Construction Management
Players
• Owner – owns project upon completion of
construction
– Private – owner owns land and pays for
construction of facility
• Able to accept/reject bids based on many
parameters including cost, quality, reputation
– Public – owner is government agency, public
pays for facility
• Very strict method of soliciting bids, accepting bids,
writing specs
• Design Professionals
– Architects, Engineers, design professionals
• Assist owner in developing plan for facility
• Make sure it is structurally sound
• Make sure all systems, utilities, facilities are
integrated into design
• Responsible for applying for and obtaining all
necessary permits
• Contractor
• Contracts to build project to the specs set
forth in the contract for a contracted price
– Contract will subcontract to specialty firms
– Subcontractors may subcontract further
• Project Management
– Acts as owners agent and works with
designers and contractors to insure high
quality and lower cost
Construction Project
• Has following characteristics
– Defined goal or objective
– Specific tasks not routinely performed
– Defined beginning and end
– Defined deliverables
– Resources being consumed
• To build a project on time and at cost
need a good map to get thru project
– Steps
• Establish project plan/objectives
• Do research into materials and design
• Design, estimate and schedule
• Present design to owner
• Analyze project for viability
• Adjust project plans as needed and go back to
beginning
• As the project progresses more
information is known and needs to be
considered
• Good early decisions provide significant
benefits. Ability to influence the project
costs decreases as the project is built
Construction Project Categories
• Residential
• Condos, town houses, apartments, single family
homes
• Owners may be development companies or
individual owners
• Fairly low tech
• Building Construction Projects
• Office buildings, large apartment buildings,
shopping malls, theaters
• Dependent on economy
• Designed by architects with engineering support
Construction Project Categories
• Heavy Construction
• Roads, bridges, dams, tunnels, water & waste
water systems
• Designed by engineers
• Usually public projects
• Industrial Projects
• Steel mills, petroleum refineries, chemical
processing plants, auto production facilities
• Specialized design and construction
• Limited companies do this work
Chronology
• Conceptual Planning
– Owner makes decisions on designers, site,
and project cost and schedule
– Iterative process – add in and delete items to
get desired final product
– Need to gather as much info as possible
• Rehab work uncovers many unknowns
– Permits are started and applications made
– Estimate +/- 25%, Schedule +/- month
Chronology
• Schematic Design
– Actual design begins
– Looking at method and materials to use
– Value engineering
– Begin setting up work packages
– Id long lead time items
– Preliminary estimate (+/- 10%) and schedule
are completed
Chronology
• Design Development
– Final design phase
– Make system choices based on cost and
schedule
– Prequalification process for bidders
– Contract documents and determination of
work packages – Woodrow Wilson Bridge
– Fair cost estimate and schedule developed
Chronology
• Construction
– Mobilization
– Milestones
– Substantial completion
– Punchlist items
– Project Close out
Project Risk
• Bid depends on amount of risk contractor is willing
to take
• Risks
– Project Site – Neighbors, Regulatory environment,
Subsurface conditions, Economic climate
– Project – complexity, planned technologies, degree of
finishes, materials, mechanical/electrical systems
– Process – Project funding, timetable, preconstruction
info, project unknowns
– Owner Org – sophistication, org structure, decision
making
• Contingency takes some of risk out
Contract Types
• Fixed Price (Lump Sum)
• Do work for a set price
• Must have an accurate estimate for bid
• Provides owner and contractor with a number
• Risk to contractor is great, to owner minimal
• Unit Price
• Price is per unit of each item. Price includes all
O&P
• Designer estimates quantities
Contract Types
• Cost Plus Fee
• Owner reimburses actual costs plus a fee to cover
O&P
• Good when scope of project is unclear
– GMP
• Owner knows max price for financing
• Clause provides a split of money if contract comes
in under budget

More Related Content

What's hot

Guc arct 702 legislations lecture 10 - contract issues for architectural fi...
Guc arct 702 legislations   lecture 10 - contract issues for architectural fi...Guc arct 702 legislations   lecture 10 - contract issues for architectural fi...
Guc arct 702 legislations lecture 10 - contract issues for architectural fi...Galala University
 
Project management services
Project management servicesProject management services
Project management servicesTina Larsson
 
