International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 968
A CASE STUDY AND DESIGN APPROACH FOR SEWAGE TREATMENT
PLANT IN KAKUMANU VILLAGE.
VINAY NANNAPANENI1
1M.S. Riga Technical University, Latvia
---------------------------------------------------------------------***----------------------------------------------------------------------
Abstract - Many villages in the developing countries are facing problems on ground water and surface water. Kakumanu Village
located in Guntur district of an Indian state Andhra Pradesh. Due to steady increase of population in the village, the generation of
domestic sewage also increase and still there is no sewage treatment plant. So, the construction of sewage treatment is required
with enough capacity. Wastewater treatment plant has many challenges for treating of excess sludge and its disposal. Several
methods involved to reduce its water and organic content and finally to protect the environment.
This paper focal point is generation of sewage and design of Wastewater treatment plant in both Kakumanu. One day the
generated sewage was estimated 0.739 MLD for the next 30-year projected population. Sewage treatment plant consists of three
process are Preliminary treatment, primary treatment and secondary treatment. Screening, gritchamber, primarysedimentation
tank, biological reactor, secondary clarifier, activated sludge tank, drying bedsarethemaincomponentsinwastewatertreatment
plant. Components are designed by considering the various standards and permissible limits oftreatingsewagewater. Ultimately,
treated sewage water is supplied to irrigation and the generated sludge can be used as manure helps in increase of soil fertility.
Key Words: Wastewater treatment plant, Design approach, Sludge, Population, Grit chamber, Aeration tank.
1. INTRODUCTION
This paper deals with design of wastewater treatment plant for Kakumanu village. The village Kakumanu is located at16.3:
North and 80.23: East altitudes in Guntur district. Over the years, with increasing population, industries and agriculture the
demand for water also pushed up. Many efforts have done for water storage in the form ofdamsandreservoirs.The demandof
water for agricultural, industrial and domestic activities are increased. Not only surface water resources but groundwater
resources also resulting below the riverbed. Due to the low availability of water with increasing growth of population the
serious water scarcity problems were increased. To minimize these problems the sewage treatment plant is to beconstructed
for treating of wastewater.
Sewage treatment plant consists of three process are Preliminary treatment, primary treatment and secondary treatment
shown in Figure 1.[6] Preliminary treatment consists of separating like floating materials like papers, wood, rags, nappies,
facewipes, bottle tops, broken bottles, diapers, plastics, cotton buds, sanitary items etc. are removed. Primary treatment
consists of removing large suspended organic solid materials which are usually settled in the process of sedimentation. In the
secondary treatment process, seed sludge is added to wastewater and the air is pumped into huge aeration tanks which helps
to mix the seed sludge with wastewater. And the large particles will settle down and wastewater passes through the large
tanks.
Figure 1: Screenshot of Function Decomposition.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 969
2. Population Forecast
As per 2011 census, the population of kakumanu village is 5,777[4]. If the rateofpopulationisincreasedas50peryear,
then the estimated population for 30 years is
P2050 =5777+(8*20) +(30*20) = 6537
Therefore, the estimated population of Kakumanu village is 6540 (assumed).
Quantity of water supply per person = 150LPCD.
Rate of water supply,
WC = 870,750 LPCD or 870 KLD or 0.87 MLD or 870 m3/day.
As per CPHEEO guideline, the generated sewage will be 80-85%
Sewage generated = *0.87 MLD = 0.739 MLD or 739 KLD
Therefore, the quantity of sewage water generated is 0.739 MLD.
Average Sewage per hour= m3/hr
Peak flow rate of sewage is 3 for population less than 20,000.
Design Flow capacity= 3* 30.79 = 92.37 m3/hr = 0.0256 m3/sec.
3. Design Considerations
The points to be considered during design of sewage treatment plant are:
 Design period is taken as 30 years.
 The design is done on average domestic basis.
 Self-cleaning velocity is to develop at every place and stage.
 Design of treatment should be economical and easily to maintain.
4. Design of Collection pit
Storage tank, a container used to store the liquids also known for artificial lakes and ponds. It can be available in
different shape: vertical and horizontal cylinder, open top and closed top, flat bottom, cone bottom and slope bottom.
Retention time = 4hr.
Average design flow= 30.79 m3/hr
Capacity of collection sump = 4*30.79= 123.16 m3.
Assumed liquid depth = 5m.
Area required for collection pit, A = = 24.63 m2.
The shape of the storage tank is taken as circular here.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 970
Now,
r = (where A=∏r2 )
r = 2.8 m.
Design of sewer chamber
Qmax = 0.0256 m3/sec
Assumptions;
Shape of bar= M.S. Flats
Size+ 10mm*50mm
Clear spacing between the bars= 20mm
Inclination of bars = 80:
Assume average velocity of sewer= 0.8 m/sec
At peak flow, required net inclined area = 0.03
Gross inclined area = (9/0.8) *1.5 =0.072 sq.m.
Gross vertical area required = 0.072* sin 80 = 0.070 sq.m.
Provide submergence depth = 0.3 m
Width of channel = 0.070/0.3 = 0.23 m.
Therefore, provide 20 bars of 10mm *50mm.
5. Design of grit chamber
The flow from screen channels is taken into grit chamber, provided with 2 duplicate C.I gates one at inlet and other at outlet.
Design Flow = (2.5 * 0.739)/2 = 0.923 MLD or 923 m3/day
Surface loading = 1100 m3/sq. m/day
To account the turbulence and short circuiting, the surface loading is reduced to 800 m3/ sq. m/day.
Therefore, required area = 923/800 = 1.15 sq. m.
Provide 1.15m dia. Chamber i.e. circular
Detention time = 60 sec.
Volume, V= (923* 60)/(24*60*60) = 0.64 m3
liquid depth= Volume/ Area = 0.64/1.15 = 0.556m.
free board = 0.6
size of grit chamber = 1.7*(0.556+0.6) = 1.7* 1.156 (dia* depth)
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 971
Check for horizontal velocity
Cross sectional area of grit chamber = 1.7*0.556 = 0.945 sq.m.
Velocity = 923/(1.7*0.556*24*60*60) = 0.011m/sec.= 1.1 cm/sec< 18 cm/sec.
Hence OK.
Assumed Grit generation = 0.05 m3 per 1000 m3 of sewage flow.
Required storage volume = (739*8*0.05) / (24*1000) = 0.012 m3
Grit storage area = ( )*1.72 = 2.27 m2.
Grit storage depth = 0.012/2.27 = 0.0052 m.
Total liquid depth = 0.556+0.005 = 0.561 = 0.6 m.
Provided size of grit chamber = 1.7*(0.6+0.6) = 1.7m * 1.2m.
6. Design of primary sedimentation tank
Detention time = 2 hr.
Volume of sewage = max quantity of sewage / (detention time*24) = 739/(2*24) = 15.39 m3
Provided depth = 2m.
Surface area = volume/depth = 15.39/2 = 7.695 sq. m.
D = (where A = )* d2
= 3.12 m.
7. Design of Aeration tank
No of tanks = 2
Average flow in each tank = 0.739 MLD/2 = 0.369 MLD
Q = 369 m3/day
Total BOD entering STP= 295 mg/L
The BOD of sewage coming to aeration tank YO= 295 mg/L
BOD left in effluent = YE= 20 mg/L
BOD removed in activated plant = 295 - 20 = 275 mg/L
Required minimum efficiency in activated plant = 275/295 = 0.93=93%
Volume of aeration tank can be designed by assuming a suitable value of MLSS and θ or F/M ratio = 3000 mg/L
F/M ratio = 0.15
F/M =Q/V= YO/XT
0.15 = (369*295)/(V * 3500)
V= (369* 295)/(3000*0.12)
V= 302.3 m3
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 972
7.1. Aeration tank dimensions
Let us adopt a depth of 3.5m and width 9m aeration tank.
Length of tank = V/(B * D) = 302.3/(9*3.5) = 9.59 m = 10m.
Therefore, provided volume= 10*9*3.5=315 m3
Check for aeration period t = (V/Q) *24hr = (315/369) *24= 20.48 = 20 hrs
Check for volumetric loading = Q*(YO/V) gm of BOD 5/m3 volume of tank.
= (369* 295)/315 gm/m3
= 345.57 gm/m3 = 0.34 kg/m3
Check for return sludge ratio
QR/Q = XT/((106/SVI)- XT)
SVI should be between 50 m/gm – 150 m/gm. Using 120 m/gm
QR/Q = 3000/((106/120)-3000) = 0.56 (between 0.5 - 1)
Check for SRT
V*XT = [αy*Q(YO-YE) θc]/ (KE* θc+1)
Where, αy=1,
KE= 0.06/d,
315*3000 = [1*369(295-20) θc]/(0.06 θc+1)
945000= 101475 θc/ (1+0.06 θc)
1+0.06 θc = 0.107 θc
θc= 1/0.047
θc = 21.27 days.
Adopted size of aeratin tank is 19m*9m*(3.5+0.6) m.
8. Design of Secondary clarifiers
Average sewage flow = 739 KLD = 739 m3/day
