Outline: One Storey Building
Construction
• Part I: Pre-Construction Process
• Part II: Construction Process
• Break Ground
• Excavation
• Foundation
• Utilities
• Framing
• Roofing
• Weather Resistant Barrier
Outline: One Storey Building
Construction
• Part II: Construction Process
• Rough Plumbing
• Mechanical Systems
• Lighting and Electrical
• Air Sealing
• Insulation
• Drywall
• Sliding
• Flooring
Outline: One Storey Building
Construction
• Part II: Construction Process
• Tiling
• Painting
• Cabinets, Shelving
• Finish Plumbing
• Finish Electrical and Lighting
• Certificate of Occupancy
• Moving In
One Storey Building Construction:
Pre-Construction
Process
Residential
• It is designed for people to live in.
• Site Survey
• provides us with information on land levels,
land contours, trees/vegetation, water/power
service, and footpath locations for accurate
drafting of plans.
Preliminaries and Site
Management
One Storey BuildingConstruction: Pre-Construction Process
• After a contract is awarded, the contractor has to:
• Determine the key personnel to supervise work
• Make provisions for the equipment to be used
• Determine the location and methods of
erecting temporary structures
Preliminaries and Site
Management
One Storey BuildingConstruction: Pre-Construction Process
• The job should be adequate, but not excessively
staffed, to ensure efficient execution of work
• The construction site should be maintained in strict
tidiness and in an orderly routine because it has
psychological effect on the staff and the workers.
Preliminaries and Site
Management
One Storey BuildingConstruction: Pre-Construction Process
• In carrying out the construction work, idle time and
unnecessary cost should be avoided
• Sufficient copies of the plan and specification
should be procured to be distributed.
Preliminaries and Site
Management
One Storey BuildingConstruction: Pre-Construction Process
• Project undergoes series of stages which includes:
• Planning
• Execution of Minor Activities
• Project Phase Out
Preliminaries in Organizing a
Construction Job
One Storey BuildingConstruction: Pre-Construction Process
• Organization of the work consist of making proper
assignments and sequence of the works in a
systematic order aimed at making the best use of
labour, materials and time
Organization of Work
One Storey BuildingConstruction: Pre-Construction Process
• The contractor has to determine the material
requirement and scheduled the sequence of its
deliveries
Material Supply
One Storey BuildingConstruction: Pre-Construction Process
• A purchasing order form should contain all the
information such as:
1. Description of the materials
2. Quantities required
3. Time and place of delivery
4. Unit price
5. Amount
Material Supply
One Storey BuildingConstruction: Pre-Construction Process
• The business must have sufficient capital structure
to sustain it’s growth
Financial and Budgeting
One Storey BuildingConstruction: Pre-Construction Process
• A budget properly planned and operated, may
have a constructive influence on the personnel of
an organization
Financial and Budgeting
One Storey BuildingConstruction: Pre-Construction Process
• It must serve as a means of bringing understanding
of the common goals of all who belong the
organization
• The budget will serve as a coordinating and
unifying influence to all concerned
Financial and Budgeting
One Storey BuildingConstruction: Pre-Construction Process
• It is important to get the right materials delivered
from the supplier to the site on time
Procurement Processes
One Storey BuildingConstruction: Pre-Construction Process
• The following major procurement factors must be
maintained:
1. QUALITY of materials
2. QUANTITY of materials
3. TIME of delivery
4. PRICE of materials
Procurement Processes
One Storey BuildingConstruction: Pre-Construction Process
• Effective inventory control is aimed at providing an
adequate but not excessive supply of materials at
hand at all times to meet operating requirements.
Inventory Control
One Storey BuildingConstruction: Pre-Construction Process
• Safety in the project construction must be given
primary consideration.
• The working place must be properly arranged and
maintained wherein equipment and the like are all
in safe operating conditions
Site Management of the Work
One Storey BuildingConstruction: Pre-Construction Process
• A complete safety program has to do with
promotion of workers health, with prevention of
such occupancy diseases and fire prevention.
Site Management of the Work
One Storey BuildingConstruction: Pre-Construction Process
• Effective maintenance of the plant and
construction equipment is a prerequisite to
efficient operation and uninterrupted construction
activities
Planned Maintenance
One Storey BuildingConstruction: Pre-Construction Process
• Planned maintenance is an organized attempt to
prevent sudden breakdown in equipment and
periodic shutdown for repairs.
Planned Maintenance
One Storey BuildingConstruction: Pre-Construction Process
• Renting equipment offers the advantages of no
capital outlay, no maintenance or servicing worries
for the user.
Equipment Rental
One Storey BuildingConstruction: Pre-Construction Process
Summary: Pre-Construction
Process
• Preliminaries and Site Management
• Preliminaries in Organizing a
Construction Job
• Organization of the Work
• Material Supply
• Financial and Budgeting
• The financial Budget
One Storey Building
Construction
One Storey BuildingConstruction: Pre-Construction Process
Summary: Pre-Construction
Process
• Procurement Process
• Quantity • Time
• Quality • Price
• Inventory Control
• Site Management of the Work
• Planned Maintenance
• Equipment Rental
One Storey Building
Construction
One Storey BuildingConstruction: Pre-Construction Process
Mabbalo!
One Storey Building Construction (Pre-Construction Process)