Flow of construction project , stakeholders , WBS (work breakdown structure)
Flow of construction project , stakeholders , WBS (work breakdown structure)Flow of construction project , stakeholders , WBS (work breakdown structure)
Flow of construction project , stakeholders , WBS (work breakdown structure)SHREYASKUMAR PATEL
 
yuyi_chen_resume[1][1]
yuyi_chen_resume[1][1]yuyi_chen_resume[1][1]
yuyi_chen_resume[1][1]Yuyi Chen
 
Professional practices (lec 1) by k.iqbal
Professional practices (lec 1) by k.iqbalProfessional practices (lec 1) by k.iqbal
Professional practices (lec 1) by k.iqbalZakee Kazmee
 
One Storey Building Construction (Pre-Construction Process)
One Storey Building Construction (Pre-Construction Process)One Storey Building Construction (Pre-Construction Process)
One Storey Building Construction (Pre-Construction Process)Cirilo Gazzingan III
 
My finished project sample on BIM...
My finished project sample on BIM...My finished project sample on BIM...
My finished project sample on BIM...FREELANCER
 
Process of Building Construction
Process of Building ConstructionProcess of Building Construction
Process of Building ConstructionAyushHajare
 
Ici and itd prensentation new
Ici and itd prensentation newIci and itd prensentation new
Ici and itd prensentation newWadeLim
 
Owner Big Picture Repair Legal Issues
Owner Big Picture Repair Legal IssuesOwner Big Picture Repair Legal Issues
Owner Big Picture Repair Legal IssuesConstruction Cicerone
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyorLY97
 
Anthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony Vitola
 
2015 Phillip Ballinger Resume MB 20151028 Plain (1)
2015 Phillip Ballinger Resume MB 20151028 Plain (1)2015 Phillip Ballinger Resume MB 20151028 Plain (1)
2015 Phillip Ballinger Resume MB 20151028 Plain (1)Phillip Ballinger
 
Resume - Robert Coronado
Resume - Robert CoronadoResume - Robert Coronado
Resume - Robert CoronadoROBERT CORONADO
 
Effective communication helps as a Mechanical Engineer: Enoch Mayfields
Effective communication helps as a Mechanical Engineer: Enoch MayfieldsEffective communication helps as a Mechanical Engineer: Enoch Mayfields
Effective communication helps as a Mechanical Engineer: Enoch MayfieldsEnochMayfield
 
Ici and itd prensentation new
Ici and itd prensentation newIci and itd prensentation new
Ici and itd prensentation newWadeLim
 
Eric_Bengtson Project_Manager
Eric_Bengtson Project_ManagerEric_Bengtson Project_Manager
Eric_Bengtson Project_ManagerEric Bengtson
 

What's hot (20)

Guc arct 702 legislations lecture 10 - contract issues for architectural fi...
Guc arct 702 legislations   lecture 10 - contract issues for architectural fi...Guc arct 702 legislations   lecture 10 - contract issues for architectural fi...
Guc arct 702 legislations lecture 10 - contract issues for architectural fi...
 
Project management services
Project management servicesProject management services
Project management services
 
mtb resume
mtb resumemtb resume
mtb resume
 
Flow of construction project , stakeholders , WBS (work breakdown structure)
Flow of construction project , stakeholders , WBS (work breakdown structure)Flow of construction project , stakeholders , WBS (work breakdown structure)
Flow of construction project , stakeholders , WBS (work breakdown structure)
 
yuyi_chen_resume[1][1]
yuyi_chen_resume[1][1]yuyi_chen_resume[1][1]
yuyi_chen_resume[1][1]
 
Professional practices (lec 1) by k.iqbal
Professional practices (lec 1) by k.iqbalProfessional practices (lec 1) by k.iqbal
Professional practices (lec 1) by k.iqbal
 
One Storey Building Construction (Pre-Construction Process)
One Storey Building Construction (Pre-Construction Process)One Storey Building Construction (Pre-Construction Process)
One Storey Building Construction (Pre-Construction Process)
 
My finished project sample on BIM...
My finished project sample on BIM...My finished project sample on BIM...
My finished project sample on BIM...
 
