Automated process planning: Process planning, general methodology of group technology, code
structures of variant and generative process planning methods,
A1 in process planning, process planning software.
DISCLAIMER
These notes are not the ultimate ‘look-up’ for Model and University exams. Students are advised to read the
references mentioned at the end thoroughly for the exams
Process Planning
Process planning is concerned with the preparation of route sheets that list the sequence of operations
and work centers require to produce the product and its components. Products and their components
are designed to perform certain specific functions. Every product has some design specifications
which ensure its functionality aspects. The task of manufacturing is to produce components such that
they meet design specifications. Process planning acts as a bridge between design and manufacturing
by translating design specifications into manufacturing process details. It refers to a set of instructions
that are used to make a component or a part so that the design specifications are met, therefore it is
major determinant of manufacturing cost and profitability of products. Process planning answers the
questions regarding required information and activities involved in transforming raw materials into a
finished product. The process starts with the selection of raw material and ends with the completion of
part. The development of process plans involves mainly a set of following activities;
 Analysis of part requirements
 Selection of raw work piece
 Selection of manufacturing operations and their sequences
 Selection of machine tools
 Selection of tools, tool holding devices, work holding devices and inspection equipments
 Selection of manufacturing conditions i.e. cutting speed, feed and depth of cut.
Manufacturing firms try to automate the task of process planning using CAPP systems due to many
limitations of manual process planning.
Approaches to Process Planing
(1) The manual experience-based planning method
(2) Computer Aided Process Planning (Automated Process Planing)
The manual experience-based planning method:
The manual experience-based process planning is most widely used. It is mainly based on a
manufacturing engineer's experience and knowledge of production facilities, equipment, their
capabilities, processes, and tooling. The major problem with this approach is that it is time consuming
and developed plans may not be consistent and optimum. The feasibility of developed process plan is
dependent on many factors such as availability of machine tools, scheduling and machine allocation
etc. Computer aided process planning is developed to overcome this problems to some extent.
CAD/CAM MODULE IV AM/JA
2 Department of Mechanical Engineering, AJCE
These includes:
– Tied to personal experience
– and knowledge of planner of production facilities, equipment, their Capabilities, process and
tooling. This results in inconsistent plans.
– Manual process planning is time consuming and slow.
– Slow in responding to changes in product design and production.
Computer Aided Process Planning (Automated Process Planning)
The primary purpose of process planning is to translate the design requirements into manufacturing
process details. This suggests a system in which design information is processed by the process
planning system to generate manufacturing process details. CAPP integrates and optimizes system
performance into the inter-organizational flow. For example, when one changes the design, it must be
able to fall back on CAPP module to generate manufacturing process and cost estimates for these
design changes. Similarly, in case of machine breakdown on the shop floor, CAPP must generate the
alternative actions so that most economical solution can be adopted in the given situation. A typical
CAPP frame-work is shown in figure below.
CAPP is the application of computer to assist the human process planer in the process planning
function. In its lowest form it will reduce the time and effort required to prepare process plans and
provide more consistent process plan. In its most advanced state, it will provide the automated
interface between CAD and CAM and in the process achieve the complete integration with in
CAD/CAM.
Advantages Over Manual Experience-based Process Planning
CAD/CAM MODULE IV AM/JA
3 Department of Mechanical Engineering, AJCE
The uses of computers in process plan have following advantages over manual experience-based
process planning :
(i) It can systematically produce accurate and consistent process plans.
(ii) It leads to the reduction of cost and lead times of process plan.
(iii) Skill requirement of process planer are reduced to develop feasible process plan.
(iv) Interfacing of software for cost, manufacturing lead time estimation, and work standards can
easily be done.
(v) Leads to the increased productivity of process planar.
With the emergence of CIM as predominate thrust area in discrete part industries process planning has
received significant attention, because it is the link between CAD and CAM. Hence, computer aided
process planning (CAPP) has become a necessary and vital objective of CIM system.
Steps Involved in CAPP
Now-a-days, rapid progress is being made in the automation of actual production process and also the
product design element. However, the interface between design and production presents the greatest
difficulty in accomplishing integration. CAPP has the potential to achieve this integration. In general,
a complete CAPP system has following steps :
(i) Design input
(ii) Material selection
(iii) Process selection
(iv) Process sequencing
(v) Machine and tool selection
(vi) Intermediate surface determination
(vii) Fixture selection
(viii) Machining parameter selection
(ix) Cost/time estimation
(x) Plan preparation
(xi) Mc tape image generation.
(i) Identify the machinable volumes called pockets by taking the difference of blank size and the finished
component size. For each of the pocket attach the necessary technological details relevant for
manufacturing. The blank size if not given directly can be identified as the largest volume that completely
encloses the finished component.
(ii) Do a preliminary sorting of the pockets in order of levels that clearly indicate the likely se-
quence in the final process plan.
(iii) Examine the pockets for any possibility of combining so that the machining operations could be
reduced.
(iv) Select the machine tool that can be used for each of the identified pockets. Minimise the total
number of machine tools required. This may have to be modified recursively based on the
operation sequence selected.
(v) Identify the process sequence required for the machining of each of the pocket based on the
technological requirements. Help may be obtained in the shape of canned sequences based on the
technological parameters. Any possible alternate plans can also be identified at this stage.
(vi) For each of the pocket and the operation decided, select the cutting tool required.
(vii) Obtain the optimum cutting process parameters (speed, feed, number of passes and depth of cut)
CAD/CAM MODULE IV AM/JA
4 Department of Mechanical Engineering, AJCE
for each of the pocket, tool and the operation combination identified in the earlier steps.
(viii) Sort the operations on the basis of machine tool and cutting tool. Sequence the operations on the
basis of machine tool and cutting tool by making use of the heuristic rules for the purpose.
(ix) Evaluate the machining time and idle time involved in the production of the component. Select the
final process plan based on the lowest cost or machining time.
(x) Present the final results in any suitable form such as
 Process sheet (alpha numeric)
 Process pictures
 Machining simulation steps
 CLDATA or CNC part program
CAPP MODEL
CAPP System Architecture
CAD System Preprocessor
Input CAPP
Knowledg
e
Planning Rules
Output
CAPP Model
Postprocessor
Production Planning
& Scheduling
CAD System
Machining Selection Module
Constraint
Creation Module
Preprocessor
Machining Knowledge Base
Process Plan Generation
Module
Constraint Application Module
Manufacturing Knowledge
Base
CAD/CAM MODULE IV AM/JA
5 Department of Mechanical Engineering, AJCE
APPROACHES TO COMPUTER-AIDED PROCESS PLANNING
In recent days, several computer-aided process planning systems are available for use for a variety of
manufacturing operation.
These systems can broadly be clarified into two categories :
(i) Variant computer aided process planning method.
(ii) Generative computer aided process planning method.
The details of these are explained in next subsections.
The variant CAPP method
In variant CAPP approach, a process plan for a new part is created by recalling, identifying and
retrieving an existing plan for a similar part and making necessary modifications for the new part.
Sometimes, the process plans are developed for parts representing a fmily of parts called 'master
parts'. The similarities in design attributes and manufacturing methods are exploited for the purpose of
formation of part families. A number of methods have been developed for part family formation using
coding and classification schemes of group technology (GT), similarity-coefficient based algorithms
and mathematical programming models.
The variant process planning approach can be realized as a four step process;
1. Definition of coding scheme
2. Grouping parts into part families
3. Development of a standard process plan
4. Retrieval and modification of standard process plan
A number of variant process planning schemes have been developed and are in use. One of the most
widely used CAPP system is CAM-I developed by McDonnell-Douglas Automation Company. This
system can be used to generate process plan for rotational, prismatic and sheet-metal parts.
– This has evolved out of the traditional manual process planning method. A process plan for a new
part is created by identifying and retrieving an existing plan for a similar part, followed by the
necessary modifications to adapt it to the new part.
– It is based on GT principles, i.e., part classification and coding. These coding allow the CAPP
system to select a baseline process plan for the part family and accomplish about 90% of the planning
work. The planner adds the remaining 10% of the planning by modifying the baseline plan.
– If the code of the part does not match with the codes stored in the database, a new process plan must
be generated manually and then entered into database to create a new baseline process plan for future
use.
Advantages and limitations of Variant CAPP
– Investment in hardware and software is not much.
– The system offers a shorter development time and lower manpower consumption to develop process
plan.
– The system is very reliable and reasonable in real production environments for small and medium
size companies.
– Quality of process plan depends on knowledge and background of process planner.
CAD/CAM MODULE IV AM/JA
6 Department of Mechanical Engineering, AJCE
The general steps for data retrieval modification are as follows :
Establishing the Coding Scheme
A variant system usually begins with building a classification and coding scheme. Because,
classification and coding provide a relatively easy way to identify similarity among existing and new
parts. Today, several classification and coding systems are commercially available. In some extreme
cases, a new coding scheme may be developed. If variant CAPP is preferred than it is useful for a
company to look into several commercially available coding and classification systems (e.g.
DCLASS, JD-CAPP etc.). Now, it is compared with companies before developing their own coding
and classification system. Because using an existing system can save tremendous development time
and manpower.
(i) Form the Part Families by Grouping Parts
The whole idea of GT lies into group numerous parts into a manageable number of part families. One
of the key issues in forming part families is that all parts in the same family should have common and
easily identifiable machined features. As a standard process plan are attached with each part family,
thereby reducing the total number of standard process plans.
(ii) Develop Standard Process Plans
CAD/CAM MODULE IV AM/JA
7 Department of Mechanical Engineering, AJCE
After formation of part families, standard process plan is developed for each part families based on
common part features. The standard plan should be as simple as possible but detailed enough to
distinguish it from other.
(iii) Retrieve and Modify the Standard Plans for New Parts
Step1 to step 3 are often referred as preparatory work. Each time when a new part enters the systems,
it is designed and coded based on its feature, using the coding and classification scheme, and than
assigned to a part family. The part should be similar to its fellow parts in the same family. Also,
family’s standard plan should represent the basic set of processes that the part has to go through. In
order to generate detailed process routes and operation sheets to this part, the standard plan is
retrieved from the data
Advantages and Disadvantages of Variant CAPP
Following advantages are associated with variant process planning approach:
(i) Processing and evaluation of complicated activities and managerial issues are done in an efficient
manner. Hence lead to the reduction of time and labour requirement.
(ii) Structuring manufacturing knowledge of the process plans to company’s needs through
