SlideShare a Scribd company logo
1 of 40
1
A
Practical Training Report
On
“CONSTRUCTION OF PLAIN CEMENT CONCRETE ROAD”
Taken at
PUBLIC WORKS DEPARTMENT, AJMER
Submitted to the
Rajasthan Technical University,Kota
In partial fulfillment of the requirement for the
Award of degree of
BACHELOR OF TECHNOLOGY
By
SATYAM ANAND
14CE51
DEPARTMENT OF CIVIL ENGINEERING
GOVT.ENGINEERING COLLEGE, AJMER
SESSION (2017-2018)
2
TABLE OF CONTENT
SNO.
TITLE
CERTIFICATE
ACKNOWLEDGEMENT
LIST OF TABLES
LIST OF FIGURES
ABSTRACT
1 INTRODUCTION
2 PROJECTOVERVIEW
2.1 Location of site
2.2 Estimate Cost
2.3 Contractor
2.4 Layout and sections
2.5 Technology used
3 MATERIAL USED
4 QUALITY CONTROLAND QUALITY ASSURANCE
4.1 Quality
4.2 Quality control
4.3 Quality Assurance
5 METHODOLOGY
6 PLANT AND MACHINERY
7 SAFETY
8 CONCLUSION
3
AKNOWLWDGEMENT
The training report on “CONSTRUCTION OF CC ROAD GULABBADI, AJMER” is an
outcome of guidance, moral support and devotion bestowed on us throughout our work. For
this we acknowledge and express our profound sense of gratitude and thanks to everybody
who have been a source of inspiration during the training.
We offer our sincere phrases of thanks with innate humility to “PUBLIC WORKS
DEPARTMENT’’ without whose support and guidance it would not have been possible for
this industrial training to have materialized and taken a concrete shape.
We our also thankful to Mr. PRADEEP KUMAR GOYAL(HOD CE), Govt. Engineering
College, Ajmer.
I would like to thank MR.KHEMARAM CHOUDHARY ,Asst. Engineer ,PWD
Ajmer , for his valuable time and guidance in completing my Industrial training and
preparation of the training Report.
DATE: - 04/08/2017 SATYAM ANAND
14CE51
4
INDEX
1. PWD :AN OVERVIEW
2. INTRODUCTION
3. WHAT IS ROAD OR PAVEMENT?
4. TYPES OF PAVEMENT
5. MATERIAL USED
6. CEMENT
7. SAND
8. AGGREGATE
9. PROPORTIONING
10. PROCEDURETO CONSTRUCT PAVEMENT
11. PREPARATION OF SUB-GRADE OR BASE COURSE
12. MIXTIG AND TRANSPORT OF CONCRETE
13. PLACING OF CONCRETE
14. SLIP FORMCONCRETE PAING
15. FILLING JOINTS
17. CURING
18. PROTECTIONOF THE CONCRETEPAVEMENT
19. SPECIAL MEASURE
20. OPENING TO TRAFFIC
21. COST AND ESTIMATE
22. CONCLUSION
5
Abstract
Name - Satyam Anand
Roll no. - 14CE51
Name of site - Shashtri Nagar, Nehra Nagar, Aam ka Taalab, Ajmer
Locationof site - Gulabadi, Ajmer
City - Ajmer
College name - Govt. Engineering College, Ajmer
Client - Public Work Department
Funding of project - Mukhya Mantri Gram Sadak Yojana
Costof project - 49.10lakhs
Submitted To: Submitted By:-
Mr. MaheshManwani Satyam Anand
Asst. Professor 14CE51
Govt. Engineering College, Ajmer
6
PUBLIC WORKS DEPARTMENT: AN OVERVIEW
Public Works Department (PWD), under the Ministry of Public Works department, is the
pioneer in construction arena of Rajasthan. Over about four centuries, PWD could
successfully set the trend and standard in the state`s infrastructure development. It plays a
pivotal role in the implementation of government construction projects. It also undertakes
projects for autonomous bodies as deposit works. Public works Department has highly
qualified and experienced professionals forming a multi-disciplinary team of civil, electrical
and mechanical engineers who work alongside architects from the Department of
Architecture. With its strong base of standards and professionalism developed over the years,
PWD is the repository of expertise and hence the first choices among discerning clients for
any type of construction project in Uttar Pradesh. Besides being the construction agency of
the Government, it performs regulatory function in setting the pace and managing projects for
the country's construction industry under the close supervision of the Ministry of Housing
and Public Works.
The Public works Department has highly qualified and experienced professionals forming a
multi-disciplinary team of civil, electrical and mechanical engineers who work alongside
architects from the Department of Architecture. As a sister organization falling under the
administrative control of the Ministry of Public Works department, the latter works well with
the PWD in providing service to the nation. With its strong base of standards and
professionalism developed over the years, the PWD is the repository of expertise and hence
the first choices among discerning clients for any type of construction project in Bangladesh.
It is recognized as a leader and pacesetter in the construction industry because of its
consistently superior performance.
7
CHAPTER-1
INTRODUCTION
Point of view geographic and population of the state is the nation's largest state. State
Industrial, economic and social development of the state and the population of each village is
absolutely necessary to re-connect to the main roads. In addition to state important national
roads, state roads and district roads and their proper broad be made to improve the quality of
traffic point of view is of particular importance. Public Works Department to build roads and
improve connectivity in rural zones, Other District Road and State broad and improvement of
rural roads and main routes narrow construction of zones and depleted bridges brides
reconstruction of the bases are transacted on a priority basis . Also under Pradhan Mantri
Gram Sadak Yojana and pre-fabricated construction of rural roads linking the work of other
district roads broad Suddikrn the scale bases are edited.
For the purpose of management and administration, roads in India are divided into the
following five categories:
 National Highways (NH)
 State Highways (SH)
 Major District Roads (MDR)
 Other District Roads (ODR)
 Village Roads (VR)
 The National Highways are intended to facilitate medium and long distance inter-city
passenger and freight traffic across the country. The State Highways are supposed to
carry the traffic along major centres within the State. Other District Roads and Village
Roads provide villages accessibility to meet their social needs as also the means to
transport agriculture produce from village to nearby markets. Major District Roads
provide the secondary function of linkage between main roads and rural roads.
Point of view geographic and population of the state is the nation's largest state. State
Industrial, economic and social development of the state and the population of each village is
absolutely necessary to re-connect to the main roads. In addition to state important national
roads, state roads and district roads and their proper broad be made to improve the quality of
traffic point of view is of particular importance. Public Works Department to build roads and
8
improve connectivity in rural zones, Other District Road and State broad and improvement of
rural roads and main routes narrow construction of zones and depleted bridges and brides
reconstruction of the bases are transacted on a priority basis. Also under Mukhaymantri
Gram Sadak Yojana and pre-fabricated construction of rural roads linking the work of other
district roads broad Kilometres the scale bases are edited.
Successful operation of various schemes for the Public Works Department engineers and
supervisory boards in different districts of the engineer‟s office has been settled. Activities
by planning, execution, and quality control etc. remove impediments find joy in relation to
the supervision over the activities are focused. Various schemes operated by the Department
of the Office of the Regional Chief Engineers and Chief Engineers office.
WHAT IS ROAD OR PAVEMENT?
Pavement or Road is an open, generally public way for the passage of vehicles, people,
and animals.
Pavement is finished with a hard smooth surface. It helped make them durable and able to
withstand traffic and the environment. They have a life span of between 20 – 30 years.
Road pavements deteriorate over time due to:-
 The impact of traffic, particularly heavy vehicles.
 Environmental factors such as weather, pollution.
TYPES OF PAVEMENTS
There are various types of pavements depending upon the materials used; a briefs
description of all types is given here-
FLEXIBLE PAVEMENTS:-
Bitumen has been widely used in the construction of flexible pavements for a long time.
This is the most convenient and simple type of construction. The cost of construction of
single lane bituminous pavement varies from 20 to 30 lakhs per km in plain areas. In some
applications, however, the performance of conventional bitumen may not be considered
satisfactory because of the following reasons.
 In summer season, due to high temperature, bitumen becomes soft resulting in
bleeding, rutting and segregation finally leading to failure of pavement.
 In winter season, due to low temperature, the bitumen becomes brittle resulting in
cracking, ravelling and unevenness which makes the pavement unsuitable for use.
9
 In rainy season, water enters the pavement resulting into pot holes and sometimes total
removal of bituminous layer.
 In hilly areas, due to sub-zero temperature, the freeze thaw and heave cycle takes
place. Due to freezing and melting of ice in bituminous voids, volume expansion and
contraction occur. This leads to pavements failure.
 The cost of bitumen has been rising continuously. In near future, there will be scarcity
of bitumen and it will be impossible to procure bitumen at very high costs.

