Every construction project has few basic steps that it needs
to follow . The process of construction begins with stakeholder identification. Work shold be divided into parts.
3. Role of various stakeholders at various stages
Concept stage
• Owner – Owner can give us Project and he can mention their requirements
for the construction.
• Competent authority – legal permissions
4. Design stage
• Architect – He or she deals with design and Liasoning of the project. As per
their experience he give his best performance and give proper guidelines to
the Owner and other person Who are involved in project.
• Geotechnical agencies – We need to check the strength of soils before
construction work so for soil testing and other test we need to hire
Geotechnical agency.
• Surveyor – Survey work is very important at the concept stage therefore one
surveyor Is necessary.
• Structure consultant – He can check feasibility study of the project.
• Other consultant like Traffic consultant, Lightning consultant, Landscape
consultant, environmental consultant, MEP consultant, Vastu consultant Also
hire at this stage.
• Testing agency for different tests
5. Planning Stage
• Project manager – He can manage the whole project from this stage. WBS can
be prepare by him or her.
• Contractor - A person who completes technical work on a per-assignment
basis, typically for one company at a time.
• Suppliers and vendors – supplier and vendors are provide man , material and
machinery.
• Engineer – site engineer and billing engineer is also involved in planning stage.
6. Operation
• Banks and NBFCs – They can provide a cash flow for the projects.
• Facility manger – They have different works on their field.
• Project manager – risk management analysis and WBS analysis , also check the
work flow according to time or not.
7. Execution
• At this stage Engineers , contractors, Project managers , and Manpower
Involved.
• Project manager and Engineers are monitoring the work.
8. Commissioning
• Finalization of the work.
• At this stage stakeholders involves safety auditors, environmental authority,
and quality check team also important.
9. WBS for single storey building
Soil Investigation
Milestone activities
Submission for approval
Pre construction Phase
12. Building Work for Block A
Pile Cap Beams, columns, slab staircase
Brick works, wall finishes,
door, windows and frame,
plaster (interior, exterior)
Floor finishes, tiling,
plumbing and sanitary
appliances
Paints, fencing, furniture,
Entrance gate, Parking
13. Post construction works
Demobilization
Clearing of debris
Submission of as-
built drawing
Submission of
test reports
Submission of
defect list
Testing and
commissioning
Submission of
warranty and
certificates
Submission of
approval from
authorities
Inspection
Final
measurement
Final billing
Delivery