standardized procedures.
(iii) Reduced development and hardware cost and shorter development time. This is an essential issue
for small and medium scale companies, where product variety is not so high and process planner are
interested in establishing their own process planning research activities.
Disadvantages of Variant Process Planning Approach
Following disadvantages are associated with variant process planning approach
(i) It is difficult to maintain consistency during editing.
(ii) Proper accommodation of various combinations of attributes such as material, geometry, size,
precision, quality, alternate processing sequence and machine loading among many other factors are
difficult.
(iii) The quality of the final process plan largely depends on the knowledge and experience of process
planner. The dependency on process planner is one of the major shortcomings of variant process
planning.
The generative CAPP method
In generative process planning, process plans are generated by means of decision logic, formulas,
technology algorithms, and geometry based data to perform uniquely processing decisions. Main aim
is to convert a part from raw material to finished state. Hence, generative process plan may be defined
as a system that synthesizes process information in order to create a process plan for a new component
automatically.
Generative process plan mainly consists of two major components :
(i) Geometry based coding scheme.
(ii) Proportional knowledge in the form of decision logic and data.
• Process plans are generated by means of decision logics, formulas, algorithms, and geometry based
data that are built or fed as input to the system.
• Format of input
– Text input (interactive)
– Graphical input (from CAD models)
CAD/CAM MODULE IV AM/JA
8 Department of Mechanical Engineering, AJCE
• First key: to develop decision rules appropriate for the part to be processed. These rules are specified
using decision trees, logical statements, such as if-then-else, or artificial intelligence approaches with
object oriented programming.
• Second key: Finding out the data related to part to drive the planning. Simple forms of generative
CAPP systems may be driven by GT codes.
 A pure generative system can produce a complete process plan from part classification and
other design data which does not require any further modification or manual interaction.
• In generating such plans, initial state of the part (stock) must be defined in order to reach the final
state i.e., finished part.
• Forward or backward planning can be done.
• Forward and backward planning apparently appear to be similar but they effect programming
significantly. The requirement and the results in of a setup in forward planning are the results and
requirements , respectively, of the set up in backward planning.
• Forward planning suffers from conditioning problems; the results of a setup affects the next set up.
• In backward planning, conditioning problems are eliminated because setups are selected to satisfy
the initial requirements only.
• The generative CAPP has all the advantages of variant CAPP however it has an additional advantage
that it is fully automatic and a up-to-date process plan is generated at each time.
• It requires major revisions if a new equipment or processing capabilities became available.
• The development of the system in the beginning is a difficult.
Geometry-based Coding Scheme
All the geometric features for all process such as related surfaces, feature dimension, locations, on the
features are defined by geometry based coding scheme. The level of detail is much greater in
generative system than a variant system.
For example, various details such as rough and finished state of the part are provided to transform into
desired state.
Proportional Knowledge in the Form of Decision Logic and Data
Process knowledge in the form of decision logic and data are used for matching of part geometry
requirement with the manufacturing capabilities. All the methods mentioned above is performed
automatically.
Operation instruction sets are automatically generated to help the operators to run the machines in
case of manual operation. NC codes are automatically generated, when numerically controlled
machines are used
CAD/CAM MODULE IV AM/JA
9 Department of Mechanical Engineering, AJCE
Manufacturing knowledge plays a vital role in process planning. The process of acquisition and
documentation of manufacturing knowledge is a recurring dynamic phenomenon. In addition, there
are various sources of manufacturing knowledge such experience of manufacturing personnel,
handbooks, supplier of machine tools, tools, jigs and fixtures materials, inspection equipment and
customers etc. Hence, in order to understand manufacturing information, ensuring its clarity and
providing a framework for future modification, it is not only necessary but also inevitable to develop a
good knowledge structure from wide spectrum of knowledge. Flowchart, decision trees, decision
tables, algorithms, concepts of unit machined surfaces, pattern recognition techniques, and artificial
intelligent based tools are used to serve the purpose. A brief discussion on decision table is given
below.
The basic elements of decision tables are condition, action and rules. They are represented in the form
of allocation matrix. Figure 9.4 is one such representation where condition states the goal that we
want to achieve and action states the operation that we have to perform. On the basis of experience the
expert rules are formed by entry values to establish the relationship between condition and action.
Table 9.1 is one such representation where entry are of Boolean-types (true, false, don’t care).
Similarly, in Table 9.2, continuous value type entries are shown.
CAD/CAM MODULE IV AM/JA
10 Department of Mechanical Engineering, AJCE
The decision making process works as follow.
For a particular set of condition entries, look for its corresponding rule from that rule determine the
action.
Advantages of Generative Process Plan
Generative process plans have a number of advantages. Among the major ones are the following :
(i) They rely less on group technology code numbers since the process, usually uses decision tree to
categorize parts into families.
(ii) Maintenance and updating of stored process plans are largely unnecessary. Since, any plan may be
quickly regenerated by processing through the tree. Indeed, many argue that with generable systems,
process plans should not be stored since if the process is changed, and out-of-dated process plan might
find its way back into the system.
(iii) The process logic rules however must be maintained up to dated and ready for use. This provides
the process planner with an assurance that the processes generated will reflect state-of-the-art
technology.
CAD/CAM MODULE IV AM/JA
11 Department of Mechanical Engineering, AJCE
Variant or Generative, Which to Use?
What CAPP approach (Variant or Generative) is better? This question has been constantly asked but,
there is no definite answer to it.
Generally speaking, a variant system is better for manufacturing setting where similar parts are
manufactured repetitively. Because parts are similar, Group Technology can easily be implemented
and shows quick and significant return on investment (ROI). Because similar parts are produced
repetitively, process plan can be retrieved, slightly modified and used, without going through too
much trouble. On the other hand, generative process planning is better suited for a manufacturing
environment in which part does not exhibit too much similarity and new part are introduced on a
regular basis. In this case, benefits cannot be gained from Group Technology due to dissimilarity of
parts. Because, new parts are regularly introduced, historical data does not have too much value to the
process planner. However, aforementioned approach is a rough guideline for selecting the appropriate
CAPP approach.
CAD/CAM MODULE IV AM/JA
12 Department of Mechanical Engineering, AJCE
GROUP TECHNOLOGY
Group technology is a manufacturing philosophy in which similar parts are identified and
grouped together to take advantage of their similarities in manufacturing and design. Similar parts are
arranged into part families. Each family would possess similar design and manufacturing
characteristics. Hence processing of each member of a given family would be similar and this results
in manufacturing efficiencies. These efficiencies are achieved in the form of reduced set-up times,
lower in-process inventories, better scheduling, improved tool control and the use of standardized
process plans. The design retrieval system is a manifestation of group technology principle applied to
the design function. To implement such a system some form of parts classification and coding is
required.
Part classification and coding is concerned with identifying the similarities among parts and
relating these similarities to a coding system. Part similarities are of three types:
i. Design attributes (such as geometric shape and size)
ii. Manufacturing attributes (sequence of processing steps required to make the part)
iii. Design and manufacturing attributes (combination of the design and manufacturing attributes)
When implementing a parts classification and coding system most companies elect to purchase a
commercially available package rather than develop their own. The following factors are considered
in selecting a parts coding and classification system:
 Objective
 Scope and application
 Costs and time
 Adaptability to other systems
 Management problems
Overview of Group Technology (GT)
 Parts in the medium production quantity range are usually made in batches
 Disadvantages of batch production:
 Downtime for changeovers
 High inventory carrying costs
 GT minimizes these disadvantages by recognizing that although the parts are
different, there
 are groups of parts that possess similarities
CAD/CAM MODULE IV AM/JA
13 Department of Mechanical Engineering, AJCE
 GT exploits the part similarities by utilizing similar processes and tooling to produce
them
 GT can be implemented by manual or automated techniques
 When automated, the term flexible manufacturing system is often applied
Group Technology Defined
 An approach to manufacturing in which similar parts are identified and grouped
together in order to take advantage of their similarities in design and production
 Similarities among parts permit them to be classified into part families
 In each part family, processing steps are similar
 The improvement is typically achieved by organizing the production facilities into
 manufacturing cells that specialize in production of certain part families
Part Family
 A group of parts that possess similarities in geometric shape and size, or in the
processing steps
 used in their manufacture
 Part families are a central feature of group technology
 There are always differences among parts in a family
 But the similarities are close enough that the parts can be grouped into the same
family
MANUFACTURINGRESOURCE,GROUPS ANDTHEIRCHARACTERISTICS
Following are the six characteristics for effective grouping
1. The Team. Groups contain a specified team of workers who solely or generally form the group.
2. Product. Groups produce a specified family or set of products. In an assembly department, the
products are assembled. In a machine shop these products will be machine parts e.g. in foundry products
will be casting.
3. Facilities. Groups are equipped with a specified set of machines and/or other production
equipment, which are used solely or generally in group.
4. Group layout. The facilities are laid out together in one area reserved for the group.
5. Independence. The group should, as far as possible, be independent of each other.
6. Size. The group should be limited to restrict the number of workers per group of 6 to 15 workers has
been widely recommended. Larger group up to 35 workers may be necessary for technology reasons in some
cases.
GROUPING PARTS INTO FAMILIES
The biggest single obstacle in changing over to group technology from a traditional shop is the problem of
grouping parts into families. There are three general methods for solving this problem. All the three
methods are time consuming and involve the analysis of much data by properly trained personnel. The
methods are
(i) Visual inspection
(ii) Production flow analysis (PFA)
(iii) Component classification and coding system (a) By design features (b) By production
features
(i) Visual Inspection. The visual inspection method is the least sophisticated and least expensive
method. It involves the classification of parts into families by looking at either the physical parts or
photographs and arranging them into similar groupings. This method is generally considered to be the
least accurate of the three.
CAD/CAM MODULE IV AM/JA
14 Department of Mechanical Engineering, AJCE
(ii) Production Flow Analysis (11
FA). Production flow analysis (PFA) method, was developed by J.L.
Burbidge. PFA is a method of indentifying part families and associated machine tool groupings by analyzing the
route sheets for parts produced in a given shop. It groups together the parts that have similar operation sequences
and machine routings. The disadvantage of PFA is that it accepts the validity of existing route sheets, with no
consideration given to whether these process plans are logical or consistent.
CAD/CAM MODULE IV AM/JA
15 Department of Mechanical Engineering, AJCE