 
flexible pavement 

RIGID PAVEMENTS:-
Rigid pavements, though costly in initial investment, are cheap in long run because of low
maintenance costs. There are various merits in the use of Rigid pavements (Concrete
pavements) are summarized below:
 Bitumen is derived from petroleum crude, which is in short supply globally and the
price of which has been rising steeply. India imports nearly 70% of the petroleum
crude. The demand for bitumen in the coming years is likely to grow steeply, far
outstripping the availability. Hence it will be in India's interest to explore alternative
binders. Cement is available in sufficient quantity in India, and its availability in the
future is also assured. Thus cement concrete roads should be the obvious choice in
future road programmes.
 Besides the easy available of cement, concrete roads have a long life and are
practically maintenance-free.
 Another major advantage of concrete roads is the savings in fuel by commercial
vehicles to an extent of 14-20%. The fuel savings themselves can support a large
programme of concreting.
 Cement concrete roads save a substantial quantity of stone aggregates and this factor
must be considered when a choice pavements is made,
 Concrete roads can withstand extreme weather conditions – wide ranging
temperatures, heavy rainfall and water logging.
 Though cement concrete roads may cost slightly more than a flexible pavement
initially, they are economical when whole-life-costing is considered.
10
Reduction in the cost of concrete pavements can be brought about by developing semi-self-
compacting concrete techniques and the use of closely spaced thin joints. R&D efforts should
be initiated in this area.
flexible and rigid pavement
TYPES OF CONCRETE PAVEMENTS
1. PLAIN CONCRETE OR SHORT PAVEMENT SLAB:-
This type of pavement consists of successive slabs whose length is limited to about 25 times
the slab thickness. At present it is recommended that the paving slabs not be made longer
than 5,even if the joints have dowels to transfer the loads. The movements as a result of
fluctuations in temperature and humidity are concentrated in the joints. Normally, these joints
are sealed to prevent water from penetrating the road structure. The width of the pavement
slabs is limited to a maximum of 4.5 m.
2. REINFORCEDCONCRETE:-
 Continuously reinforcedconcrete
Continuously reinforced concrete pavements are characterised by the absence of transverse
joints and are equipped with longitudinal steel reinforcement. The diameter of the reinforcing
bars is calculated in such a way that cracking can be controlled and that the cracks are
uniformly distributed (spacing at 1 to 3 m). The crack width has to remain very small, i.e.
less than 0.3 mm.
 Reinforcedpavement slabs
Reinforced concrete pavement slabs are almost never used, except for inside or outside
industrial floors that are subjected to large loads or if the number of contraction joints has to
be limited.
 Steelfibre concrete
The use of steel fibre concrete pavements is mainly limited to industrial floors. However, in
that sector they are used intensively. For road pavements steel fibre concrete can be used for
thin or very thin paving slabs or for very specific application.
11
CHAPTER-2
PROJECT OVERVIEW
2.1 LOCATION OF SITE:-
The cement concrete road is constructed at SHAKTI NAGAR , NEHRU NAGAR AND
AAM KA TALAB in Ward No.-41 GULABBARI, AJMER.
2.2 CLIENT:-PWD, AJMER
2.3 CONTRACTOR:-Nakoda Construction Pvt. Ltd.
2.4 OVERALL COST OF PROJECT:-
The overall cost of project is 49.10 lakhs.
2.5 LAYOUT:-
CROSS-SECTION Image
12
CHAPTER-3
MATERIAL USED
Concrete is widely used in domestic, commercial, recreational, rural and educational
construction.
Communities around the world rely on concrete as a safe, strong and simple building
material. It is used in all types of construction; from domestic work to multi-storey office
blocks and shopping complexes.
Despite the common usage of concrete, few people are aware of the considerations involved
in designing strong, durable, high quality concrete.
There are mainly three types-
1-Cement
2-Sand
3-Aggregate
1. CEMENT
A cement is a binder, a substance used in construction that sets and hardens and can bind
other materials together. The most important types of cement are used as a component in the
production of mortar in masonry, and of concrete, which is a combination of cement and
an aggregate to form a strong building material.
Cements used in construction can be characterized as being either hydraulic or non-hydraulic:
Hydraulic cements :-
(e.g., Portland cement) set and become adhesive due to a chemical reaction between the dry
ingredients and water. The chemical reaction results in mineral hydrates that are not very
water-soluble and so are quite durable in water and safe from chemical attack. This allows
setting in wet condition or underwater and further protects the hardened material from
chemical attack.
Non-hydraulic cement will not set in wet conditions or underwater; rather, it sets as it
dries and reacts with carbon dioxide in the air. It is resistant to attack by chemicals after
setting.
13
CEMENT
TYPES OF CEMENT
 Portland Cement
Portland cement is by far the most common type of cement in general use around the world.
This cement is made by heating limestone (calcium carbonate) with small quantities of other
materials (such as clay) to 1450 °C in a kiln, in a process known as calcination, whereby a
molecule of carbon dioxide is liberated from the calcium carbonate to form calcium oxide, or
quicklime, which is then blended with the other materials that have been included in the mix.
The resulting hard substance, called 'clinker', is then ground with a small amount
14
of gypsum into a powder to make 'Ordinary Portland Cement', the most commonly used type
of cement (often referred to as OPC). Portland cement is a basic ingredient
of concrete, mortar and most non-specialty grout. The most common use for Portland cement
is in the production of concrete. Concrete is a composite material consisting
of aggregate (gravel and sand), cement, and water. As a construction material, concrete can
be cast in almost any shape desired, and once hardened, can become a structural (load
bearing) element. Portland cement may be grey or white.
 Portland fly ashcement
Its contains up to 35% fly ash. The fly ash is pozzolanic, so that ultimate strength is
maintained. Because fly ash addition allows a lower concrete water content, early strength
can also be maintained. Where good quality cheap fly ash is available, this can be an
economic alternative to ordinary Portland cement.
 Portland pozzolan cement
It includes fly ash cement, since fly ash is a pozzolana , but also includes cements made from
other natural or artificial pozzolans. In countries where volcanic ashes are available.
 Portland silica fume cement
Addition of silica fume can yield exceptionally high strengths, and cements containing 5–
20% silica fume are occasionally produced. However, silica fume is more usually added to
Portland cement at the concrete mixer.
15
2. SAND
Sand is a naturally occurring granular material composed of finely
divided rock and mineral particles. The composition of sand is highly variable, depending on
the local rock sources and conditions, but the most common constituent of sand in inland
continental settings and non-tropical coastal settings is silica (silicon dioxide, or SiO2),
usually in the form of quartz.
The second most common type of sand is calcium carbonate, for example aragonite, which
has mostly been created, over the past half billion years, by various forms of life,
like coral and shellfish. It is, for example, the primary form of sand apparent in areas where
reefs have dominated the ecosystem for millions of years like the Caribbean.
Sand
16
3. AGGREGATES
Two types of aggregatesare used-
 CORASE AGGREGATE
 FINE AGGREGATE
COARSE AGGREGATES
Coarse aggregates shall consist of clean, hard, strong, dense, non-porous and durable pieces
of crush stone, crush gravel, natural gravel or a suitable combination of these material. They
shall not contain pieces of disintegrated stone, soft, flaky, elongated particles, salt, alkali,
vegetable matters or other deleterious materials in such quantities as to reduce the strength
and durability of the concrete. Coarse aggregates having positive alkali-silica reaction shall
not be used.
Maximum size of coarse aggregates not exceeding 25 mm.
The maximum value for flakiness index for the coarse aggregates shall not exceed 35
percentage. Los Angeles Abrasion value not exceeding 35 percentage. Combined flakiness
index and elongation index not to exceed 35 percent. Water absorption not to exceeding 3
percentage.
Grading requirement of coarse aggregates according to MoRTH specification is.
17
FINE AGGREGATES
Natural sand, crushed stone, or crushed gravel sand or a suitable combination of natural sand,
crushed stone, or crushed gravel, used as fine aggregates. The fine aggregates shall be dense,
durable, clean and free from veins and adherent coating and other deleterious material. They
shall not contain dust, lump, soft or flaky material, mica or other deleterious, material in such
quantities to reduce the strength and durability of concrete.
18
According to MoRTH specification Fine aggregates shall conform to the following grading
requirement-
19
WATER
Portable water is used for mixing and curing of concrete. It should be free from
harmful matter like salt, acid, oil etc. generally used water is from local water source
from economic view.
Water tanker
STEEL BLOCK
Steel block is used as formwork. Before using formwork it should be free from all
types material like dust, cement.
The depth of steel block is same as level of slab thickness.
20
CHAPTER:-4
QUALITY CONTROL AND QUALITY ASSURANCE
INTRODUCTION
Quality control:-The routine application, at the prescribed frequencies, of a system.
Of procedures for the sampling and testing of materials prior to placing and following
completion that ensure that specified standards are achieved.
Quality Assurance:-The identification of roles and responsibilities of all parties.
Together with procedure and systematic management is implemented effectively.
QUALITY CONTROL AT SITE
1. Testsample is not taken properly:For testing the bearing capacity of
soil, soil sample is taken from Khanpura side only, sample is not taken from
Ajmer side. Due to which pier P2 is redesign.
2. Lack of proper formwork: For piers, the formwork of ht. 2m is provided
only.
3. Lack of proper knowledge: Leveling for REWall is not done properly,
due to which its construction is banned for some time.
4. Quality of curing water: Water used for curing is of bad quality.
5. Lack of proper sources: Temporary stair is not present on the site, due to
which it become difficult to examine pier cap properly.
6. Lack of Engineers and workers: There is only one engineer at the site
who has to take care of work done by workers, making bills and bar bending
schedule, leveling and surveying …Hence, there is no proper quality control
at the site is present.
21
CHAPTER- 5
METHODOLOGY
1. SITE CLEARANCE
Removalof unserviceable soil, blown sand including excavation , loading and disposal up
to 1000m lead. Clearing and grubbing to remove vegetations, root and other organic matter
along the alignment up to the bottom width of the embankment and the side drains.
2. PREPARATION OF SUBGRADE
The soil sub-grade of rigid pavements also consists of natural or selected soil from
identified borrows pits fulfilling the specified requirement and well compacted in layer to
the specified density and thickness , as in the case of flexible pavement .The sub-grade is
the lowest layer of the components of the CC pavement which ultimately support all other
component layer and traffic load .If the sub-grade settles down or yield due to in adequate
compaction or any other cause, different type of failure start developing in the rigid
pavement also.
The strength test commonly adopted for the evaluation of soil sub-grade for rigid pavement
design is ‘plate bearing test’ using a relatively large diameter plate. The load supporting
capacity of the sub-grade is assed in term of ‘modulus of sub-grade reaction ’,K in
Westergaard’s approach of rigid pavement analysis.
3. PREPARATION OF GRANULAR SUB-BASE(GSB)/
DRAINAGE LAYER
The granular sub-base (GSB) course has to serve as an affective drainage layer
of the rigid pavement to prevent early failure due to excessive moisture content
in the sub-grade soil. Presence of excess moisture in soil sub-grade consisting of
fines (such as silt and clay) will cause early failure of rigid pavement due to ‘
pumping and blowing’ .Crushed stone aggregate are preferred in the GSB
coarse as this material has high permeability and serve as an effective drainage
layer .
The road sub grade has to be prepared carefully, in order to realize everywhere a pavement
structure of an adequate and uniform thickness. This allows to provide a homogeneous
bond between the concrete slab and its foundation which is important for the later
behaviour of the pavement structure.
For roads with a base, drainage of the water must be provided. Mud, leaves, etc. have to be
removed.
22
When the base is permeable, it should be sprayed with water in order to prevent the mixing
water from being sucked out of the concrete.
However, if the base is impermeable (e.g. if the concrete is placed on a watertight asphalt
concrete.
However, if the base is impermeable (e.g. if the concrete is placed on a watertight asphalt
concrete interlayer) it can be necessary under warm weather conditions to cool down this
layer by spraying water on the surface. Prepare the GSB (150mm)using following thickness
of by gravel.
Gravel layer is compacted using 8-10 tonn roller.
The granular sub-base or drainage layer is prepared by laying the two layer are:
• 75 mm thick layer using of 65-45 mm ballast.
• 75 mm thick layer using of 53-22.4 mm ballast.
The following points are important for roads without a foundation:
 Drainage of all surface water;
 Good compaction of the sub grade;
 Filling and compaction of any ruts caused by construction traffic;
Provide an additional width of the sub grade for more lateral support.
It is forbidden to level the sub grade by means of a course of sand. If the sub
grade has to be levelled, it is advisable to do this by using a granular material:
either slag or coarse aggregate e.g. with a grain size 0/20;
An effective drainage layer under the CC pavement has the following benefit :
 Increase in service life and improved performance of the CC
pavement.
Prevention of early failure of the rigid pavement due to ‘pumping and blowing’ Protection
of the sub-grade against frost action in frost susceptible areas.
23
PROPORTIONING
 In plane cement concrete (cc road) we use the proportioning of 1:4:8(40mm)
