International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 02 | Feb 2019 www.irjet.net p-ISSN: 2395-0072
One Day National Conference on Recent Advancement in Civil Engineering (RACE 2K19)
25th February 2019
Organized by
Department of Civil Engineering, T John Institute of Technology, Bangalore-83
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1913
COST COMPARISON ON INDUSTRIALIZED BUILDING SYSTEM (IBS) AND
CONVENTIONAL METHOD FOR SCHOOL CONSTRUCTION PROJECT
PRAJITH DEV V P1, Ms Anchu Ajayakumar2
1PG Scholar Department of Civil Engineering, EASA College of Engineering and Technology (ECET),
Coimbatore, Tamil Nadu, India.
2Assistant Professor Department of Civil Engineering, EASA College of Engineering and Technology (ECET),
Coimbatore, Tamil Nadu, India.
-------------------------------------------------------------------------***----------------------------------------------------------------------
Abstract:- Industrialized Building System (IBS) can be
defined as one of construction method that can upgrade the
quality and productivity of the construction by using better
or less machineries, equipment, materials, and extensive
project planning. IBS can be classified into many types,
depending on each country. Five types of IBS that were
commonly used in India for structural elements such as wall,
roof truss, beam, column, and slab are precast concrete
system, reusable formwork system, steel framing systems,
prefabricated timber framing systems, and block work
systems. One of the barrier for IBS implementation in India
that are currently facing by most of construction industry
players is the negative thought of implementing IBS is
not cost effective compared to conventional method.
Hence, the study which focused on school construction
project was done to determine the cost comparison
based on technical data collection and analysis between
IBS which using half slab with conventional method for
slab structure and also to determine the perception from the
industrial players on IBS and conventional method through
questionnaire surveys. From the results obtained, the
difference (in percentage) for both construction methods
which also can be said as the percentage of reduction in cost
for the calculated floor slab is 11.9%. This shows that IBS
offers a good reduction in cost compared to conventional
system.
Index Terms:- IBS, FRAMING SYSTEMS
I. INTRODUCTION
Construction sector in India is one of important and
productive sector. As a developing country, this sector
plays a major role for the economic growth and also to
upgrade the quality of life and living standard of Indian
(Khan, 2014). In year 2006, the expenditure due to the
funding of building construction and improvements of
infrastructure such as schools, hospitals, and government
living quarters by the Federal Government was RM35.8
billion compared to year 2007 which was RM 40.6 billion
(CIDB, 2008). The increasing of the expenditure was
partly due to increasing price of the building construction
materials. As the Indian construction sector keep on
expanding, it is going through a transitional change to a
more systematic and mechanized system, prefabrication
technology and upgrading the skills of workers compared to
conventional technologies as a trend towards the global
competition (Haron, 2005; Chan, 2011). Rahim et al.
(2013) explained four major parts of construction
methods that usually were used in the construction
industry which are conventional method, full fabrication
method, cast in-situ method (formwork system), and
composite construction method
IBS in India
In India, prefabricated construction has started almost 40
years ago but there was no proper plan formulated by the
Government for the industrialization of construction until
the inception of the IBS Roadmap 2003-2010 by CIDB
(2003).
As to remain competitive in the era of globalization of
construction sector and to align the construction technology
development with the IBS Roadmap, government has
promoted the usage of IBS in the local industry with the
collaboration of CIDB as the scenario for the local
construction industry during that time is low in quality
and productivity (Rahman, 2006).
IBS was first implemented in India in early 1980’s when
Ministry of Housing and Local Government of India visited
several European countries and evaluated their housing
development program (Thanoon et al., 2003). After their
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 02 | Feb 2019 www.irjet.net p-ISSN: 2395-0072
One Day National Conference on Recent Advancement in Civil Engineering (RACE 2K19)
25th February 2019
Organized by
Department of Civil Engineering, T John Institute of Technology, Bangalore-83
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1914
successful visit in 1984, the Federal government built
some pilot projects using the IBS such as 3,009 units of flat in
Bangalore, Karnataka in 1986 comprising seven blocks of 17
stories flat, and 3000 units of low-cost flat and 40 shops
lot and 3,741 units of flat . The project at Bangalore was
awarded to Gammon and Larsen Nielsen using Danish
System of large panel of prefabricated system. The project
only took 27 months to complete, which was from 1986 to
1988 including the time taken in the construction of the
RM 2.5 million casting yard at Jalan Damansara (CIDB, 2006;
CIDB, 2003; Thanoon et al., 2003).
COLLABORATIONS AT THE DESIGN STAGES
Without having to quote the statistics, it is quite evident that
concrete is the material of choice for building construction
works in this country by a significant margin. As such,
when industrialised building systems are discussed in the
industry, the comparison is always between the
conventional cast in-situ concrete construction and the
off-site factory casting of precast concrete construction.
Fully aware that IBS covers more that just deploying the
concepts of precast construction in the building works, the
approach of this paper is to follow the local trend and to
limit the discussion on the issues of IBS implementation
to those related to concrete structures. The intention of
this approach is to stay as relevant as possible to the
local construction environment and hopefully by so doing,
able to exert the full impact through the publication of this
paper.
II. LITERATURE REVIEW
The concept of mass production of quality building is termed
as Industrialized building system (IBS)”. Among the benefits
of using IBS are: speed, quality and economics, all of which
are required so as to meet the large demand for housing. In
order to develop techniques for mass produced houses, India
needs to access itself to the world’s most modern building
system, building materials and housing products (Waleed et.
al., 2003). The IBS, which enables on-site prefabricated or
pre-cast building components manufactured at factories,
will enable cost saving and quality improvement through
the reduction of labour intensity and construction
standardization. Apart from this, it offers minimal wastage,
less site materials, cleaner and neater environment,
controlled quality, and lower total construction cost (CIDB,
2003).
One fact which seems to have the common consensus of
all the stakeholders of IBS in India is that, the
implementation of IBS in Indian building construction
industry is still very low compared to the conventional
methods. It is most intriguing to find out why: which set the
author to this paper.
The purpose of this paper is to conduct a critical review
on the IBS implementation in construction industry as a
whole. The review focused on the advantages and barriers
factors on the IBS implementation.
III. METHODOLOGY
Survey
In the survey data collection, questionnaire has been used
and structured questionnaire survey has been distributed
out to the construction industry players and researcher, who
have been involved in IBS projects to investigate their
knowledge and perception towards IBS.
To make the survey can be easily reached by the
respondents; the survey was also conducted online. The link
of the questionnaire survey was shared through email and
other electronic devices application. Some of the survey
was mailed to the Public Work Department in Putrajaya via
hardcopy.
From the survey data collection, all the data were presented
in the table form or graph form to have more understanding
and the relationship of each questions such as respondent’s
opinion, number of project involved using IBS and
awareness of advantages on using IBS can be easily
observed.
Technical data
To have more understanding on the construction costs which
uses IBS method, the evaluation of the existing school data