The classical GT cell allows parts to move from any machine to any other machine. Flow is not
Unidirectional. However, since machines are located in close proximity short and fast transfer
is possible.
The GT center may be appropriate when large machines have already been located and cannot be
moved, or product mix and part families are dynamic and would require frequent relayout. Then,
machines may be located as in a process layout by using functional departments (job shops), but
each machine is dedicated to producing only certain Part families. This way, only the tooling and
control advantages of GT can be achieved. Compared to a GT cell layout, increased material
handling is necessary.
(iii) Components classification and coding system. This method is the most time con-
suming and complicated of the three methods. However, it is the most frequently
applied method and is generally recognised to be the most powerful of the three. This
method of grouping parts into families involves an examinations of the individual design
and/or manufacturing attributes of each part. The attributes of the parts are uniquely
identified by means of a code number. This classification and coding may be carried out
on the entire list of active parts of the firm, or a sampling process may be used to establish
the part families.
Many parts classification and coding system have been developed throughout the world,
and there are several commercially available packages being sold to industrial
concerns. It should be noted that none of them has been universally adopted. One of the
reason for this is that a classification and coding system should be custom - engineered for a
given company or industry. One system may be best for one company while another
system is more suited to another company.
(a) The Opitz Classification System. This classification and coding system for parts was
developed by H. Opitz of the University of Aachen in West Germany. It represents one of the
pioneering efforts in the GT area and is perhaps the best known of the classification and coding
schemes.
The Opitz coding system has the following digit sequence :
CAD/CAM MODULE IV AM/JA
16 Department of Mechanical Engineering, AJCE
The basic code consists of 9 digit, which can be extended by adding four more digits. The first nine
digits are intended to convey both design and manufacturing data. The first five digits, 12345, are
called the "Form Code" and describe the primary design attribute of the part. The next four digits,
6789, constitute the "Supplementary Code". It indicates some of the at¬tribute that would be of use to
manufacturing (Dimensions. Work Material, Starting Raw Work Piece Shape and Accuracy).The
extra four digits. ABCD are referred to as the "Secondary Code" and are intended to identify the
production operation type and sequence. The secondary code can be designed by the firm to serve its
own particular needs.
CAD/CAM MODULE IV AM/JA
17 Department of Mechanical Engineering, AJCE
CAD/CAM MODULE IV AM/JA
18 Department of Mechanical Engineering, AJCE
(b) The MICLASS System: MICLASS stand for Metal Institute Classification System arid was
developed by TNO, the Netherland's Organisation for Applied Scientific Research. It was started in
Europe in 1969. The MICLASS system was developed to help automation and standardize a number
of designs, production, and management functions. These include
 Standardization of engineering drawings
 Retries al of drawings according to classification number
 Standardization of process routing
 Automated process planning
 Selection of parts for processing on particular groups of machine tools
 Machine tool investment analysis
The MICLASS classification number can range from 12 to 30 digits. The first 12 digits are a universal
code that can be applied to any part and up to 18 additional digits can be used to code data that are
specific to the particular company or industry.
For example, lot size, company drawing no., piece time, machine tool te be used, cost data and
operation sequence might be included in the 18 supplementary digits. The work part attributes coded
in the first 18 digits of the MICLASS number are as follows.
One of the unique features of the MICLASS system is that parts can be coded using a computer
interactively. To classify a given part design, the user responds to a series of questions asked by the
computer. The number of questions depends on the complexity of the part. For a simple part, as few
as seven questions are needed to classify the part. For an average part, number of questions ranges
between 10 and 20. On the basis of the responses to its questions, the computer assigns a code number
to the part.
CAD/CAM MODULE IV AM/JA
19 Department of Mechanical Engineering, AJCE
CAD/CAM MODULE IV AM/JA
20 Department of Mechanical Engineering, AJCE
(c) The CODE System. The CODE system is a parts classification and coding system developed and
marketed by Manufacturing Data System. Inc. (MDSI) of Ann Arbor, Michigan. Its most universal
application is in design engineering for retrieval of part design data, but it also has applications in
manufacturing process planning, purchasing, tool design, and inventory control.
The CODE number has eight digits. For each digit there are 16 possible values (Zero through 9 and A
through F) which are used to describe the part's design and manufacturing characteristics.
1st Digit indicates the basic geometry of the part and is called the major division of the CODE system.
This digit would be used to specify whether the shape was a cylinder, flat piece, block, or other. The
interpretation of the remaining seven digits depends on the value of first digit, but these remaining
digits from a chain-type structure. Hence the CODE system possesses a hybrid structure.
2nd
and 3rd
Digit provide additional information concerning the basic geometry and manufacturing
process for the part.
4th
5
th
and 6th
digits specify secondary manufacturing processes such as threads grooves, slots
and so forth.
7
th
and 8th Digits are used to indicate overall size of the part (e .g .Diameter and Length of the
turned part) by classifying it into one of 16 size ranges for each of two dimension.
Fig. 19.3.Coding a component by the CODE system.
For example : Coding the component given in Fig. 19.3 is to be found out by code system and is given
as under :
So that the code for a given component is 13188D75
19.4.1. (i) Coding System Structure. Parts coding scheme consists of a sequence of symbols that
identify the part's design and/or manufacturing attributes. The symbols in the code can be all numeric,
CAD/CAM MODULE IV AM/JA
21 Department of Mechanical Engineering, AJCE
all alphabetic, or a combination of both types. However, most of the classification and coding system
use number digits only. There are three basics code structures used in GT application:
(a) Hierarchical Code Structure
(b) Poly Code Structure
(c) Hybrid Code Structure, a combination of hierarchical and polycode structures known as
decision - Tree coding.
(a) Hierarchical Code Structure. With the hierarchical structure, the interpretation of each
succeeding symbol depends on the value of the preceding symbols. Other names commonly used for
this structure are monocode and tree structure. The hierarchical code provides a relatively compact
structure which conveys much information about the part in a limited number of digits.
(b) Poly Code Structure. In the poly code structure, the interpretation of each symbol in the sequence
is fixed and does not depend on the value of preceding digits. Another name commonly given to this
structure is chain type structure. The problem associated with poly code is that they tend to be
relatively long. On the other hand, the use of a polycode allows for convenient identification of
specific part attributes. This can be helpful in recognizing parts with similar processing requirements.
To illustrate the difference between the hierarchical structure and chain-type structure, consider a two-
digit code, such as 15 or 25. Suppose that the first digit stands for the general part shape. The symbol,
1 means round work part and 2 means flat rectangular geometry. In a hierarchical code structure, the
interpretation of the second digit would depend on the value of first digit. If, preceded by 1, the 5
might indicate some length/diameter ratio, and by 2, the 5 might be interpreted to specify some
overall length. In the chain-type code structure, the symbol 5 would be interpreted the same way
regardless of the value of the first digit. For example, it might indicate overall part length, or whether
the part is rotational or rectangular.
(c) Decision - Tree Codes. Most of the commercial parts coding system used in industry are a
combination of two pure structures. The hybrid structure is an attempt to achieve the best features of
monocodes and polycodes. Within each of these shorter chains, the digits are independent, but one or
more symbols in the complete code number are used to classify the part population into groups, as in
the hierarchical structure. This hybrid coding seems to best serve the needs of both design and
production.
Part Design Attributes
 Major dimensions
 Basic external shape
 Basic internal shape
 Length/diameter ratio
 Material type
 Part function
 Tolerances
 Surface finish
CAD/CAM MODULE IV AM/JA
22 Department of Mechanical Engineering, AJCE
Part Manufacturing Attributes
 Major process
 Operation sequence
 Batch size
 Annual production
 Machine tools
 Cutting tools
 Material type
Benefits of Group Technology
 Standardization of tooling, fixtures, and setups is encouraged
 Material handling is reduced
 Parts are moved within a machine cell rather than entire factory
 Process planning and production scheduling are simplified
 Work-in-process and manufacturing lead time are reduced
 Improved worker satisfaction in a GT cell
 Higher quality work
Problems in Group Technology
 Identifying the part families (the biggest problem)
 If the plant makes 10,000 different parts, reviewing all of the part drawings and
grouping
 the parts into families is a substantial task
 Rearranging production machines in the plant into the appropriate machine cells
 It takes time to plan and accomplish this rearrangement, and the machines are not
 producing during the changeover
Artificial Intelligence in Process Planning
Artificial Intelligence
Artificial Intelligence (AI) is the area of computer science focusing on creating machines that
can engage on behaviors that humans consider intelligent. The ability to create intelligent
machines has intrigued humans since ancient times, and today with the advent of the
computer and 50 years of research into AI programming techniques, the dream of smart
machines is becoming a reality. Researchers are creating systems which can mimic human
thought, understand speech, beat the best human chessplayer, and countless other feats never
before possible. Find out how the military is applying AI logic to its hi-tech systems, and how
in the near future Artificial Intelligence may impact our lives.
AI textbooks define the field as "the study and design of intelligent agents" where an
intelligent agent is a system that perceives its environment and takes actions that maximize its
chances of success. John McCarthy, who coined the term in 1956, defines it as "the science
and engineering of making intelligent machines." Artificial intelligence takes the intelligence
of humans, such as perception, natural language processing, problem solving and planning,
CAD/CAM MODULE IV AM/JA
23 Department of Mechanical Engineering, AJCE
learning and adaptation, and acting on the environment and applies them with machines,
systems, and virtual objects.
Use of AI in PP
The use of artificial intelligence has proved to be beneficial in various areas since the mid-
1960s. Recently, more and more studies on AI applications to manufacturing systems have
been reported. Process planning is one of the areas to which artificial intelligence can be
successfully applied. AI techniques which may have a substantial influence on process
planning include:
Natural language processing
Voice/speech recognition
Pattern recognition and
Expert systems
Natural Language Processing
Formal communication between users and computers is designed to be more considerate of
computers than humans. Users must enter data in a pre-defined, rigid format without any
flexibility. Therefore even a minor error in data entry may lead to a confusing result. Natural
language processors have been developed to solve this problem, by allowing humans to
communicate with computers in formal English. Natural language understanding could be
applied to both variant and generative process planning systems. In a variant system, a natural
language interface would be convenient to the user in entering, retrieving and editing the data
and process plans.
For instance, a user may request:
• Give me all the parts in part family 1.
• What are those parts in part family 1?
• List all the parts which belong to part family 1.
The computer should be able to interpret these lexically different sentences as having the
same meaning. As to a generative system, although in the long run the shape, tolerance, and
surface finish for a part can be directed from a CAD's database, it would be advantageous if
the user could enter the required data in English.
Pattern Recognition
Pattern recognition is another AI technique that can contribute to process planning. One can