 Means 1 part of cement ,4 part of fine aggregate and 8 part of course aggregate.
 In cement concrete (top surface) we mix in the proportioning of 2:6:4:7 by
 Means that we mix
 2 bag of cement (100 kgs)
o bowl of coarse aggregate
 4 bowl of fine aggregate
o bowl of sand
 Bowl mean generally for carrier use by labour
PREPARATION OF THE SUB- GRADE OR BASE
Prepare the sub-Surface using wmm thickness of 40 mm by gravel. Gravel layer is compacted
using 8-10 tonn roller and on the gravel surface pcc is provide .pcc mean plain cement
concrete(kaccha) which is producing using 33 grade off wonder cement or ordinary plain
cement.
Thick ness of the pcc layer is about 40 mm and the mix proportioning is 1:4:8.
1 =cement ,4 =sand,8=coarse aggregate batching by volume. On pcc layer cement concrete
layer spread of 150 mm(6”).
24
MIXING AND TRANSPORT OF CONCRETE
CONCRETE MIXING PLANT :-The concrete mixing plant must have a sufficient
capacity in order to be able to continuously supply concrete to the paving machines. The mix
constituents and admixtures have to be dosed very accurately. The number of aggregate feed
bins has to equal at least the number of different aggregate fractions. The bins shall have
raised edges to prevent contamination of the aggregate fractions. The equipment for loading
the materials shall be in good condition and shall have sufficient capacity to be able to
continuously feed the bins. The bucket of the loaders shall not be wider than the bins. The
content of the cement silos and the water tank are in proportion to the production rates.
For small works, permanent concrete mixing plants are often called on. In that case, mixing
plants that are inspected and that can deliver Indian quality certification concrete should be
used.
Furthermore it is useful and even essential to have a communication system between the
concrete mixing plant and the construction site in order to coordinate the batching and paving
operations.
25
TRANSPORT OF THE CONCRETE
 Sufficient trucks must be available to continuously supply the paving machines. The
number depends on the yield at the construction site, the loading capacity of the trucks
and the cycle time (i.e. the transport time plus the time required to load and unload a
truck). The loading capacity and the type of truck to be used depend on the nature of the
work, the haul roads and the concrete paving machines.
Usually, the specifications prescribe that the concrete has to be transported in
dump trucks as paving concrete consists of a relatively dry mix having a
consistency that makes transport and unloading in truck mixers difficult.
Furthermore, dump trucks can discharge the concrete faster.
For small works and in urban areas, the use of truck mixers is increasingly accepted.
Under these circumstances an admixture (e.g. a superplastisizer ) can be mixed in just before
discharging the concrete.
The necessary measures have to be taken to prevent changes of the water
content and temperature of the concrete during transport. To this end, the
specifications prescribe to cover the dump trucks by means of a tarpaulin.
26
27
PLACING THE CONCRETE
Usually the concrete is placed using slip form paving machines which applies for all
categories of roads. This equipment meets both the requirements for quality and for the
envisaged rate of production. Conventional concreting trains riding on set up rails, are
hardly used any more for roadwork's in our country. For this reason this manner of
execution will not be dealt with here. However, the technique of manually placing the
concrete using forms s still applied in certain cases, such as for the construction of
roundabouts with a small diameter, at intersections, for repair work or when the execution
conditions are such that slip
form pavers cannot be utilized. This occurs increasingly often in urban areas for the
construction of pavement surfaces of exposed aggregate and possibly coloured concrete.
28
COMPACTION & FINISHING OF CONCRETE
 Compaction is the process that expels entrapped air from freshly placed concrete and
packs the aggregate particles together so as to increase the density of the concrete.
Compaction is the process which expels entrapped air from freshly placed
concrete and packs the aggregate particles together so as to increase the
density of concrete. It increases significantly the ultimate strength of
concrete.
Compaction significantly increases the ultimate strength of concrete and
enhances the bond with reinforcement. It also increases the abrasion
resistance and general durability of the concrete, decreases the
permeability and helps to minimise its shrinkage and creep characteristics.
Proper compaction also ensures that the reinforcement, tendons, inserts and
fixings are completely surrounded by dense concrete, the formwork is
completely filled – i.e. there are no pockets of honey-combed material – and
that the required surface finish is obtained on vertical surfaces.
Concrete shall be compacted during placing so that:
 A monolithic mass is created between the ends of the member, planned joints or
both;
 The formwork is completely filled to the intended level;
 The entrapped air is expelled;
 All reinforcement, tendons, ducts, anchorages and embedments are completely
surrounded;
 The specified finish to the formed surfaces of the member is provided;
The required properties of the concrete can be achieved.
29
CURING
Curing is the process or operation which controls the loss of moisture from concrete after it
has been placed in position, or in the manufacture of concrete products, thereby providing
time for the hydration of the cement to occur. Since the hydration of cement does take time,
days, and even weeks, rather than hours, curing must be undertaken for some specified period
of time if the concrete is to achieve its potential strength and durability. Curing may also
encompass the control of temperature since this affects the rate at which cement hydrates.
This period will depend on the properties required of the concrete, the purpose for which it is
to be used, and the ambient conditions, that is the temperature and relative humidity of the
surrounding atmosphere.
Since curing is designed primarily to keep the concrete moist by preventing the loss of
moisture from the concrete during the period in which it is gaining strength, it may be done in
two ways:
 By preventing an excessive loss of moisture from the concrete for some period of
time, e.g. by leaving formwork in place, covering the concrete with an impermeable
membrane after the formwork has been removed, or by a combination of such
methods; or
 By continuously wetting the surface thereby preventing the loss of moisture from it.
Ponding or spraying the surface with water are methods typically employed to this
end.
Methods:-
There are three basic ways of curing concrete.
1. The first - involves keeping the surface of the concrete moist by the use ponding,
spraying/sprinkling, damp sand or damp hessian.
2. The second prevents the loss of moisture from the concrete by covering it with
polythene sheeting or leaving the formwork in place.
3. The third involves the use of spray or roller applied curing compounds.
WaterCuring:-
Water curing, if properly carried out, can be the most efficient - and the most
appropriate for some t ypes of work, e.g. floors, and include ponding, sprinkling, and wet
coverings.
30
Ponding:-
On flat surfaces such as pavements, footpaths, and floors, concrete can be cured by ponding.
Earth or sand dykes around the perimeter of the concrete surface retain a pond of water
within the enclosed area. An efficient method for preventing loss of moisture from the
concrete, ponding is also effective for maintaining a uniform temperature however, the
method is often impractical except for small jobs.
Wet Coverings:-
Wet coverings such as hessian or other moisture retaining fabrics are extensively used for
curing. Such coverings should be placed as soon as the concrete has hardened sufficiently to
prevent surface damage. Care should be taken to cover the entire surface, including the edges
of slabs such as pavements and footpaths. The coverings should be kept continuously moist
so that a film of water remains on the concrete surface throughout the curing.
31
CHAPTER-6
PLANT AND MACHINERY
 INTRODUCTION:-It is a very useful part of any project .The aim of machinery is to
save time, to achieve accuracy. It is beneficial for economy. There are different type of
machinery which are used in construction cement concrete road:-
1. NOMINAL MIXERS:- (2 NOS)
 Capacity: - 0.1 Cu. M. per Mix Batch.
 Function: - Mixing of concrete in a by taking the help of volume batcher for proper
ratio.
Nominal Mixer
2. TRACTOR:-
 Manufactured by:- SONALIKA.
 Function:- To transport material from one place to another on site.It
even carry potable water tank for curing of structures .
32
3. VIBRATOR:-
a. Plate Vibrator
b. Needle Vibrator
33
c. FloaterVibrator
d .Strip Vibrator
ROLLER :-
 Weight: 8-10 tones
 Function: To compact the Earth & Soling.
34
GENERATOR:-
 Function: - To generate elctricity.
4. TROLLEY:-
 Function: -To carry material from one place to another.
35
EXECUTION OF JOINTS
All the equipment that is necessary to make joints in the fresh or hardened concrete must be
present at the construction site.
The saw blades have to be suitable to the quality of the concrete, i.e. to the hardness and the
abrasion resistance of the aggregates. It is useful to have spare equipment available in case of
a defect.
The beam for making a construction joint shall be rigid and shall allow the realization of a
straight joint perpendicular to the axis of the road. This beam has to be adapted to the type of
pavement (jointed pavement, continuously reinforced concrete pavement).
36
CHAPTER-7
STUDY OF SAFETY
1. BASIC RULES FOR SAFETY:-
a. Tidy up Construction Sites:-
 Keep passage clear all the time.
 Sort out materials and pile them up safely. The stacks Should not be too high.
 Beware of floor openings and ensure that they are fenced or covered.
TYPE OF SAFETY
1. Site safety-
 Avoid going to any area with insufficient lighting as there may
be some dangerous places which have not been provided with
fencing.
 Keep vigilant all the time and watch out for moving cranes
hooks or other lifting equipment.
 Avoid the dragging electric cables on the ground or allowing
the cables to come into contact with water.
2. Labour safety-
For your own safety and interest use the personal protective equipments provided by
your employer.
1. Gloves-Wear gloves when handling or contacting chemicals.
2. Helmet-Wear a safety helmet on construction site. Keep the harness of the helmet
clean and make sure that it fits well.
3. Safety shoes-Wear safety shoes to prevent foot injuries.
4. Nose mask-Wear a mask when working a dusty environment.
5. Safety Goggles-When there is a risk of eye injury, such as in concrete breaking or
using abrasive wheels.
6. Ear protector-Wear ear protectors in areas with high noise levels.
37
3. Personalsafety
 Wear protective equipment
 Do not drink or takes drugs while working.
 Pay attention to personal hygiene.
 Do not play in workplace
4. Equipment and material safety
Routine maintenance of rural roads are regularly carried out-
 All safety issues out of maintenance inspection are properly addressed.
 In all cases of accidents and inquiry/investigation thereof, safety issues are resolved,
and a report is made to the SQC for examination whether standard design features
need to be incorporated in other rural roads.
 All resolutions of Panchayats regarding safety issues are acknowledged and action
proposed/taken intimated to the Panchayat.
 Road safety awareness camps are organised involving Panchayats, School, Rural road
users (inhabitants as well as drivers), in accordance with programmers drawn up by
the State Quality Coordinator.
 The State Quality Coordinator will be the State Rural Road Safety Officer and shall
ensure:
 Adequate coordination with the State Road Safety Council and road safety
programmers.
 Formulation of rural road safety awareness programmed proposals (for funding under
PMGSY).
 Implementation and coordination of rural road safety awareness programmed in the
field.
 Hold quarterly meeting with DRRSO and take feedback for improving safety
standards.
5. Engineering measures in design phase
 Rural roads have to necessarily have a tortuous path, keeping in view the narrow land
width available.
 The vertical profile of the road should be designed such that the required minimum
stopping sight distance is available. Suitable summit and valley curves should be
provided.
 In hill roads, blind curves are a safety hazard. Suitable vision berms may be cut at
such locations.
 Passing places must be provided at convenient locations particularly on hill roads.
 The provision of rural connectivity leads to the introduction of bus services. Properly
designed bus-bays must be provided at bus stop to ensure that the buses do not
hamper the normal traffic.
38
 Where the roads pass through habitations and school, it is necessary that the
motorized vehicles travel at low speeds. This can be ensured by providing adequately
designed road humps or rumble strips.
 The junction of rural roads with a main road is always a point of conflict and an
accident-prone zone. Such junctions must be designed scientifically by providing
minimum turning radii, flaring of the side road with taper, acceleration/deceleration
must be provided at dangerous locations.
6. Safetyduring constructionand maintenance
 Barricades, drums, traffic cones, cylinders and signs around work zones o Flagmen
with red flags positioned to regulate and warn the road users.
 Stacking construction materials such that only the quantity needed for one operation
is stacked along the road, and obstruction to road users is minimised.
7. Using construction machinery carefully and parking such machinery at locations
where they are not traffic hazards.
.
39
CHAPTER-8
CONCLUSION
This training work is a outcome of immense dedication and hardwork of not one but many
people. The things which we got to learn in this project work are really important as well as
very helpful in our future.
The theory part taught in our colleges and universities are way different than the actual world
. The things which we got to learn practically are very different from that of the theory. In
fact there are several things which we got to learn in field would never have been learnt
theoretically . Also there was interaction with the workers and the public which was
something like a sense of responsibility.
The nation is developing and the future aspects of construction are very wide keeping that in
mind we need to contribute ourselves with full dedication towards the progress of our country
.
Reference
www.Google.com
www.concrete.net.au
www.res.gov.in
www.upjl.com
www.concrete.com
www.sand.uk
40