Process of Building Construction
Process of Building ConstructionProcess of Building Construction
Process of Building Construction
 
Ici and itd prensentation new
Ici and itd prensentation newIci and itd prensentation new
Ici and itd prensentation new
 
Owner Big Picture Repair Legal Issues
Owner Big Picture Repair Legal IssuesOwner Big Picture Repair Legal Issues
Owner Big Picture Repair Legal Issues
 
Quantity surveyor
Quantity surveyorQuantity surveyor
Quantity surveyor
 
Flowchart maintenance
Flowchart maintenanceFlowchart maintenance
Flowchart maintenance
 
Anthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_ResumeAnthony_F_Vitola_Engineer_Resume
Anthony_F_Vitola_Engineer_Resume
 
@resume
@resume@resume
@resume
 
2015 Phillip Ballinger Resume MB 20151028 Plain (1)
2015 Phillip Ballinger Resume MB 20151028 Plain (1)2015 Phillip Ballinger Resume MB 20151028 Plain (1)
2015 Phillip Ballinger Resume MB 20151028 Plain (1)
 
Resume - Robert Coronado
Resume - Robert CoronadoResume - Robert Coronado
Resume - Robert Coronado
 
Effective communication helps as a Mechanical Engineer: Enoch Mayfields
Effective communication helps as a Mechanical Engineer: Enoch MayfieldsEffective communication helps as a Mechanical Engineer: Enoch Mayfields
Effective communication helps as a Mechanical Engineer: Enoch Mayfields
 
Ici and itd prensentation new
Ici and itd prensentation newIci and itd prensentation new
Ici and itd prensentation new
 
Eric_Bengtson Project_Manager
Eric_Bengtson Project_ManagerEric_Bengtson Project_Manager
Eric_Bengtson Project_Manager
 

Similar to Construction management l1

Construction Management Lesson - L1.pptx
Construction Management Lesson - L1.pptxConstruction Management Lesson - L1.pptx
Construction Management Lesson - L1.pptxMaxwellAcquah1
 
Classification of contracts
Classification of contractsClassification of contracts
Classification of contractsAnil Kumar(6)
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryMECandPMV
 
Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Elsahen
 
Construction Documents
Construction DocumentsConstruction Documents
Construction DocumentsAllan Berry
 
Effective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryEffective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryPMI Chennai Chapter
 
Time & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and InspectionTime & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and InspectionGalala University
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Amir Mohammed
 
Om lect 07 (r3-jul 11)_basics of project management_mms-bharti_sies
Om lect 07 (r3-jul 11)_basics of project management_mms-bharti_siesOm lect 07 (r3-jul 11)_basics of project management_mms-bharti_sies
Om lect 07 (r3-jul 11)_basics of project management_mms-bharti_siesvideoaakash15
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020MTAF
 

Similar to Construction management l1 (20)

Construction Management Lesson - L1.pptx
Construction Management Lesson - L1.pptxConstruction Management Lesson - L1.pptx
Construction Management Lesson - L1.pptx
 
Lecture 1.pptx
Lecture 1.pptxLecture 1.pptx
Lecture 1.pptx
 
Classification of contracts
Classification of contractsClassification of contracts
Classification of contracts
 
Exploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project deliveryExploration of risks and risk management in construction project delivery
Exploration of risks and risk management in construction project delivery
 
PEEM 4.pptx
PEEM 4.pptxPEEM 4.pptx
PEEM 4.pptx
 
Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016
 
Final pp1
Final pp1Final pp1
Final pp1
 
Construction Documents
Construction DocumentsConstruction Documents
Construction Documents
 
Effective Engineering Management in EPC Industry
Effective Engineering Management in EPC IndustryEffective Engineering Management in EPC Industry
Effective Engineering Management in EPC Industry
 
SANPPT
SANPPTSANPPT
SANPPT
 
CV-Sounder
CV-SounderCV-Sounder
CV-Sounder
 
Time & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and InspectionTime & Schedule, Submittals, Site visits, Testing and Inspection
Time & Schedule, Submittals, Site visits, Testing and Inspection
 
Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...Curriculum vitae of civil engineer for construction manager or Sr. project en...
Curriculum vitae of civil engineer for construction manager or Sr. project en...
 