use this technique to design a pattern-directed expert system[29], or apply it to design an
interface scheme to communicate with a CAD's database such that the computer can access
the position, the dimension and machining requirements of each shape entity in order to
recognise the work piece that it is going to plan. Several different schemes are being used to
resolve the pattern recognition problem. Algorithms have been developed which can
construct a 3D object from 2D drawings under certain assumptions. These algorithms,
however, work well only within narrow ranges; there is no universal algorithm to resolve this
type of problem.
CAD/CAM MODULE IV AM/JA
24 Department of Mechanical Engineering, AJCE
Speech/Voice Recognition
Speech recognition, also known as voice data entry, involves translating spoken languages
into machine-readable forms[30]. Because speech is the natural method of communication
amongst human beings, the use of speech I/O technology at the man-machine interface
accommodates the machine to the user rather than forcing the user to conform to the
computer. Therefore, voice recognition will very probably surpass mouse interface and CRT
usage in the near future. Process planning would then benefit more from this technique than
from natural language
processing.
Expert Systems
Expert systems are probably the most promising AI technique for process planners. An expert
system gains its name from the fact that the system contains massive domain-specific
knowledge designed to successfully solve problems in a field which would normally be
thought of as requiring a human expert. An expert system approach is ideally suited to[31]:
• ill-structured problems;
• problems which can be formulated analytically but for which the number
of alternative solutions is large;
• situations where the domain knowledge is vast and relevant knowledge must
be used selectively;
• problems where the solution is related to human expertise.
An ideal process planning expert system should be equipped with domain knowledge such
that it can behave like an experienced process planner in preparing plans.
Expert Systems Approach to Process Planning
Early research in APP has provided a basic structure for process planning analysis. However,
an expert system technique may replace traditional approaches for the following reasons:
(1) Various factors influence process selection and sequencing; currently, it is not obvious
what all of these factors are, nor what their effects might be.
(2) During the development of an APP system, it would be necessary to make extensive
modification of the facts and decision logic. This can be done more easily in an expert system
structure than in a conventional program.
(3) Decision trees and decision tables, as usually used in a traditional generative APP system,
work effectively only for simple processes. If one wants a fully automated process planning
function, intelligent reasoning must be performed.
(4) Expert process planning systems can be designed to accumulate knowledge as time goes
by, which is more appropriate for a process planning function that requires considerable
experiential knowledge.
CAD/CAM MODULE IV AM/JA
25 Department of Mechanical Engineering, AJCE
Ideally, an expert system, able to emulate human thinking, reasoning, and behavior, should
consist of most of the following components :
• a language processor that manages user-system inferences;
• domain-related facts;
• domain-related rules for drawing inferences;
• an interpreter that controls and executes the rules;
• a justifier that explains the system's action or reasoning;
• a consistency enforcer that maintains a consistent representation of the
emerging solution;
• a scheduler that arranges the order of rules to be executed;
• a blackboard or working space where intermediate hypotheses and decision making that the
system manipulates can be stored.
The actual system architecture depends on the special needs of each application arena. For
example, in order to design a perfect APP system, a CAD database, a machining database, a
CAD interpreter, and a process plan generator should be included in the system. A conceptual
framework for designing such an expert system for process planning purposes is given in
Figure F, where:
• a CAD interpreter extracts geometric data from a CAD data base;
• a machining database is used to store the machine tool and tooling information;
• domain-specific facts and rules are stored in a knowledge base;
• an inference/control module serves as the mechanism to interpret, schedule
CAD/CAM MODULE IV AM/JA
26 Department of Mechanical Engineering, AJCE
and resolve conflicts among candidate rules; and
• a queries/answers processor manages the interaction between users and
the system.
For a computer to emulate human experience and access domain-specific facts, the experts'
knowledge and facts must be extracted, represented and organized in a specific format that
the computer can recognize. One of the popular representing methods is production rule or
production system. The basic idea of production systems is that the database (or rule base)
consists of rules, called productions, in the form of IF-THEN or CONDITION-ACTION
pairs. Three components are normally required for a product system:
• rule bases, which are a set of productions;
• context; a short-term memory buffer-like data structure, which is to be
matched by the left-hand side of productions; and
• inference engine (or interpreter), which controls the system's activities.
Figure F
A typical system built according to the above framework, using a rule-based approach,
should be able to function as follows:
(1) Knowledge is extracted from experienced process planners and stored in a rule base in
CONDITION-ACTION pairs.
(2) When one starts the system, the control program will first examine the left-hand side of a
rule. If the condition matches the input, the right-hand side of this rule is triggered, i.e. put
CAD/CAM MODULE IV AM/JA
27 Department of Mechanical Engineering, AJCE
into action. At the same time, this piece of action is accumulated with inputs and the
condition-match procedure continues.
(3) The inference terminates whenever a satisfactory result (succeeded) or
a conflict (failed) is generated.
(4) A process plan based on the successful result is prepared and displayed (or printed).
Process Planning Software
Programming Language
The choice of language for expert systems, although not as critical as other issues because of
the variety of programming languages available [37], should not be neglected. At the lowest
level, an expert system can be programmed in a high-level programming language, such as
FORTRAN, PASCAL, BASIC or C. A builder using this type of tool must write everything
from scratch which is very time consuming; however, some sort of flexibility is retained. At
the other extreme, an expert system can be built via an environment called an expert system
shell (EMYCIN and OPS5 are examples). This type of tool, which has blocks or subroutines
built in internally, can save time for the system builder, but does not offer much flexibility for
selection. Their functions are normally limited to certain specific systems that can be
constructed. At the middle of the range are those AI-oriented languages such as LISP or
PROLOG, which usually provide the logic for facilitating the tasks of acquiring knowledge
and building an inference engine. Many early expert systems were constructed using this type
of language. Among the existing expert APP systems, GARI uses LISP, and SIPP and
AGMPO utilize PROLOG. TOM and EXCAP are coded in PASCAL, and the system used by
Preiss and Kaplansky is written in FORTRAN 77.
Manufacturing Software: Scheduling & Production Planning
The PIMSS production software toolset provides advanced planning and optimization
functionality, including manufacturing capacity planning, master production scheduling and
factory scheduling:
Production Planning Systems manufacturing software - factory planning systems -
production scheduler
Advanced Manufacturing Planning real-time production planning system - JIT
manufacturing planning
Production Capacity Planning master schedule - capacity planning - batch scheduling -
capacity planner
Material Planning & MRP material planning - MRP systems - production order
scheduling
Strategic Production System strategic optimization - production schedule analysis -
plant planning
CAD/CAM MODULE IV AM/JA
28 Department of Mechanical Engineering, AJCE
Lean Manufacturing Software manufacturing ERP software - factory & production
optimization
PIMSS (Process Industry Manufacturing Scheduling System) offers an integrated solution
spanning the manufacturing supply chain, ranging from long term strategic optimization to
real-time manufacturing scheduling. PIMSS is the fastest production scheduler on the market
and is capable of automatically planning and optimizing very large manufacturing
operations in seconds. Its flexibility enables it to model highly complex production processes
accurately without the need for approximation or compromise on performance.
PIMSS maintains high customer service levels while minimizing inventory and maximizing
manufacturing efficiency. PIMSS is designed for manufacturing operations that process
1000s of products in an environment where minimizing changeovers and balancing resource
usage are vital.
MJC²'s advanced manufacturing software is particularly applicable to operations which
produce short shelf-life or fast-turnover goods against a backdrop of tight order fulfillment
windows and increased demand for flexibility from the customer.
The PIMSS production planning software takes into account:
 Demands & orders: actual or forecast orders by customer and due date(s); branded
& own label volumes;
 Ideal stock levels: taken as a constraint or calculated by the production system;
 Materials planning: raw materials planning requirements, as a constraint or
calculated by PIMSS;
 Labour planning: shift patterns, break cover, rosters, skills, teams, working time
constraints, cost calculation;
 Process capacities: by product/type, machines & packing/bottling areas, plant
scheduling constraints;
 Machine routing: links to secondary processes, fixed production order scheduling,
product scheduling sequences;
 Work in progress: intermediate products, core blends, inter-factory, on-line/off-line
packing, assembly planning;
 Master scheduling: batch planning, master production schedule constraints (color,
formers, moulds, etc.);
 Factory scheduling constraints: product mix changes, plan size, pack size,
packaging material, product type, etc.
MJC²- Process Planning & Optimization
MJC²'s process planning software is designed for large production and manufacturing
operations which need to manage complex processing lines and facilities. Our manufacturing
process optimization tools include:
 Advanced process control software: real-time planning of manufacturing operations
taking account of feedback from production control (e.g. SCADA), process
automation software and inventory management systems.
CAD/CAM MODULE IV AM/JA
29 Department of Mechanical Engineering, AJCE
 Process planning tools: automated scheduling of manufacturing lines and factories,
keeping stock levels within defined limits while optimizing production capacity and
throughput.
 Capacity planning: strategic forward planning of production and related process
control to assess long-term throughput and availability profiles along the supply
chain.
 Process scheduling: modelling and production process optimization to improve
efficiency and customer service levels.
Our process control software is applicable to all large manufacturing operations, particularly
those which produce high-turnover or short shelf life goods. The planning tools can model
complex multi-stage (and multi-site) automated processes and inter-linking lines.
Aras Solutions | Manufacturing Process Planning
Aras Manufacturing Process Planning ensures information accuracy and quality for
manufacturing processes by providing a reliable, single version of the truth in a secure, online
location. Users throughout Engineering, Production Control, Manufacturing and Quality rely
on Aras as the source of official, released information about production processes and related
technical data.
Manufacturing Process Planning:
 Automates and manages all the information and processes required to manufacture
parts, assemble final products and conduct product quality inspections
 Provides revision and version control of manufacturing process plans, production
routing, product descriptions, operation sequencing, tooling assets, and set-up and
run-time instructions
 Ensures the accuracy of Lean Six Sigma methods and integrates with ERP systems for
business analytics and more
SMARTer Manager's
SMARTer Manager offers a wide range of capabilities and a more complete manufacturing
management software solution than any other manufacturing software technology.
Unparalleled functionality at a fraction of the cost and the ability to implement, execute and
operate across any manufacturing enterprise with one single solution. SMARTer Manager's
innovative applications are completely scalable for job shops or larger product oriented
organizations.
Reference:
1. Principles of Automation and Advanced Manufacturing Systems- Dr. K.C. Jain
2. CAD/CAM-Concepts and Applications- Chennakesava R. Alavala
3. CAD/CAM- M Groover, E. Zinners
4. Computer Aided Manufacturing-P.N Rao, N.K. Tewari, T.K. Kundra
5. CAD/CAM-P.N Rao

