Executive Profile
• A well respected architect in my profession, an outstanding creative and hard-working individual who can be counted on to “get the job done.”
Experience Brief
• Project Architect with 16 years total experience covering all phases of the design process and the construction implementation.
• Demonstrated knowledge of construction principles, practices, and technology
• Expert in BIM modeling & Documentation using Revit, Rhino/Grasshopper.
• Project experience includes Mixed-Use (Retail + Offices + Hotel 5 stars), healthcare facilities, educational facilities and office building.
• The work experience I possessed has prepared me as a distinguished participant in architectural design & delivery that integrates highly into the
digital era of the profession.
Academic Qualifications:-
• BS Architecture (Honors, 5years Degree)- University of Khartoum, Faculty of Engineering & Architecture – 2003
• EESA: NAAB accredited degree in architecture.
Ahmed M Abubaker
Assoc. AIA, LEED AP BD+C, PMP
ahmed.abubaker2015@hotmail.com
Mobile:+1 (224)814-8219
3
Experience
Senior Architectural Professional | February 2020 – April 2020
SOM | Skidmore, Owings & Merrill LLP - Chicago, United States
Projects:
600 Lonsdale - Melbourne, Australia
• Successfully participated with the architecture team to develop and issue the schematic design 100% package.
800 West Fullton Market – Chicago, IL
• Successfully participated with the interior team to develop and issue the 100% construction documents for the amenities package.
Project Architect | February 2017 – January 2020
Gensler - Chicago, United States
Projects:
Willis Tower Repositioning - Chicago, IL
• Successfully participated with the architecture team to develop and issue bid & permit drawings and an addendum for the permit.
Old Post Office Repositioning - Chicago, IL
• Amenities floor package: successfully participated with the interior team to develop and issue DD, CDs & IFC drawings.
• Parking Package: successfully participated in developing and issuing DD, CDs & IFC drawings.
• Exterior package: successfully participated with the architecture team during the CA phase to detail and redefine complex parts of the project.
Manchester Pacific Gate way - San Diego , CA
• BLDG 1B: successfully participated with the architecture team to develop the exterior envelop & issue DD drawings.
Travis County Courthouse - Austin, TX
• Successfully participated with the architecture team to develop and issue CDs & IFC drawings.
HyperGrid Navy Pier - Chicago, IL
• Successfully participated with the architecture team to develop and issue of bid & permit drawings.
SC Johnson - Racine, WI
• B18 Reskin: Successfully participated with the architecture team to develop and issue of DD drawings.
One North Wacker Corridors Renovation - Chicago, IL
• Successfully participated in the issuance of bid, permit & IFC drawings and CA for different packages
4
Professional Registration:-
•Specialist Engineer, Sudanese
Engineering Council.
• Full Member, Sudanese Associ-
ation of Architects.
•Member, Saudi Engineering
Council.
NCARB: Seating for ARE exams
in Illinois.
Professional Associations:-
• Assoc.AIA
• Certified PMP
• LEED AP BD+C
Certification under Process:-
•CM-BIM, Association of General
Contractor
Skills
• Revit Architecture
• AutoCAD 2D/3D
• Naviswork Manage
• Rhino/Grasshopper – Ladybug/
Honeybee for Energy Modeling
• 3d Max
Project Architect | July 2014 – October 2016
Arcadis, Incorporating Hyder Consulting - Riyadh, Saudi Arabia
Project: Alrajhi Operational Buildings & Data Center Project
Responsibilities:
• Reviewed contractor’s material, shop drawing and method statement submissions for conformance with contract documents
• Ensured that works are constructed in accordance with the design and contract documentation
• Liaison with the client, contractor and design consultant representatives
• Assisted in preparation of daily, weekly and monthly progress reports
• Attended inspections to ensure that works are constructed in accordance with the contract documentation and method statements
• Liaison with the contractor on all construction related matters
• Maintained photo and written diaries to record daily works
• Reviewed of As-Built documents
Senior Architect/ Acting Technical Manager | February 2013–June 2014
Youssef Marroun Contracting Company (YMCO) - Riyadh, Saudi Arabia
• Studied contract’s document prior to starting shop drawings preparation and planning for the design of related shop drawings.
• Interpreted contractual agreements for buildings into blueprints covering all design aspects pertaining required designs and projects.
• Managed the preparation of sketch drawings, architectural drawings and detailed drawings by hand or using computer-aided design (CAD).
• Participated in preparing specifications and contract documents, specified building materials, construction equipment and required staff.
• Participated in solving discrepancies related to the contract and discussed ways to resolve conflicts in a professional manner and provided
assistance on all engineering matters such as design and specifications clarifications and changes, field engineering and scheduling.
Senior Architect | March 2012–December 2012
S.E.I.G spa Italy - Sudan Branch
Project :Al Qasswa Factory for Veterinary Production
• Studied contract’s document prior to starting shop drawings preparation and planning for the design of related shop drawings according to GMP
requirements.
• Interpreted contractual agreements for buildings into blueprints covering all design aspects pertaining required designs and projects.
• Prepared sketch drawings, architectural drawings and detailed drawings by hand or using computer-aided design (CAD) equipment.
5
• Photoshop CS
•InDesign
•SketchUp
•Effective Project Management
applications (MS-Excel, MS-
Project, Primavera).
Short Courses:-
•FIDIC contract, claims and
arbitrations.
• Participated in preparing specifications and contract documents, specifying building materials, construction equipment and required staff.
• Observed, inspected and monitored building work, to make sure that the progress is according to the predetermined specification and contractual
agreements.
• Negotiated with builders and planning engineers, administered building activities and inspected the work carried out on the sites.
• Facilitated site work execution and communicated with project staff to clarify drawing’s details and discussed modifications when required.
• Participated in solving discrepancies related to the contract and discussed ways to resolve conflicts in a professional manner and provided
assistance on all engineering matters such as design and specifications clarifications and changes, field engineering and scheduling.
• Provided value engineering for tender reports and found better ways to design shop drawings and reduced costs.
• Prepared periodic reports with respect to the Architectural Section activities and achievements to be submitted to the Project Manager.
Tenant Coordinator / Asst. Chief Engineer | October 2011 –February 2012
AlWaha Khartoum - Khartoum, Sudan
• Maintained tenant design criteria manuals for each shopping mall, to be used by tenants to design and build stores that will enhance the overall
look and feel of the shopping center.
• Coordinated with departments such as the Leasing, Legal Leasing and Mall Management in order to facilitate Tenant Openings.
• Provided guidance to Leasing in regard to all design and construction activities to enhance Landlord’s opportunity for earlier rent commencements.
Architect | September 2008 - September 2011
Noon Consultancy Co. Ltd - Khartoum, Sudan
Projects:
• Retail Buildings (New Corporate image for the Bank of Khartoum) Branding old branches, new branches and stand-alone ATMs.
• Mix Use Buildings (Wahat Alkhartoum Urban Development)
• Hotel Arjaan by Rotana Khartoum – Sudan site coordination.
• High End Residential complex (Al Manshieh Gardens)
• Commercial Buildings (Al Nour Convention & International Trading Center)
Responsibilities:
• Developed architectural design for concepts presented by concept architect.
• Prepared detailed design drawings.
• Coordinated with MEP engineers to develop services design for the building.
• Evaluated design and material specifications for tender.
6