PEEM 1.pptx
PEEM 1.pptxPEEM 1.pptx
PEEM 1.pptx
 
CV
CVCV
CV
 
Introduction to pm
Introduction to pmIntroduction to pm
Introduction to pm
 
Ddg architecture
Ddg architectureDdg architecture
Ddg architecture
 
Om lect 07 (r3-jul 11)_basics of project management_mms-bharti_sies
Om lect 07 (r3-jul 11)_basics of project management_mms-bharti_siesOm lect 07 (r3-jul 11)_basics of project management_mms-bharti_sies
Om lect 07 (r3-jul 11)_basics of project management_mms-bharti_sies
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020Updated Architecture Portfolio 2020
Updated Architecture Portfolio 2020
 

Recently uploaded

(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...Call girls in Ahmedabad High profile
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxhumanexperienceaaa
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 

Recently uploaded (20)

(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptxthe ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
the ladakh protest in leh ladakh 2024 sonam wangchuk.pptx
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 

Construction management l1

  • 2. Players • Owner – owns project upon completion of construction – Private – owner owns land and pays for construction of facility • Able to accept/reject bids based on many parameters including cost, quality, reputation – Public – owner is government agency, public pays for facility • Very strict method of soliciting bids, accepting bids, writing specs
  • 3. • Design Professionals – Architects, Engineers, design professionals • Assist owner in developing plan for facility • Make sure it is structurally sound • Make sure all systems, utilities, facilities are integrated into design • Responsible for applying for and obtaining all necessary permits
  • 4. • Contractor • Contracts to build project to the specs set forth in the contract for a contracted price – Contract will subcontract to specialty firms – Subcontractors may subcontract further • Project Management – Acts as owners agent and works with designers and contractors to insure high quality and lower cost
  • 5. Construction Project • Has following characteristics – Defined goal or objective – Specific tasks not routinely performed – Defined beginning and end – Defined deliverables – Resources being consumed
  • 6. • To build a project on time and at cost need a good map to get thru project – Steps • Establish project plan/objectives • Do research into materials and design • Design, estimate and schedule • Present design to owner • Analyze project for viability • Adjust project plans as needed and go back to beginning
  • 7. • As the project progresses more information is known and needs to be considered • Good early decisions provide significant benefits. Ability to influence the project costs decreases as the project is built
  • 8. Construction Project Categories • Residential • Condos, town houses, apartments, single family homes • Owners may be development companies or individual owners • Fairly low tech • Building Construction Projects • Office buildings, large apartment buildings, shopping malls, theaters • Dependent on economy • Designed by architects with engineering support
  • 9. Construction Project Categories • Heavy Construction • Roads, bridges, dams, tunnels, water & waste water systems • Designed by engineers • Usually public projects • Industrial Projects • Steel mills, petroleum refineries, chemical processing plants, auto production facilities • Specialized design and construction • Limited companies do this work
  • 10. Chronology • Conceptual Planning – Owner makes decisions on designers, site, and project cost and schedule – Iterative process – add in and delete items to get desired final product – Need to gather as much info as possible • Rehab work uncovers many unknowns – Permits are started and applications made – Estimate +/- 25%, Schedule +/- month
  • 11. Chronology • Schematic Design – Actual design begins – Looking at method and materials to use – Value engineering – Begin setting up work packages – Id long lead time items – Preliminary estimate (+/- 10%) and schedule are completed
  • 12. Chronology • Design Development – Final design phase – Make system choices based on cost and schedule – Prequalification process for bidders – Contract documents and determination of work packages – Woodrow Wilson Bridge – Fair cost estimate and schedule developed
  • 13. Chronology • Construction – Mobilization – Milestones – Substantial completion – Punchlist items – Project Close out
  • 14. Project Risk • Bid depends on amount of risk contractor is willing to take • Risks – Project Site – Neighbors, Regulatory environment, Subsurface conditions, Economic climate – Project – complexity, planned technologies, degree of finishes, materials, mechanical/electrical systems – Process – Project funding, timetable, preconstruction info, project unknowns – Owner Org – sophistication, org structure, decision making • Contingency takes some of risk out
  • 15. Contract Types • Fixed Price (Lump Sum) • Do work for a set price • Must have an accurate estimate for bid • Provides owner and contractor with a number • Risk to contractor is great, to owner minimal • Unit Price • Price is per unit of each item. Price includes all O&P • Designer estimates quantities
  • 16. Contract Types • Cost Plus Fee • Owner reimburses actual costs plus a fee to cover O&P • Good when scope of project is unclear – GMP • Owner knows max price for financing • Clause provides a split of money if contract comes in under budget