More Related Content

What's hot

Process planning approaches
Process planning approaches Process planning approaches
Process planning approaches chethan kumar
 
Group Technology, coding and cell design
Group Technology, coding and cell designGroup Technology, coding and cell design
Group Technology, coding and cell designNauman khan
 
Cnc, dnc & adaptive control
Cnc, dnc & adaptive controlCnc, dnc & adaptive control
Cnc, dnc & adaptive controlparabajinkya0070
 
Unit 4-ME8691 & COMPUTER AIDED DESIGN AND MANUFACTURING
Unit 4-ME8691 & COMPUTER AIDED DESIGN AND    MANUFACTURINGUnit 4-ME8691 & COMPUTER AIDED DESIGN AND    MANUFACTURING
Unit 4-ME8691 & COMPUTER AIDED DESIGN AND MANUFACTURINGMohanumar S
 
Automated assembly systems
Automated assembly systemsAutomated assembly systems
Automated assembly systemsVibhas Purushu
 
introduction to process planning murugananthan
introduction to process planning murugananthanintroduction to process planning murugananthan
introduction to process planning murugananthanMurugananthan K
 
Computer aided process planning
Computer aided process planningComputer aided process planning
Computer aided process planningsushma chinta
 
COMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNINGCOMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNINGjntuhcej
 
CELLULAR MANUFACTURING & FLEXIBLE MANUFACTURING SYSTEM - UNIT 5 - CAD & M
CELLULAR MANUFACTURING & FLEXIBLE MANUFACTURING SYSTEM - UNIT 5 - CAD & MCELLULAR MANUFACTURING & FLEXIBLE MANUFACTURING SYSTEM - UNIT 5 - CAD & M
CELLULAR MANUFACTURING & FLEXIBLE MANUFACTURING SYSTEM - UNIT 5 - CAD & MBalamurugan Subburaj
 
Unit 3-ME8691 & COMPUTER AIDED DESIGN AND MANUFACTURING
Unit 3-ME8691 & COMPUTER AIDED DESIGN AND    MANUFACTURINGUnit 3-ME8691 & COMPUTER AIDED DESIGN AND    MANUFACTURING
Unit 3-ME8691 & COMPUTER AIDED DESIGN AND MANUFACTURINGMohanumar S
 
Computer aided manufacturing
Computer aided manufacturingComputer aided manufacturing
Computer aided manufacturingGulfaraz alam
 
GROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPPGROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPPmanimaran m
 
Computer generated time standards
Computer  generated time standardsComputer  generated time standards
Computer generated time standardsVenu Yadav
 
DISTRIBUTED NUMERICAL CONTROL
DISTRIBUTED NUMERICAL CONTROLDISTRIBUTED NUMERICAL CONTROL
DISTRIBUTED NUMERICAL CONTROLParamesh .
 

What's hot (20)

Process planning approaches
Process planning approaches Process planning approaches
Process planning approaches
 
CIM Unit 1
CIM Unit 1CIM Unit 1
CIM Unit 1
 
CIM
CIMCIM
CIM
 
Group Technology, coding and cell design
Group Technology, coding and cell designGroup Technology, coding and cell design
Group Technology, coding and cell design
 
Cnc, dnc & adaptive control
Cnc, dnc & adaptive controlCnc, dnc & adaptive control
Cnc, dnc & adaptive control
 
Unit 4-ME8691 & COMPUTER AIDED DESIGN AND MANUFACTURING
Unit 4-ME8691 & COMPUTER AIDED DESIGN AND    MANUFACTURINGUnit 4-ME8691 & COMPUTER AIDED DESIGN AND    MANUFACTURING
Unit 4-ME8691 & COMPUTER AIDED DESIGN AND MANUFACTURING
 
Automated assembly systems
Automated assembly systemsAutomated assembly systems
Automated assembly systems
 
introduction to process planning murugananthan
introduction to process planning murugananthanintroduction to process planning murugananthan
introduction to process planning murugananthan
 
Computer aided process planning
Computer aided process planningComputer aided process planning
Computer aided process planning
 
COMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNINGCOMPUTER AIDED PROCESS PLANNING
COMPUTER AIDED PROCESS PLANNING
 
CELLULAR MANUFACTURING & FLEXIBLE MANUFACTURING SYSTEM - UNIT 5 - CAD & M
CELLULAR MANUFACTURING & FLEXIBLE MANUFACTURING SYSTEM - UNIT 5 - CAD & MCELLULAR MANUFACTURING & FLEXIBLE MANUFACTURING SYSTEM - UNIT 5 - CAD & M
CELLULAR MANUFACTURING & FLEXIBLE MANUFACTURING SYSTEM - UNIT 5 - CAD & M
 
Unit 3-ME8691 & COMPUTER AIDED DESIGN AND MANUFACTURING
Unit 3-ME8691 & COMPUTER AIDED DESIGN AND    MANUFACTURINGUnit 3-ME8691 & COMPUTER AIDED DESIGN AND    MANUFACTURING
Unit 3-ME8691 & COMPUTER AIDED DESIGN AND MANUFACTURING
 