Recommended

Portfolio, Ahmed Mahgoub Abubaker
Portfolio, Ahmed Mahgoub AbubakerPortfolio, Ahmed Mahgoub Abubaker
Portfolio, Ahmed Mahgoub AbubakerMTAF
 
M.abdelwahab cv 2016 Design Director IPartner
M.abdelwahab cv 2016 Design Director IPartnerM.abdelwahab cv 2016 Design Director IPartner
M.abdelwahab cv 2016 Design Director IPartnerMohamed A.Elwahab S.
 
Keshava Murthy K Architect & Urban Designer Resume LATEST2
Keshava Murthy K Architect & Urban Designer Resume LATEST2Keshava Murthy K Architect & Urban Designer Resume LATEST2
Keshava Murthy K Architect & Urban Designer Resume LATEST2keshava murthy
 
Leo San Diego Resume
Leo San Diego ResumeLeo San Diego Resume
Leo San Diego ResumeLeo San Diego
 
Resume of Wael Fareed- Architect
Resume of Wael Fareed- Architect Resume of Wael Fareed- Architect
Resume of Wael Fareed- Architect wael hassan
 
Rabih_Rabah_Resume
Rabih_Rabah_ResumeRabih_Rabah_Resume
Rabih_Rabah_ResumeRabih Rabah
 

More Related Content

What's hot

irshad siddiqui, auto cad, diplpma, 10 years
 irshad siddiqui, auto cad, diplpma, 10 years irshad siddiqui, auto cad, diplpma, 10 years
irshad siddiqui, auto cad, diplpma, 10 yearsirshad ahmad siddiqui
 
Nancy Mohamed Nader Khalifa CV
Nancy Mohamed Nader Khalifa CVNancy Mohamed Nader Khalifa CV
Nancy Mohamed Nader Khalifa CVnancy nader
 
C.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDFC.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDFHaider Salman
 
architect Inigovenish cv
architect Inigovenish  cv architect Inigovenish  cv
architect Inigovenish cv inigo venish
 
AHMED SAKR 2016
AHMED SAKR 2016AHMED SAKR 2016
AHMED SAKR 2016Ahmed Sakr
 
Moustapha El Gharbawy Resume March 2015
Moustapha El Gharbawy Resume March 2015Moustapha El Gharbawy Resume March 2015
Moustapha El Gharbawy Resume March 2015Moustapha El Gharbawy
 
Arch ici&itd pp1
Arch  ici&itd pp1Arch  ici&itd pp1
Arch ici&itd pp1Jordon Wong
 
Hany Mahboub Ahmad formatted April-2016
Hany Mahboub Ahmad formatted April-2016Hany Mahboub Ahmad formatted April-2016
Hany Mahboub Ahmad formatted April-2016Hani Ahmed
 
CV - Alaa Nour
CV - Alaa Nour CV - Alaa Nour
CV - Alaa Nour Zoy Zoy
 
Khaled sedky(Senior architect) cv
Khaled sedky(Senior architect) cv Khaled sedky(Senior architect) cv
Khaled sedky(Senior architect) cv Khaled Sedky
 
Iswar Tripathy_2015.AUG
Iswar Tripathy_2015.AUGIswar Tripathy_2015.AUG
Iswar Tripathy_2015.AUGIswar Tripathy
 

What's hot (19)

irshad siddiqui, auto cad, diplpma, 10 years
 irshad siddiqui, auto cad, diplpma, 10 years irshad siddiqui, auto cad, diplpma, 10 years
irshad siddiqui, auto cad, diplpma, 10 years
 
Nancy Mohamed Nader Khalifa CV
Nancy Mohamed Nader Khalifa CVNancy Mohamed Nader Khalifa CV
Nancy Mohamed Nader Khalifa CV
 
C.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDFC.V of Project Manager Haider Ahmed Al Dure.PDF
C.V of Project Manager Haider Ahmed Al Dure.PDF
 
architect Inigovenish cv
architect Inigovenish  cv architect Inigovenish  cv
architect Inigovenish cv
 
AHMED SAKR 2016
AHMED SAKR 2016AHMED SAKR 2016
AHMED SAKR 2016
 
Construction Project Manager_RE
Construction Project Manager_REConstruction Project Manager_RE
Construction Project Manager_RE
 
Hannes strydom CV
Hannes strydom CVHannes strydom CV
Hannes strydom CV
 
Hannes strydom cv
Hannes strydom cvHannes strydom cv
Hannes strydom cv
 
Eng. Sagheer
Eng. Sagheer Eng. Sagheer
Eng. Sagheer
 
Moustapha El Gharbawy Resume March 2015
Moustapha El Gharbawy Resume March 2015Moustapha El Gharbawy Resume March 2015
Moustapha El Gharbawy Resume March 2015
 
Arch ici&itd pp1
Arch  ici&itd pp1Arch  ici&itd pp1
Arch ici&itd pp1
 
MOATAZ GHANEM - CV
MOATAZ GHANEM - CVMOATAZ GHANEM - CV
MOATAZ GHANEM - CV
 
al shami pro=
al shami  pro=al shami  pro=
al shami pro=
 
Hany Mahboub Ahmad formatted April-2016
Hany Mahboub Ahmad formatted April-2016Hany Mahboub Ahmad formatted April-2016
Hany Mahboub Ahmad formatted April-2016
 
CV - Alaa Nour
CV - Alaa Nour CV - Alaa Nour
CV - Alaa Nour
 
ACH 216 Lecture 03 (Whos Who)
ACH 216 Lecture 03 (Whos Who)ACH 216 Lecture 03 (Whos Who)
ACH 216 Lecture 03 (Whos Who)
 