More Related Content

What's hot

Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
Awanish Shukla
 
Construction process
Construction processConstruction process
Construction process
Mazen Al-Qadi
 
Quantity Surveying
Quantity SurveyingQuantity Surveying
Quantity Surveying
geddolan
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
ALI HYDER GADHI
 

What's hot (20)

9. introduction to site preparation
9. introduction to site preparation9. introduction to site preparation
9. introduction to site preparation
 
Estimation and quantity surveying
Estimation and quantity surveyingEstimation and quantity surveying
Estimation and quantity surveying
 
Construction process
Construction processConstruction process
Construction process
 
QUANTITY SURVEYING
QUANTITY SURVEYINGQUANTITY SURVEYING
QUANTITY SURVEYING
 
Stages in Construction
Stages in Construction Stages in Construction
Stages in Construction
 
Specification writing-I
Specification writing-ISpecification writing-I
Specification writing-I
 
Rate analysis
Rate analysisRate analysis
Rate analysis
 
Quantity Surveying
Quantity SurveyingQuantity Surveying
Quantity Surveying
 
Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works  Rates Analysis For Calculating Material and Labour for building works
Rates Analysis For Calculating Material and Labour for building works
 
Construction Material Management
Construction Material ManagementConstruction Material Management
Construction Material Management
 
Shear wall and its design guidelines
Shear wall and its design guidelinesShear wall and its design guidelines
Shear wall and its design guidelines
 
Introduction of Reinforced Concrete Design
Introduction of Reinforced Concrete DesignIntroduction of Reinforced Concrete Design
Introduction of Reinforced Concrete Design
 
Construction work of a multi storied residential building
Construction work of a multi storied residential buildingConstruction work of a multi storied residential building
Construction work of a multi storied residential building
 
Underpinning
UnderpinningUnderpinning
Underpinning
 
5#rate analysis problems
5#rate analysis   problems5#rate analysis   problems
5#rate analysis problems
 
Quantity Surveyor presentation
Quantity Surveyor presentationQuantity Surveyor presentation
Quantity Surveyor presentation
 
NSCP 2010 , Volume 1
NSCP 2010 , Volume 1NSCP 2010 , Volume 1
NSCP 2010 , Volume 1
 
Lecture slides4; Construction Project Planning
Lecture slides4; Construction Project PlanningLecture slides4; Construction Project Planning
Lecture slides4; Construction Project Planning
 
Introduction to construction project.pptx
Introduction to construction project.pptxIntroduction to construction project.pptx
Introduction to construction project.pptx
 
Formwork construction in structures
Formwork construction in structuresFormwork construction in structures
Formwork construction in structures
 

Similar to One Storey Building Construction (Pre-Construction Process)

building economics.PPT LAESE, BUDGET MANAGEMENT
building economics.PPT LAESE, BUDGET MANAGEMENTbuilding economics.PPT LAESE, BUDGET MANAGEMENT
building economics.PPT LAESE, BUDGET MANAGEMENT
RiyaVerma238431
 
61T01411 - PEP for Valeo Fosha New Facility - rev 0.0 -draft
61T01411 - PEP for Valeo Fosha New Facility - rev 0.0 -draft61T01411 - PEP for Valeo Fosha New Facility - rev 0.0 -draft
61T01411 - PEP for Valeo Fosha New Facility - rev 0.0 -draft
James Zhang (Chi, Zhang)
 
Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Elsahen
 
WEC CV_2016 09 06
WEC CV_2016 09 06WEC CV_2016 09 06
WEC CV_2016 09 06
Wauren Cruz
 
PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE
S. Sathishkumar
 

Similar to One Storey Building Construction (Pre-Construction Process) (20)

Project life cycle.pptx
Project life cycle.pptxProject life cycle.pptx
Project life cycle.pptx
 
Qaqc in civil construction
Qaqc in civil constructionQaqc in civil construction
Qaqc in civil construction
 
Greg Southorn CV 2017
Greg Southorn CV 2017Greg Southorn CV 2017
Greg Southorn CV 2017
 
How to Navigate the Commissioning Process From Planning to Post-Constructi...
How to Navigate the Commissioning Process    From Planning to Post-Constructi...How to Navigate the Commissioning Process    From Planning to Post-Constructi...
How to Navigate the Commissioning Process From Planning to Post-Constructi...
 
building economics.PPT LAESE, BUDGET MANAGEMENT
building economics.PPT LAESE, BUDGET MANAGEMENTbuilding economics.PPT LAESE, BUDGET MANAGEMENT
building economics.PPT LAESE, BUDGET MANAGEMENT
 
Mechanized construction
Mechanized constructionMechanized construction
Mechanized construction
 
cv17 uk
cv17 ukcv17 uk
cv17 uk
 
Project Review Presentation (2)
Project Review Presentation (2)Project Review Presentation (2)
Project Review Presentation (2)
 
iosh-temporary-works.pdf
iosh-temporary-works.pdfiosh-temporary-works.pdf
iosh-temporary-works.pdf
 
1.Project Management in construction Industry
1.Project Management in construction Industry1.Project Management in construction Industry
1.Project Management in construction Industry
 
W1.pdf
W1.pdfW1.pdf
W1.pdf
 
61T01411 - PEP for Valeo Fosha New Facility - rev 0.0 -draft
61T01411 - PEP for Valeo Fosha New Facility - rev 0.0 -draft61T01411 - PEP for Valeo Fosha New Facility - rev 0.0 -draft
61T01411 - PEP for Valeo Fosha New Facility - rev 0.0 -draft
 
Mouyadin moumin abdillahi.pptx
Mouyadin moumin abdillahi.pptxMouyadin moumin abdillahi.pptx
Mouyadin moumin abdillahi.pptx
 
Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016Mohamed Mostafa Kamal Mohamed Elsahn 2016
Mohamed Mostafa Kamal Mohamed Elsahn 2016
 
shahul updated resume
shahul updated resumeshahul updated resume
shahul updated resume
 
Ateeq cv d
Ateeq cv dAteeq cv d
Ateeq cv d
 
WEC CV_2016 09 06
WEC CV_2016 09 06WEC CV_2016 09 06
WEC CV_2016 09 06
 
Final -jan-apr_2013
Final  -jan-apr_2013Final  -jan-apr_2013
Final -jan-apr_2013
 
PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE PROJECT MANAGEMENT AND FINANCE
PROJECT MANAGEMENT AND FINANCE
 
Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.Kumlachew Mechanical QC Eng.
Kumlachew Mechanical QC Eng.
 

Recently uploaded

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
Tonystark477637
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
 

Recently uploaded (20)

KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTINGMANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
MANUFACTURING PROCESS-II UNIT-1 THEORY OF METAL CUTTING
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 

One Storey Building Construction (Pre-Construction Process)

