REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION
MODELLING
Prof. Manohar B. 1, Sachin Krishna Gond2, Sandesh Shanmukha Naik3,
Sanjay Bhaskar Naik4, Shikha Sunil Govekar5
1Assistant Professor, Department of Civil Engineering, Anjuman Institute of Technology and Management,
Bhatkal, Karnataka, India
2,3,4,5Student, Civil Engineering, Anjuman Institute of Technology and Management, Bhatkal, Karnataka, India
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - Building InformationModelling(BIM)isa method
consisting creating, processing, handling and using a
computerised visualization of physical and functional
characteristics of building. The term 4D is intended to refer to
the fourth dimension: time, means, 4D is 3D + schedule (time).
The BIM extends this technique into 3 dimensional (3D)
drawings in the three basic dimensional breadth (b), height
(h) and thickness (d) with time as 4th dimension and cost as
5th dimension. BIM is a process of the development and use of
computer-generatedmulti-dimensionalmodelstosimulate the
planning, design, construction and operation of a facility. BIM
ia an intelligent 3D model based process plays an important
role in AEC industry. BIM in terms of modelling saves a lot of
time and money comparing to traditional scheduling process.
Key Words: Real time analysis, 4D, 5D, BIM, Rendering,
Simulation, Scheduling, Time and Cost overrun
1. INTRODUCTION
Construction planning and scheduling are
considered as integralandsignificantunitsofallconstruction
project. The interpretation of a design to a construction
schedule consist users interpretationandrequiresvariations
of data in different stages. The present planning methodsare
completely manual and time-consuming process. Current
practices of construction project planning involve a number
of approaches/skills that model dependencies and
sequencing of project activities. There are some manual
approaches like bar charts, CPM based network diagrams,
and time-changesdiagram.Noneofthesetechniqueshavethe
capability of modelling and visualizing both the sequencing
and finishing the pattern of activities.
Building Information Modeling (BIM) is the
documentation interaction including of data about various
periods ofanyundertakinglikeplan,development,arranging,
managing, office the executives and activity. It is one
comprehensive documentationprocessgainfulforfunctional
representation, and development application, for example,
assessing, planning and plan coordination. Principal benefit
of carrying out BIM application is the visual coordination of
the structure frameworks like preparing three dimensional
models and it additionally recognizes the potential struggles
between the structure frameworks such as clash detection
work. By identifying the struggles, issues can be settled
before sincere development which sets aside cost and time
contributed.
1.1 BIM Software
Building plan and building data displaying (BIM)
programming includes computer aided plan (CAD
programming), items utilizednormally insidethe designand
development enterprises. BIMsoftwareoffersamodel-based
process for planning and supervision structures and
frameworks, going past development drawings to produce a
computerized representation of the useful properties of the
workplace. Different items in this classification might be
utilized for a scope of CAD purposes past structural plan,
modelling of plan to get three dimensional structure etc.
1.2 Cost Overrun
A cost overrun, also known as a cost increase or
budget overrun, involves unexpected incurred costs. When
these costs are in excess of budgeted amounts due to a value
engineering underestimation of the actual cost during
budgeting, they are known by these terms called cost
overrun.
Cost overrun= Actual Cost – Expected Cost
1.3 Time Overrun
It is the phenomenon in which the project gets
delayed beyond its expectedcompletion time due to certain
difficulties i.e. more time is required to finish the project
than initially planned. Causes:- Plans, specifications etc. are
not received by the contractor i
ntime.
Time overrun= Actual Time – Expected Time
1.4 Objectives
 Explain theideologies ofBuildingInformationModeling
(BIM).
 Describe the features of a BIM model.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2224
 To compare total cost and time difference between
manual and BIM based estimation approach outcome.
 Explain applications for BIM in Commercial and
Residential architecture.
 Explain the common tools and processes used in
software design.
 To enhance project performance and produce better
outcomes.
 To display and share design and viability studies for
construction.
 To offer improved quality assuranceanddata exchange
to process for more effective and inefficient design.
 To make effective use of data of the building project
during construction, operation, maintenance.
2. METHODOLY
2.1 General
The typical work flow diagram of the real time analysis
has been shown in the figure below
Fig -2.1: Methodology Flow chart
For this study of time and cost overrun, following
software’s were used in order to create an intellectual 3D
model with detailed design, analysis and planning: -
 Autodesk AutoCAD
 Revit Architecture
 Microsoft Excel
 Microsoft Project
 Autodesk Naviswork
2.2 Autodesk AutoCAD
AutoCAD allows you to design and explore your
theoretical design ideas, modify your designs using
Autodesk AutoCAD tools and generate intelligent model
documentation, transform your designs into 3D
renderings.
Following are the works carried out in Autodesk
AutoCAD
 Data collection from site
 2D design using AutoCAD
The common structure plan is gathered and similar
has been drawn utilizing AutoCAD software are shown
below
Fig -2.2: Elevation of the building
Fig -2.3: Plan of the building
2.3 Revit Architecture
 Referring AutoCAD Plan
 Design 3D Modelling
 The plans are exported in DXF formats from
AutoCAD to Revit
 The sketch of the building is made as per the plan
 Material of construction is selected from the
material library
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2225
 Building visuals are created to check with the
architectural visuals
 Further rendering of the Revit is carried out to
produce a photorealistic image of the 3D model
Fig -2.4: Revit work Sheet-Front View
Fig -2.5: Revit work Sheet-Top View
2.4 Microsoft Excel
 Utilizing Microsoft Excel information hasbeeninserted
as CSV.
 By referring the data from MicrosoftExcel furtherwork
used to be done.
 By classifying data using programming like Excel,
data specialists and various clients can simplify
information to see as data is added or changed.
2.5 Microsoft Project
 Using MSP budgets based on assignment work and
resourceratesarecarriedout.Asresourcesare assigned
to tasks and assignment work.
 The MSP gave us the program that calculates the cost,
equal to the work times therate up to the next level.
Fig -2.6: Microsoft Project Worksheet
2.6 Autodesk Naviswork
 The 3D plan from Revit which is in the (*.ifc) format is
imported to Naviswork
 After schedule file is taken in the form of MSP, it is
imported in Autodesk Naviswork and tasks are linked
with building objects to get construction orders.
 With the Timeliner tool in Naviswork,linkedmodel to
an external construction program and saw a more
accurate simulation of all construction tasks in a
sequenced animation.
Fig -2.7: Autodesk Naviswork Worksheet
3. Results and Discussion
To complete the project and obtain the objectives
various software are used such as Revit is used such as
Revit is used for presentation, rendered views and
quantification. For planning and scheduling the project
Microsoft project is used, it is also used for resource
allocation outputs in the form of graph and charts.
Navisworks manage is used to trace the project planned vs
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2226
actual and Individual activities are analyzed with BIM
software for both cost and time
Fig -3.1: Tracing of project on date 08/09/2017
According to planned schedule at 08-09-2017 the 1st
floor RCC work of column should be completed (1st slab to
2nd slab) including staircase but on this same day actually
slab work of 1st floor (parking to1st slab) excludingstaircase
is completed and RCC work of 1st floor slab and beam is in
progress. The overriding green color to identify structural
elements in the project.
It is observed that this construction experienced cost
and time overrun. If the construction was properlymanaged
than 7.7 month and above 9 lakhs may be saved in case
study construction project.
4. CONCLUSION
Project management plays an important role for the
even completion of project. Now a day’s selecting proper
project management tool for the project is key of
accomplishment to complete the project in specified time and
instandardway.BuildingInformationmodelinghasprovided
a new approach towards project management. It is an
developing tool for project management which makes use of
various tools for visualization, 2D planning, 3D modelling,
quantification, cost estimation, resource distribution, and
monitoring these tools results in to accelerating the
construction process, effective resource management, 4D
visualization of the construction schedule, identification of
unexpected conditions and the resultant cost and securing
more profit. These benefits made BIM a successful project
managementtool.Thesetoolsdefinitely improveeachstageof
the construction project.
In this case study the concept of BIM is simulated
through 3D modeling, scheduling and cost estimation using
BIM supporting software such as Revit, Microsoft Project and
Navisworks Manage. Although developing 5D (cost) - BIM
model with slight details is very time expensive, but then cost
control process is very much beneficial with BIM than a
manual approaches throughout the project succession.
Simulation proves to be a powerful tool to find out critical
areas of project with respect to time and cost, so it helps in
decision making.
REFERENCES
[1] ChanwoJo, Jungsik Choi(2021),“BIMInformation
Standard Framework for Model Integration and
Utilization Based on Open BIM”, Major in
Architecture IT Convergence Engineering, School of
Smart Convergence Engineering, Hanyang
University, Ansan-si 15588, Korea.
[2] Samad M.E. Sepasgozar, Felix Kin Peng Hui, Sara
Shirowzhan, Mona Foroozanfar,Liming Yang,Lu
Aye (2021), “Lean Practices Using BIM and Digital
Twinning for Sustainable Construction”, Faculty of
Built Environment, The University of New South
Wales, Sydney, NSW 2052, Australia.
[3] Pathan.Md Rafi, K.J. Brahma Chari (2019), “5D
Applications of BIM in Construction Management”,
International Conference on Advance in Civil
Engineering [ ICACE- 2019]|21-23-Marech2019|K
L Deemed to be University, Vijayawada, A.P. India.
[4] F. D’Amicoa, L. D’Ascanioa, M.C. De Falcoa, C.
Ferrantea, D. Prestaa, F.Tostib (2019), “BIM for
infrastructure: an efficient process to achieve 4D e
5D digital dimensions”, Department ofEngineering,
Roma Tre University, Via Vito Voltera 62,00146,
Rome, Italy.
[5] Mr. Sachin Nalawade, Himanshu Ramani,
Prashant Pawar, Prashant Sathe, Rushikesh
Gaikwad (2019), “A Case study on a Residential
Building using BIM”, Civil Engineering, Volume 6,
Issue 5, Cikitusi Journal for Multidisciplinary
Research.

More Related Content

Similar to REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING

Contribution Of Building Information Modeling (BIM) To Solve Problems In Arch...
Contribution Of Building Information Modeling (BIM) To Solve Problems In Arch...Contribution Of Building Information Modeling (BIM) To Solve Problems In Arch...
Contribution Of Building Information Modeling (BIM) To Solve Problems In Arch...IRJET Journal
 
Software assignment 1
Software assignment 1Software assignment 1
Software assignment 1Timun Loh
 
IRJET- Building Information Modeling in AEC Industry with its Implementation ...
IRJET- Building Information Modeling in AEC Industry with its Implementation ...IRJET- Building Information Modeling in AEC Industry with its Implementation ...
IRJET- Building Information Modeling in AEC Industry with its Implementation ...IRJET Journal
 
“Analysis and Planning of Residential Building by Using AutoCAD and Revit.”
“Analysis and Planning of Residential Building by Using AutoCAD and Revit.”“Analysis and Planning of Residential Building by Using AutoCAD and Revit.”
“Analysis and Planning of Residential Building by Using AutoCAD and Revit.”IRJET Journal
 
Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...IRJET Journal
 
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
IRJET -  	  Digital Engineering & Project Management for AEC Industry using BIMIRJET -  	  Digital Engineering & Project Management for AEC Industry using BIM
IRJET - Digital Engineering & Project Management for AEC Industry using BIMIRJET Journal
 
Building Information Modelling (BIM): Benefits for Small Scale Construction I...
Building Information Modelling (BIM): Benefits for Small Scale Construction I...Building Information Modelling (BIM): Benefits for Small Scale Construction I...
Building Information Modelling (BIM): Benefits for Small Scale Construction I...Dr. Amarjeet Singh
 
Software full
Software fullSoftware full
Software fullahmong4
 
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”IRJET Journal
 
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET Journal
 
3D Modeling and Energy Analysis of a Residential Building using BIM Tools
3D Modeling and Energy Analysis of a Residential Building using BIM Tools3D Modeling and Energy Analysis of a Residential Building using BIM Tools
3D Modeling and Energy Analysis of a Residential Building using BIM ToolsIRJET Journal
 
Building Information Modelling Technology For Risk Analysis And Mitigation: A...
Building Information Modelling Technology For Risk Analysis And Mitigation: A...Building Information Modelling Technology For Risk Analysis And Mitigation: A...
Building Information Modelling Technology For Risk Analysis And Mitigation: A...IRJET Journal
 
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction SchedulingIRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction SchedulingIRJET Journal
 
Revit_Architecture_Structure_Modelling_C.pptx
Revit_Architecture_Structure_Modelling_C.pptxRevit_Architecture_Structure_Modelling_C.pptx
Revit_Architecture_Structure_Modelling_C.pptxVandanaBrahmani1
 
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...IRJET Journal
 
Cscm group report
Cscm  group reportCscm  group report
Cscm group reportlohwenjun
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectMANNU KUMAR
 
Review on Benefits, Features, Applications and Implementation of Building Inf...
Review on Benefits, Features, Applications and Implementation of Building Inf...Review on Benefits, Features, Applications and Implementation of Building Inf...
Review on Benefits, Features, Applications and Implementation of Building Inf...IRJET Journal
 

Similar to REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING (20)

Contribution Of Building Information Modeling (BIM) To Solve Problems In Arch...
Contribution Of Building Information Modeling (BIM) To Solve Problems In Arch...Contribution Of Building Information Modeling (BIM) To Solve Problems In Arch...
Contribution Of Building Information Modeling (BIM) To Solve Problems In Arch...
 
Software assignment 1
Software assignment 1Software assignment 1
Software assignment 1
 
IRJET- Building Information Modeling in AEC Industry with its Implementation ...
IRJET- Building Information Modeling in AEC Industry with its Implementation ...IRJET- Building Information Modeling in AEC Industry with its Implementation ...
IRJET- Building Information Modeling in AEC Industry with its Implementation ...
 
“Analysis and Planning of Residential Building by Using AutoCAD and Revit.”
“Analysis and Planning of Residential Building by Using AutoCAD and Revit.”“Analysis and Planning of Residential Building by Using AutoCAD and Revit.”
“Analysis and Planning of Residential Building by Using AutoCAD and Revit.”
 
Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...Application of BIM and Construction Process Simulation using 5D BIM for Resid...
Application of BIM and Construction Process Simulation using 5D BIM for Resid...
 
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
IRJET -  	  Digital Engineering & Project Management for AEC Industry using BIMIRJET -  	  Digital Engineering & Project Management for AEC Industry using BIM
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
 
Building Information Modelling (BIM): Benefits for Small Scale Construction I...
Building Information Modelling (BIM): Benefits for Small Scale Construction I...Building Information Modelling (BIM): Benefits for Small Scale Construction I...
Building Information Modelling (BIM): Benefits for Small Scale Construction I...
 
Software full
Software fullSoftware full
Software full
 
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
 
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIMIRJET- Digital Engineering & Project Management for AEC Industry using BIM
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
 
3D Modeling and Energy Analysis of a Residential Building using BIM Tools
3D Modeling and Energy Analysis of a Residential Building using BIM Tools3D Modeling and Energy Analysis of a Residential Building using BIM Tools
3D Modeling and Energy Analysis of a Residential Building using BIM Tools
 
Building Information Modelling Technology For Risk Analysis And Mitigation: A...
Building Information Modelling Technology For Risk Analysis And Mitigation: A...Building Information Modelling Technology For Risk Analysis And Mitigation: A...
Building Information Modelling Technology For Risk Analysis And Mitigation: A...
 
Software
SoftwareSoftware
Software
 
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction SchedulingIRJET- Application of 4D CAD BIM Technology in Construction Scheduling
IRJET- Application of 4D CAD BIM Technology in Construction Scheduling
 
BIM
BIMBIM
BIM
 
Revit_Architecture_Structure_Modelling_C.pptx
Revit_Architecture_Structure_Modelling_C.pptxRevit_Architecture_Structure_Modelling_C.pptx
Revit_Architecture_Structure_Modelling_C.pptx
 
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
CONSTRUCTION PROJECT MANAGEMANT BY USING M. S PROJECT FOR ATULA ELEGANCE AT V...
 
Cscm group report
Cscm  group reportCscm  group report
Cscm group report
 
Use of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real projectUse of BIM in planning and construction and implementation in real project
Use of BIM in planning and construction and implementation in real project
 
Review on Benefits, Features, Applications and Implementation of Building Inf...
Review on Benefits, Features, Applications and Implementation of Building Inf...Review on Benefits, Features, Applications and Implementation of Building Inf...
Review on Benefits, Features, Applications and Implementation of Building Inf...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 

Recently uploaded (20)

★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 

REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2223 REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING Prof. Manohar B. 1, Sachin Krishna Gond2, Sandesh Shanmukha Naik3, Sanjay Bhaskar Naik4, Shikha Sunil Govekar5 1Assistant Professor, Department of Civil Engineering, Anjuman Institute of Technology and Management, Bhatkal, Karnataka, India 2,3,4,5Student, Civil Engineering, Anjuman Institute of Technology and Management, Bhatkal, Karnataka, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - Building InformationModelling(BIM)isa method consisting creating, processing, handling and using a computerised visualization of physical and functional characteristics of building. The term 4D is intended to refer to the fourth dimension: time, means, 4D is 3D + schedule (time). The BIM extends this technique into 3 dimensional (3D) drawings in the three basic dimensional breadth (b), height (h) and thickness (d) with time as 4th dimension and cost as 5th dimension. BIM is a process of the development and use of computer-generatedmulti-dimensionalmodelstosimulate the planning, design, construction and operation of a facility. BIM ia an intelligent 3D model based process plays an important role in AEC industry. BIM in terms of modelling saves a lot of time and money comparing to traditional scheduling process. Key Words: Real time analysis, 4D, 5D, BIM, Rendering, Simulation, Scheduling, Time and Cost overrun 1. INTRODUCTION Construction planning and scheduling are considered as integralandsignificantunitsofallconstruction project. The interpretation of a design to a construction schedule consist users interpretationandrequiresvariations of data in different stages. The present planning methodsare completely manual and time-consuming process. Current practices of construction project planning involve a number of approaches/skills that model dependencies and sequencing of project activities. There are some manual approaches like bar charts, CPM based network diagrams, and time-changesdiagram.Noneofthesetechniqueshavethe capability of modelling and visualizing both the sequencing and finishing the pattern of activities. Building Information Modeling (BIM) is the documentation interaction including of data about various periods ofanyundertakinglikeplan,development,arranging, managing, office the executives and activity. It is one comprehensive documentationprocessgainfulforfunctional representation, and development application, for example, assessing, planning and plan coordination. Principal benefit of carrying out BIM application is the visual coordination of the structure frameworks like preparing three dimensional models and it additionally recognizes the potential struggles between the structure frameworks such as clash detection work. By identifying the struggles, issues can be settled before sincere development which sets aside cost and time contributed. 1.1 BIM Software Building plan and building data displaying (BIM) programming includes computer aided plan (CAD programming), items utilizednormally insidethe designand development enterprises. BIMsoftwareoffersamodel-based process for planning and supervision structures and frameworks, going past development drawings to produce a computerized representation of the useful properties of the workplace. Different items in this classification might be utilized for a scope of CAD purposes past structural plan, modelling of plan to get three dimensional structure etc. 1.2 Cost Overrun A cost overrun, also known as a cost increase or budget overrun, involves unexpected incurred costs. When these costs are in excess of budgeted amounts due to a value engineering underestimation of the actual cost during budgeting, they are known by these terms called cost overrun. Cost overrun= Actual Cost – Expected Cost 1.3 Time Overrun It is the phenomenon in which the project gets delayed beyond its expectedcompletion time due to certain difficulties i.e. more time is required to finish the project than initially planned. Causes:- Plans, specifications etc. are not received by the contractor i ntime. Time overrun= Actual Time – Expected Time 1.4 Objectives  Explain theideologies ofBuildingInformationModeling (BIM).  Describe the features of a BIM model.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2224  To compare total cost and time difference between manual and BIM based estimation approach outcome.  Explain applications for BIM in Commercial and Residential architecture.  Explain the common tools and processes used in software design.  To enhance project performance and produce better outcomes.  To display and share design and viability studies for construction.  To offer improved quality assuranceanddata exchange to process for more effective and inefficient design.  To make effective use of data of the building project during construction, operation, maintenance. 2. METHODOLY 2.1 General The typical work flow diagram of the real time analysis has been shown in the figure below Fig -2.1: Methodology Flow chart For this study of time and cost overrun, following software’s were used in order to create an intellectual 3D model with detailed design, analysis and planning: -  Autodesk AutoCAD  Revit Architecture  Microsoft Excel  Microsoft Project  Autodesk Naviswork 2.2 Autodesk AutoCAD AutoCAD allows you to design and explore your theoretical design ideas, modify your designs using Autodesk AutoCAD tools and generate intelligent model documentation, transform your designs into 3D renderings. Following are the works carried out in Autodesk AutoCAD  Data collection from site  2D design using AutoCAD The common structure plan is gathered and similar has been drawn utilizing AutoCAD software are shown below Fig -2.2: Elevation of the building Fig -2.3: Plan of the building 2.3 Revit Architecture  Referring AutoCAD Plan  Design 3D Modelling  The plans are exported in DXF formats from AutoCAD to Revit  The sketch of the building is made as per the plan  Material of construction is selected from the material library
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2225  Building visuals are created to check with the architectural visuals  Further rendering of the Revit is carried out to produce a photorealistic image of the 3D model Fig -2.4: Revit work Sheet-Front View Fig -2.5: Revit work Sheet-Top View 2.4 Microsoft Excel  Utilizing Microsoft Excel information hasbeeninserted as CSV.  By referring the data from MicrosoftExcel furtherwork used to be done.  By classifying data using programming like Excel, data specialists and various clients can simplify information to see as data is added or changed. 2.5 Microsoft Project  Using MSP budgets based on assignment work and resourceratesarecarriedout.Asresourcesare assigned to tasks and assignment work.  The MSP gave us the program that calculates the cost, equal to the work times therate up to the next level. Fig -2.6: Microsoft Project Worksheet 2.6 Autodesk Naviswork  The 3D plan from Revit which is in the (*.ifc) format is imported to Naviswork  After schedule file is taken in the form of MSP, it is imported in Autodesk Naviswork and tasks are linked with building objects to get construction orders.  With the Timeliner tool in Naviswork,linkedmodel to an external construction program and saw a more accurate simulation of all construction tasks in a sequenced animation. Fig -2.7: Autodesk Naviswork Worksheet 3. Results and Discussion To complete the project and obtain the objectives various software are used such as Revit is used such as Revit is used for presentation, rendered views and quantification. For planning and scheduling the project Microsoft project is used, it is also used for resource allocation outputs in the form of graph and charts. Navisworks manage is used to trace the project planned vs
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2226 actual and Individual activities are analyzed with BIM software for both cost and time Fig -3.1: Tracing of project on date 08/09/2017 According to planned schedule at 08-09-2017 the 1st floor RCC work of column should be completed (1st slab to 2nd slab) including staircase but on this same day actually slab work of 1st floor (parking to1st slab) excludingstaircase is completed and RCC work of 1st floor slab and beam is in progress. The overriding green color to identify structural elements in the project. It is observed that this construction experienced cost and time overrun. If the construction was properlymanaged than 7.7 month and above 9 lakhs may be saved in case study construction project. 4. CONCLUSION Project management plays an important role for the even completion of project. Now a day’s selecting proper project management tool for the project is key of accomplishment to complete the project in specified time and instandardway.BuildingInformationmodelinghasprovided a new approach towards project management. It is an developing tool for project management which makes use of various tools for visualization, 2D planning, 3D modelling, quantification, cost estimation, resource distribution, and monitoring these tools results in to accelerating the construction process, effective resource management, 4D visualization of the construction schedule, identification of unexpected conditions and the resultant cost and securing more profit. These benefits made BIM a successful project managementtool.Thesetoolsdefinitely improveeachstageof the construction project. In this case study the concept of BIM is simulated through 3D modeling, scheduling and cost estimation using BIM supporting software such as Revit, Microsoft Project and Navisworks Manage. Although developing 5D (cost) - BIM model with slight details is very time expensive, but then cost control process is very much beneficial with BIM than a manual approaches throughout the project succession. Simulation proves to be a powerful tool to find out critical areas of project with respect to time and cost, so it helps in decision making. REFERENCES [1] ChanwoJo, Jungsik Choi(2021),“BIMInformation Standard Framework for Model Integration and Utilization Based on Open BIM”, Major in Architecture IT Convergence Engineering, School of Smart Convergence Engineering, Hanyang University, Ansan-si 15588, Korea. [2] Samad M.E. Sepasgozar, Felix Kin Peng Hui, Sara Shirowzhan, Mona Foroozanfar,Liming Yang,Lu Aye (2021), “Lean Practices Using BIM and Digital Twinning for Sustainable Construction”, Faculty of Built Environment, The University of New South Wales, Sydney, NSW 2052, Australia. [3] Pathan.Md Rafi, K.J. Brahma Chari (2019), “5D Applications of BIM in Construction Management”, International Conference on Advance in Civil Engineering [ ICACE- 2019]|21-23-Marech2019|K L Deemed to be University, Vijayawada, A.P. India. [4] F. D’Amicoa, L. D’Ascanioa, M.C. De Falcoa, C. Ferrantea, D. Prestaa, F.Tostib (2019), “BIM for infrastructure: an efficient process to achieve 4D e 5D digital dimensions”, Department ofEngineering, Roma Tre University, Via Vito Voltera 62,00146, Rome, Italy. [5] Mr. Sachin Nalawade, Himanshu Ramani, Prashant Pawar, Prashant Sathe, Rushikesh Gaikwad (2019), “A Case study on a Residential Building using BIM”, Civil Engineering, Volume 6, Issue 5, Cikitusi Journal for Multidisciplinary Research.