had been carried out.
The technical data such as bill of quantities, construction
drawing, and the work programme of the selected school
projects has been collected and evaluated as these technical
data had provided the necessary information on the
school building information.
For the construction of the slab by using IBS material which
is half slab, few elements were considered in the calculation
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 02 | Feb 2019 www.irjet.net p-ISSN: 2395-0072
One Day National Conference on Recent Advancement in Civil Engineering (RACE 2K19)
25th February 2019
Organized by
Department of Civil Engineering, T John Institute of Technology, Bangalore-83
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1915
of the cost per area or per volume of the slab which are:
1. Concrete for topping
2. Half slab panel
3. Formwork for topping
4. Fabricated reinforcement bar/ BRC
5. Grouting
As for the conventional method, only three elements are
taking into the calculation of the cost construction which are:
1. Slab concrete
2. Reinforcement bar
3. Formwork
The elements chose for both construction methods are based
on construction of slab structure scope of work. This is to
ensure that the comparison was made based on “apple to
apple comparison” and not with other works or materials
which was not in the similar scope.
IV. RESEARCH METHODOLOGY
This paper is a preliminary study to a PhD research on IBS
implementation among the contractors. This paper has been
divided into four parts. The first part deals reviews and
analyse the current state of IBS implementation including
the barriers, push and pull factors and enabling factors
which affected IBS implementation. The second part
investigates literatures conserving the CSFs for
contractors to embrace into IBS construction. The third
part is report on pilot study to validate CSFs and the final
part is discussion and conclusion derives from evidence
commencing both the literature reviews and the pilot study.
First, the paper use literature review to investigate existing
evidences conserving CSFs in IBS implementation.
Then, the paper applies unstructured interview and open
discussion within the pre-determined context to validate the
CSFs.
The qualitative method permits informal setting that natural
reflects the reality of what happen in the real setting. This
approach also allows the researcher and the participants to
probe each argument in details and obtain rich and more
complex data in term of tacit knowledge, perception and
human experience in which cannot be measured in
quantitative approach. The authors imposed a careful
selection process of the participants which has need a
compulsory high degree of knowledge and direct practice in
the area of IBS to construct some validity and robustness of
the method. The authors also appointed an experience
moderator to lead the discussion and to avoid any ‘leading
question’ which can influence the data validity. In addition,
the authors have ensured that the participants are aware
of the aims, objectives and methodology of the study.
Though the paper make some action to establish validity
and reliability in constructivism setting, caution must be
applied as the findings might not be representing the whole
scenario construction industry thus more data collection
need to done. Therefore, the result is inconclusive but
rather a call for debate and obtains more feedback from
the audience. Further data collection is required to
determine exactly how CSFs effect the transformation of IBS
contractors.
Survey
This section gather all information related to the analysis
and relationship from the respondents by the questionnaire
which related to the perspective of IBS and conventional
method. There were 110 of respondents answered the
questionnaire surveys. From the survey by questionnaire,
position of the respondents was divided into several parts
which are Engineer, Architect, IBS Researcher, Project
Manager and BS Manufacturer. It was found that 64% of the
respondents are Engineers, 14% are the developers, 9%
from IBS researchers followed with 5% from manufacturers
while 4% from project managers and quantity surveyor
V. CONCLUSION
Despite all the obstacles and barriers that was faced by the
construction industry players as well as the government
bodies to ensure the implementation of IBS in India run
smoothly and successfully, India still standing bravely to
chase the continuously innovates the construction industry
with this new modern method of constructions. The
challenges arise has slowly been overcomes by the
construction industry players to achieve a high quality
standardization of IBS in India and fully utilizing the IBS
system in all the construction projects following the IBS
Roadmap 2011 – 2015 missions. In addition, based on the
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 02 | Feb 2019 www.irjet.net p-ISSN: 2395-0072
One Day National Conference on Recent Advancement in Civil Engineering (RACE 2K19)
25th February 2019
Organized by
Department of Civil Engineering, T John Institute of Technology, Bangalore-83
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1916
survey made by CIDB from May 2008 until October 2010, it
has reportedly stated the positive impacts and the
effectiveness of IBS implementation in government projects.
Based on the cost evaluation made, it can be concluded that
IBS has shown the advantages in the cost reduction on slab
structure of the school construction project. The costs
calculated were based on the construction of ground floor
slab which is conventional method and the first floor slab
which used half slab (IBS method) to complete the
construction. The cost difference is 11.9% of reduction on
IBS method compared to conventional method. As stated in
the earlier chapter, IBS has offer the reduction of unskilled
workers, especially foreign workers on the construction site.
Since conventional method has depended intensely on the
usage of general workers, IBS has been introduced in India to
overcome the dependency of foreign workers in the
construction industry. Therefore, this study can be a starting
point for any researchers to investigate more on the
advantages of IBS compare to conventional method which
then can be used as a benchmark for construction industry
players to realize and widely use IBS as their construction
method. Based on the literature review, there are nine (9)
potential success factors and eight (8) barriers that that had
been found for the success of IBS implementation in India.
With these factors identified the author attempted to weigh
the benefits of IBS and the reasons for not fully realizing the
benefits in the Indian IBS context. This brings the author to
conclude that there is insufficient research work being done
to highlight the benefits and the reasons for IBS lack of
implementation in Indian construction industry.
REFERENCES
1. Marsono, M. Tap, N. Ching, and A. Mokhtar (2006).
Simulation of industrialized building system (ibs)
components production. In Proceedings of the 6th
Asia-Pacific Structural Engineering and Construction
Conference (APSEC 2006) Kuala Lumpur India
2. C. Lou, K. A. Kamar (2012). Industrialized Building
Systems: Strategic outlook for manufactured
construction in India. Journal of Architectural
Engineering, vol. 18(2), pp. 69-74, May 2012.
3. Anuar, Z. A. Hamid, M. Nor, A. Azman, and M. S.
Ahamad (2011). Industrialized Building System
(IBS): Revisiting Issues of Definition and
Classification. Int. J. Emerg. Sci, 1(2), 120-132..
4. M. R. Abdullah, and C. O. Egbu (2009). January.
Industrialised building system in India: issues for
research in a changing financial and property
market. In Proceedings of the BUHU 9th
International Post Graduate Research Conference
vol. 1, pp. 15-25, January 2009. University of Salford.
5. M. Rahim, M. Syazwan, and N. A. Haron (2013).
Construction cost comparison between conventional
and formwork system for condominium project.
International Journal of Advanced Studies in
Computer Science and Engineering, vol. 2(5), pp. 19-
25.
6. Daud, and A. M. Salleh (2014). The Importance of
Lightweight Concrete Technology Development for
IBS Industry in India Based on Cost Comparison
between Concrete Slab and Hollow Core Slab: A Case
Study of LRT Car Park Project. In Applied Mechanics
and Materials vol. 567, pp. 637-641, June 2014.
7. A. Haron, I. S. Hassim, M. R. A. Kadir, and M. S. Jaafar
(2005). Building cost comparison between
conventional and formwork system: a case study of
four-storey school buildings in India. American
Journal of Applied Sciences, vol. 2(4), pp.819-823.

More Related Content

What's hot

IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...IRJET Journal
 
Cost Control on Construction with Maximum Usage of Ecofriendly Materials
Cost Control on Construction with Maximum Usage of Ecofriendly MaterialsCost Control on Construction with Maximum Usage of Ecofriendly Materials
Cost Control on Construction with Maximum Usage of Ecofriendly MaterialsIRJET Journal
 
IRJET- Role of Construction Waste Material Management in Construction Ind...
IRJET-  	  Role of Construction Waste Material Management in Construction Ind...IRJET-  	  Role of Construction Waste Material Management in Construction Ind...
IRJET- Role of Construction Waste Material Management in Construction Ind...IRJET Journal
 
Greening existing buildings strategies
Greening existing buildings strategiesGreening existing buildings strategies
Greening existing buildings strategiesAhmad Shah Kakar
 
A Review on Challenges Involved in Implementing Building Information Modeling...
A Review on Challenges Involved in Implementing Building Information Modeling...A Review on Challenges Involved in Implementing Building Information Modeling...
A Review on Challenges Involved in Implementing Building Information Modeling...IRJET Journal
 
IRJET- Replacement of Aggregate by C&D Waste Concrete
IRJET- Replacement of Aggregate by C&D Waste ConcreteIRJET- Replacement of Aggregate by C&D Waste Concrete
IRJET- Replacement of Aggregate by C&D Waste ConcreteIRJET Journal
 
Advanced manufacturing technology adoption in manufacturing companies in kenya
Advanced manufacturing technology adoption in manufacturing companies in kenyaAdvanced manufacturing technology adoption in manufacturing companies in kenya
Advanced manufacturing technology adoption in manufacturing companies in kenyaeSAT Journals
 
Cost Comparison Between Normal Building and Green Building Considering Its C...
	Cost Comparison Between Normal Building and Green Building Considering Its C...	Cost Comparison Between Normal Building and Green Building Considering Its C...
Cost Comparison Between Normal Building and Green Building Considering Its C...IJSRED
 
The Role of Industrial Engineering Management in the New Era of Industrial Re...
The Role of Industrial Engineering Management in the New Era of Industrial Re...The Role of Industrial Engineering Management in the New Era of Industrial Re...
The Role of Industrial Engineering Management in the New Era of Industrial Re...JosephineSurya2
 
Green Building Effect in Commercial Building
Green Building Effect in Commercial Building Green Building Effect in Commercial Building
Green Building Effect in Commercial Building vivatechijri
 
Generation of Emergy Consumption Indicator using Sustainable Approach
Generation of Emergy Consumption Indicator using Sustainable ApproachGeneration of Emergy Consumption Indicator using Sustainable Approach
Generation of Emergy Consumption Indicator using Sustainable ApproachIRJET Journal
 
A review of soft computing techniques in materials engineering
A review of soft computing techniques in materials engineeringA review of soft computing techniques in materials engineering
A review of soft computing techniques in materials engineeringIAEME Publication
 
IRJET- Study on Properties of Bc Mix by Adding Carbon Black Powder and E- Waste
IRJET- Study on Properties of Bc Mix by Adding Carbon Black Powder and E- WasteIRJET- Study on Properties of Bc Mix by Adding Carbon Black Powder and E- Waste
IRJET- Study on Properties of Bc Mix by Adding Carbon Black Powder and E- WasteIRJET Journal
 
Benefits and Barriers of BIM Adoption in the Iraqi Construction Firms
Benefits and Barriers of BIM Adoption in the Iraqi Construction FirmsBenefits and Barriers of BIM Adoption in the Iraqi Construction Firms
Benefits and Barriers of BIM Adoption in the Iraqi Construction FirmsAM Publications
 

What's hot (18)

IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
IRJET- Recognition of Factor Impacting Labor Productivity for Reinforcement I...
 
Cost Control on Construction with Maximum Usage of Ecofriendly Materials
Cost Control on Construction with Maximum Usage of Ecofriendly MaterialsCost Control on Construction with Maximum Usage of Ecofriendly Materials
Cost Control on Construction with Maximum Usage of Ecofriendly Materials
 
IRJET- Role of Construction Waste Material Management in Construction Ind...
IRJET-  	  Role of Construction Waste Material Management in Construction Ind...IRJET-  	  Role of Construction Waste Material Management in Construction Ind...
IRJET- Role of Construction Waste Material Management in Construction Ind...
 
Greening existing buildings strategies
Greening existing buildings strategiesGreening existing buildings strategies
Greening existing buildings strategies
 
Catching Up With BIM: A Curriculum Re-Design Strategy
Catching Up With BIM: A Curriculum Re-Design StrategyCatching Up With BIM: A Curriculum Re-Design Strategy
Catching Up With BIM: A Curriculum Re-Design Strategy
 
A Review on Challenges Involved in Implementing Building Information Modeling...
A Review on Challenges Involved in Implementing Building Information Modeling...A Review on Challenges Involved in Implementing Building Information Modeling...
A Review on Challenges Involved in Implementing Building Information Modeling...
 
Isde 2
Isde 2Isde 2
Isde 2
 
IRJET- Replacement of Aggregate by C&D Waste Concrete
IRJET- Replacement of Aggregate by C&D Waste ConcreteIRJET- Replacement of Aggregate by C&D Waste Concrete
IRJET- Replacement of Aggregate by C&D Waste Concrete
 
Advanced manufacturing technology adoption in manufacturing companies in kenya
Advanced manufacturing technology adoption in manufacturing companies in kenyaAdvanced manufacturing technology adoption in manufacturing companies in kenya
Advanced manufacturing technology adoption in manufacturing companies in kenya
 
Cost Comparison Between Normal Building and Green Building Considering Its C...
	Cost Comparison Between Normal Building and Green Building Considering Its C...	Cost Comparison Between Normal Building and Green Building Considering Its C...
Cost Comparison Between Normal Building and Green Building Considering Its C...
 
The Role of Industrial Engineering Management in the New Era of Industrial Re...
The Role of Industrial Engineering Management in the New Era of Industrial Re...The Role of Industrial Engineering Management in the New Era of Industrial Re...
The Role of Industrial Engineering Management in the New Era of Industrial Re...
 
Green Building Effect in Commercial Building
Green Building Effect in Commercial Building Green Building Effect in Commercial Building
Green Building Effect in Commercial Building
 
Generation of Emergy Consumption Indicator using Sustainable Approach
Generation of Emergy Consumption Indicator using Sustainable ApproachGeneration of Emergy Consumption Indicator using Sustainable Approach
Generation of Emergy Consumption Indicator using Sustainable Approach
 
A review of soft computing techniques in materials engineering
A review of soft computing techniques in materials engineeringA review of soft computing techniques in materials engineering
A review of soft computing techniques in materials engineering
 
IRJET- Study on Properties of Bc Mix by Adding Carbon Black Powder and E- Waste
IRJET- Study on Properties of Bc Mix by Adding Carbon Black Powder and E- WasteIRJET- Study on Properties of Bc Mix by Adding Carbon Black Powder and E- Waste
IRJET- Study on Properties of Bc Mix by Adding Carbon Black Powder and E- Waste
 
20320140503042 2
20320140503042 220320140503042 2
20320140503042 2
 
SBE16 Hamburg
SBE16 Hamburg SBE16 Hamburg
SBE16 Hamburg
 
Benefits and Barriers of BIM Adoption in the Iraqi Construction Firms
Benefits and Barriers of BIM Adoption in the Iraqi Construction FirmsBenefits and Barriers of BIM Adoption in the Iraqi Construction Firms
Benefits and Barriers of BIM Adoption in the Iraqi Construction Firms
 

Similar to IRJET- Cost Comparison on Industrialized Building System (IBS) and Conventional Method for School Construction Project

Chapter 1-research proposal
Chapter 1-research proposalChapter 1-research proposal
Chapter 1-research proposalJessyca Than
 
Challenges in High-Rise Building Projects for Parameters of Project Managemen...
Challenges in High-Rise Building Projects for Parameters of Project Managemen...Challenges in High-Rise Building Projects for Parameters of Project Managemen...
Challenges in High-Rise Building Projects for Parameters of Project Managemen...IRJET Journal
 
An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...
An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...
An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...IRJET Journal
 
Chap 2-literature-review (3)
Chap 2-literature-review (3)Chap 2-literature-review (3)
Chap 2-literature-review (3)Jessyca Than
 
Adoption of Value Engineering in the Affordable Housing Initiative – A Review
Adoption of Value Engineering in the Affordable Housing Initiative – A ReviewAdoption of Value Engineering in the Affordable Housing Initiative – A Review
Adoption of Value Engineering in the Affordable Housing Initiative – A ReviewIRJET Journal
 
IRJET- Cost Estimation of a Building using Cost Effective Building Materials
IRJET-  	  Cost Estimation of a Building using Cost Effective Building MaterialsIRJET-  	  Cost Estimation of a Building using Cost Effective Building Materials
IRJET- Cost Estimation of a Building using Cost Effective Building MaterialsIRJET Journal
 
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...IRJET Journal
 
Mechanized Construction- Relevance and Importance in India
Mechanized Construction- Relevance and Importance in IndiaMechanized Construction- Relevance and Importance in India
Mechanized Construction- Relevance and Importance in IndiaJIT KUMAR GUPTA
 
Mivan Formwork in Construction
Mivan Formwork in ConstructionMivan Formwork in Construction
Mivan Formwork in ConstructionIRJET Journal
 
Redefining Construction in India: Advancements in Prefabrication and Their Im...
Redefining Construction in India: Advancements in Prefabrication and Their Im...Redefining Construction in India: Advancements in Prefabrication and Their Im...
Redefining Construction in India: Advancements in Prefabrication and Their Im...IRJET Journal
 
Exploring the Adoption of Building Information Modelling In India and Need Fo...
Exploring the Adoption of Building Information Modelling In India and Need Fo...Exploring the Adoption of Building Information Modelling In India and Need Fo...
Exploring the Adoption of Building Information Modelling In India and Need Fo...IRJET Journal
 
IRJET- Redevelopment of Structure with the Help of Building Information M...
IRJET-  	  Redevelopment of Structure with the Help of Building Information M...IRJET-  	  Redevelopment of Structure with the Help of Building Information M...
IRJET- Redevelopment of Structure with the Help of Building Information M...IRJET Journal
 
SRR714_THESIS_SIDDHARTH NALLAGOUNDER_214043679
SRR714_THESIS_SIDDHARTH NALLAGOUNDER_214043679SRR714_THESIS_SIDDHARTH NALLAGOUNDER_214043679
SRR714_THESIS_SIDDHARTH NALLAGOUNDER_214043679Siddharth Nallagounder
 
MS Ibs in malaysia
MS Ibs in malaysiaMS Ibs in malaysia
MS Ibs in malaysiaEst
 
CSCM Ibs in malaysia
CSCM Ibs in malaysiaCSCM Ibs in malaysia
CSCM Ibs in malaysiaEst
 
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit ModelIRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit ModelIRJET Journal
 

Similar to IRJET- Cost Comparison on Industrialized Building System (IBS) and Conventional Method for School Construction Project (20)

Chapter 1-research proposal
Chapter 1-research proposalChapter 1-research proposal
Chapter 1-research proposal
 
Challenges in High-Rise Building Projects for Parameters of Project Managemen...
Challenges in High-Rise Building Projects for Parameters of Project Managemen...Challenges in High-Rise Building Projects for Parameters of Project Managemen...
Challenges in High-Rise Building Projects for Parameters of Project Managemen...
 
An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...
An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...
An Analysis of Building Information Modeling (BIM) Usage in Nigerian Construc...
 
Chap 2-literature-review (3)
Chap 2-literature-review (3)Chap 2-literature-review (3)
Chap 2-literature-review (3)
 
Adoption of Value Engineering in the Affordable Housing Initiative – A Review
Adoption of Value Engineering in the Affordable Housing Initiative – A ReviewAdoption of Value Engineering in the Affordable Housing Initiative – A Review
Adoption of Value Engineering in the Affordable Housing Initiative – A Review
 
IRJET- Cost Estimation of a Building using Cost Effective Building Materials
IRJET-  	  Cost Estimation of a Building using Cost Effective Building MaterialsIRJET-  	  Cost Estimation of a Building using Cost Effective Building Materials
IRJET- Cost Estimation of a Building using Cost Effective Building Materials
 
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
Study of Factors Affecting the Implementation of BIM: An Evaluation of Risk V...
 
Mechanized Construction- Relevance and Importance in India
Mechanized Construction- Relevance and Importance in IndiaMechanized Construction- Relevance and Importance in India
Mechanized Construction- Relevance and Importance in India
 
Mivan Formwork in Construction
Mivan Formwork in ConstructionMivan Formwork in Construction
Mivan Formwork in Construction
 
Redefining Construction in India: Advancements in Prefabrication and Their Im...
Redefining Construction in India: Advancements in Prefabrication and Their Im...Redefining Construction in India: Advancements in Prefabrication and Their Im...
Redefining Construction in India: Advancements in Prefabrication and Their Im...
 
Ijciet 08 02_023
Ijciet 08 02_023Ijciet 08 02_023
Ijciet 08 02_023
 
IBS Roadmap.pdf
IBS Roadmap.pdfIBS Roadmap.pdf
IBS Roadmap.pdf
 
Exploring the Adoption of Building Information Modelling In India and Need Fo...
Exploring the Adoption of Building Information Modelling In India and Need Fo...Exploring the Adoption of Building Information Modelling In India and Need Fo...
Exploring the Adoption of Building Information Modelling In India and Need Fo...
 
IRJET- Redevelopment of Structure with the Help of Building Information M...
IRJET-  	  Redevelopment of Structure with the Help of Building Information M...IRJET-  	  Redevelopment of Structure with the Help of Building Information M...
IRJET- Redevelopment of Structure with the Help of Building Information M...
 
wong2020.pdf
wong2020.pdfwong2020.pdf
wong2020.pdf
 
SRR714_THESIS_SIDDHARTH NALLAGOUNDER_214043679
SRR714_THESIS_SIDDHARTH NALLAGOUNDER_214043679SRR714_THESIS_SIDDHARTH NALLAGOUNDER_214043679
SRR714_THESIS_SIDDHARTH NALLAGOUNDER_214043679
 
MS Ibs in malaysia
MS Ibs in malaysiaMS Ibs in malaysia
MS Ibs in malaysia
 
CSCM Ibs in malaysia
CSCM Ibs in malaysiaCSCM Ibs in malaysia
CSCM Ibs in malaysia
 
Bim adoptation to sri lanka
Bim adoptation to sri lanka Bim adoptation to sri lanka
Bim adoptation to sri lanka
 
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit ModelIRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
IRJET - To Extract GFC’s from Clash Free and Well Coordinated Revit Model
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGSIVASHANKAR N
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...Call Girls in Nagpur High Profile
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 

Recently uploaded (20)

The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 

IRJET- Cost Comparison on Industrialized Building System (IBS) and Conventional Method for School Construction Project

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 02 | Feb 2019 www.irjet.net p-ISSN: 2395-0072 One Day National Conference on Recent Advancement in Civil Engineering (RACE 2K19) 25th February 2019 Organized by Department of Civil Engineering, T John Institute of Technology, Bangalore-83 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1913 COST COMPARISON ON INDUSTRIALIZED BUILDING SYSTEM (IBS) AND CONVENTIONAL METHOD FOR SCHOOL CONSTRUCTION PROJECT PRAJITH DEV V P1, Ms Anchu Ajayakumar2 1PG Scholar Department of Civil Engineering, EASA College of Engineering and Technology (ECET), Coimbatore, Tamil Nadu, India. 2Assistant Professor Department of Civil Engineering, EASA College of Engineering and Technology (ECET), Coimbatore, Tamil Nadu, India. -------------------------------------------------------------------------***---------------------------------------------------------------------- Abstract:- Industrialized Building System (IBS) can be defined as one of construction method that can upgrade the quality and productivity of the construction by using better or less machineries, equipment, materials, and extensive project planning. IBS can be classified into many types, depending on each country. Five types of IBS that were commonly used in India for structural elements such as wall, roof truss, beam, column, and slab are precast concrete system, reusable formwork system, steel framing systems, prefabricated timber framing systems, and block work systems. One of the barrier for IBS implementation in India that are currently facing by most of construction industry players is the negative thought of implementing IBS is not cost effective compared to conventional method. Hence, the study which focused on school construction project was done to determine the cost comparison based on technical data collection and analysis between IBS which using half slab with conventional method for slab structure and also to determine the perception from the industrial players on IBS and conventional method through questionnaire surveys. From the results obtained, the difference (in percentage) for both construction methods which also can be said as the percentage of reduction in cost for the calculated floor slab is 11.9%. This shows that IBS offers a good reduction in cost compared to conventional system. Index Terms:- IBS, FRAMING SYSTEMS I. INTRODUCTION Construction sector in India is one of important and productive sector. As a developing country, this sector plays a major role for the economic growth and also to upgrade the quality of life and living standard of Indian (Khan, 2014). In year 2006, the expenditure due to the funding of building construction and improvements of infrastructure such as schools, hospitals, and government living quarters by the Federal Government was RM35.8 billion compared to year 2007 which was RM 40.6 billion (CIDB, 2008). The increasing of the expenditure was partly due to increasing price of the building construction materials. As the Indian construction sector keep on expanding, it is going through a transitional change to a more systematic and mechanized system, prefabrication technology and upgrading the skills of workers compared to conventional technologies as a trend towards the global competition (Haron, 2005; Chan, 2011). Rahim et al. (2013) explained four major parts of construction methods that usually were used in the construction industry which are conventional method, full fabrication method, cast in-situ method (formwork system), and composite construction method IBS in India In India, prefabricated construction has started almost 40 years ago but there was no proper plan formulated by the Government for the industrialization of construction until the inception of the IBS Roadmap 2003-2010 by CIDB (2003). As to remain competitive in the era of globalization of construction sector and to align the construction technology development with the IBS Roadmap, government has promoted the usage of IBS in the local industry with the collaboration of CIDB as the scenario for the local construction industry during that time is low in quality and productivity (Rahman, 2006). IBS was first implemented in India in early 1980’s when Ministry of Housing and Local Government of India visited several European countries and evaluated their housing development program (Thanoon et al., 2003). After their
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 02 | Feb 2019 www.irjet.net p-ISSN: 2395-0072 One Day National Conference on Recent Advancement in Civil Engineering (RACE 2K19) 25th February 2019 Organized by Department of Civil Engineering, T John Institute of Technology, Bangalore-83 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1914 successful visit in 1984, the Federal government built some pilot projects using the IBS such as 3,009 units of flat in Bangalore, Karnataka in 1986 comprising seven blocks of 17 stories flat, and 3000 units of low-cost flat and 40 shops lot and 3,741 units of flat . The project at Bangalore was awarded to Gammon and Larsen Nielsen using Danish System of large panel of prefabricated system. The project only took 27 months to complete, which was from 1986 to 1988 including the time taken in the construction of the RM 2.5 million casting yard at Jalan Damansara (CIDB, 2006; CIDB, 2003; Thanoon et al., 2003). COLLABORATIONS AT THE DESIGN STAGES Without having to quote the statistics, it is quite evident that concrete is the material of choice for building construction works in this country by a significant margin. As such, when industrialised building systems are discussed in the industry, the comparison is always between the conventional cast in-situ concrete construction and the off-site factory casting of precast concrete construction. Fully aware that IBS covers more that just deploying the concepts of precast construction in the building works, the approach of this paper is to follow the local trend and to limit the discussion on the issues of IBS implementation to those related to concrete structures. The intention of this approach is to stay as relevant as possible to the local construction environment and hopefully by so doing, able to exert the full impact through the publication of this paper. II. LITERATURE REVIEW The concept of mass production of quality building is termed as Industrialized building system (IBS)”. Among the benefits of using IBS are: speed, quality and economics, all of which are required so as to meet the large demand for housing. In order to develop techniques for mass produced houses, India needs to access itself to the world’s most modern building system, building materials and housing products (Waleed et. al., 2003). The IBS, which enables on-site prefabricated or pre-cast building components manufactured at factories, will enable cost saving and quality improvement through the reduction of labour intensity and construction standardization. Apart from this, it offers minimal wastage, less site materials, cleaner and neater environment, controlled quality, and lower total construction cost (CIDB, 2003). One fact which seems to have the common consensus of all the stakeholders of IBS in India is that, the implementation of IBS in Indian building construction industry is still very low compared to the conventional methods. It is most intriguing to find out why: which set the author to this paper. The purpose of this paper is to conduct a critical review on the IBS implementation in construction industry as a whole. The review focused on the advantages and barriers factors on the IBS implementation. III. METHODOLOGY Survey In the survey data collection, questionnaire has been used and structured questionnaire survey has been distributed out to the construction industry players and researcher, who have been involved in IBS projects to investigate their knowledge and perception towards IBS. To make the survey can be easily reached by the respondents; the survey was also conducted online. The link of the questionnaire survey was shared through email and other electronic devices application. Some of the survey was mailed to the Public Work Department in Putrajaya via hardcopy. From the survey data collection, all the data were presented in the table form or graph form to have more understanding and the relationship of each questions such as respondent’s opinion, number of project involved using IBS and awareness of advantages on using IBS can be easily observed. Technical data To have more understanding on the construction costs which uses IBS method, the evaluation of the existing school data had been carried out. The technical data such as bill of quantities, construction drawing, and the work programme of the selected school projects has been collected and evaluated as these technical data had provided the necessary information on the school building information. For the construction of the slab by using IBS material which is half slab, few elements were considered in the calculation
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 02 | Feb 2019 www.irjet.net p-ISSN: 2395-0072 One Day National Conference on Recent Advancement in Civil Engineering (RACE 2K19) 25th February 2019 Organized by Department of Civil Engineering, T John Institute of Technology, Bangalore-83 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1915 of the cost per area or per volume of the slab which are: 1. Concrete for topping 2. Half slab panel 3. Formwork for topping 4. Fabricated reinforcement bar/ BRC 5. Grouting As for the conventional method, only three elements are taking into the calculation of the cost construction which are: 1. Slab concrete 2. Reinforcement bar 3. Formwork The elements chose for both construction methods are based on construction of slab structure scope of work. This is to ensure that the comparison was made based on “apple to apple comparison” and not with other works or materials which was not in the similar scope. IV. RESEARCH METHODOLOGY This paper is a preliminary study to a PhD research on IBS implementation among the contractors. This paper has been divided into four parts. The first part deals reviews and analyse the current state of IBS implementation including the barriers, push and pull factors and enabling factors which affected IBS implementation. The second part investigates literatures conserving the CSFs for contractors to embrace into IBS construction. The third part is report on pilot study to validate CSFs and the final part is discussion and conclusion derives from evidence commencing both the literature reviews and the pilot study. First, the paper use literature review to investigate existing evidences conserving CSFs in IBS implementation. Then, the paper applies unstructured interview and open discussion within the pre-determined context to validate the CSFs. The qualitative method permits informal setting that natural reflects the reality of what happen in the real setting. This approach also allows the researcher and the participants to probe each argument in details and obtain rich and more complex data in term of tacit knowledge, perception and human experience in which cannot be measured in quantitative approach. The authors imposed a careful selection process of the participants which has need a compulsory high degree of knowledge and direct practice in the area of IBS to construct some validity and robustness of the method. The authors also appointed an experience moderator to lead the discussion and to avoid any ‘leading question’ which can influence the data validity. In addition, the authors have ensured that the participants are aware of the aims, objectives and methodology of the study. Though the paper make some action to establish validity and reliability in constructivism setting, caution must be applied as the findings might not be representing the whole scenario construction industry thus more data collection need to done. Therefore, the result is inconclusive but rather a call for debate and obtains more feedback from the audience. Further data collection is required to determine exactly how CSFs effect the transformation of IBS contractors. Survey This section gather all information related to the analysis and relationship from the respondents by the questionnaire which related to the perspective of IBS and conventional method. There were 110 of respondents answered the questionnaire surveys. From the survey by questionnaire, position of the respondents was divided into several parts which are Engineer, Architect, IBS Researcher, Project Manager and BS Manufacturer. It was found that 64% of the respondents are Engineers, 14% are the developers, 9% from IBS researchers followed with 5% from manufacturers while 4% from project managers and quantity surveyor V. CONCLUSION Despite all the obstacles and barriers that was faced by the construction industry players as well as the government bodies to ensure the implementation of IBS in India run smoothly and successfully, India still standing bravely to chase the continuously innovates the construction industry with this new modern method of constructions. The challenges arise has slowly been overcomes by the construction industry players to achieve a high quality standardization of IBS in India and fully utilizing the IBS system in all the construction projects following the IBS Roadmap 2011 – 2015 missions. In addition, based on the
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 02 | Feb 2019 www.irjet.net p-ISSN: 2395-0072 One Day National Conference on Recent Advancement in Civil Engineering (RACE 2K19) 25th February 2019 Organized by Department of Civil Engineering, T John Institute of Technology, Bangalore-83 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1916 survey made by CIDB from May 2008 until October 2010, it has reportedly stated the positive impacts and the effectiveness of IBS implementation in government projects. Based on the cost evaluation made, it can be concluded that IBS has shown the advantages in the cost reduction on slab structure of the school construction project. The costs calculated were based on the construction of ground floor slab which is conventional method and the first floor slab which used half slab (IBS method) to complete the construction. The cost difference is 11.9% of reduction on IBS method compared to conventional method. As stated in the earlier chapter, IBS has offer the reduction of unskilled workers, especially foreign workers on the construction site. Since conventional method has depended intensely on the usage of general workers, IBS has been introduced in India to overcome the dependency of foreign workers in the construction industry. Therefore, this study can be a starting point for any researchers to investigate more on the advantages of IBS compare to conventional method which then can be used as a benchmark for construction industry players to realize and widely use IBS as their construction method. Based on the literature review, there are nine (9) potential success factors and eight (8) barriers that that had been found for the success of IBS implementation in India. With these factors identified the author attempted to weigh the benefits of IBS and the reasons for not fully realizing the benefits in the Indian IBS context. This brings the author to conclude that there is insufficient research work being done to highlight the benefits and the reasons for IBS lack of implementation in Indian construction industry. REFERENCES 1. Marsono, M. Tap, N. Ching, and A. Mokhtar (2006). Simulation of industrialized building system (ibs) components production. In Proceedings of the 6th Asia-Pacific Structural Engineering and Construction Conference (APSEC 2006) Kuala Lumpur India 2. C. Lou, K. A. Kamar (2012). Industrialized Building Systems: Strategic outlook for manufactured construction in India. Journal of Architectural Engineering, vol. 18(2), pp. 69-74, May 2012. 3. Anuar, Z. A. Hamid, M. Nor, A. Azman, and M. S. Ahamad (2011). Industrialized Building System (IBS): Revisiting Issues of Definition and Classification. Int. J. Emerg. Sci, 1(2), 120-132.. 4. M. R. Abdullah, and C. O. Egbu (2009). January. Industrialised building system in India: issues for research in a changing financial and property market. In Proceedings of the BUHU 9th International Post Graduate Research Conference vol. 1, pp. 15-25, January 2009. University of Salford. 5. M. Rahim, M. Syazwan, and N. A. Haron (2013). Construction cost comparison between conventional and formwork system for condominium project. International Journal of Advanced Studies in Computer Science and Engineering, vol. 2(5), pp. 19- 25. 6. Daud, and A. M. Salleh (2014). The Importance of Lightweight Concrete Technology Development for IBS Industry in India Based on Cost Comparison between Concrete Slab and Hollow Core Slab: A Case Study of LRT Car Park Project. In Applied Mechanics and Materials vol. 567, pp. 637-641, June 2014. 7. A. Haron, I. S. Hassim, M. R. A. Kadir, and M. S. Jaafar (2005). Building cost comparison between conventional and formwork system: a case study of four-storey school buildings in India. American Journal of Applied Sciences, vol. 2(4), pp.819-823.