More Related Content

What's hot

Anshul pwd training report
Anshul pwd training reportAnshul pwd training report
Anshul pwd training report
Anshul Shakya
 

What's hot (20)

Road construction report
Road construction reportRoad construction report
Road construction report
 
Concrete Road Pavement
Concrete Road Pavement Concrete Road Pavement
Concrete Road Pavement
 
Anshul pwd training report
Anshul pwd training reportAnshul pwd training report
Anshul pwd training report
 
Summer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) RoadSummer Training Report On Bituminous (Asphalt) Road
Summer Training Report On Bituminous (Asphalt) Road
 
Road construction ppt
Road construction pptRoad construction ppt
Road construction ppt
 
Bitumin road construction
Bitumin road constructionBitumin road construction
Bitumin road construction
 
Highway construction or Road work report
Highway construction or Road work reportHighway construction or Road work report
Highway construction or Road work report
 
Bituminous Road
 Bituminous Road Bituminous Road
Bituminous Road
 
project final year civil
project final year civilproject final year civil
project final year civil
 
Gangaram yadav ppt road con....
Gangaram yadav ppt road con....Gangaram yadav ppt road con....
Gangaram yadav ppt road con....
 
CONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROADCONSTRUCTION OF CEMENT CONCRETE ROAD
CONSTRUCTION OF CEMENT CONCRETE ROAD
 
TRAINING REPORT A PROJECT ON ROAD WIDENI...
                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...                       TRAINING REPORT              A PROJECT  ON ROAD WIDENI...
TRAINING REPORT A PROJECT ON ROAD WIDENI...
 
Highway construction Report
Highway construction Report Highway construction Report
Highway construction Report
 
Construction of cc_road
Construction of cc_roadConstruction of cc_road
Construction of cc_road
 
Bombay road plan
Bombay road planBombay road plan
Bombay road plan
 
Bridge report
Bridge reportBridge report
Bridge report
 
SUMMER TRAINING FROM PWD
SUMMER TRAINING FROM PWDSUMMER TRAINING FROM PWD
SUMMER TRAINING FROM PWD
 
Road construction
Road constructionRoad construction
Road construction
 
DESIGN OF RCC CULVERT
DESIGN OF  RCC CULVERTDESIGN OF  RCC CULVERT
DESIGN OF RCC CULVERT
 
PROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTIONPROJECT REPORT ON ROAD CONSTRUCTION
PROJECT REPORT ON ROAD CONSTRUCTION
 

Similar to PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT

training report civil engg. 7th sem
training report civil engg. 7th semtraining report civil engg. 7th sem
training report civil engg. 7th sem
Rajat kashv
 
Design of rural road in uttarakhand
Design of rural road in uttarakhandDesign of rural road in uttarakhand
Design of rural road in uttarakhand
eSAT Journals
 
pdfcoffee.com_road-construction-7-pdf-free.pdf
pdfcoffee.com_road-construction-7-pdf-free.pdfpdfcoffee.com_road-construction-7-pdf-free.pdf
pdfcoffee.com_road-construction-7-pdf-free.pdf
mymail34
 

Similar to PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT (20)

PWD, national highway
PWD, national highwayPWD, national highway
PWD, national highway
 
BBM Report
BBM ReportBBM Report
BBM Report
 
INTERNSHIP REPORT ON FLEXIBLE PAVEMENT by SANJAY ACHARYA.pdf
INTERNSHIP REPORT ON FLEXIBLE PAVEMENT by SANJAY ACHARYA.pdfINTERNSHIP REPORT ON FLEXIBLE PAVEMENT by SANJAY ACHARYA.pdf
INTERNSHIP REPORT ON FLEXIBLE PAVEMENT by SANJAY ACHARYA.pdf
 