Recirculated flow = 461 m3/day (assume 50%)
Total inflow = 739+ 461= 1200 m3/day
Detention time= 2hrs
Volume of tank = 1200*(2/24) = 100 m3
Liquid depth =3.5m (assumed)
Area = 100/3.5 = 28.57 m2
Average flow of surface loading = 15 m/day
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 973
Surface area to be provided = 739/15 = 49.26 m2 = 50 m2
Diameter of circular tank, d= = 7.97m = 8m.
Check for weir loading
Average sewage flow = 739 KLD = 739 m3/day
Weir loading = 739/ (∏*8) = 29.40 m3/day/m. (< 185 m3/day/m)
Check for solids loading
Recirculated flow = 461 m3/day
Average sewage flow = 739 KLD = 739 m3/day
MLSS solids inflow = 3000 mg/L
Total solids inflow = (739+461) *3 = 3600 kg/day.
Solids loading = 3600/50 = 72 kg/day/m2.
Provide a clarifier with 8m dia and depth 3.5m.
Hopper slope = 1 in 12
9. Return sludge pump house
Total return flow = 461 m3/day = 19.20 m3/hr = 0.32 m3/ min.
Detention time = 15 min
Volume of wet well = 0.32*15
wet well provided = 2.5m*1.5*1.8m
dry well provided = 2.5m*2.5m
control room size = 2.5m* 2.5m
Provide 2 pumps with capacity 0.461 MLD and diameter of return sludge pipe should be 150mm.
10. Design of Sludge drying beds
Sludge applied for drying beds@ 100 kg/MLD
Sludge applied per day =125kg
Specific gravity, g=1.015
Percentage of solid contents = 1.5
volume of sludge = (125/ 1.5%) *(1/(1000*1.015)) = 8.2 m3/day.
Total number of cycles in one year =33
Therefore, period of each cycle = 365/33 = 11 days
Volume of sludge = 8.2 * 11 = 90.2 m3
Area of beds required for 0.3m/cycle spreading layer = 90.2/0.3 = 300.67
Provide 4 beds with dimensions 1.2m * 7m and hence the area provided is 336 m2
11. Filter Pumphouse and sump
Excess sludge water, θc = V*(XT/QW*XR)
21.27d = (315*3000)/(QW*XR)
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 974
QW*XR = 44428.77gm/d = 44.4kg/d
Assume excess sludge contains 1% solids and specific gravity = 1.015
Volume of excess sludge = 44.4/(1000* 1.015* 1%) = 4.37 m3/ day = 0.18 m3/ hr.
Detention time = 8 hrs
Volume of wet well = 8 * 0.18 = 1.44 m3 for 1% concentration
Liquid depth provided = 1m
Therefore, the area required for 1% concentration of solids = 1.44/1 = 1.44 m2
Diameter of wet well = = 1.35m
Assume 2m diameter.
12. CONCLUSION
Due to increase in population in Kakumanu village, looking on future aspect, it is quite necessary to construct
wastewater treatmennt plant. In the present study, wastewater treatment plant in Kakumanu is analysed and designed
perfectly to meet needs and demand for population 6540 for 30 years. The utilization of treated water will reduce the use of
fresh water and ground water. Treated sludge can be used for manure helps to increase fertility in soil. The construction of
wastewater treatment plant helps to prevent direct disposal of sewage into fields and reduce the freshwater consumption.
REFERENCES
1. Aswathy. M and Hemapriya (2017), Analysis and DesignofSewageTreatmentPlantof ApartmentsinChennai,Volume116
157-163p
2. Aswathy. M and Harini T. (2017) Design of Wastewater Treatment Plant for Tambaram municipality, Volume11677-83p
3. Census of India, C. villages & Towns in Kakumanu mandal Guntur, Andhrapradesh- Census 2011. [Retrived on 1st October
2019].
4. Directorate of Census operations, (2011) District Census Handbook, Guntur [Part B].
5. George, T. at. al. Wastewater engineering- treatment and Reuse [Fourth Edition].
6. Janaki Vallakeerthi and Aenumula Mallikarjun. (2018) A Design Approach for Sewage Treatment Plant: A case study of
Guntur Greater Muncipality, Andhra Pradesh, India. Volume-5.
7. Ministry of Urban Development, M. New Delhi (1993, December), Manual on Sewerage and sewage Treatment, Second
Edition (accessed on 1 October 2019).
8. Nhapi I. and Huub J (2005) A 3 step strategic approach to sustainable wastewater management.
9. Ravi kumar, P. at. al. (2010, November) Assessment of the Efficiency of Sewage Treatment Plants: A comparative study
between Nagasandra and Mailasandra sewage treatment plants. Volume-6.
BIOGRAPHIES
Vinay Nannapaneni received
master’s degree in Civil
Construction and Real Estate
Management, Latvia, Europe in
2019. Done Bachelor’s degree in
Civil Engineering from R.V. R & J.C.
College of Engineering, Guntur,
Andhra Pradesh, India.
hoto

More Related Content

Similar to IRJET- A Case Study and Design Approach for Sewage Treatment Plant in Kakumanu Village

Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...IRJET Journal
 
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...IRJET Journal
 
Kelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in ColomboKelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in ColomboAnton Ricalovskis
 
IRJET- Design of Bell-Mouth Spillway at Barvi Dam
IRJET- Design of Bell-Mouth Spillway at Barvi DamIRJET- Design of Bell-Mouth Spillway at Barvi Dam
IRJET- Design of Bell-Mouth Spillway at Barvi DamIRJET Journal
 
IRJET- Design of the Support Structure for the Pipe Line System
IRJET- Design of the Support Structure for the Pipe Line SystemIRJET- Design of the Support Structure for the Pipe Line System
IRJET- Design of the Support Structure for the Pipe Line SystemIRJET Journal
 
Design of Floating Bridge Cross Over
Design of Floating Bridge Cross OverDesign of Floating Bridge Cross Over
Design of Floating Bridge Cross OverIRJET Journal
 
Detritor Design
Detritor DesignDetritor Design
Detritor DesignNaveen NB
 
IRJET- Meliorate Strength of Concrete by using Fly Ash
IRJET-  	  Meliorate Strength of Concrete by using Fly AshIRJET-  	  Meliorate Strength of Concrete by using Fly Ash
IRJET- Meliorate Strength of Concrete by using Fly AshIRJET Journal
 
Design of Automated Circular Pedestrian Crossing at a Road Intersection
Design of Automated Circular Pedestrian Crossing at a Road IntersectionDesign of Automated Circular Pedestrian Crossing at a Road Intersection
Design of Automated Circular Pedestrian Crossing at a Road IntersectionIRJET Journal
 
Retrofitting of road gutters with an infiltration-exfiltration system for sto...
Retrofitting of road gutters with an infiltration-exfiltration system for sto...Retrofitting of road gutters with an infiltration-exfiltration system for sto...
Retrofitting of road gutters with an infiltration-exfiltration system for sto...Mariana Marchioni
 
Experimental study on partial repalcement of fine aggregate with construction...
Experimental study on partial repalcement of fine aggregate with construction...Experimental study on partial repalcement of fine aggregate with construction...
Experimental study on partial repalcement of fine aggregate with construction...eSAT Journals
 
IRJET- Planning and Design of Container Terminal
IRJET-  	  Planning and Design of Container TerminalIRJET-  	  Planning and Design of Container Terminal
IRJET- Planning and Design of Container TerminalIRJET Journal
 
Physical Unit Operation- Screening, Grit Removal, Equalization
Physical Unit Operation-Screening, Grit Removal,EqualizationPhysical Unit Operation-Screening, Grit Removal,Equalization
Physical Unit Operation- Screening, Grit Removal, EqualizationYash Patel
 
Design and Fabrication of Multi-purpose Agriculture Machine
Design and Fabrication of Multi-purpose Agriculture MachineDesign and Fabrication of Multi-purpose Agriculture Machine
Design and Fabrication of Multi-purpose Agriculture MachineIRJET Journal
 
An Experimental Study on Partial Replacement of Cement with Sugarcane Bagasse...
An Experimental Study on Partial Replacement of Cement with Sugarcane Bagasse...An Experimental Study on Partial Replacement of Cement with Sugarcane Bagasse...
An Experimental Study on Partial Replacement of Cement with Sugarcane Bagasse...IRJET Journal
 
Design and Estimation of Rain Water Harvesting Scheme in VIVA Institute of T...
Design and Estimation of Rain Water Harvesting Scheme in VIVA  Institute of T...Design and Estimation of Rain Water Harvesting Scheme in VIVA  Institute of T...
Design and Estimation of Rain Water Harvesting Scheme in VIVA Institute of T...vivatechijri
 

Similar to IRJET- A Case Study and Design Approach for Sewage Treatment Plant in Kakumanu Village (20)

Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
 
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
Designing of Sewage Treatment Plant for Society Level By using Sequential Bat...
 
Kelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in ColomboKelani River Water Treatment Plant in Colombo
Kelani River Water Treatment Plant in Colombo
 
IRJET- Design of Bell-Mouth Spillway at Barvi Dam
IRJET- Design of Bell-Mouth Spillway at Barvi DamIRJET- Design of Bell-Mouth Spillway at Barvi Dam
IRJET- Design of Bell-Mouth Spillway at Barvi Dam
 
IRJET- Design of the Support Structure for the Pipe Line System
IRJET- Design of the Support Structure for the Pipe Line SystemIRJET- Design of the Support Structure for the Pipe Line System
IRJET- Design of the Support Structure for the Pipe Line System
 
Design of Floating Bridge Cross Over
Design of Floating Bridge Cross OverDesign of Floating Bridge Cross Over
Design of Floating Bridge Cross Over
 
Detritor Design
Detritor DesignDetritor Design
Detritor Design
 
M.i tank
M.i  tankM.i  tank
M.i tank
 
IRJET- Meliorate Strength of Concrete by using Fly Ash
IRJET-  	  Meliorate Strength of Concrete by using Fly AshIRJET-  	  Meliorate Strength of Concrete by using Fly Ash
IRJET- Meliorate Strength of Concrete by using Fly Ash
 
Design of Automated Circular Pedestrian Crossing at a Road Intersection
Design of Automated Circular Pedestrian Crossing at a Road IntersectionDesign of Automated Circular Pedestrian Crossing at a Road Intersection
Design of Automated Circular Pedestrian Crossing at a Road Intersection
 
Retrofitting of road gutters with an infiltration-exfiltration system for sto...
Retrofitting of road gutters with an infiltration-exfiltration system for sto...Retrofitting of road gutters with an infiltration-exfiltration system for sto...
Retrofitting of road gutters with an infiltration-exfiltration system for sto...
 
Experimental study on partial repalcement of fine aggregate with construction...
Experimental study on partial repalcement of fine aggregate with construction...Experimental study on partial repalcement of fine aggregate with construction...
Experimental study on partial repalcement of fine aggregate with construction...
 
IRJET- Planning and Design of Container Terminal
IRJET-  	  Planning and Design of Container TerminalIRJET-  	  Planning and Design of Container Terminal
IRJET- Planning and Design of Container Terminal
 
Physical Unit Operation- Screening, Grit Removal, Equalization
Physical Unit Operation-Screening, Grit Removal,EqualizationPhysical Unit Operation-Screening, Grit Removal,Equalization
Physical Unit Operation- Screening, Grit Removal, Equalization
 
water tank
water tankwater tank
water tank
 
Design and Fabrication of Multi-purpose Agriculture Machine
Design and Fabrication of Multi-purpose Agriculture MachineDesign and Fabrication of Multi-purpose Agriculture Machine
Design and Fabrication of Multi-purpose Agriculture Machine
 
An Experimental Study on Partial Replacement of Cement with Sugarcane Bagasse...
An Experimental Study on Partial Replacement of Cement with Sugarcane Bagasse...An Experimental Study on Partial Replacement of Cement with Sugarcane Bagasse...
An Experimental Study on Partial Replacement of Cement with Sugarcane Bagasse...
 
Wwwe
WwweWwwe
Wwwe
 
Physical Unit Operations
Physical Unit OperationsPhysical Unit Operations
Physical Unit Operations
 
Design and Estimation of Rain Water Harvesting Scheme in VIVA Institute of T...
Design and Estimation of Rain Water Harvesting Scheme in VIVA  Institute of T...Design and Estimation of Rain Water Harvesting Scheme in VIVA  Institute of T...
Design and Estimation of Rain Water Harvesting Scheme in VIVA Institute of T...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 

Recently uploaded (20)

Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 

IRJET- A Case Study and Design Approach for Sewage Treatment Plant in Kakumanu Village

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 968 A CASE STUDY AND DESIGN APPROACH FOR SEWAGE TREATMENT PLANT IN KAKUMANU VILLAGE. VINAY NANNAPANENI1 1M.S. Riga Technical University, Latvia ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract - Many villages in the developing countries are facing problems on ground water and surface water. Kakumanu Village located in Guntur district of an Indian state Andhra Pradesh. Due to steady increase of population in the village, the generation of domestic sewage also increase and still there is no sewage treatment plant. So, the construction of sewage treatment is required with enough capacity. Wastewater treatment plant has many challenges for treating of excess sludge and its disposal. Several methods involved to reduce its water and organic content and finally to protect the environment. This paper focal point is generation of sewage and design of Wastewater treatment plant in both Kakumanu. One day the generated sewage was estimated 0.739 MLD for the next 30-year projected population. Sewage treatment plant consists of three process are Preliminary treatment, primary treatment and secondary treatment. Screening, gritchamber, primarysedimentation tank, biological reactor, secondary clarifier, activated sludge tank, drying bedsarethemaincomponentsinwastewatertreatment plant. Components are designed by considering the various standards and permissible limits oftreatingsewagewater. Ultimately, treated sewage water is supplied to irrigation and the generated sludge can be used as manure helps in increase of soil fertility. Key Words: Wastewater treatment plant, Design approach, Sludge, Population, Grit chamber, Aeration tank. 1. INTRODUCTION This paper deals with design of wastewater treatment plant for Kakumanu village. The village Kakumanu is located at16.3: North and 80.23: East altitudes in Guntur district. Over the years, with increasing population, industries and agriculture the demand for water also pushed up. Many efforts have done for water storage in the form ofdamsandreservoirs.The demandof water for agricultural, industrial and domestic activities are increased. Not only surface water resources but groundwater resources also resulting below the riverbed. Due to the low availability of water with increasing growth of population the serious water scarcity problems were increased. To minimize these problems the sewage treatment plant is to beconstructed for treating of wastewater. Sewage treatment plant consists of three process are Preliminary treatment, primary treatment and secondary treatment shown in Figure 1.[6] Preliminary treatment consists of separating like floating materials like papers, wood, rags, nappies, facewipes, bottle tops, broken bottles, diapers, plastics, cotton buds, sanitary items etc. are removed. Primary treatment consists of removing large suspended organic solid materials which are usually settled in the process of sedimentation. In the secondary treatment process, seed sludge is added to wastewater and the air is pumped into huge aeration tanks which helps to mix the seed sludge with wastewater. And the large particles will settle down and wastewater passes through the large tanks. Figure 1: Screenshot of Function Decomposition.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 969 2. Population Forecast As per 2011 census, the population of kakumanu village is 5,777[4]. If the rateofpopulationisincreasedas50peryear, then the estimated population for 30 years is P2050 =5777+(8*20) +(30*20) = 6537 Therefore, the estimated population of Kakumanu village is 6540 (assumed). Quantity of water supply per person = 150LPCD. Rate of water supply, WC = 870,750 LPCD or 870 KLD or 0.87 MLD or 870 m3/day. As per CPHEEO guideline, the generated sewage will be 80-85% Sewage generated = *0.87 MLD = 0.739 MLD or 739 KLD Therefore, the quantity of sewage water generated is 0.739 MLD. Average Sewage per hour= m3/hr Peak flow rate of sewage is 3 for population less than 20,000. Design Flow capacity= 3* 30.79 = 92.37 m3/hr = 0.0256 m3/sec. 3. Design Considerations The points to be considered during design of sewage treatment plant are:  Design period is taken as 30 years.  The design is done on average domestic basis.  Self-cleaning velocity is to develop at every place and stage.  Design of treatment should be economical and easily to maintain. 4. Design of Collection pit Storage tank, a container used to store the liquids also known for artificial lakes and ponds. It can be available in different shape: vertical and horizontal cylinder, open top and closed top, flat bottom, cone bottom and slope bottom. Retention time = 4hr. Average design flow= 30.79 m3/hr Capacity of collection sump = 4*30.79= 123.16 m3. Assumed liquid depth = 5m. Area required for collection pit, A = = 24.63 m2. The shape of the storage tank is taken as circular here.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 970 Now, r = (where A=∏r2 ) r = 2.8 m. Design of sewer chamber Qmax = 0.0256 m3/sec Assumptions; Shape of bar= M.S. Flats Size+ 10mm*50mm Clear spacing between the bars= 20mm Inclination of bars = 80: Assume average velocity of sewer= 0.8 m/sec At peak flow, required net inclined area = 0.03 Gross inclined area = (9/0.8) *1.5 =0.072 sq.m. Gross vertical area required = 0.072* sin 80 = 0.070 sq.m. Provide submergence depth = 0.3 m Width of channel = 0.070/0.3 = 0.23 m. Therefore, provide 20 bars of 10mm *50mm. 5. Design of grit chamber The flow from screen channels is taken into grit chamber, provided with 2 duplicate C.I gates one at inlet and other at outlet. Design Flow = (2.5 * 0.739)/2 = 0.923 MLD or 923 m3/day Surface loading = 1100 m3/sq. m/day To account the turbulence and short circuiting, the surface loading is reduced to 800 m3/ sq. m/day. Therefore, required area = 923/800 = 1.15 sq. m. Provide 1.15m dia. Chamber i.e. circular Detention time = 60 sec. Volume, V= (923* 60)/(24*60*60) = 0.64 m3 liquid depth= Volume/ Area = 0.64/1.15 = 0.556m. free board = 0.6 size of grit chamber = 1.7*(0.556+0.6) = 1.7* 1.156 (dia* depth)
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 971 Check for horizontal velocity Cross sectional area of grit chamber = 1.7*0.556 = 0.945 sq.m. Velocity = 923/(1.7*0.556*24*60*60) = 0.011m/sec.= 1.1 cm/sec< 18 cm/sec. Hence OK. Assumed Grit generation = 0.05 m3 per 1000 m3 of sewage flow. Required storage volume = (739*8*0.05) / (24*1000) = 0.012 m3 Grit storage area = ( )*1.72 = 2.27 m2. Grit storage depth = 0.012/2.27 = 0.0052 m. Total liquid depth = 0.556+0.005 = 0.561 = 0.6 m. Provided size of grit chamber = 1.7*(0.6+0.6) = 1.7m * 1.2m. 6. Design of primary sedimentation tank Detention time = 2 hr. Volume of sewage = max quantity of sewage / (detention time*24) = 739/(2*24) = 15.39 m3 Provided depth = 2m. Surface area = volume/depth = 15.39/2 = 7.695 sq. m. D = (where A = )* d2 = 3.12 m. 7. Design of Aeration tank No of tanks = 2 Average flow in each tank = 0.739 MLD/2 = 0.369 MLD Q = 369 m3/day Total BOD entering STP= 295 mg/L The BOD of sewage coming to aeration tank YO= 295 mg/L BOD left in effluent = YE= 20 mg/L BOD removed in activated plant = 295 - 20 = 275 mg/L Required minimum efficiency in activated plant = 275/295 = 0.93=93% Volume of aeration tank can be designed by assuming a suitable value of MLSS and θ or F/M ratio = 3000 mg/L F/M ratio = 0.15 F/M =Q/V= YO/XT 0.15 = (369*295)/(V * 3500) V= (369* 295)/(3000*0.12) V= 302.3 m3
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 972 7.1. Aeration tank dimensions Let us adopt a depth of 3.5m and width 9m aeration tank. Length of tank = V/(B * D) = 302.3/(9*3.5) = 9.59 m = 10m. Therefore, provided volume= 10*9*3.5=315 m3 Check for aeration period t = (V/Q) *24hr = (315/369) *24= 20.48 = 20 hrs Check for volumetric loading = Q*(YO/V) gm of BOD 5/m3 volume of tank. = (369* 295)/315 gm/m3 = 345.57 gm/m3 = 0.34 kg/m3 Check for return sludge ratio QR/Q = XT/((106/SVI)- XT) SVI should be between 50 m/gm – 150 m/gm. Using 120 m/gm QR/Q = 3000/((106/120)-3000) = 0.56 (between 0.5 - 1) Check for SRT V*XT = [αy*Q(YO-YE) θc]/ (KE* θc+1) Where, αy=1, KE= 0.06/d, 315*3000 = [1*369(295-20) θc]/(0.06 θc+1) 945000= 101475 θc/ (1+0.06 θc) 1+0.06 θc = 0.107 θc θc= 1/0.047 θc = 21.27 days. Adopted size of aeratin tank is 19m*9m*(3.5+0.6) m. 8. Design of Secondary clarifiers Average sewage flow = 739 KLD = 739 m3/day Recirculated flow = 461 m3/day (assume 50%) Total inflow = 739+ 461= 1200 m3/day Detention time= 2hrs Volume of tank = 1200*(2/24) = 100 m3 Liquid depth =3.5m (assumed) Area = 100/3.5 = 28.57 m2 Average flow of surface loading = 15 m/day
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 973 Surface area to be provided = 739/15 = 49.26 m2 = 50 m2 Diameter of circular tank, d= = 7.97m = 8m. Check for weir loading Average sewage flow = 739 KLD = 739 m3/day Weir loading = 739/ (∏*8) = 29.40 m3/day/m. (< 185 m3/day/m) Check for solids loading Recirculated flow = 461 m3/day Average sewage flow = 739 KLD = 739 m3/day MLSS solids inflow = 3000 mg/L Total solids inflow = (739+461) *3 = 3600 kg/day. Solids loading = 3600/50 = 72 kg/day/m2. Provide a clarifier with 8m dia and depth 3.5m. Hopper slope = 1 in 12 9. Return sludge pump house Total return flow = 461 m3/day = 19.20 m3/hr = 0.32 m3/ min. Detention time = 15 min Volume of wet well = 0.32*15 wet well provided = 2.5m*1.5*1.8m dry well provided = 2.5m*2.5m control room size = 2.5m* 2.5m Provide 2 pumps with capacity 0.461 MLD and diameter of return sludge pipe should be 150mm. 10. Design of Sludge drying beds Sludge applied for drying beds@ 100 kg/MLD Sludge applied per day =125kg Specific gravity, g=1.015 Percentage of solid contents = 1.5 volume of sludge = (125/ 1.5%) *(1/(1000*1.015)) = 8.2 m3/day. Total number of cycles in one year =33 Therefore, period of each cycle = 365/33 = 11 days Volume of sludge = 8.2 * 11 = 90.2 m3 Area of beds required for 0.3m/cycle spreading layer = 90.2/0.3 = 300.67 Provide 4 beds with dimensions 1.2m * 7m and hence the area provided is 336 m2 11. Filter Pumphouse and sump Excess sludge water, θc = V*(XT/QW*XR) 21.27d = (315*3000)/(QW*XR)
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 10 | Oct 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.34 | ISO 9001:2008 Certified Journal | Page 974 QW*XR = 44428.77gm/d = 44.4kg/d Assume excess sludge contains 1% solids and specific gravity = 1.015 Volume of excess sludge = 44.4/(1000* 1.015* 1%) = 4.37 m3/ day = 0.18 m3/ hr. Detention time = 8 hrs Volume of wet well = 8 * 0.18 = 1.44 m3 for 1% concentration Liquid depth provided = 1m Therefore, the area required for 1% concentration of solids = 1.44/1 = 1.44 m2 Diameter of wet well = = 1.35m Assume 2m diameter. 12. CONCLUSION Due to increase in population in Kakumanu village, looking on future aspect, it is quite necessary to construct wastewater treatmennt plant. In the present study, wastewater treatment plant in Kakumanu is analysed and designed perfectly to meet needs and demand for population 6540 for 30 years. The utilization of treated water will reduce the use of fresh water and ground water. Treated sludge can be used for manure helps to increase fertility in soil. The construction of wastewater treatment plant helps to prevent direct disposal of sewage into fields and reduce the freshwater consumption. REFERENCES 1. Aswathy. M and Hemapriya (2017), Analysis and DesignofSewageTreatmentPlantof ApartmentsinChennai,Volume116 157-163p 2. Aswathy. M and Harini T. (2017) Design of Wastewater Treatment Plant for Tambaram municipality, Volume11677-83p 3. Census of India, C. villages & Towns in Kakumanu mandal Guntur, Andhrapradesh- Census 2011. [Retrived on 1st October 2019]. 4. Directorate of Census operations, (2011) District Census Handbook, Guntur [Part B]. 5. George, T. at. al. Wastewater engineering- treatment and Reuse [Fourth Edition]. 6. Janaki Vallakeerthi and Aenumula Mallikarjun. (2018) A Design Approach for Sewage Treatment Plant: A case study of Guntur Greater Muncipality, Andhra Pradesh, India. Volume-5. 7. Ministry of Urban Development, M. New Delhi (1993, December), Manual on Sewerage and sewage Treatment, Second Edition (accessed on 1 October 2019). 8. Nhapi I. and Huub J (2005) A 3 step strategic approach to sustainable wastewater management. 9. Ravi kumar, P. at. al. (2010, November) Assessment of the Efficiency of Sewage Treatment Plants: A comparative study between Nagasandra and Mailasandra sewage treatment plants. Volume-6. BIOGRAPHIES Vinay Nannapaneni received master’s degree in Civil Construction and Real Estate Management, Latvia, Europe in 2019. Done Bachelor’s degree in Civil Engineering from R.V. R & J.C. College of Engineering, Guntur, Andhra Pradesh, India. hoto