Khaled sedky(Senior architect) cv
Khaled sedky(Senior architect) cv Khaled sedky(Senior architect) cv
Khaled sedky(Senior architect) cv
 
Shady Alakhal
Shady AlakhalShady Alakhal
Shady Alakhal
 
Iswar Tripathy_2015.AUG
Iswar Tripathy_2015.AUGIswar Tripathy_2015.AUG
Iswar Tripathy_2015.AUG
 

Similar to Updated Architecture Portfolio 2020

Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Elsahen
 
Curriculum vita mohamed nabil
Curriculum vita  mohamed nabilCurriculum vita  mohamed nabil
Curriculum vita mohamed nabilMohamed Omer
 
Rasha AlMbiadin CV - 4 Years Experiance Jordanian Riyadh
Rasha AlMbiadin CV - 4 Years Experiance Jordanian RiyadhRasha AlMbiadin CV - 4 Years Experiance Jordanian Riyadh
Rasha AlMbiadin CV - 4 Years Experiance Jordanian RiyadhRasha AlMbaidin
 
Arch ici&itd pp1
Arch  ici&itd pp1Arch  ici&itd pp1
Arch ici&itd pp1Jordon Wong
 
Derek swift cv_2016
Derek swift cv_2016Derek swift cv_2016
Derek swift cv_2016Derek Swift
 
UDATED CV-19032016
UDATED CV-19032016UDATED CV-19032016
UDATED CV-19032016Vic Carino
 
ZAKI Michael_CV 042014
ZAKI Michael_CV 042014ZAKI Michael_CV 042014
ZAKI Michael_CV 042014Michael Khalil
 
Nagham K.T Albhaisi Resume
Nagham K.T Albhaisi ResumeNagham K.T Albhaisi Resume
Nagham K.T Albhaisi ResumeNagham Albhaisi
 
Ahmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Shafik
 
Arch ici&itd pp1
Arch  ici&itd pp1Arch  ici&itd pp1
Arch ici&itd pp1Trace96
 
Presentation2
Presentation2Presentation2
Presentation2muna nour
 
5yr_Tendering & Estimation Engineer
5yr_Tendering & Estimation Engineer5yr_Tendering & Estimation Engineer
5yr_Tendering & Estimation EngineerFehmeena Hameed
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi tttDhana Lakshmi
 

Similar to Updated Architecture Portfolio 2020 (20)

MOSTAFA IBRAHIM2
MOSTAFA IBRAHIM2MOSTAFA IBRAHIM2
MOSTAFA IBRAHIM2
 
Vinay CV Arch
Vinay CV ArchVinay CV Arch
Vinay CV Arch
 
Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016
 
Curriculum vita mohamed nabil
Curriculum vita  mohamed nabilCurriculum vita  mohamed nabil
Curriculum vita mohamed nabil
 
Rasha AlMbiadin CV - 4 Years Experiance Jordanian Riyadh
Rasha AlMbiadin CV - 4 Years Experiance Jordanian RiyadhRasha AlMbiadin CV - 4 Years Experiance Jordanian Riyadh
Rasha AlMbiadin CV - 4 Years Experiance Jordanian Riyadh
 
Arch ici&itd pp1
Arch  ici&itd pp1Arch  ici&itd pp1
Arch ici&itd pp1
 
Derek swift cv_2016
Derek swift cv_2016Derek swift cv_2016
Derek swift cv_2016
 
Project Engineer
Project EngineerProject Engineer
Project Engineer
 
UDATED CV-19032016
UDATED CV-19032016UDATED CV-19032016
UDATED CV-19032016
 
ZAKI Michael_CV 042014
ZAKI Michael_CV 042014ZAKI Michael_CV 042014
ZAKI Michael_CV 042014
 
Cover Letter (Meinhardt)
Cover Letter (Meinhardt)Cover Letter (Meinhardt)
Cover Letter (Meinhardt)
 
Nagham K.T Albhaisi Resume
Nagham K.T Albhaisi ResumeNagham K.T Albhaisi Resume
Nagham K.T Albhaisi Resume
 
CV
CVCV
CV
 
Ahmed Abdallah Resume
Ahmed Abdallah ResumeAhmed Abdallah Resume
Ahmed Abdallah Resume
 
Ahmed Mohamed Maher Shafik
Ahmed Mohamed Maher ShafikAhmed Mohamed Maher Shafik
Ahmed Mohamed Maher Shafik
 
Arch ici&itd pp1
Arch  ici&itd pp1Arch  ici&itd pp1
Arch ici&itd pp1
 
Presentation2
Presentation2Presentation2
Presentation2
 
5yr_Tendering & Estimation Engineer
5yr_Tendering & Estimation Engineer5yr_Tendering & Estimation Engineer
5yr_Tendering & Estimation Engineer
 
Bates Brochure (1)
Bates Brochure (1)Bates Brochure (1)
Bates Brochure (1)
 
Resume for Dhanalakshmi ttt
Resume for Dhanalakshmi  tttResume for Dhanalakshmi  ttt
Resume for Dhanalakshmi ttt
 

Recently uploaded

VSST103 - Digital Portfolio.pdf character
VSST103 - Digital Portfolio.pdf characterVSST103 - Digital Portfolio.pdf character
VSST103 - Digital Portfolio.pdf characterschell
 
40 Shots.docxmjggggggggggggmgjjjjjjjjjjmjm
40 Shots.docxmjggggggggggggmgjjjjjjjjjjmjm40 Shots.docxmjggggggggggggmgjjjjjjjjjjmjm
40 Shots.docxmjggggggggggggmgjjjjjjjjjjmjm22nvatafu
 
Anavi Gold And Diamond Ring by Dishis Designer Jewellery.pdf
Anavi Gold And Diamond Ring by Dishis Designer Jewellery.pdfAnavi Gold And Diamond Ring by Dishis Designer Jewellery.pdf
Anavi Gold And Diamond Ring by Dishis Designer Jewellery.pdfanishdishis
 
The Role Of Antique Mirrors In Boutique Hotel Design
The Role Of Antique Mirrors In Boutique Hotel DesignThe Role Of Antique Mirrors In Boutique Hotel Design
The Role Of Antique Mirrors In Boutique Hotel DesignAlbany Glass
 
Heathers Symbols for Gerald Freedman Theatre.pdf
Heathers Symbols for Gerald Freedman Theatre.pdfHeathers Symbols for Gerald Freedman Theatre.pdf
Heathers Symbols for Gerald Freedman Theatre.pdfLizShek
 
