DESIGN OF MECHANICAL DETRITOR TANK FOR GRIT REMOVAL
Details Value Units Formula
Average Flow 60 MLD
Peak Factor 2.25 (As per CPHEEO - give correct ref pg/table no. and estimate
population)
Peak Flow 135 MLD
Number Of Working Units 2 Nos. (Providing 100% standby units) Choose min. no. of units for techno-
economic optimisation. Give cpheeo ref pg no for 100% standby
requirement
Grit Size 0.00015 m
Specific Gravity 2.65
Settling Velocity of Grit particle 0.018 m/s Table 5.6,Pg.5-41 CPHEEO 1993
Surface Overflow Rate 959 m^3/m^2/day Table 5.6,Pg.5-41 CPHEEO 1993
Plan Area for Detritor 70.385818561001 m^2
Side Length of Square Detritor 8.4 m
Kc Constant 4 Range 3-4.5 CPHEEO Manual Page 5-42
Ss Specific Gravity 2.65
Acceleration due to gravity g 9.81 m/s^2
Diameter of Particle 15 mm
Critical Displacement Velocity of Grit 0.160929798359409 m/s Vc=(8k*(Ss-1)gd/f)^0.5
Detention time at avg flow 60 s Pg 5-42, Cl. 5.6.2.7.1.3 ,CPHEEO Manual
So, Volume of each detritor tank 20.8333333333333 m3
Liquid depth of tank required 0.3 m
Providing liquid depth 0.6 m Providing LD in the range of 0.6 - 0.9, to accommodate the Scrapper
mechanism - a manufacturing std., at the cost of excess detention time
Horizontal velocity of flow 0.155009920634921 m/s
Check for Vh < Vc: Hence Ok Vh should be less than Vc, to prevent Scouring or resuspension of grit
Actual detention time provided 121.92768 s
Grit Storage Space
Rotary Speed of scrapper 0.25 rpm
Time between scraping .e Duration of 1
rotation
4 mins (Retention time of settled Grit particles till next round of scrapping)
Grit Content 0.1 m^3/ML Grit content for domestic sewage varies from 0.05m3 to 0.15m3 per
ML
So, Flow of grit 0.00416666666666667m3/min
Quantity Of Grit required to be stored 0.0166666666666667m3 Volume = Discharge x Retention Time
Depth needed to hold grit 0.000118102796674225m Negligible. Can be accomodated in provided liquid depth.
Providing Free Board 0.5 m
Size of Detritor: 8.4 m L x 8.4 m W x 0.6 m LD + 0.5 m FB
1

More Related Content

What's hot

The joule thomson experiment
The joule thomson experimentThe joule thomson experiment
The joule thomson experiment
MidoOoz
 
Q913 rfp w3 lec 12, Separators and Phase envelope calculations
Q913 rfp w3 lec 12, Separators and Phase envelope calculationsQ913 rfp w3 lec 12, Separators and Phase envelope calculations
Q913 rfp w3 lec 12, Separators and Phase envelope calculations
AFATous
 
Q913 re1 w2 lec 7
Q913 re1 w2 lec 7Q913 re1 w2 lec 7
Q913 re1 w2 lec 7
AFATous
 

What's hot (13)

The joule thomson experiment
The joule thomson experimentThe joule thomson experiment
The joule thomson experiment
 
Q913 rfp w3 lec 12, Separators and Phase envelope calculations
Q913 rfp w3 lec 12, Separators and Phase envelope calculationsQ913 rfp w3 lec 12, Separators and Phase envelope calculations
Q913 rfp w3 lec 12, Separators and Phase envelope calculations
 
Fluid mechanics(2130602)
Fluid mechanics(2130602)Fluid mechanics(2130602)
Fluid mechanics(2130602)
 
various flow meter
various flow metervarious flow meter
various flow meter
 
Reservoir characterization
Reservoir characterizationReservoir characterization
Reservoir characterization
 
ADVANCED PRODUCTION LOGGING, CASED HOLE & PRODUCTION LOG EVALUATION
ADVANCED  PRODUCTION LOGGING, CASED HOLE & PRODUCTION LOG EVALUATIONADVANCED  PRODUCTION LOGGING, CASED HOLE & PRODUCTION LOG EVALUATION
ADVANCED PRODUCTION LOGGING, CASED HOLE & PRODUCTION LOG EVALUATION
 
Project scope management 1
Project scope management 1Project scope management 1
Project scope management 1
 
3D oil reservoir model uncertainty: model-derived uncertainty or uncertainty ...
3D oil reservoir model uncertainty: model-derived uncertainty or uncertainty ...3D oil reservoir model uncertainty: model-derived uncertainty or uncertainty ...
3D oil reservoir model uncertainty: model-derived uncertainty or uncertainty ...
 
Q913 re1 w2 lec 7
Q913 re1 w2 lec 7Q913 re1 w2 lec 7
Q913 re1 w2 lec 7
 
Surface tension &amp; capillarity c
Surface tension &amp; capillarity cSurface tension &amp; capillarity c
Surface tension &amp; capillarity c
 
Potential flow
Potential flowPotential flow
Potential flow
 
Material balance Equation
  Material balance Equation  Material balance Equation
Material balance Equation
 
part 1 .pdf.pdf
part 1 .pdf.pdfpart 1 .pdf.pdf
part 1 .pdf.pdf
 

Similar to Detritor Design

Grit Design
Grit Design Grit Design
Grit Design
Naveen NB
 
Dewatering project pit alam 1 3
Dewatering project pit alam 1   3Dewatering project pit alam 1   3
Dewatering project pit alam 1 3
Muhammad Ichsan
 
processoptimization-rawmillcoalmill-moduleday2-230314110558-e03314c6.pdf
processoptimization-rawmillcoalmill-moduleday2-230314110558-e03314c6.pdfprocessoptimization-rawmillcoalmill-moduleday2-230314110558-e03314c6.pdf
processoptimization-rawmillcoalmill-moduleday2-230314110558-e03314c6.pdf
Santosh190549
 
COOP training-Bokhari
COOP training-BokhariCOOP training-Bokhari
COOP training-Bokhari
Assad Bokhari
 

Similar to Detritor Design (20)

Grit Design
Grit Design Grit Design
Grit Design
 
IRJET- A Case Study and Design Approach for Sewage Treatment Plant in Kakuman...
IRJET- A Case Study and Design Approach for Sewage Treatment Plant in Kakuman...IRJET- A Case Study and Design Approach for Sewage Treatment Plant in Kakuman...
IRJET- A Case Study and Design Approach for Sewage Treatment Plant in Kakuman...
 
FLUID MECHANICS LAB MANUAL BSc Civil Technology 3rd Semster
FLUID  MECHANICS LAB  MANUAL BSc Civil Technology 3rd Semster FLUID  MECHANICS LAB  MANUAL BSc Civil Technology 3rd Semster
FLUID MECHANICS LAB MANUAL BSc Civil Technology 3rd Semster
 
Wtp design
Wtp designWtp design
Wtp design
 
Consumo de aire cruz jose
Consumo de aire cruz joseConsumo de aire cruz jose
Consumo de aire cruz jose
 
Physical Unit Operation- Screening, Grit Removal, Equalization
Physical Unit Operation-Screening, Grit Removal,EqualizationPhysical Unit Operation-Screening, Grit Removal,Equalization
Physical Unit Operation- Screening, Grit Removal, Equalization
 
Design of Sewage Treatment Plant
Design of Sewage Treatment PlantDesign of Sewage Treatment Plant
Design of Sewage Treatment Plant
 
Wwwe
WwweWwwe
Wwwe
 
Calight 70 f
Calight 70 fCalight 70 f
Calight 70 f
 
Peclet Number HDS Sizing Method for Stormwater Treatment
Peclet Number HDS Sizing Method for Stormwater TreatmentPeclet Number HDS Sizing Method for Stormwater Treatment
Peclet Number HDS Sizing Method for Stormwater Treatment
 
ZBC in commodities.ppt
ZBC in commodities.pptZBC in commodities.ppt
ZBC in commodities.ppt
 
Dewatering project pit alam 1 3
Dewatering project pit alam 1   3Dewatering project pit alam 1   3
Dewatering project pit alam 1 3
 
processoptimization-rawmillcoalmill-moduleday2-230314110558-e03314c6.pdf
processoptimization-rawmillcoalmill-moduleday2-230314110558-e03314c6.pdfprocessoptimization-rawmillcoalmill-moduleday2-230314110558-e03314c6.pdf
processoptimization-rawmillcoalmill-moduleday2-230314110558-e03314c6.pdf
 
Numericals.pptx
Numericals.pptxNumericals.pptx
Numericals.pptx
 
PED_Distillation_Column_designing_Sum (1).pptx
PED_Distillation_Column_designing_Sum (1).pptxPED_Distillation_Column_designing_Sum (1).pptx
PED_Distillation_Column_designing_Sum (1).pptx
 
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
Planning and deployment of CSM at moderate depth opencast mines-a blast free ...
 
IRJET-Testing of Fluidized Bed Sand Cooler for Foundry Reclamation
IRJET-Testing of Fluidized Bed Sand Cooler for Foundry ReclamationIRJET-Testing of Fluidized Bed Sand Cooler for Foundry Reclamation
IRJET-Testing of Fluidized Bed Sand Cooler for Foundry Reclamation
 
Designing of sprinkler irrigation system
Designing of sprinkler irrigation systemDesigning of sprinkler irrigation system
Designing of sprinkler irrigation system
 
Multi cyclone dust collector
Multi cyclone dust collectorMulti cyclone dust collector
Multi cyclone dust collector
 
COOP training-Bokhari
COOP training-BokhariCOOP training-Bokhari
COOP training-Bokhari
 

Detritor Design

  • 1. DESIGN OF MECHANICAL DETRITOR TANK FOR GRIT REMOVAL Details Value Units Formula Average Flow 60 MLD Peak Factor 2.25 (As per CPHEEO - give correct ref pg/table no. and estimate population) Peak Flow 135 MLD Number Of Working Units 2 Nos. (Providing 100% standby units) Choose min. no. of units for techno- economic optimisation. Give cpheeo ref pg no for 100% standby requirement Grit Size 0.00015 m Specific Gravity 2.65 Settling Velocity of Grit particle 0.018 m/s Table 5.6,Pg.5-41 CPHEEO 1993 Surface Overflow Rate 959 m^3/m^2/day Table 5.6,Pg.5-41 CPHEEO 1993 Plan Area for Detritor 70.385818561001 m^2 Side Length of Square Detritor 8.4 m Kc Constant 4 Range 3-4.5 CPHEEO Manual Page 5-42 Ss Specific Gravity 2.65 Acceleration due to gravity g 9.81 m/s^2 Diameter of Particle 15 mm Critical Displacement Velocity of Grit 0.160929798359409 m/s Vc=(8k*(Ss-1)gd/f)^0.5 Detention time at avg flow 60 s Pg 5-42, Cl. 5.6.2.7.1.3 ,CPHEEO Manual So, Volume of each detritor tank 20.8333333333333 m3 Liquid depth of tank required 0.3 m Providing liquid depth 0.6 m Providing LD in the range of 0.6 - 0.9, to accommodate the Scrapper mechanism - a manufacturing std., at the cost of excess detention time Horizontal velocity of flow 0.155009920634921 m/s Check for Vh < Vc: Hence Ok Vh should be less than Vc, to prevent Scouring or resuspension of grit Actual detention time provided 121.92768 s Grit Storage Space Rotary Speed of scrapper 0.25 rpm Time between scraping .e Duration of 1 rotation 4 mins (Retention time of settled Grit particles till next round of scrapping) Grit Content 0.1 m^3/ML Grit content for domestic sewage varies from 0.05m3 to 0.15m3 per ML So, Flow of grit 0.00416666666666667m3/min Quantity Of Grit required to be stored 0.0166666666666667m3 Volume = Discharge x Retention Time Depth needed to hold grit 0.000118102796674225m Negligible. Can be accomodated in provided liquid depth. Providing Free Board 0.5 m Size of Detritor: 8.4 m L x 8.4 m W x 0.6 m LD + 0.5 m FB 1