  • 1.
  • 2. Outline: One Storey Building Construction • Part I: Pre-Construction Process • Part II: Construction Process • Break Ground • Excavation • Foundation • Utilities • Framing • Roofing • Weather Resistant Barrier
  • 3. Outline: One Storey Building Construction • Part II: Construction Process • Rough Plumbing • Mechanical Systems • Lighting and Electrical • Air Sealing • Insulation • Drywall • Sliding • Flooring
  • 4. Outline: One Storey Building Construction • Part II: Construction Process • Tiling • Painting • Cabinets, Shelving • Finish Plumbing • Finish Electrical and Lighting • Certificate of Occupancy • Moving In
  • 5. One Storey Building Construction: Pre-Construction Process
  • 6. Residential • It is designed for people to live in.
  • 7. • Site Survey • provides us with information on land levels, land contours, trees/vegetation, water/power service, and footpath locations for accurate drafting of plans. Preliminaries and Site Management One Storey BuildingConstruction: Pre-Construction Process
  • 8. • After a contract is awarded, the contractor has to: • Determine the key personnel to supervise work • Make provisions for the equipment to be used • Determine the location and methods of erecting temporary structures Preliminaries and Site Management One Storey BuildingConstruction: Pre-Construction Process
  • 9. • The job should be adequate, but not excessively staffed, to ensure efficient execution of work • The construction site should be maintained in strict tidiness and in an orderly routine because it has psychological effect on the staff and the workers. Preliminaries and Site Management One Storey BuildingConstruction: Pre-Construction Process
  • 10. • In carrying out the construction work, idle time and unnecessary cost should be avoided • Sufficient copies of the plan and specification should be procured to be distributed. Preliminaries and Site Management One Storey BuildingConstruction: Pre-Construction Process
  • 11. • Project undergoes series of stages which includes: • Planning • Execution of Minor Activities • Project Phase Out Preliminaries in Organizing a Construction Job One Storey BuildingConstruction: Pre-Construction Process
  • 12. • Organization of the work consist of making proper assignments and sequence of the works in a systematic order aimed at making the best use of labour, materials and time Organization of Work One Storey BuildingConstruction: Pre-Construction Process
  • 13. • The contractor has to determine the material requirement and scheduled the sequence of its deliveries Material Supply One Storey BuildingConstruction: Pre-Construction Process
  • 14. • A purchasing order form should contain all the information such as: 1. Description of the materials 2. Quantities required 3. Time and place of delivery 4. Unit price 5. Amount Material Supply One Storey BuildingConstruction: Pre-Construction Process
  • 15. • The business must have sufficient capital structure to sustain it’s growth Financial and Budgeting One Storey BuildingConstruction: Pre-Construction Process
  • 16. • A budget properly planned and operated, may have a constructive influence on the personnel of an organization Financial and Budgeting One Storey BuildingConstruction: Pre-Construction Process
  • 17. • It must serve as a means of bringing understanding of the common goals of all who belong the organization • The budget will serve as a coordinating and unifying influence to all concerned Financial and Budgeting One Storey BuildingConstruction: Pre-Construction Process
  • 18. • It is important to get the right materials delivered from the supplier to the site on time Procurement Processes One Storey BuildingConstruction: Pre-Construction Process
  • 19. • The following major procurement factors must be maintained: 1. QUALITY of materials 2. QUANTITY of materials 3. TIME of delivery 4. PRICE of materials Procurement Processes One Storey BuildingConstruction: Pre-Construction Process
  • 20. • Effective inventory control is aimed at providing an adequate but not excessive supply of materials at hand at all times to meet operating requirements. Inventory Control One Storey BuildingConstruction: Pre-Construction Process
  • 21. • Safety in the project construction must be given primary consideration. • The working place must be properly arranged and maintained wherein equipment and the like are all in safe operating conditions Site Management of the Work One Storey BuildingConstruction: Pre-Construction Process
  • 22. • A complete safety program has to do with promotion of workers health, with prevention of such occupancy diseases and fire prevention. Site Management of the Work One Storey BuildingConstruction: Pre-Construction Process
  • 23. • Effective maintenance of the plant and construction equipment is a prerequisite to efficient operation and uninterrupted construction activities Planned Maintenance One Storey BuildingConstruction: Pre-Construction Process
  • 24. • Planned maintenance is an organized attempt to prevent sudden breakdown in equipment and periodic shutdown for repairs. Planned Maintenance One Storey BuildingConstruction: Pre-Construction Process
  • 25. • Renting equipment offers the advantages of no capital outlay, no maintenance or servicing worries for the user. Equipment Rental One Storey BuildingConstruction: Pre-Construction Process
  • 26. Summary: Pre-Construction Process • Preliminaries and Site Management • Preliminaries in Organizing a Construction Job • Organization of the Work • Material Supply • Financial and Budgeting • The financial Budget One Storey Building Construction One Storey BuildingConstruction: Pre-Construction Process
  • 27. Summary: Pre-Construction Process • Procurement Process • Quantity • Time • Quality • Price • Inventory Control • Site Management of the Work • Planned Maintenance • Equipment Rental One Storey Building Construction One Storey BuildingConstruction: Pre-Construction Process