CAD/CAM/CIM (Lecture 1 CAD)
CAD/CAM/CIM  (Lecture 1 CAD)CAD/CAM/CIM  (Lecture 1 CAD)
CAD/CAM/CIM (Lecture 1 CAD)
 
Computer aided manufacturing
Computer aided manufacturingComputer aided manufacturing
Computer aided manufacturing
 
Introduction to cad cam
Introduction to cad camIntroduction to cad cam
Introduction to cad cam
 
GROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPPGROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPP
 
Computer generated time standards
Computer  generated time standardsComputer  generated time standards
Computer generated time standards
 
DISTRIBUTED NUMERICAL CONTROL
DISTRIBUTED NUMERICAL CONTROLDISTRIBUTED NUMERICAL CONTROL
DISTRIBUTED NUMERICAL CONTROL
 
Unit 1 cim
Unit 1 cimUnit 1 cim
Unit 1 cim
 
Unit 2 cim
Unit 2 cimUnit 2 cim
Unit 2 cim
 

Viewers also liked

ALL Non destructive testings at one pdf
ALL Non destructive testings at one pdfALL Non destructive testings at one pdf
ALL Non destructive testings at one pdfDenny John
 
NON TRADITIONAL MACHINING & MATERIAL ADDITION PROCESS ( as per MGU syllabus)
NON TRADITIONAL MACHINING & MATERIAL ADDITION PROCESS ( as per MGU syllabus)NON TRADITIONAL MACHINING & MATERIAL ADDITION PROCESS ( as per MGU syllabus)
NON TRADITIONAL MACHINING & MATERIAL ADDITION PROCESS ( as per MGU syllabus)Denny John
 
COMPOSITES ( as per MGU syllabus)
COMPOSITES ( as per MGU syllabus)COMPOSITES ( as per MGU syllabus)
COMPOSITES ( as per MGU syllabus)Denny John
 
geometric modelling and PLC
geometric modelling and PLCgeometric modelling and PLC
geometric modelling and PLCDenny John
 
Theory of metal cutting MG University(S8 Production Notes)
Theory of metal cutting MG University(S8 Production Notes)Theory of metal cutting MG University(S8 Production Notes)
Theory of metal cutting MG University(S8 Production Notes)Denny John
 
powder metallurgy and micromachining notes
powder metallurgy and micromachining notespowder metallurgy and micromachining notes
powder metallurgy and micromachining notesDenny John
 
REFRIGERATION SYSTEM
REFRIGERATION SYSTEMREFRIGERATION SYSTEM
REFRIGERATION SYSTEMDenny John
 
SIMULATION AND OPTIMIZATION OF MATERIAL FLOW FORGING DEFECTS IN AUTOMOBILE CO...
SIMULATION AND OPTIMIZATION OF MATERIAL FLOW FORGING DEFECTS IN AUTOMOBILE CO...SIMULATION AND OPTIMIZATION OF MATERIAL FLOW FORGING DEFECTS IN AUTOMOBILE CO...
SIMULATION AND OPTIMIZATION OF MATERIAL FLOW FORGING DEFECTS IN AUTOMOBILE CO...Denny John
 
A Comparison Of Group Technology & Process Layout (3)
A   Comparison  Of  Group  Technology &  Process  Layout (3)A   Comparison  Of  Group  Technology &  Process  Layout (3)
A Comparison Of Group Technology & Process Layout (3)guest42598d4
 
Fracture Project Report (2)
Fracture Project Report (2)Fracture Project Report (2)
Fracture Project Report (2)Harshada Patil
 
ME5720 Team Project Report
ME5720 Team Project ReportME5720 Team Project Report
ME5720 Team Project ReportHarshada Patil
 
evolution of cad/cam
evolution of cad/camevolution of cad/cam
evolution of cad/camDenny John
 
Optimisation of machining parameters for slot milling operation in Inconel 62...
Optimisation of machining parameters for slot milling operation in Inconel 62...Optimisation of machining parameters for slot milling operation in Inconel 62...
Optimisation of machining parameters for slot milling operation in Inconel 62...Denny John
 
Measurement techniques in micro machining PDF by badebhau4@gmail.com
Measurement techniques in micro machining PDF by badebhau4@gmail.comMeasurement techniques in micro machining PDF by badebhau4@gmail.com
Measurement techniques in micro machining PDF by badebhau4@gmail.comEr. Bade Bhausaheb
 
NC part programing & Robotics
NC part programing & RoboticsNC part programing & Robotics
NC part programing & RoboticsDenny John
 
DESIGN AND FABRICATION OF DISC TYPE HYBRID TURBINE-PUMP
DESIGN AND FABRICATION OF DISC TYPE HYBRID TURBINE-PUMPDESIGN AND FABRICATION OF DISC TYPE HYBRID TURBINE-PUMP
DESIGN AND FABRICATION OF DISC TYPE HYBRID TURBINE-PUMPDenny John
 

Viewers also liked (20)

ALL Non destructive testings at one pdf
ALL Non destructive testings at one pdfALL Non destructive testings at one pdf
ALL Non destructive testings at one pdf
 
NON TRADITIONAL MACHINING & MATERIAL ADDITION PROCESS ( as per MGU syllabus)
NON TRADITIONAL MACHINING & MATERIAL ADDITION PROCESS ( as per MGU syllabus)NON TRADITIONAL MACHINING & MATERIAL ADDITION PROCESS ( as per MGU syllabus)
NON TRADITIONAL MACHINING & MATERIAL ADDITION PROCESS ( as per MGU syllabus)
 
COMPOSITES ( as per MGU syllabus)
COMPOSITES ( as per MGU syllabus)COMPOSITES ( as per MGU syllabus)
COMPOSITES ( as per MGU syllabus)
 
geometric modelling and PLC
geometric modelling and PLCgeometric modelling and PLC
geometric modelling and PLC
 
Theory of metal cutting MG University(S8 Production Notes)
Theory of metal cutting MG University(S8 Production Notes)Theory of metal cutting MG University(S8 Production Notes)
Theory of metal cutting MG University(S8 Production Notes)
 
powder metallurgy and micromachining notes
powder metallurgy and micromachining notespowder metallurgy and micromachining notes
powder metallurgy and micromachining notes
 
REFRIGERATION SYSTEM
REFRIGERATION SYSTEMREFRIGERATION SYSTEM
REFRIGERATION SYSTEM
 
SIMULATION AND OPTIMIZATION OF MATERIAL FLOW FORGING DEFECTS IN AUTOMOBILE CO...
SIMULATION AND OPTIMIZATION OF MATERIAL FLOW FORGING DEFECTS IN AUTOMOBILE CO...SIMULATION AND OPTIMIZATION OF MATERIAL FLOW FORGING DEFECTS IN AUTOMOBILE CO...
SIMULATION AND OPTIMIZATION OF MATERIAL FLOW FORGING DEFECTS IN AUTOMOBILE CO...
 
A Comparison Of Group Technology & Process Layout (3)
A   Comparison  Of  Group  Technology &  Process  Layout (3)A   Comparison  Of  Group  Technology &  Process  Layout (3)
A Comparison Of Group Technology & Process Layout (3)
 
Fracture Project Report (2)
Fracture Project Report (2)Fracture Project Report (2)
Fracture Project Report (2)
 
Final print report
Final print reportFinal print report
Final print report
 
ME5720 Team Project Report
ME5720 Team Project ReportME5720 Team Project Report
ME5720 Team Project Report
 
Group 6 NDE project
Group 6 NDE projectGroup 6 NDE project
Group 6 NDE project
 
evolution of cad/cam
evolution of cad/camevolution of cad/cam
evolution of cad/cam
 
Powder metallurgy
Powder metallurgyPowder metallurgy
Powder metallurgy
 
Optimisation of machining parameters for slot milling operation in Inconel 62...
Optimisation of machining parameters for slot milling operation in Inconel 62...Optimisation of machining parameters for slot milling operation in Inconel 62...
Optimisation of machining parameters for slot milling operation in Inconel 62...
 
Measurement techniques in micro machining PDF by badebhau4@gmail.com
Measurement techniques in micro machining PDF by badebhau4@gmail.comMeasurement techniques in micro machining PDF by badebhau4@gmail.com
Measurement techniques in micro machining PDF by badebhau4@gmail.com
 
NC part programing & Robotics
NC part programing & RoboticsNC part programing & Robotics
NC part programing & Robotics
 
DESIGN AND FABRICATION OF DISC TYPE HYBRID TURBINE-PUMP
DESIGN AND FABRICATION OF DISC TYPE HYBRID TURBINE-PUMPDESIGN AND FABRICATION OF DISC TYPE HYBRID TURBINE-PUMP
DESIGN AND FABRICATION OF DISC TYPE HYBRID TURBINE-PUMP
 
Group technology and cellular manufacturing
Group technology and cellular manufacturingGroup technology and cellular manufacturing
Group technology and cellular manufacturing
 

Similar to CAPP , JIT, FMS

CADCAM CAE Notes
CADCAM CAE NotesCADCAM CAE Notes
CADCAM CAE NotesAbhay Gore
 
Chapter 7 automation techniques
Chapter 7  automation techniquesChapter 7  automation techniques
Chapter 7 automation techniquesMohamad Sahiedan
 
computer aided process planning
computer aided process planning computer aided process planning
computer aided process planning Danish saifi
 
Computer Aided Process Planning Using Neutral File Step for Rotational Parts
Computer Aided Process Planning Using Neutral File Step for Rotational PartsComputer Aided Process Planning Using Neutral File Step for Rotational Parts
Computer Aided Process Planning Using Neutral File Step for Rotational PartsRSIS International
 
Introduction to CAD-CAM.pdf
Introduction to CAD-CAM.pdfIntroduction to CAD-CAM.pdf
Introduction to CAD-CAM.pdfrajauesi2002
 
4th unit CADM important questions related to capp and fms etc design processs
4th unit CADM important questions related to capp and fms etc design processs4th unit CADM important questions related to capp and fms etc design processs
4th unit CADM important questions related to capp and fms etc design processsPrudhviRaj667957
 
COMPUTER AIDED DESIGN / COMPUTER AIDED MANUFACTURING (CAD/CAM
COMPUTER AIDED DESIGN / COMPUTER AIDED MANUFACTURING  (CAD/CAMCOMPUTER AIDED DESIGN / COMPUTER AIDED MANUFACTURING  (CAD/CAM
COMPUTER AIDED DESIGN / COMPUTER AIDED MANUFACTURING (CAD/CAMshishirrathod1
 
Siemens-PLM-Quality-Planning-Environment-br-X29
Siemens-PLM-Quality-Planning-Environment-br-X29Siemens-PLM-Quality-Planning-Environment-br-X29
Siemens-PLM-Quality-Planning-Environment-br-X29Brady Walther
 
A Survey of Automated Process Planning Approaches in Machining
A Survey of Automated Process Planning Approaches in MachiningA Survey of Automated Process Planning Approaches in Machining
A Survey of Automated Process Planning Approaches in MachiningDr. Amarjeet Singh
 
CAD/CAM -PPT UNIT NO-I
CAD/CAM -PPT UNIT NO-ICAD/CAM -PPT UNIT NO-I
CAD/CAM -PPT UNIT NO-IMalothHeeralal
 
Process planning unit two
Process planning  unit twoProcess planning  unit two
Process planning unit twoZELALEMGIRMAW
 

Similar to CAPP , JIT, FMS (20)

CADCAM CAE Notes
CADCAM CAE NotesCADCAM CAE Notes
CADCAM CAE Notes
 
M-2_CAPP.pptx
M-2_CAPP.pptxM-2_CAPP.pptx
M-2_CAPP.pptx
 
Chapter 7 automation techniques
Chapter 7  automation techniquesChapter 7  automation techniques
Chapter 7 automation techniques
 
computer aided process planning
computer aided process planning computer aided process planning
computer aided process planning
 
Computer Aided Process Planning Using Neutral File Step for Rotational Parts
Computer Aided Process Planning Using Neutral File Step for Rotational PartsComputer Aided Process Planning Using Neutral File Step for Rotational Parts
Computer Aided Process Planning Using Neutral File Step for Rotational Parts
 
CIM MODULE 2.pptx
CIM MODULE 2.pptxCIM MODULE 2.pptx
CIM MODULE 2.pptx
 
Introduction to CAD-CAM.pdf
Introduction to CAD-CAM.pdfIntroduction to CAD-CAM.pdf
Introduction to CAD-CAM.pdf
 
4th unit CADM important questions related to capp and fms etc design processs
4th unit CADM important questions related to capp and fms etc design processs4th unit CADM important questions related to capp and fms etc design processs
4th unit CADM important questions related to capp and fms etc design processs
 
COMPUTER AIDED DESIGN / COMPUTER AIDED MANUFACTURING (CAD/CAM
COMPUTER AIDED DESIGN / COMPUTER AIDED MANUFACTURING  (CAD/CAMCOMPUTER AIDED DESIGN / COMPUTER AIDED MANUFACTURING  (CAD/CAM
COMPUTER AIDED DESIGN / COMPUTER AIDED MANUFACTURING (CAD/CAM
 
CAPP-ppt.ppt
CAPP-ppt.pptCAPP-ppt.ppt
CAPP-ppt.ppt
 
DOC of Crank shaft
DOC of Crank shaftDOC of Crank shaft
DOC of Crank shaft
 
Siemens-PLM-Quality-Planning-Environment-br-X29
Siemens-PLM-Quality-Planning-Environment-br-X29Siemens-PLM-Quality-Planning-Environment-br-X29
Siemens-PLM-Quality-Planning-Environment-br-X29
 
A Survey of Automated Process Planning Approaches in Machining
A Survey of Automated Process Planning Approaches in MachiningA Survey of Automated Process Planning Approaches in Machining
A Survey of Automated Process Planning Approaches in Machining
 
Cad cam
Cad camCad cam
Cad cam
 
Unit 1 manufacturing system design
Unit   1 manufacturing system designUnit   1 manufacturing system design
Unit 1 manufacturing system design
 
CAD/CAM -PPT UNIT NO-I
CAD/CAM -PPT UNIT NO-ICAD/CAM -PPT UNIT NO-I
CAD/CAM -PPT UNIT NO-I
 
Me6703 cim systems
Me6703 cim systemsMe6703 cim systems
Me6703 cim systems
 
Process planning unit two
Process planning  unit twoProcess planning  unit two
Process planning unit two
 
CIM unit-1
CIM  unit-1CIM  unit-1
CIM unit-1
 
CAD-CAM-CIM
CAD-CAM-CIMCAD-CAM-CIM
CAD-CAM-CIM
 

More from Denny John

ADDITIVE MANUFACTURING
ADDITIVE MANUFACTURINGADDITIVE MANUFACTURING
ADDITIVE MANUFACTURINGDenny John
 
CERAMICS ( as per MGU syllabus)
CERAMICS ( as per MGU syllabus)CERAMICS ( as per MGU syllabus)
CERAMICS ( as per MGU syllabus)Denny John
 
Machining and Thermal aspects (MGU S8 ME)
Machining and Thermal aspects (MGU S8 ME)Machining and Thermal aspects (MGU S8 ME)
Machining and Thermal aspects (MGU S8 ME)Denny John
 
EXPERIMENTAL AND NUMERICAL STUDY OF A MICRO-COGENERATION STIRLING ENGINE FOR ...
EXPERIMENTAL AND NUMERICAL STUDY OF A MICRO-COGENERATION STIRLING ENGINE FOR ...EXPERIMENTAL AND NUMERICAL STUDY OF A MICRO-COGENERATION STIRLING ENGINE FOR ...
EXPERIMENTAL AND NUMERICAL STUDY OF A MICRO-COGENERATION STIRLING ENGINE FOR ...Denny John
 
SOLAR UPDRAFT POWER PLANT
 SOLAR UPDRAFT POWER PLANT SOLAR UPDRAFT POWER PLANT
SOLAR UPDRAFT POWER PLANTDenny John
 
Challenges of future aircraft propulsion
Challenges of future aircraft propulsionChallenges of future aircraft propulsion
Challenges of future aircraft propulsionDenny John
 
Design and testing of disc type hybrid turbine pump
Design and testing  of disc type hybrid turbine pumpDesign and testing  of disc type hybrid turbine pump
Design and testing of disc type hybrid turbine pumpDenny John
 

More from Denny John (7)

ADDITIVE MANUFACTURING
ADDITIVE MANUFACTURINGADDITIVE MANUFACTURING
ADDITIVE MANUFACTURING
 
CERAMICS ( as per MGU syllabus)
CERAMICS ( as per MGU syllabus)CERAMICS ( as per MGU syllabus)
CERAMICS ( as per MGU syllabus)
 
Machining and Thermal aspects (MGU S8 ME)
Machining and Thermal aspects (MGU S8 ME)Machining and Thermal aspects (MGU S8 ME)
Machining and Thermal aspects (MGU S8 ME)
 
EXPERIMENTAL AND NUMERICAL STUDY OF A MICRO-COGENERATION STIRLING ENGINE FOR ...
EXPERIMENTAL AND NUMERICAL STUDY OF A MICRO-COGENERATION STIRLING ENGINE FOR ...EXPERIMENTAL AND NUMERICAL STUDY OF A MICRO-COGENERATION STIRLING ENGINE FOR ...
EXPERIMENTAL AND NUMERICAL STUDY OF A MICRO-COGENERATION STIRLING ENGINE FOR ...
 
SOLAR UPDRAFT POWER PLANT
 SOLAR UPDRAFT POWER PLANT SOLAR UPDRAFT POWER PLANT
SOLAR UPDRAFT POWER PLANT
 
Challenges of future aircraft propulsion
Challenges of future aircraft propulsionChallenges of future aircraft propulsion
Challenges of future aircraft propulsion
 
Design and testing of disc type hybrid turbine pump
Design and testing  of disc type hybrid turbine pumpDesign and testing  of disc type hybrid turbine pump
Design and testing of disc type hybrid turbine pump
 

Recently uploaded

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)dollysharma2066
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHC Sai Kiran
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixingviprabot1
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 

Recently uploaded (20)

Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
Call Us ≽ 8377877756 ≼ Call Girls In Shastri Nagar (Delhi)
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
Introduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECHIntroduction to Machine Learning Unit-3 for II MECH
Introduction to Machine Learning Unit-3 for II MECH
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Effects of rheological properties on mixing
Effects of rheological properties on mixingEffects of rheological properties on mixing
Effects of rheological properties on mixing
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 

CAPP , JIT, FMS

  • 1. CAD/CAM MODULE IV AM/JA 1 Department of Mechanical Engineering, AJCE Module IV Automated process planning: Process planning, general methodology of group technology, code structures of variant and generative process planning methods, A1 in process planning, process planning software. DISCLAIMER These notes are not the ultimate ‘look-up’ for Model and University exams. Students are advised to read the references mentioned at the end thoroughly for the exams Process Planning Process planning is concerned with the preparation of route sheets that list the sequence of operations and work centers require to produce the product and its components. Products and their components are designed to perform certain specific functions. Every product has some design specifications which ensure its functionality aspects. The task of manufacturing is to produce components such that they meet design specifications. Process planning acts as a bridge between design and manufacturing by translating design specifications into manufacturing process details. It refers to a set of instructions that are used to make a component or a part so that the design specifications are met, therefore it is major determinant of manufacturing cost and profitability of products. Process planning answers the questions regarding required information and activities involved in transforming raw materials into a finished product. The process starts with the selection of raw material and ends with the completion of part. The development of process plans involves mainly a set of following activities;  Analysis of part requirements  Selection of raw work piece  Selection of manufacturing operations and their sequences  Selection of machine tools  Selection of tools, tool holding devices, work holding devices and inspection equipments  Selection of manufacturing conditions i.e. cutting speed, feed and depth of cut. Manufacturing firms try to automate the task of process planning using CAPP systems due to many limitations of manual process planning. Approaches to Process Planing (1) The manual experience-based planning method (2) Computer Aided Process Planning (Automated Process Planing) The manual experience-based planning method: The manual experience-based process planning is most widely used. It is mainly based on a manufacturing engineer's experience and knowledge of production facilities, equipment, their capabilities, processes, and tooling. The major problem with this approach is that it is time consuming and developed plans may not be consistent and optimum. The feasibility of developed process plan is dependent on many factors such as availability of machine tools, scheduling and machine allocation etc. Computer aided process planning is developed to overcome this problems to some extent.
  • 2. CAD/CAM MODULE IV AM/JA 2 Department of Mechanical Engineering, AJCE These includes: – Tied to personal experience – and knowledge of planner of production facilities, equipment, their Capabilities, process and tooling. This results in inconsistent plans. – Manual process planning is time consuming and slow. – Slow in responding to changes in product design and production. Computer Aided Process Planning (Automated Process Planning) The primary purpose of process planning is to translate the design requirements into manufacturing process details. This suggests a system in which design information is processed by the process planning system to generate manufacturing process details. CAPP integrates and optimizes system performance into the inter-organizational flow. For example, when one changes the design, it must be able to fall back on CAPP module to generate manufacturing process and cost estimates for these design changes. Similarly, in case of machine breakdown on the shop floor, CAPP must generate the alternative actions so that most economical solution can be adopted in the given situation. A typical CAPP frame-work is shown in figure below. CAPP is the application of computer to assist the human process planer in the process planning function. In its lowest form it will reduce the time and effort required to prepare process plans and provide more consistent process plan. In its most advanced state, it will provide the automated interface between CAD and CAM and in the process achieve the complete integration with in CAD/CAM. Advantages Over Manual Experience-based Process Planning
  • 3. CAD/CAM MODULE IV AM/JA 3 Department of Mechanical Engineering, AJCE The uses of computers in process plan have following advantages over manual experience-based process planning : (i) It can systematically produce accurate and consistent process plans. (ii) It leads to the reduction of cost and lead times of process plan. (iii) Skill requirement of process planer are reduced to develop feasible process plan. (iv) Interfacing of software for cost, manufacturing lead time estimation, and work standards can easily be done. (v) Leads to the increased productivity of process planar. With the emergence of CIM as predominate thrust area in discrete part industries process planning has received significant attention, because it is the link between CAD and CAM. Hence, computer aided process planning (CAPP) has become a necessary and vital objective of CIM system. Steps Involved in CAPP Now-a-days, rapid progress is being made in the automation of actual production process and also the product design element. However, the interface between design and production presents the greatest difficulty in accomplishing integration. CAPP has the potential to achieve this integration. In general, a complete CAPP system has following steps : (i) Design input (ii) Material selection (iii) Process selection (iv) Process sequencing (v) Machine and tool selection (vi) Intermediate surface determination (vii) Fixture selection (viii) Machining parameter selection (ix) Cost/time estimation (x) Plan preparation (xi) Mc tape image generation. (i) Identify the machinable volumes called pockets by taking the difference of blank size and the finished component size. For each of the pocket attach the necessary technological details relevant for manufacturing. The blank size if not given directly can be identified as the largest volume that completely encloses the finished component. (ii) Do a preliminary sorting of the pockets in order of levels that clearly indicate the likely se- quence in the final process plan. (iii) Examine the pockets for any possibility of combining so that the machining operations could be reduced. (iv) Select the machine tool that can be used for each of the identified pockets. Minimise the total number of machine tools required. This may have to be modified recursively based on the operation sequence selected. (v) Identify the process sequence required for the machining of each of the pocket based on the technological requirements. Help may be obtained in the shape of canned sequences based on the technological parameters. Any possible alternate plans can also be identified at this stage. (vi) For each of the pocket and the operation decided, select the cutting tool required. (vii) Obtain the optimum cutting process parameters (speed, feed, number of passes and depth of cut)
  • 4. CAD/CAM MODULE IV AM/JA 4 Department of Mechanical Engineering, AJCE for each of the pocket, tool and the operation combination identified in the earlier steps. (viii) Sort the operations on the basis of machine tool and cutting tool. Sequence the operations on the basis of machine tool and cutting tool by making use of the heuristic rules for the purpose. (ix) Evaluate the machining time and idle time involved in the production of the component. Select the final process plan based on the lowest cost or machining time. (x) Present the final results in any suitable form such as  Process sheet (alpha numeric)  Process pictures  Machining simulation steps  CLDATA or CNC part program CAPP MODEL CAPP System Architecture CAD System Preprocessor Input CAPP Knowledg e Planning Rules Output CAPP Model Postprocessor Production Planning & Scheduling CAD System Machining Selection Module Constraint Creation Module Preprocessor Machining Knowledge Base Process Plan Generation Module Constraint Application Module Manufacturing Knowledge Base
  • 5. CAD/CAM MODULE IV AM/JA 5 Department of Mechanical Engineering, AJCE APPROACHES TO COMPUTER-AIDED PROCESS PLANNING In recent days, several computer-aided process planning systems are available for use for a variety of manufacturing operation. These systems can broadly be clarified into two categories : (i) Variant computer aided process planning method. (ii) Generative computer aided process planning method. The details of these are explained in next subsections. The variant CAPP method In variant CAPP approach, a process plan for a new part is created by recalling, identifying and retrieving an existing plan for a similar part and making necessary modifications for the new part. Sometimes, the process plans are developed for parts representing a fmily of parts called 'master parts'. The similarities in design attributes and manufacturing methods are exploited for the purpose of formation of part families. A number of methods have been developed for part family formation using coding and classification schemes of group technology (GT), similarity-coefficient based algorithms and mathematical programming models. The variant process planning approach can be realized as a four step process; 1. Definition of coding scheme 2. Grouping parts into part families 3. Development of a standard process plan 4. Retrieval and modification of standard process plan A number of variant process planning schemes have been developed and are in use. One of the most widely used CAPP system is CAM-I developed by McDonnell-Douglas Automation Company. This system can be used to generate process plan for rotational, prismatic and sheet-metal parts. – This has evolved out of the traditional manual process planning method. A process plan for a new part is created by identifying and retrieving an existing plan for a similar part, followed by the necessary modifications to adapt it to the new part. – It is based on GT principles, i.e., part classification and coding. These coding allow the CAPP system to select a baseline process plan for the part family and accomplish about 90% of the planning work. The planner adds the remaining 10% of the planning by modifying the baseline plan. – If the code of the part does not match with the codes stored in the database, a new process plan must be generated manually and then entered into database to create a new baseline process plan for future use. Advantages and limitations of Variant CAPP – Investment in hardware and software is not much. – The system offers a shorter development time and lower manpower consumption to develop process plan. – The system is very reliable and reasonable in real production environments for small and medium size companies. – Quality of process plan depends on knowledge and background of process planner.
  • 6. CAD/CAM MODULE IV AM/JA 6 Department of Mechanical Engineering, AJCE The general steps for data retrieval modification are as follows : Establishing the Coding Scheme A variant system usually begins with building a classification and coding scheme. Because, classification and coding provide a relatively easy way to identify similarity among existing and new parts. Today, several classification and coding systems are commercially available. In some extreme cases, a new coding scheme may be developed. If variant CAPP is preferred than it is useful for a company to look into several commercially available coding and classification systems (e.g. DCLASS, JD-CAPP etc.). Now, it is compared with companies before developing their own coding and classification system. Because using an existing system can save tremendous development time and manpower. (i) Form the Part Families by Grouping Parts The whole idea of GT lies into group numerous parts into a manageable number of part families. One of the key issues in forming part families is that all parts in the same family should have common and easily identifiable machined features. As a standard process plan are attached with each part family, thereby reducing the total number of standard process plans. (ii) Develop Standard Process Plans
  • 7. CAD/CAM MODULE IV AM/JA 7 Department of Mechanical Engineering, AJCE After formation of part families, standard process plan is developed for each part families based on common part features. The standard plan should be as simple as possible but detailed enough to distinguish it from other. (iii) