subgrade (CBR2) and traffic in T2 category and poor. Subgrade (CBR<4) and traffic in T3 category may be provided. Thin bituminous surfacing may be in the form of surface dressing or chip sealing. Roads within the habitations may be provided with cement Concrete Block pavement or Fly Ash block Pavements or stone set pavements with adequate drainage facilities. Farm net roads and intra habitation roads would be executed by the concerned Gram Panchayat. Inter- habitation roads and link roads would be executed by intermediate district panchayat or line department State Government may also make stae specific implementation arrangements. Routine maintenance and funding there of including the process of creating the management capacity for the purpose. Would be provided for under framework. Quality management procedures would be implemented by (District panchayat or technical department like PWD OR RWD as decided by the State Government. The state Government may assign the work of construction and supervision of such roads to any their agency. In general such work may be assigned to Zilla panchayat or intermediate Panchayats or technical department implementing 2.1 LEVERAGING THE IMPLEMENTATIONAL INFRASTRUCTER: In order to create a uniform and institutionalized framework for managing the non PMGSY Rural Road network it is best to start by leveraging MGNREGA Which in para 1B of schedule 1 to the MGNREG Act provides for taking up of works of “rural connectivity to provide all weather access including culverts and roads within a village wherever necessary” MGNREGA has inbuilt provisions for planning funding supervising and monitoring of the works which if properly utilized provide an excellent starting point for the creation of durable and productive assets However MGNREGA has the limitation of materials component some restriction on use of labour displacing machinery in this context. In this context the following system may be adopted: Creating the internal technical capacity. Among the various levels of the PRIs; for example the District
3.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 11 | Nov 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 3552 Panchayat needs the services of a Superintending Engineer or Executive Engineer to handle issues of planning. Design, supervision. Monitoring, quality and maintenance management etc. The intermediate /Block panchayat /cluster needs the services of one or more Assistant Engineers to Supervise the work of the junior engineers (ideally in the ration of 1:4): and the Gram panchayat shoul be able to avail the services of a Junior Engineer. Wherever the panchayat raj institutions or the department implementing this programme do not have adequate technical capacity. A retired Engineer (or the level of sub-divisional officer) with rural road expertise may be designted as a Block Technical Agency (BTA) and paid a Retainer by the division to check the design and estimate for which appropriate funds must be provided by the state Government Where the workload is high a Graduate Junior Engineer may be provided at the cluster level for the local roads by the PRIs or the concerned state Government Department out of its own resources and he may be provided training under the Rural Roads Training Framework. BTAs can also function as resource persons to do capacity building for the personnel PREPARATION OF ESTIMATE A Standard Template for Estimate of the work should be formulated and circulated and used. The Estimate should be based on the various ratios of local and transported soil, with various lead distances, both for construction and for maintenance (including replenishment of gravel and restoration of shoulders) Detailed estimates should be prepared by the field staff the estimates may also be prepared by PIU engineers further in case of capacity constraints or over work load field staff consultants may be hired for preparing these estimates. Detailed Estimate for construction/upgradation of an unsealed engineered road/path comprising formation cutting earth work for embankment including compaction. CDs and protection and base course using local materials; and wearing course with local materials creating unsealed or sealed gravel roads. Incase on considerations of traffic or climatic conditions, the road needs to be sealed or built to a higher standard. Which entails a higher materials component or sophisticated machinery at high hiring cost. State founded schemes should have a clear demarcation of the items of works machinery quantity and monitory value to be executed A common estimate should be prepared for the entire work. For every item. The complete cost of unskilled labour and cost of material and skilled labor should be clearly indicated. In the common estimate itemwise activity wise source of funding would be indicated. Part of the work which is funded by the State schemes may be allowed to be executed through contracts. Following items may be included in the estimate under contingency: Survey design, drawings and estimate preparation Preparation of tender documents and NIT publication charges Hire charges of vehicles and POL for inspection of works Photography video graphy and documentation Consumable items related to Quality Control and Planation maintenance Any small item left out from estimate due to unforeseen circumstances any additional item that is required to ensure proper use of approved / executed work. Quality control of works. Payment of testing fees Payment of technical Assistants /bare foot technicians may be made from the skilled wage (material component) of the work subject to the condition that all positions of the technical assistants/ bear foot engineers @ 1 for every 2500 cards shall be filled by the State Govt. and suitable provisions shall be made every work estimate and the amount shall be credited in the account form which remuneration of this functionaries is paid. Bare foot technicians to also act as laboratory technicians. 3.1 PAVEMENT DESIGN Indian roads congress (IRC) has brought out revised and updated “Guidelines for the Design of Flexible Pavements for low volume roads” IRC: SP: 72: 2015. These IRC Guidelines among others provides for design of low volume rural roads of T1 to T3 traffic categories (roads with 10,000 to 1,00,000 Equivalent Standard Axel Load (ESAL application). Which are ideal for non-PMGSY roads also. These roads can be constructed using gravel base, without using water Bound Macadam (WBM) base course and bituminous surfacing . Such roads can perform well for a long time for very low volume traffic with regravelling as maintenance requirement Such roads may be considered for connecting small habitations to Centres of economic educational and health services. The relevant design thicknesses for different traffic volumes and subgrade strength for T1 to T3 category of IRC SP: 72:2015 are as under for ready reference.
4.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 11 | Nov 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 3553 Table 3.1 Design Thickness For different Traffic Volumes and Subgrades Strength Traffic category T1 T2 T3 Sub grade strength 10.000-30.000 ESAL 30.000-60.000 60,000- 1,00.000 Very poor CBR=2 200 mm GB 100 mm MS 225 mm GB 100 mm MS 350 mm GB 100 mm MS Poor CBR = 3-4 200 mm GB 275 mm GB 400 mm GB Fair CBR=5-6 175 mm GB 250 mm GB 275 mm GB Good CBR=7-9 150 mm GB 175 mm GB 225 mm GB Very Good CBR = 10-15 125 mm GB 150 mm GB 175 mm GB GB: Gravel Base of CBR Not less than 80 MS: Modified Soil of CBR not less than 10 IRC SP: 72; 2015 has also brought out than the road should not be designed for subgrade CBR of less than 5. In case sub grade CBR is less than 5 either the improved sub grade material should be used or the material should be stabilized using cement, lime or other The CBR of the gravel base should be not be less than 80% for using above design charts. The CBR of the sub grade as well as gravel material may be based on Dynamic cone Penetrometer (DCP) values, as is also indicated in IRC SP 72.2015. As the gravel material of 80% CBR may not be available at all the palces the following simplified chart which allows the use of gravel material of any strength (above 15%) as is also suggested by couple of international experts may be used for design of such very low volume roads. It may also be indicated that in future whenever such roads are to be upgraded to higher category of traffic, the strength of the existing layers should be evaluated material to be reused and additional compaction may be permitted. Table 3.2 Traffic Category Sub Grade strength Traffic Category sub grade strength T1 10,000-30,000 ESAL T2 30,000-60,000 T3 60,000- 1,00,000 Very poor CBR=2 400 mm G1 or 325 mm G2 or 250 mm G3 450 mm G1 or 425 mm G2 or 350 mm G3 500 mm G1 or 450 mm G2 or 375 mm G3 Poor CBR= 3-4 325 mm G1 or 300 mm G2 or 225 mm G3 375 mm G1 or 350 mm G2 or 300 mm G3 450 mm G1 or 400 mm G2 or 350 mm G3 Fair CBR= 5-6 300 mm G1 or 250 mm G2 or 200 mm G3 350 mm G1 or 300 mm G2 or 250 mm G3 400 mm G1 or 350 mm G2 or 275 mm G3 Good CBR=7-9 250 mm G1 or 200 mm G2 or 300 mm G1 or 250 mm G2 or 325 mm G1 or 275 mm G2 or 150 mm G3 200 mm G3 225 mm G3 Very Good CBR = 10-15 275 mm G1 or 175 mm G2 or 150 mm G3 300 mm G1 or 200 mm G2 or 175 mm G3 275 mm G1 or 225 mm G2 or 200 mm G3 G1: Gravel material with CBR 15-24 G2: Gravel Material with CBR 25-44 G3: Gravel material with CBR 45 and above. As an alternative design stabilized base and sub-base with an appropriately designed thickness with thin bituminous surfacing have also been provided in IRC: SP: 72: 2015. Relevant design standards for gravel roads are available in Gravel Roads Manual I.e. IRC: SP: 77: 2008. Where conditions for providing a gravel road are not appropriate brick pavement or stone set pavement can be considered Brick aggregates are already in use as sub- base in Tripura and some parts of Bihar and uttar Pradesh and roads constructed using brick aggregates have performed well. The Gravel Roads Manual (IRC: SP-77:2008) and the Rural Roads manual (IRC: SP- 20:2002) would be the standard for Category I and Category II roads. CONCLUSIONS Based on the present study, the conclusions drawn are presented in three sections as given below: Relationship of Pavement Strength and Pavement Composition The strength of the pavement represented by the measured deflection at the surface on mature soil sub grades is influenced by the sub grade soil properties and layer composition on an in-service pavement in urban conditions. There is good correlation between deflection and Modified Structural Number for various classes of Pavement Condition Index for sub grade soil types SM and SC. In the case of pavement in good condition, ie, for the PCI range 60-80, linear relationship give better correlation. In the case of soil type SM, power function relationship showed better correlation. In general, either power function or linear relationships can be used for finding the deflection in order to arrive at a suitable maintenance option. The parameters such as Field Dry Density, Field Moisture Content, Optimum Moisture Content, Maximum Dry Density, Atterberg Limits, CBR, Soil composition and the fraction of Silt & Clay of the subgrade soil have influence on the strength of the pavement.
5.
International Research Journal
of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 11 | Nov 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 3554 Field Dry Density and Plasticity Index of the sub grade soil influence the deflection, whereas Maximum Dry Density has got less impact when gravel and silt and clay fractions are considered as variables. REFERENCE S.Chand Traffic Engineering Highway. AASHTO (1993), 'AASHTO Guide for design of pavement structures', American Association of State Highway & Transportation Officials, Washington, D C. Aggarwal S, Jain S S and Parida M (2002), 'A critical Appraisal of pavement management system', Journal of the Indian Roads Congress, Volume 63-2, 327 – 403. Aggarwal S, Jain S S and Parida M (2005), ‘Use of Pavement Management systems in Developing Countries’, Indian Highways, 5 – 17. Ali B, Sadek M and Shahrour I (2009), 'Finite Element Model for Urban Pavement Rutting: Analysis of Pavement Rehabilitation Methods', Journal of Transportation Engineering © ASCE, 235 – 239. Andreas L, Jonathan R and Siman C (2002), ‘Asphalt pavement deterioration models for wild climatic conditions', (web search) Arya I R, Kamaraj C and Ram A (1999), ‘Maintenance Cost Study on flexible pavements in India’, Highway Research Bulletin, No. 61, 101-115. Bassam S, Mitri H and Hormoz P (2005), 'Three Dimensional dynamic analysis of flexible conventional pavement foundation', Journal of Transportation Engineering Bexabith A G and Chandra S (2009), 'Comparative Study of Flexible and Rigid Pavements for Different Soil and Traffic Conditions', Journal of Indian Roads Congress, 153 - 162.
Download now