Interior Landscape and Landscape Features Extraction
Interior Landscape and Landscape Features ExtractionInterior Landscape and Landscape Features Extraction
Interior Landscape and Landscape Features ExtractionNityaSharma77
 
urban design case study of old city Jodhpur
urban design case study of  old city Jodhpururban design case study of  old city Jodhpur
urban design case study of old city JodhpurSreyaseeNath1
 
SECMOL School In Leh- A Role Model of Vernacular , Passive and Sustainable H...
SECMOL School In Leh- A  Role Model of Vernacular , Passive and Sustainable H...SECMOL School In Leh- A  Role Model of Vernacular , Passive and Sustainable H...
SECMOL School In Leh- A Role Model of Vernacular , Passive and Sustainable H...JIT KUMAR GUPTA
 
sustainable-interior-design-strategy-with-case-study_TANIA-BERA.ppt
sustainable-interior-design-strategy-with-case-study_TANIA-BERA.pptsustainable-interior-design-strategy-with-case-study_TANIA-BERA.ppt
sustainable-interior-design-strategy-with-case-study_TANIA-BERA.pptAr. TANIA BERA
 
Mother Courage and Her Children Shop Order.pdf
Mother Courage and Her Children Shop Order.pdfMother Courage and Her Children Shop Order.pdf
Mother Courage and Her Children Shop Order.pdfLizShek
 
MidJourney: How to Prompt on Midjourney and Other AI Tools for Creatives
MidJourney: How to Prompt on Midjourney and Other AI Tools for CreativesMidJourney: How to Prompt on Midjourney and Other AI Tools for Creatives
MidJourney: How to Prompt on Midjourney and Other AI Tools for CreativesSaurav Srivastava
 
homescreen revamp homescreen revamphomescreen revamp
homescreen revamp homescreen revamphomescreen revamphomescreen revamp homescreen revamphomescreen revamp
homescreen revamp homescreen revamphomescreen revampvidya934261
 
Passing Strange Lighting Plot AS BUILT).pdf
Passing Strange Lighting Plot AS BUILT).pdfPassing Strange Lighting Plot AS BUILT).pdf
Passing Strange Lighting Plot AS BUILT).pdfLizShek
 
acervus process book no cover--character
acervus process book no cover--characteracervus process book no cover--character
acervus process book no cover--characterschell
 
HTM Example Layouts Freedman Theatre.pdf
HTM Example Layouts Freedman Theatre.pdfHTM Example Layouts Freedman Theatre.pdf
HTM Example Layouts Freedman Theatre.pdfLizShek
 
Copy of VSST102 Digital Portfolio.pdffff
Copy of VSST102 Digital Portfolio.pdffffCopy of VSST102 Digital Portfolio.pdffff
Copy of VSST102 Digital Portfolio.pdffffschell
 
impact of packaging on consumer buying behaviour project report pdf.pdf
impact of packaging on consumer buying behaviour project  report pdf.pdfimpact of packaging on consumer buying behaviour project  report pdf.pdf
impact of packaging on consumer buying behaviour project report pdf.pdfSanjivanisShirodkar
 
Hill Area development- Issues and Options
Hill Area development- Issues and OptionsHill Area development- Issues and Options
Hill Area development- Issues and OptionsJIT KUMAR GUPTA
 

Recently uploaded (20)

VSST103 - Digital Portfolio.pdf character
VSST103 - Digital Portfolio.pdf characterVSST103 - Digital Portfolio.pdf character
VSST103 - Digital Portfolio.pdf character
 
40 Shots.docxmjggggggggggggmgjjjjjjjjjjmjm
40 Shots.docxmjggggggggggggmgjjjjjjjjjjmjm40 Shots.docxmjggggggggggggmgjjjjjjjjjjmjm
40 Shots.docxmjggggggggggggmgjjjjjjjjjjmjm
 
Anavi Gold And Diamond Ring by Dishis Designer Jewellery.pdf
Anavi Gold And Diamond Ring by Dishis Designer Jewellery.pdfAnavi Gold And Diamond Ring by Dishis Designer Jewellery.pdf
Anavi Gold And Diamond Ring by Dishis Designer Jewellery.pdf
 
The Role Of Antique Mirrors In Boutique Hotel Design
The Role Of Antique Mirrors In Boutique Hotel DesignThe Role Of Antique Mirrors In Boutique Hotel Design
The Role Of Antique Mirrors In Boutique Hotel Design
 
Heathers Symbols for Gerald Freedman Theatre.pdf
Heathers Symbols for Gerald Freedman Theatre.pdfHeathers Symbols for Gerald Freedman Theatre.pdf
Heathers Symbols for Gerald Freedman Theatre.pdf
 
Bring Your Office Interiors Back to Life The Enchantment of Personalized Wall...
Bring Your Office Interiors Back to Life The Enchantment of Personalized Wall...Bring Your Office Interiors Back to Life The Enchantment of Personalized Wall...
Bring Your Office Interiors Back to Life The Enchantment of Personalized Wall...
 
Interior Landscape and Landscape Features Extraction
Interior Landscape and Landscape Features ExtractionInterior Landscape and Landscape Features Extraction
Interior Landscape and Landscape Features Extraction
 
urban design case study of old city Jodhpur
urban design case study of  old city Jodhpururban design case study of  old city Jodhpur
urban design case study of old city Jodhpur
 
SECMOL School In Leh- A Role Model of Vernacular , Passive and Sustainable H...
SECMOL School In Leh- A  Role Model of Vernacular , Passive and Sustainable H...SECMOL School In Leh- A  Role Model of Vernacular , Passive and Sustainable H...
SECMOL School In Leh- A Role Model of Vernacular , Passive and Sustainable H...
 
sustainable-interior-design-strategy-with-case-study_TANIA-BERA.ppt
sustainable-interior-design-strategy-with-case-study_TANIA-BERA.pptsustainable-interior-design-strategy-with-case-study_TANIA-BERA.ppt
sustainable-interior-design-strategy-with-case-study_TANIA-BERA.ppt
 
Mother Courage and Her Children Shop Order.pdf
Mother Courage and Her Children Shop Order.pdfMother Courage and Her Children Shop Order.pdf
Mother Courage and Her Children Shop Order.pdf
 
MidJourney: How to Prompt on Midjourney and Other AI Tools for Creatives
MidJourney: How to Prompt on Midjourney and Other AI Tools for CreativesMidJourney: How to Prompt on Midjourney and Other AI Tools for Creatives
MidJourney: How to Prompt on Midjourney and Other AI Tools for Creatives
 
homescreen revamp homescreen revamphomescreen revamp
homescreen revamp homescreen revamphomescreen revamphomescreen revamp homescreen revamphomescreen revamp
homescreen revamp homescreen revamphomescreen revamp
 
Passing Strange Lighting Plot AS BUILT).pdf
Passing Strange Lighting Plot AS BUILT).pdfPassing Strange Lighting Plot AS BUILT).pdf
Passing Strange Lighting Plot AS BUILT).pdf
 
Maximize Your Brand Impact with a Box Truck Wrap Design
Maximize Your Brand Impact with a Box Truck Wrap DesignMaximize Your Brand Impact with a Box Truck Wrap Design
Maximize Your Brand Impact with a Box Truck Wrap Design
 
acervus process book no cover--character
acervus process book no cover--characteracervus process book no cover--character
acervus process book no cover--character
 
HTM Example Layouts Freedman Theatre.pdf
HTM Example Layouts Freedman Theatre.pdfHTM Example Layouts Freedman Theatre.pdf
HTM Example Layouts Freedman Theatre.pdf
 
Copy of VSST102 Digital Portfolio.pdffff
Copy of VSST102 Digital Portfolio.pdffffCopy of VSST102 Digital Portfolio.pdffff
Copy of VSST102 Digital Portfolio.pdffff
 
impact of packaging on consumer buying behaviour project report pdf.pdf
impact of packaging on consumer buying behaviour project  report pdf.pdfimpact of packaging on consumer buying behaviour project  report pdf.pdf
impact of packaging on consumer buying behaviour project report pdf.pdf
 
Hill Area development- Issues and Options
Hill Area development- Issues and OptionsHill Area development- Issues and Options
Hill Area development- Issues and Options
 

Updated Architecture Portfolio 2020

  • 1. 1
  • 3. Executive Profile • A well respected architect in my profession, an outstanding creative and hard-working individual who can be counted on to “get the job done.” Experience Brief • Project Architect with 16 years total experience covering all phases of the design process and the construction implementation. • Demonstrated knowledge of construction principles, practices, and technology • Expert in BIM modeling & Documentation using Revit, Rhino/Grasshopper. • Project experience includes Mixed-Use (Retail + Offices + Hotel 5 stars), healthcare facilities, educational facilities and office building. • The work experience I possessed has prepared me as a distinguished participant in architectural design & delivery that integrates highly into the digital era of the profession. Academic Qualifications:- • BS Architecture (Honors, 5years Degree)- University of Khartoum, Faculty of Engineering & Architecture – 2003 • EESA: NAAB accredited degree in architecture. Ahmed M Abubaker Assoc. AIA, LEED AP BD+C, PMP ahmed.abubaker2015@hotmail.com Mobile:+1 (224)814-8219 3
  • 4. Experience Senior Architectural Professional | February 2020 – April 2020 SOM | Skidmore, Owings & Merrill LLP - Chicago, United States Projects: 600 Lonsdale - Melbourne, Australia • Successfully participated with the architecture team to develop and issue the schematic design 100% package. 800 West Fullton Market – Chicago, IL • Successfully participated with the interior team to develop and issue the 100% construction documents for the amenities package. Project Architect | February 2017 – January 2020 Gensler - Chicago, United States Projects: Willis Tower Repositioning - Chicago, IL • Successfully participated with the architecture team to develop and issue bid & permit drawings and an addendum for the permit. Old Post Office Repositioning - Chicago, IL • Amenities floor package: successfully participated with the interior team to develop and issue DD, CDs & IFC drawings. • Parking Package: successfully participated in developing and issuing DD, CDs & IFC drawings. • Exterior package: successfully participated with the architecture team during the CA phase to detail and redefine complex parts of the project. Manchester Pacific Gate way - San Diego , CA • BLDG 1B: successfully participated with the architecture team to develop the exterior envelop & issue DD drawings. Travis County Courthouse - Austin, TX • Successfully participated with the architecture team to develop and issue CDs & IFC drawings. HyperGrid Navy Pier - Chicago, IL • Successfully participated with the architecture team to develop and issue of bid & permit drawings. SC Johnson - Racine, WI • B18 Reskin: Successfully participated with the architecture team to develop and issue of DD drawings. One North Wacker Corridors Renovation - Chicago, IL • Successfully participated in the issuance of bid, permit & IFC drawings and CA for different packages 4 Professional Registration:- •Specialist Engineer, Sudanese Engineering Council. • Full Member, Sudanese Associ- ation of Architects. •Member, Saudi Engineering Council. NCARB: Seating for ARE exams in Illinois. Professional Associations:- • Assoc.AIA • Certified PMP • LEED AP BD+C Certification under Process:- •CM-BIM, Association of General Contractor Skills • Revit Architecture • AutoCAD 2D/3D • Naviswork Manage • Rhino/Grasshopper – Ladybug/ Honeybee for Energy Modeling • 3d Max
  • 5. Project Architect | July 2014 – October 2016 Arcadis, Incorporating Hyder Consulting - Riyadh, Saudi Arabia Project: Alrajhi Operational Buildings & Data Center Project Responsibilities: • Reviewed contractor’s material, shop drawing and method statement submissions for conformance with contract documents • Ensured that works are constructed in accordance with the design and contract documentation • Liaison with the client, contractor and design consultant representatives • Assisted in preparation of daily, weekly and monthly progress reports • Attended inspections to ensure that works are constructed in accordance with the contract documentation and method statements • Liaison with the contractor on all construction related matters • Maintained photo and written diaries to record daily works • Reviewed of As-Built documents Senior Architect/ Acting Technical Manager | February 2013–June 2014 Youssef Marroun Contracting Company (YMCO) - Riyadh, Saudi Arabia • Studied contract’s document prior to starting shop drawings preparation and planning for the design of related shop drawings. • Interpreted contractual agreements for buildings into blueprints covering all design aspects pertaining required designs and projects. • Managed the preparation of sketch drawings, architectural drawings and detailed drawings by hand or using computer-aided design (CAD). • Participated in preparing specifications and contract documents, specified building materials, construction equipment and required staff. • Participated in solving discrepancies related to the contract and discussed ways to resolve conflicts in a professional manner and provided assistance on all engineering matters such as design and specifications clarifications and changes, field engineering and scheduling. Senior Architect | March 2012–December 2012 S.E.I.G spa Italy - Sudan Branch Project :Al Qasswa Factory for Veterinary Production • Studied contract’s document prior to starting shop drawings preparation and planning for the design of related shop drawings according to GMP requirements. • Interpreted contractual agreements for buildings into blueprints covering all design aspects pertaining required designs and projects. • Prepared sketch drawings, architectural drawings and detailed drawings by hand or using computer-aided design (CAD) equipment. 5 • Photoshop CS •InDesign •SketchUp •Effective Project Management applications (MS-Excel, MS- Project, Primavera). Short Courses:- •FIDIC contract, claims and arbitrations.
  • 6. • Participated in preparing specifications and contract documents, specifying building materials, construction equipment and required staff. • Observed, inspected and monitored building work, to make sure that the progress is according to the predetermined specification and contractual agreements. • Negotiated with builders and planning engineers, administered building activities and inspected the work carried out on the sites. • Facilitated site work execution and communicated with project staff to clarify drawing’s details and discussed modifications when required. • Participated in solving discrepancies related to the contract and discussed ways to resolve conflicts in a professional manner and provided assistance on all engineering matters such as design and specifications clarifications and changes, field engineering and scheduling. • Provided value engineering for tender reports and found better ways to design shop drawings and reduced costs. • Prepared periodic reports with respect to the Architectural Section activities and achievements to be submitted to the Project Manager. Tenant Coordinator / Asst. Chief Engineer | October 2011 –February 2012 AlWaha Khartoum - Khartoum, Sudan • Maintained tenant design criteria manuals for each shopping mall, to be used by tenants to design and build stores that will enhance the overall look and feel of the shopping center. • Coordinated with departments such as the Leasing, Legal Leasing and Mall Management in order to facilitate Tenant Openings. • Provided guidance to Leasing in regard to all design and construction activities to enhance Landlord’s opportunity for earlier rent commencements. Architect | September 2008 - September 2011 Noon Consultancy Co. Ltd - Khartoum, Sudan Projects: • Retail Buildings (New Corporate image for the Bank of Khartoum) Branding old branches, new branches and stand-alone ATMs. • Mix Use Buildings (Wahat Alkhartoum Urban Development) • Hotel Arjaan by Rotana Khartoum – Sudan site coordination. • High End Residential complex (Al Manshieh Gardens) • Commercial Buildings (Al Nour Convention & International Trading Center) Responsibilities: • Developed architectural design for concepts presented by concept architect. • Prepared detailed design drawings. • Coordinated with MEP engineers to develop services design for the building. • Evaluated design and material specifications for tender. 6
  • 7. • Prepared material data sheets and coordinated with the procurement engineer. • Incorporated feedback from customers for design clarification and modifications. Architect (PMO) | September 2004 – March 2008 Al-Amal National Hospital - Khartoum North, Sudan Al-Amal National Hospital (200beds) general hospital, multi-story building over 25,000m² Built area, high quality finishing standards and services Hospital Planner: AL–Mashora for Healthcare Technologies, Amman-Jordan MEP Design: Universal Consultancy Services, Amman-Jordan • Followed-up the process of re-design made by the hospital planner in order to prepare and present design proposals for the other proposed hospitals for Al-Amal National Hospital; • Managed the preparation of the as-built drawings for existing buildings to enable the re-design process. • Followed-up and documented the recommendation made by the consultant to the client on the practicality of the project; • Followed-up and monitored the preparation and handling of the detailed drawings from which quantities were made; • Followed-up the preparation and handling of the MEP detailed drawings to assure its applicability for the architectural design, and tender documents; • Followed-up negotiating with contractors and other professionals; • Designed 70beds hospital as filtering (at suburbs) hospitals for Al-Amal National Hospital. • Redesigned & supervised the construction of Emergency, CCU, ICU units in the temporary location for Al-Amal National Hospital – Kobar Junior Designer | December 2003 - August 2004 Perfection Engineering Consultancy – Khartoum North, Sudan • Work with firm Principals on project phases including planning, design, development, exploring new design directions, furniture design, selection and specification. • Interact with clients through various project phases. • Explore new and innovative materials and applications while interacting with vendors and manufacturers.
  • 9. UnitedStatesPojects-Gensler&SOM................................................................................. Wahat Alkhartoum Urban Development Noon Consultancy ............................................ 12 20 Commercial Buildings Projects Noon Consultancy ......................................................... 26 Bank of Khartoum - New Corporate Image Noon Consultancy ........................................ 28 Healthcare Projects | Multiple ....................................................................................... 32 Residential Projects | Multiple ...................................................................................... 33 Construction Administration & Contracting Projects | Multiple ...................................... 34
  • 11. 12 Willis Tower Repositioning - Chicago, USA Gensler 2017 | 2019
  • 12. 13 Willis Tower Repositioning - Chicago, USA Gensler 2017 | 2019
  • 13. 14 The Old Chicago Post Office - Chicago, USA Gensler 2017 | 2019
  • 14. 15 Manchester Pacific Gateway - San Deigo, USA Gensler 2018 | 2019
  • 15. 16 Travis County Court House - Austin, USA Gensler 2019 | 2019
  • 16. 17 HyperGrid Navy Peir - Chicago, USA Gensler 2019 | 2020
  • 17. 18 600 Lonsdale - Melbourne, Australia SOM 2020 | 209
  • 18. 19 Wahat Alkhartoum Urban Development Noon Consultancy Wahat Alkhar
  • 19. 20 Wahat Alkhartoum Urban Development Noon Consultancy 2009 | 2011 The project is built on 26,000m2 of prime land located in down town Khar- toum the capital city of Sudan. Noon was appointed as the PMC & Lead Architect, to implement the new Owner’s requirements regarding the complex, the super structure and the exterior envelope for the 4 towers were already constructed. The new Owner’s objective was to create a one stop business facility that would attract the investors by providing a 5 star hotel with a high-tech business center, premium office spaces, a luxurious shopping center and a city center landscaped area. The project team included me as a project architect, in charge of the in house engineering department, the building operation firm, and the nominated interior designer firm. The first challenge was to accommodate the 5 star hotel requirements in the existing two office towers buildings connected to a central core services area.This required the adapting of 14 new shafts in each of the existing floors to provide services to the wet areas in each room. Providing a swimming pool was the second challenge, utilizing the malls main foyer roof to locate an open air swimming pool in between the towers by using a new steel structure. The pool was accessible from the second floor terrace. A separation feature wall was added to divide the terrace, provide privacy and form seating areas for both the pool area and the food court out door seating area. 01 Main alwaha
  • 20. 21 02 Elevations Design & Construction Adminstration The scope was to re-design elevations for the two floor podium out of the 14 floor complex to reflect the new Owner’s vision and the function change of the complex. The old elevation solution with massive glazing, curtain walls with unjustified cost. The new concept was to distinguish the lower floors and create a horizontal solid mass bounding the entire complex and forming a base for the upper towers. A combination of granite and marble were used as finishing cladding. Vertical thin decorative aluminium columns were used to divide the horizontal mass and create a visual connection with the vertical parts of the towers. In between these columns, staggered dummy horizontal windows were engraved in the solid granite mass. A frame-less tempered glass system was used for these windows to consolidate the concept. A Transparent hand-railing system was used for the terrace to be the visual transition from the solid base mass to the tower light finishing. This design provides a modern architectural solution that unified the complex facades while addressing the environmental requirements and significant cost reduction & energy savings for both building and operation costs. Wahat Alkhartoum Urban Development Noon Consultancy 2009 | 2011
  • 21. 22 03 Landscape Design & Construction Adminstration The scope was to re-design a 13,000m2 landmark & a public entertainment hub above the underground parking area that would serve both the complex and surrounding areas and reducing the cost in the previous design. Leasing with the landscape architect, structural and MEP designers, I was leading the design process. A simple yet coordinated & efficient layout was selected to accommodate the different functional requirements and to reflect diversified landscaping techniques. The main challenge was to provide enough depth for different planting requirements, without exceeding the allowable structural loading that was considered in the previous design. Accordingly, a crater shape was implemented on a stamped concrete finish to simulate the natural stone effect. The second challenge was to conceal the concrete structure below and create a natural landscape effect. Limiting the expansion joints in the green areas under planting soil and implementing a cost effective waterproofing system for the massive wet area where some of the techniques used. Water features took the same crater shape for design unity, with a special designed fountain on the hotel side to reflect the function change and identify the area. The colonnade was selected to define the main plaza and to present a historical theme in the complex. To minimize the dead loads on the lower structure, a lightweight steel structure was used that presented a chal- lenge in achieving the required ancient finish. A mixed technique of both painting and stamping was used for that purpose. Outdoor lighting, LED luminaires were used in the entire landscaped area to reduce the complex operational cost. Wahat Alkhartoum Urban Development Noon Consultancy 2009 | 2011
  • 22. 23 Major changes had to be implemented internally to the previous design as well to fulfil the new functional requirements, mainly re-designing the horizontal circulation, adding new vertical circulation elements and adopting new shafts to the existing slabs. Transforming the existing twin office building structure with a central core area to a 5 star hotel, where the existing core was used as guests lifts, required two additional service lifts to serve all 14 floors. Two of the four U-shape fire escape stairs were used to add the lifts using a steel structure. From the drop point and parking area in the basement one, another new lift was added to provide access to the business center, health club and outdoor swimming pool on the second floor. The mall area in the previous design extended throughout the entire built-up area in basement one, ground and first floors. %20 of the existing mall layouts had to be used in the hotel and the remaining %80 had to be rearranged to accommodate the new tenant layout. A new food-court area was added on the second floor of the twin tower office building to benefit from the large terrace area.Two new escalators on a steel structure were added to enable smooth access from the mall area on the first floor. The main skylight in the mall central foyer was replaced by the new swimming pool structure. Therefore, an artificial sky painted ceiling was used for simulation. 04 Interior Architecture & Design and Construction Adminstration Wahat Alkhartoum Urban Development Noon Consultancy 2009 | 2011
  • 24. 26 Al Nour Convention & International Trading Center Having a prime location on the Aljamaa street in Khartoum, just one block from the Nile river and the magnif- icent view of Toti island, the client was looking for a building that Would fulfil the market demands. Our response was converting the market research data that resulted into a modern convention and international trade center. The form addressed, reflecting the smooth visual transition from the three floor podium convention center, to a twin tower high-rise international trade center. Special steel mesh was selected for that purpose to form semi-enclosed spaces for the terrace. The terrace space was used as a landscaped area with marvelous views, mainly because %100 of the site was to be developed due to the high value of land. The podium architecture was restricted by the historical nature of the area and the local regulations, therefore, block techniques with void corners were implemented to allow integration with the modern designed twin tower. SSD Bank Commercial Building In response to the client program of constructing a commercial building with two different functions, one being high end office space the other being luxurious showrooms. The concept was to create a transparent form with a solid mass at one edge to identify the vertical circulation and provide the maximum rentable areas, connected with a horizontal mass that separated the show room areas from the office spaces. Horizontal shading devices were used, parallel with the building form and to reduce direct sun rays. Commercial Buildings Projects Noon Consultancy 2008 | 2011
  • 25. 27 Bank of Khartoum - Aldmazine Commercial Building Commercial Buildings Projects Noon Consultancy 2008 | 2011 Upgrading the city center of the Aldamazine city in the eastern south of Sudan was the aim of the project, by providing a mixed-use complex of hotel space, shopping center, bank branch and a semi-shaded food-court area to enhance the social interaction and separate the bank branch from the complex. An in depth environmental study was carried out to minimize the energy consumption, due to high temperature from the direct sun and the strong seasonal winds. As a result, a triangular shape was selected for the building plan with reduced glazing surfaces.
  • 26. 28 Being the biggest bank in Sudan, bank of Khartoum had hundreds of branches scattered all over the country. The majority of these branches were built decades ago and were not designed to support the leading edge banking systems and technology were not up to modern aesthetical standards. Another problem was that each branch was designed separately by a different designer. Noon was hired to prepare and implement a standardized architectural image to reflect the bank’s long history and support future technology growth. Accordingly, the concept was to identify the main elevation by two solid stone finished walls representing the bank’s long history. In between the entrance is formed as a modern designed steel and glazing facade. The steel plate elements concept was inspired by the sugar cane plantations in the country, as the bank had a leading role in supporting and enhancing this sector. Internally, a combination of high technology and local materials were used together with modern furniture. The remodelling project for the main branch in Portsudan the country’s gate to the Red sea and the biggest city in the eastern region. My task was to prepare the as built-drawings for the existing branch and implement the new theme. The old facades were completely replaced and a complete remodelling for the interior space.The challenge was to solve deficiencies In the existing layout, where %70 of the spaces were not utilized, 10 of the space was a customer waiting hall and scattered not functioning back of house offices. As a result one new floor was created from the wasted space as a rentable office space. Bank of Khartoum - New Corporate Image Noon Consultancy Bank of Khartoum - Portsudan Branch
  • 27. 29 Bank of Khartoum - New Corporate Image Noon Consultancy Aljamhoria Branch 2010 Remodelling the branch in a historical building limited the facade area and solutions, even though a complete representation of the new theme was developed with minimum effect to the building. Internally a complete new layout was implemented, utilizing the double volume hall for the customer service and waiting area. Adding 8 teller stations with a compacted back of house offices with a newly constructed, safe room and all the required services.
  • 28. 30 To lead the competition, Bank of Khartoum initiated the Cash Office project. The concept was to provide teller service coverage for all the prospective customers. Working with the client I developed the minimum spaces required to accommodate their functional requirements, according to with the new theme. The client rented two floor spaces in the center of Khartoum. 77m2 of ground floor and 105m2 of mezzanine floors. Accommodating all the functional requirements was accomplished. To provide spacious visual effects different techniques were implemented, such as an open layout, transparent staircase and feature elements. Almshtal Branch 2009 This was the first branch to implement a new theme. The existing two floor building was selected by the bank and a total remodelling took place. The requirements were to provide complete banking facilities in the ground floor with two main areas. One was the customer hall and the other a teller area with compacted back office facilities. A luxurious elite banking area with private teller facilities was located on the first floor. A new steel structure extension for both the ground and first floor was implemented.The entrance, modern steel and glazing designed facade allowed flexibility to cover the slab edges of the structure, by utilizing the main sign board and canopy for that purpose. The solid stone walls formed the location for both the ATM and deposit boxes, that are accessed 24 hours out-side the main entrance to minimize the operational power consumption. Transparent partitions were used internally, together with simple, modern designed furniture, that would reflect the bank’s vision towards its customers and to create a spacious atmosphere. Cash Office 2010 National Exchane Company 2008 Drive Thru ATM 2009 Bank of Khartoum - New Corporate Image Noon Consultancy
  • 29. 31 Bank of Khartoum - New Corporate Image Noon Consultancy Healthcare Projects Multiple Residential Projects Multiple Construction Administration and Contracting Projects Multiple
  • 30. 32 Healthcare Projects Multiple Massa Private Hospital 2008 Alamal National Hospital 2004-2008 Alsalam Hospital 2007 Iwas hired as a freelancer to provide programming and conceptual design for a 100 bed private hospital. The cultural aspect was a major factor in the facility planning. Long visiting habits mandated separating the visitors access from the inpatient area without affecting the hospital operation. 1- Facades Design & 3D visualization Services - Perfection Engineering Consultancy: The scope was to design the facades for a 200 bed general hospital, located on the Nile river side in Khartoum Bahry. The complex was developed through different stages, from a single building to four buildings with a separate power plant facility. Working with the project architect, I used diversified visualization techniques to achieve the final architectural solution that was approved by the client. 2- Project Management Services - Alamal National Hospital: Working as part of the client’s team, my task was to liaise with all the consultants engaged, collect and communicate the client’s requirements at different design stages. Monitor the design schedule and deliverables, finalize the bidding and negotiation process. Working as part of the clients team, I provided the programming and conceptual design services for the 3 new proposed filtering hospitals to be located at the far end of Khartoum, Khartoum Bahry and Ummdurman. The proposal was based on a minimum site area to accommodate the functional requirements for a 70 bed hospital, providing ER, Obstetrics & gynecology, surgical services with all supporting facilities. As well as sep- arately accessed outpatient facility.
  • 31. 33 Residential Projects Multiple Private Resort Private Residential Palace English Language Training Center Single Family Home Multi-Family Home Privet Residential Palace Noon Client owned a farm in Khartoum country side on the bank of the Nile river. The client was fascinated by the ancient Nubian architecture theme, therefore he hired me to provide a luxurious resort. A courtyard layout was selected to provide the required privacy by the client and inline with the Nubian theme. Separate blocks, small windows, decorated parapets, higher dominating main entrance building defined by columns were the main elements defining this architecture. As a freelancer my job was to provide facade solutions for an existing concrete structure of 5 typical slabs. The structure was 1600m2 with central enclosed spaces surrounded by terraces and many columns were exposed to the facades.The slab layout at the edges had many sides and it was a very complicated structure. Differently colored, lightweight surfaces were used to create modern cost effective solutions addressing all the deficiencies. The client had major changes required to transform his already designed residential building into a luxurious palace. As the project’s design architect I performed the schematic design phase, including complete facade redesign and 3D visualization services. The concept was to implement the Andalusian architecture theme. A new open sky garden was introduced in the basement to provide natural lighting and viewing opportunities for the indoor swimming pool located there. New materials were introduced to the building, including natural stone and GRC decorated panels. The staircase as part of a feature wall was utilized as the dominating architectural element shaped to represent the center’s helping hand policy. Natural lighting was provided for all the center spaces. The client required maximum usage of the land. He needed to locate his family residence on the ground floor with completely separate entrances from 6 rentable apartments in the upper floors and 2 rentable commercial shops. Feature walls were used to identify the building architecture. A Simple architectural form was selected with maximum viewing opportunities from the family halls in both the ground and first floors. Sustainability techniques were considered in the early design stages, 35cm wide load bearing clay brick walls were used to provide maximum thermal insulation, glazing openings were reduced.
  • 32. 34 Alrajhi Bank Operational and Data Center Buildings Arcadis - Incorporating Hyder Consulting 2014 Client: Alrajhi Bank Value: 500 Million SAR National Institute of Industrial Training -Ahsa, KSA YMCO Contracting 2014-2015 Client: Technical & Vocational Training Corporation Value: 465 Million SAR Al Qasswa Factory for Veterinary Production S.E.I.G spa Italy - Sudan Branch 2012 Client: Arab Company for Veterinary Medicine Production Value: 33 Million USD Arcadis scope was to provide project management and construction administration services for the complex built on 24,000m2. The building includes a tier 4 data center building, cash center building, utilities’ building and an operations building with 39,000m2 underground car parking. My responsibilities were to: Review of contractor’s material, shop drawing and method statement submissions for compliance with contract documents. Ensure that works were constructed in accordance with the design and contract documentation. Liaise with the client, contractor and design consultant representatives. Aramco and Technical & Vocational Training Corporation (TVTC) agreed to construct an Industrial Institute for training TVTC students. They are to be trained through real life experience case studies in different fields. Working from the central technical office for a grade one main contractor. Interpreted contractual agreements for buildings into blueprints covering all design aspects pertaining to required designs and projects. Working from the project site technical office for specialized industrial main contractor, I Provided value engineering for tender reports and found improved ways to design shop drawings that reduce costs. Construction Administration & Contracting Projects Multiple
  • 33. Commercial Buildings Projects Noon Consultancy 2009 | 2011