Training report on highway project
Training report on highway projectTraining report on highway project
Training report on highway project
 
training report civil engg. 7th sem
training report civil engg. 7th semtraining report civil engg. 7th sem
training report civil engg. 7th sem
 
Training Report on "ELEVATED ROAD"
Training Report on "ELEVATED ROAD"Training Report on "ELEVATED ROAD"
Training Report on "ELEVATED ROAD"
 
Smart Management of Heavy Traffic Urban Roads
Smart Management of Heavy Traffic Urban RoadsSmart Management of Heavy Traffic Urban Roads
Smart Management of Heavy Traffic Urban Roads
 
Dhruv atal 030
Dhruv atal 030Dhruv atal 030
Dhruv atal 030
 
Training report 2
Training report 2Training report 2
Training report 2
 
Study of causes of failures and remedies on road
Study of causes of failures and remedies on roadStudy of causes of failures and remedies on road
Study of causes of failures and remedies on road
 
Design of rural road in uttarakhand
Design of rural road in uttarakhandDesign of rural road in uttarakhand
Design of rural road in uttarakhand
 
BCE-UNIT-II Highway Engineering.pdf
BCE-UNIT-II Highway Engineering.pdfBCE-UNIT-II Highway Engineering.pdf
BCE-UNIT-II Highway Engineering.pdf
 
Rural road development_of_india_based_on PMGSY.
Rural road development_of_india_based_on PMGSY.Rural road development_of_india_based_on PMGSY.
Rural road development_of_india_based_on PMGSY.
 
pdfcoffee.com_road-construction-7-pdf-free.pdf
pdfcoffee.com_road-construction-7-pdf-free.pdfpdfcoffee.com_road-construction-7-pdf-free.pdf
pdfcoffee.com_road-construction-7-pdf-free.pdf
 
Summar tranning report of pwd
Summar tranning report of pwdSummar tranning report of pwd
Summar tranning report of pwd
 
Narendra nagar flexible road pavement training report
Narendra nagar  flexible road pavement training reportNarendra nagar  flexible road pavement training report
Narendra nagar flexible road pavement training report
 
IRJET- Self-Cleaning of Street by Sewage Treated Water using Street Stud
IRJET-  	  Self-Cleaning of Street by Sewage Treated Water using Street StudIRJET-  	  Self-Cleaning of Street by Sewage Treated Water using Street Stud
IRJET- Self-Cleaning of Street by Sewage Treated Water using Street Stud
 
AVNEET TRAINING
AVNEET TRAININGAVNEET TRAINING
AVNEET TRAINING
 
CTA110 Anand Barate-Patil seminar.pptx
CTA110 Anand Barate-Patil seminar.pptxCTA110 Anand Barate-Patil seminar.pptx
CTA110 Anand Barate-Patil seminar.pptx
 
IRJET- Highway Networking System
IRJET-  	  Highway Networking SystemIRJET-  	  Highway Networking System
IRJET- Highway Networking System
 

Recently uploaded

"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
mphochane1998
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
AldoGarca30
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
meharikiros2
 

Recently uploaded (20)

Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments""Lesotho Leaps Forward: A Chronicle of Transformative Developments"
"Lesotho Leaps Forward: A Chronicle of Transformative Developments"
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor8086 Microprocessor Architecture: 16-bit microprocessor
8086 Microprocessor Architecture: 16-bit microprocessor
 
Introduction to Geographic Information Systems
Introduction to Geographic Information SystemsIntroduction to Geographic Information Systems
Introduction to Geographic Information Systems
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...Basic Electronics for diploma students as per technical education Kerala Syll...
Basic Electronics for diploma students as per technical education Kerala Syll...
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...8th International Conference on Soft Computing, Mathematics and Control (SMC ...
8th International Conference on Soft Computing, Mathematics and Control (SMC ...
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
Worksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptxWorksharing and 3D Modeling with Revit.pptx
Worksharing and 3D Modeling with Revit.pptx
 
Query optimization and processing for advanced database systems
Query optimization and processing for advanced database systemsQuery optimization and processing for advanced database systems
Query optimization and processing for advanced database systems
 
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKARHAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
HAND TOOLS USED AT ELECTRONICS WORK PRESENTED BY KOUSTAV SARKAR
 

PWD CC ROAD CONSTRUCTION WORK TRAINING REPORT

  • 1. 1 A Practical Training Report On “CONSTRUCTION OF PLAIN CEMENT CONCRETE ROAD” Taken at PUBLIC WORKS DEPARTMENT, AJMER Submitted to the Rajasthan Technical University,Kota In partial fulfillment of the requirement for the Award of degree of BACHELOR OF TECHNOLOGY By SATYAM ANAND 14CE51 DEPARTMENT OF CIVIL ENGINEERING GOVT.ENGINEERING COLLEGE, AJMER SESSION (2017-2018)
  • 2. 2 TABLE OF CONTENT SNO. TITLE CERTIFICATE ACKNOWLEDGEMENT LIST OF TABLES LIST OF FIGURES ABSTRACT 1 INTRODUCTION 2 PROJECTOVERVIEW 2.1 Location of site 2.2 Estimate Cost 2.3 Contractor 2.4 Layout and sections 2.5 Technology used 3 MATERIAL USED 4 QUALITY CONTROLAND QUALITY ASSURANCE 4.1 Quality 4.2 Quality control 4.3 Quality Assurance 5 METHODOLOGY 6 PLANT AND MACHINERY 7 SAFETY 8 CONCLUSION
  • 3. 3 AKNOWLWDGEMENT The training report on “CONSTRUCTION OF CC ROAD GULABBADI, AJMER” is an outcome of guidance, moral support and devotion bestowed on us throughout our work. For this we acknowledge and express our profound sense of gratitude and thanks to everybody who have been a source of inspiration during the training. We offer our sincere phrases of thanks with innate humility to “PUBLIC WORKS DEPARTMENT’’ without whose support and guidance it would not have been possible for this industrial training to have materialized and taken a concrete shape. We our also thankful to Mr. PRADEEP KUMAR GOYAL(HOD CE), Govt. Engineering College, Ajmer. I would like to thank MR.KHEMARAM CHOUDHARY ,Asst. Engineer ,PWD Ajmer , for his valuable time and guidance in completing my Industrial training and preparation of the training Report. DATE: - 04/08/2017 SATYAM ANAND 14CE51
  • 4. 4 INDEX 1. PWD :AN OVERVIEW 2. INTRODUCTION 3. WHAT IS ROAD OR PAVEMENT? 4. TYPES OF PAVEMENT 5. MATERIAL USED 6. CEMENT 7. SAND 8. AGGREGATE 9. PROPORTIONING 10. PROCEDURETO CONSTRUCT PAVEMENT 11. PREPARATION OF SUB-GRADE OR BASE COURSE 12. MIXTIG AND TRANSPORT OF CONCRETE 13. PLACING OF CONCRETE 14. SLIP FORMCONCRETE PAING 15. FILLING JOINTS 17. CURING 18. PROTECTIONOF THE CONCRETEPAVEMENT 19. SPECIAL MEASURE 20. OPENING TO TRAFFIC 21. COST AND ESTIMATE 22. CONCLUSION
  • 5. 5 Abstract Name - Satyam Anand Roll no. - 14CE51 Name of site - Shashtri Nagar, Nehra Nagar, Aam ka Taalab, Ajmer Locationof site - Gulabadi, Ajmer City - Ajmer College name - Govt. Engineering College, Ajmer Client - Public Work Department Funding of project - Mukhya Mantri Gram Sadak Yojana Costof project - 49.10lakhs Submitted To: Submitted By:- Mr. MaheshManwani Satyam Anand Asst. Professor 14CE51 Govt. Engineering College, Ajmer
  • 6. 6 PUBLIC WORKS DEPARTMENT: AN OVERVIEW Public Works Department (PWD), under the Ministry of Public Works department, is the pioneer in construction arena of Rajasthan. Over about four centuries, PWD could successfully set the trend and standard in the state`s infrastructure development. It plays a pivotal role in the implementation of government construction projects. It also undertakes projects for autonomous bodies as deposit works. Public works Department has highly qualified and experienced professionals forming a multi-disciplinary team of civil, electrical and mechanical engineers who work alongside architects from the Department of Architecture. With its strong base of standards and professionalism developed over the years, PWD is the repository of expertise and hence the first choices among discerning clients for any type of construction project in Uttar Pradesh. Besides being the construction agency of the Government, it performs regulatory function in setting the pace and managing projects for the country's construction industry under the close supervision of the Ministry of Housing and Public Works. The Public works Department has highly qualified and experienced professionals forming a multi-disciplinary team of civil, electrical and mechanical engineers who work alongside architects from the Department of Architecture. As a sister organization falling under the administrative control of the Ministry of Public Works department, the latter works well with the PWD in providing service to the nation. With its strong base of standards and professionalism developed over the years, the PWD is the repository of expertise and hence the first choices among discerning clients for any type of construction project in Bangladesh. It is recognized as a leader and pacesetter in the construction industry because of its consistently superior performance.
  • 7. 7 CHAPTER-1 INTRODUCTION Point of view geographic and population of the state is the nation's largest state. State Industrial, economic and social development of the state and the population of each village is absolutely necessary to re-connect to the main roads. In addition to state important national roads, state roads and district roads and their proper broad be made to improve the quality of traffic point of view is of particular importance. Public Works Department to build roads and improve connectivity in rural zones, Other District Road and State broad and improvement of rural roads and main routes narrow construction of zones and depleted bridges brides reconstruction of the bases are transacted on a priority basis . Also under Pradhan Mantri Gram Sadak Yojana and pre-fabricated construction of rural roads linking the work of other district roads broad Suddikrn the scale bases are edited. For the purpose of management and administration, roads in India are divided into the following five categories:  National Highways (NH)  State Highways (SH)  Major District Roads (MDR)  Other District Roads (ODR)  Village Roads (VR)  The National Highways are intended to facilitate medium and long distance inter-city passenger and freight traffic across the country. The State Highways are supposed to carry the traffic along major centres within the State. Other District Roads and Village Roads provide villages accessibility to meet their social needs as also the means to transport agriculture produce from village to nearby markets. Major District Roads provide the secondary function of linkage between main roads and rural roads. Point of view geographic and population of the state is the nation's largest state. State Industrial, economic and social development of the state and the population of each village is absolutely necessary to re-connect to the main roads. In addition to state important national roads, state roads and district roads and their proper broad be made to improve the quality of traffic point of view is of particular importance. Public Works Department to build roads and
  • 8. 8 improve connectivity in rural zones, Other District Road and State broad and improvement of rural roads and main routes narrow construction of zones and depleted bridges and brides reconstruction of the bases are transacted on a priority basis. Also under Mukhaymantri Gram Sadak Yojana and pre-fabricated construction of rural roads linking the work of other district roads broad Kilometres the scale bases are edited. Successful operation of various schemes for the Public Works Department engineers and supervisory boards in different districts of the engineer‟s office has been settled. Activities by planning, execution, and quality control etc. remove impediments find joy in relation to the supervision over the activities are focused. Various schemes operated by the Department of the Office of the Regional Chief Engineers and Chief Engineers office. WHAT IS ROAD OR PAVEMENT? Pavement or Road is an open, generally public way for the passage of vehicles, people, and animals. Pavement is finished with a hard smooth surface. It helped make them durable and able to withstand traffic and the environment. They have a life span of between 20 – 30 years. Road pavements deteriorate over time due to:-  The impact of traffic, particularly heavy vehicles.  Environmental factors such as weather, pollution. TYPES OF PAVEMENTS There are various types of pavements depending upon the materials used; a briefs description of all types is given here- FLEXIBLE PAVEMENTS:- Bitumen has been widely used in the construction of flexible pavements for a long time. This is the most convenient and simple type of construction. The cost of construction of single lane bituminous pavement varies from 20 to 30 lakhs per km in plain areas. In some applications, however, the performance of conventional bitumen may not be considered satisfactory because of the following reasons.  In summer season, due to high temperature, bitumen becomes soft resulting in bleeding, rutting and segregation finally leading to failure of pavement.  In winter season, due to low temperature, the bitumen becomes brittle resulting in cracking, ravelling and unevenness which makes the pavement unsuitable for use.
  • 9. 9  In rainy season, water enters the pavement resulting into pot holes and sometimes total removal of bituminous layer.  In hilly areas, due to sub-zero temperature, the freeze thaw and heave cycle takes place. Due to freezing and melting of ice in bituminous voids, volume expansion and contraction occur. This leads to pavements failure.  The cost of bitumen has been rising continuously. In near future, there will be scarcity of bitumen and it will be impossible to procure bitumen at very high costs.    flexible pavement   RIGID PAVEMENTS:- Rigid pavements, though costly in initial investment, are cheap in long run because of low maintenance costs. There are various merits in the use of Rigid pavements (Concrete pavements) are summarized below:  Bitumen is derived from petroleum crude, which is in short supply globally and the price of which has been rising steeply. India imports nearly 70% of the petroleum crude. The demand for bitumen in the coming years is likely to grow steeply, far outstripping the availability. Hence it will be in India's interest to explore alternative binders. Cement is available in sufficient quantity in India, and its availability in the future is also assured. Thus cement concrete roads should be the obvious choice in future road programmes.  Besides the easy available of cement, concrete roads have a long life and are practically maintenance-free.  Another major advantage of concrete roads is the savings in fuel by commercial vehicles to an extent of 14-20%. The fuel savings themselves can support a large programme of concreting.  Cement concrete roads save a substantial quantity of stone aggregates and this factor must be considered when a choice pavements is made,  Concrete roads can withstand extreme weather conditions – wide ranging temperatures, heavy rainfall and water logging.  Though cement concrete roads may cost slightly more than a flexible pavement initially, they are economical when whole-life-costing is considered.
  • 10. 10 Reduction in the cost of concrete pavements can be brought about by developing semi-self- compacting concrete techniques and the use of closely spaced thin joints. R&D efforts should be initiated in this area. flexible and rigid pavement TYPES OF CONCRETE PAVEMENTS 1. PLAIN CONCRETE OR SHORT PAVEMENT SLAB:- This type of pavement consists of successive slabs whose length is limited to about 25 times the slab thickness. At present it is recommended that the paving slabs not be made longer than 5,even if the joints have dowels to transfer the loads. The movements as a result of fluctuations in temperature and humidity are concentrated in the joints. Normally, these joints are sealed to prevent water from penetrating the road structure. The width of the pavement slabs is limited to a maximum of 4.5 m. 2. REINFORCEDCONCRETE:-  Continuously reinforcedconcrete Continuously reinforced concrete pavements are characterised by the absence of transverse joints and are equipped with longitudinal steel reinforcement. The diameter of the reinforcing bars is calculated in such a way that cracking can be controlled and that the cracks are uniformly distributed (spacing at 1 to 3 m). The crack width has to remain very small, i.e. less than 0.3 mm.  Reinforcedpavement slabs Reinforced concrete pavement slabs are almost never used, except for inside or outside industrial floors that are subjected to large loads or if the number of contraction joints has to be limited.  Steelfibre concrete The use of steel fibre concrete pavements is mainly limited to industrial floors. However, in that sector they are used intensively. For road pavements steel fibre concrete can be used for thin or very thin paving slabs or for very specific application.
  • 11. 11 CHAPTER-2 PROJECT OVERVIEW 2.1 LOCATION OF SITE:- The cement concrete road is constructed at SHAKTI NAGAR , NEHRU NAGAR AND AAM KA TALAB in Ward No.-41 GULABBARI, AJMER. 2.2 CLIENT:-PWD, AJMER 2.3 CONTRACTOR:-Nakoda Construction Pvt. Ltd. 2.4 OVERALL COST OF PROJECT:- The overall cost of project is 49.10 lakhs. 2.5 LAYOUT:- CROSS-SECTION Image
  • 12. 12 CHAPTER-3 MATERIAL USED Concrete is widely used in domestic, commercial, recreational, rural and educational construction. Communities around the world rely on concrete as a safe, strong and simple building material. It is used in all types of construction; from domestic work to multi-storey office blocks and shopping complexes. Despite the common usage of concrete, few people are aware of the considerations involved in designing strong, durable, high quality concrete. There are mainly three types- 1-Cement 2-Sand 3-Aggregate 1. CEMENT A cement is a binder, a substance used in construction that sets and hardens and can bind other materials together. The most important types of cement are used as a component in the production of mortar in masonry, and of concrete, which is a combination of cement and an aggregate to form a strong building material. Cements used in construction can be characterized as being either hydraulic or non-hydraulic: Hydraulic cements :- (e.g., Portland cement) set and become adhesive due to a chemical reaction between the dry ingredients and water. The chemical reaction results in mineral hydrates that are not very water-soluble and so are quite durable in water and safe from chemical attack. This allows setting in wet condition or underwater and further protects the hardened material from chemical attack. Non-hydraulic cement will not set in wet conditions or underwater; rather, it sets as it dries and reacts with carbon dioxide in the air. It is resistant to attack by chemicals after setting.
  • 13. 13 CEMENT TYPES OF CEMENT  Portland Cement Portland cement is by far the most common type of cement in general use around the world. This cement is made by heating limestone (calcium carbonate) with small quantities of other materials (such as clay) to 1450 °C in a kiln, in a process known as calcination, whereby a molecule of carbon dioxide is liberated from the calcium carbonate to form calcium oxide, or quicklime, which is then blended with the other materials that have been included in the mix. The resulting hard substance, called 'clinker', is then ground with a small amount
  • 14. 14 of gypsum into a powder to make 'Ordinary Portland Cement', the most commonly used type of cement (often referred to as OPC). Portland cement is a basic ingredient of concrete, mortar and most non-specialty grout. The most common use for Portland cement is in the production of concrete. Concrete is a composite material consisting of aggregate (gravel and sand), cement, and water. As a construction material, concrete can be cast in almost any shape desired, and once hardened, can become a structural (load bearing) element. Portland cement may be grey or white.  Portland fly ashcement Its contains up to 35% fly ash. The fly ash is pozzolanic, so that ultimate strength is maintained. Because fly ash addition allows a lower concrete water content, early strength can also be maintained. Where good quality cheap fly ash is available, this can be an economic alternative to ordinary Portland cement.  Portland pozzolan cement It includes fly ash cement, since fly ash is a pozzolana , but also includes cements made from other natural or artificial pozzolans. In countries where volcanic ashes are available.  Portland silica fume cement Addition of silica fume can yield exceptionally high strengths, and cements containing 5– 20% silica fume are occasionally produced. However, silica fume is more usually added to Portland cement at the concrete mixer.
  • 15. 15 2. SAND Sand is a naturally occurring granular material composed of finely divided rock and mineral particles. The composition of sand is highly variable, depending on the local rock sources and conditions, but the most common constituent of sand in inland continental settings and non-tropical coastal settings is silica (silicon dioxide, or SiO2), usually in the form of quartz. The second most common type of sand is calcium carbonate, for example aragonite, which has mostly been created, over the past half billion years, by various forms of life, like coral and shellfish. It is, for example, the primary form of sand apparent in areas where reefs have dominated the ecosystem for millions of years like the Caribbean. Sand
  • 16. 16 3. AGGREGATES Two types of aggregatesare used-  CORASE AGGREGATE  FINE AGGREGATE COARSE AGGREGATES Coarse aggregates shall consist of clean, hard, strong, dense, non-porous and durable pieces of crush stone, crush gravel, natural gravel or a suitable combination of these material. They shall not contain pieces of disintegrated stone, soft, flaky, elongated particles, salt, alkali, vegetable matters or other deleterious materials in such quantities as to reduce the strength and durability of the concrete. Coarse aggregates having positive alkali-silica reaction shall not be used. Maximum size of coarse aggregates not exceeding 25 mm. The maximum value for flakiness index for the coarse aggregates shall not exceed 35 percentage. Los Angeles Abrasion value not exceeding 35 percentage. Combined flakiness index and elongation index not to exceed 35 percent. Water absorption not to exceeding 3 percentage. Grading requirement of coarse aggregates according to MoRTH specification is.
  • 17. 17 FINE AGGREGATES Natural sand, crushed stone, or crushed gravel sand or a suitable combination of natural sand, crushed stone, or crushed gravel, used as fine aggregates. The fine aggregates shall be dense, durable, clean and free from veins and adherent coating and other deleterious material. They shall not contain dust, lump, soft or flaky material, mica or other deleterious, material in such quantities to reduce the strength and durability of concrete.
  • 18. 18 According to MoRTH specification Fine aggregates shall conform to the following grading requirement-
  • 19. 19 WATER Portable water is used for mixing and curing of concrete. It should be free from harmful matter like salt, acid, oil etc. generally used water is from local water source from economic view. Water tanker STEEL BLOCK Steel block is used as formwork. Before using formwork it should be free from all types material like dust, cement. The depth of steel block is same as level of slab thickness.
  • 20. 20 CHAPTER:-4 QUALITY CONTROL AND QUALITY ASSURANCE INTRODUCTION Quality control:-The routine application, at the prescribed frequencies, of a system. Of procedures for the sampling and testing of materials prior to placing and following completion that ensure that specified standards are achieved. Quality Assurance:-The identification of roles and responsibilities of all parties. Together with procedure and systematic management is implemented effectively. QUALITY CONTROL AT SITE 1. Testsample is not taken properly:For testing the bearing capacity of soil, soil sample is taken from Khanpura side only, sample is not taken from Ajmer side. Due to which pier P2 is redesign. 2. Lack of proper formwork: For piers, the formwork of ht. 2m is provided only. 3. Lack of proper knowledge: Leveling for REWall is not done properly, due to which its construction is banned for some time. 4. Quality of curing water: Water used for curing is of bad quality. 5. Lack of proper sources: Temporary stair is not present on the site, due to which it become difficult to examine pier cap properly. 6. Lack of Engineers and workers: There is only one engineer at the site who has to take care of work done by workers, making bills and bar bending schedule, leveling and surveying …Hence, there is no proper quality control at the site is present.
  • 21. 21 CHAPTER- 5 METHODOLOGY 1. SITE CLEARANCE Removalof unserviceable soil, blown sand including excavation , loading and disposal up to 1000m lead. Clearing and grubbing to remove vegetations, root and other organic matter along the alignment up to the bottom width of the embankment and the side drains. 2. PREPARATION OF SUBGRADE The soil sub-grade of rigid pavements also consists of natural or selected soil from identified borrows pits fulfilling the specified requirement and well compacted in layer to the specified density and thickness , as in the case of flexible pavement .The sub-grade is the lowest layer of the components of the CC pavement which ultimately support all other component layer and traffic load .If the sub-grade settles down or yield due to in adequate compaction or any other cause, different type of failure start developing in the rigid pavement also. The strength test commonly adopted for the evaluation of soil sub-grade for rigid pavement design is ‘plate bearing test’ using a relatively large diameter plate. The load supporting capacity of the sub-grade is assed in term of ‘modulus of sub-grade reaction ’,K in Westergaard’s approach of rigid pavement analysis. 3. PREPARATION OF GRANULAR SUB-BASE(GSB)/ DRAINAGE LAYER The granular sub-base (GSB) course has to serve as an affective drainage layer of the rigid pavement to prevent early failure due to excessive moisture content in the sub-grade soil. Presence of excess moisture in soil sub-grade consisting of fines (such as silt and clay) will cause early failure of rigid pavement due to ‘ pumping and blowing’ .Crushed stone aggregate are preferred in the GSB coarse as this material has high permeability and serve as an effective drainage layer . The road sub grade has to be prepared carefully, in order to realize everywhere a pavement structure of an adequate and uniform thickness. This allows to provide a homogeneous bond between the concrete slab and its foundation which is important for the later behaviour of the pavement structure. For roads with a base, drainage of the water must be provided. Mud, leaves, etc. have to be removed.
  • 22. 22 When the base is permeable, it should be sprayed with water in order to prevent the mixing water from being sucked out of the concrete. However, if the base is impermeable (e.g. if the concrete is placed on a watertight asphalt concrete. However, if the base is impermeable (e.g. if the concrete is placed on a watertight asphalt concrete interlayer) it can be necessary under warm weather conditions to cool down this layer by spraying water on the surface. Prepare the GSB (150mm)using following thickness of by gravel. Gravel layer is compacted using 8-10 tonn roller. The granular sub-base or drainage layer is prepared by laying the two layer are: • 75 mm thick layer using of 65-45 mm ballast. • 75 mm thick layer using of 53-22.4 mm ballast. The following points are important for roads without a foundation:  Drainage of all surface water;  Good compaction of the sub grade;  Filling and compaction of any ruts caused by construction traffic; Provide an additional width of the sub grade for more lateral support. It is forbidden to level the sub grade by means of a course of sand. If the sub grade has to be levelled, it is advisable to do this by using a granular material: either slag or coarse aggregate e.g. with a grain size 0/20; An effective drainage layer under the CC pavement has the following benefit :  Increase in service life and improved performance of the CC pavement. Prevention of early failure of the rigid pavement due to ‘pumping and blowing’ Protection of the sub-grade against frost action in frost susceptible areas.
  • 23. 23 PROPORTIONING  In plane cement concrete (cc road) we use the proportioning of 1:4:8(40mm)  Means 1 part of cement ,4 part of fine aggregate and 8 part of course aggregate.  In cement concrete (top surface) we mix in the proportioning of 2:6:4:7 by  Means that we mix  2 bag of cement (100 kgs) o bowl of coarse aggregate  4 bowl of fine aggregate o bowl of sand  Bowl mean generally for carrier use by labour PREPARATION OF THE SUB- GRADE OR BASE Prepare the sub-Surface using wmm thickness of 40 mm by gravel. Gravel layer is compacted using 8-10 tonn roller and on the gravel surface pcc is provide .pcc mean plain cement concrete(kaccha) which is producing using 33 grade off wonder cement or ordinary plain cement. Thick ness of the pcc layer is about 40 mm and the mix proportioning is 1:4:8. 1 =cement ,4 =sand,8=coarse aggregate batching by volume. On pcc layer cement concrete layer spread of 150 mm(6”).
  • 24. 24 MIXING AND TRANSPORT OF CONCRETE CONCRETE MIXING PLANT :-The concrete mixing plant must have a sufficient capacity in order to be able to continuously supply concrete to the paving machines. The mix constituents and admixtures have to be dosed very accurately. The number of aggregate feed bins has to equal at least the number of different aggregate fractions. The bins shall have raised edges to prevent contamination of the aggregate fractions. The equipment for loading the materials shall be in good condition and shall have sufficient capacity to be able to continuously feed the bins. The bucket of the loaders shall not be wider than the bins. The content of the cement silos and the water tank are in proportion to the production rates. For small works, permanent concrete mixing plants are often called on. In that case, mixing plants that are inspected and that can deliver Indian quality certification concrete should be used. Furthermore it is useful and even essential to have a communication system between the concrete mixing plant and the construction site in order to coordinate the batching and paving operations.
  • 25. 25 TRANSPORT OF THE CONCRETE  Sufficient trucks must be available to continuously supply the paving machines. The number depends on the yield at the construction site, the loading capacity of the trucks and the cycle time (i.e. the transport time plus the time required to load and unload a truck). The loading capacity and the type of truck to be used depend on the nature of the work, the haul roads and the concrete paving machines. Usually, the specifications prescribe that the concrete has to be transported in dump trucks as paving concrete consists of a relatively dry mix having a consistency that makes transport and unloading in truck mixers difficult. Furthermore, dump trucks can discharge the concrete faster. For small works and in urban areas, the use of truck mixers is increasingly accepted. Under these circumstances an admixture (e.g. a superplastisizer ) can be mixed in just before discharging the concrete. The necessary measures have to be taken to prevent changes of the water content and temperature of the concrete during transport. To this end, the specifications prescribe to cover the dump trucks by means of a tarpaulin.
  • 26. 26
  • 27. 27 PLACING THE CONCRETE Usually the concrete is placed using slip form paving machines which applies for all categories of roads. This equipment meets both the requirements for quality and for the envisaged rate of production. Conventional concreting trains riding on set up rails, are hardly used any more for roadwork's in our country. For this reason this manner of execution will not be dealt with here. However, the technique of manually placing the concrete using forms s still applied in certain cases, such as for the construction of roundabouts with a small diameter, at intersections, for repair work or when the execution conditions are such that slip form pavers cannot be utilized. This occurs increasingly often in urban areas for the construction of pavement surfaces of exposed aggregate and possibly coloured concrete.
  • 28. 28 COMPACTION & FINISHING OF CONCRETE  Compaction is the process that expels entrapped air from freshly placed concrete and packs the aggregate particles together so as to increase the density of the concrete. Compaction is the process which expels entrapped air from freshly placed concrete and packs the aggregate particles together so as to increase the density of concrete. It increases significantly the ultimate strength of concrete. Compaction significantly increases the ultimate strength of concrete and enhances the bond with reinforcement. It also increases the abrasion resistance and general durability of the concrete, decreases the permeability and helps to minimise its shrinkage and creep characteristics. Proper compaction also ensures that the reinforcement, tendons, inserts and fixings are completely surrounded by dense concrete, the formwork is completely filled – i.e. there are no pockets of honey-combed material – and that the required surface finish is obtained on vertical surfaces. Concrete shall be compacted during placing so that:  A monolithic mass is created between the ends of the member, planned joints or both;  The formwork is completely filled to the intended level;  The entrapped air is expelled;  All reinforcement, tendons, ducts, anchorages and embedments are completely surrounded;  The specified finish to the formed surfaces of the member is provided; The required properties of the concrete can be achieved.
  • 29. 29 CURING Curing is the process or operation which controls the loss of moisture from concrete after it has been placed in position, or in the manufacture of concrete products, thereby providing time for the hydration of the cement to occur. Since the hydration of cement does take time, days, and even weeks, rather than hours, curing must be undertaken for some specified period of time if the concrete is to achieve its potential strength and durability. Curing may also encompass the control of temperature since this affects the rate at which cement hydrates. This period will depend on the properties required of the concrete, the purpose for which it is to be used, and the ambient conditions, that is the temperature and relative humidity of the surrounding atmosphere. Since curing is designed primarily to keep the concrete moist by preventing the loss of moisture from the concrete during the period in which it is gaining strength, it may be done in two ways:  By preventing an excessive loss of moisture from the concrete for some period of time, e.g. by leaving formwork in place, covering the concrete with an impermeable membrane after the formwork has been removed, or by a combination of such methods; or  By continuously wetting the surface thereby preventing the loss of moisture from it. Ponding or spraying the surface with water are methods typically employed to this end. Methods:- There are three basic ways of curing concrete. 1. The first - involves keeping the surface of the concrete moist by the use ponding, spraying/sprinkling, damp sand or damp hessian. 2. The second prevents the loss of moisture from the concrete by covering it with polythene sheeting or leaving the formwork in place. 3. The third involves the use of spray or roller applied curing compounds. WaterCuring:- Water curing, if properly carried out, can be the most efficient - and the most appropriate for some t ypes of work, e.g. floors, and include ponding, sprinkling, and wet coverings.
  • 30. 30 Ponding:- On flat surfaces such as pavements, footpaths, and floors, concrete can be cured by ponding. Earth or sand dykes around the perimeter of the concrete surface retain a pond of water within the enclosed area. An efficient method for preventing loss of moisture from the concrete, ponding is also effective for maintaining a uniform temperature however, the method is often impractical except for small jobs. Wet Coverings:- Wet coverings such as hessian or other moisture retaining fabrics are extensively used for curing. Such coverings should be placed as soon as the concrete has hardened sufficiently to prevent surface damage. Care should be taken to cover the entire surface, including the edges of slabs such as pavements and footpaths. The coverings should be kept continuously moist so that a film of water remains on the concrete surface throughout the curing.
  • 31. 31 CHAPTER-6 PLANT AND MACHINERY  INTRODUCTION:-It is a very useful part of any project .The aim of machinery is to save time, to achieve accuracy. It is beneficial for economy. There are different type of machinery which are used in construction cement concrete road:- 1. NOMINAL MIXERS:- (2 NOS)  Capacity: - 0.1 Cu. M. per Mix Batch.  Function: - Mixing of concrete in a by taking the help of volume batcher for proper ratio. Nominal Mixer 2. TRACTOR:-  Manufactured by:- SONALIKA.  Function:- To transport material from one place to another on site.It even carry potable water tank for curing of structures .
  • 32. 32 3. VIBRATOR:- a. Plate Vibrator b. Needle Vibrator
  • 33. 33 c. FloaterVibrator d .Strip Vibrator ROLLER :-  Weight: 8-10 tones  Function: To compact the Earth & Soling.
  • 34. 34 GENERATOR:-  Function: - To generate elctricity. 4. TROLLEY:-  Function: -To carry material from one place to another.
  • 35. 35 EXECUTION OF JOINTS All the equipment that is necessary to make joints in the fresh or hardened concrete must be present at the construction site. The saw blades have to be suitable to the quality of the concrete, i.e. to the hardness and the abrasion resistance of the aggregates. It is useful to have spare equipment available in case of a defect. The beam for making a construction joint shall be rigid and shall allow the realization of a straight joint perpendicular to the axis of the road. This beam has to be adapted to the type of pavement (jointed pavement, continuously reinforced concrete pavement).
  • 36. 36 CHAPTER-7 STUDY OF SAFETY 1. BASIC RULES FOR SAFETY:- a. Tidy up Construction Sites:-  Keep passage clear all the time.  Sort out materials and pile them up safely. The stacks Should not be too high.  Beware of floor openings and ensure that they are fenced or covered. TYPE OF SAFETY 1. Site safety-  Avoid going to any area with insufficient lighting as there may be some dangerous places which have not been provided with fencing.  Keep vigilant all the time and watch out for moving cranes hooks or other lifting equipment.  Avoid the dragging electric cables on the ground or allowing the cables to come into contact with water. 2. Labour safety- For your own safety and interest use the personal protective equipments provided by your employer. 1. Gloves-Wear gloves when handling or contacting chemicals. 2. Helmet-Wear a safety helmet on construction site. Keep the harness of the helmet clean and make sure that it fits well. 3. Safety shoes-Wear safety shoes to prevent foot injuries. 4. Nose mask-Wear a mask when working a dusty environment. 5. Safety Goggles-When there is a risk of eye injury, such as in concrete breaking or using abrasive wheels. 6. Ear protector-Wear ear protectors in areas with high noise levels.
  • 37. 37 3. Personalsafety  Wear protective equipment  Do not drink or takes drugs while working.  Pay attention to personal hygiene.  Do not play in workplace 4. Equipment and material safety Routine maintenance of rural roads are regularly carried out-  All safety issues out of maintenance inspection are properly addressed.  In all cases of accidents and inquiry/investigation thereof, safety issues are resolved, and a report is made to the SQC for examination whether standard design features need to be incorporated in other rural roads.  All resolutions of Panchayats regarding safety issues are acknowledged and action proposed/taken intimated to the Panchayat.  Road safety awareness camps are organised involving Panchayats, School, Rural road users (inhabitants as well as drivers), in accordance with programmers drawn up by the State Quality Coordinator.  The State Quality Coordinator will be the State Rural Road Safety Officer and shall ensure:  Adequate coordination with the State Road Safety Council and road safety programmers.  Formulation of rural road safety awareness programmed proposals (for funding under PMGSY).  Implementation and coordination of rural road safety awareness programmed in the field.  Hold quarterly meeting with DRRSO and take feedback for improving safety standards. 5. Engineering measures in design phase  Rural roads have to necessarily have a tortuous path, keeping in view the narrow land width available.  The vertical profile of the road should be designed such that the required minimum stopping sight distance is available. Suitable summit and valley curves should be provided.  In hill roads, blind curves are a safety hazard. Suitable vision berms may be cut at such locations.  Passing places must be provided at convenient locations particularly on hill roads.  The provision of rural connectivity leads to the introduction of bus services. Properly designed bus-bays must be provided at bus stop to ensure that the buses do not hamper the normal traffic.
  • 38. 38  Where the roads pass through habitations and school, it is necessary that the motorized vehicles travel at low speeds. This can be ensured by providing adequately designed road humps or rumble strips.  The junction of rural roads with a main road is always a point of conflict and an accident-prone zone. Such junctions must be designed scientifically by providing minimum turning radii, flaring of the side road with taper, acceleration/deceleration must be provided at dangerous locations. 6. Safetyduring constructionand maintenance  Barricades, drums, traffic cones, cylinders and signs around work zones o Flagmen with red flags positioned to regulate and warn the road users.  Stacking construction materials such that only the quantity needed for one operation is stacked along the road, and obstruction to road users is minimised. 7. Using construction machinery carefully and parking such machinery at locations where they are not traffic hazards. .
  • 39. 39 CHAPTER-8 CONCLUSION This training work is a outcome of immense dedication and hardwork of not one but many people. The things which we got to learn in this project work are really important as well as very helpful in our future. The theory part taught in our colleges and universities are way different than the actual world . The things which we got to learn practically are very different from that of the theory. In fact there are several things which we got to learn in field would never have been learnt theoretically . Also there was interaction with the workers and the public which was something like a sense of responsibility. The nation is developing and the future aspects of construction are very wide keeping that in mind we need to contribute ourselves with full dedication towards the progress of our country . Reference www.Google.com www.concrete.net.au www.res.gov.in www.upjl.com www.concrete.com www.sand.uk
  • 40. 40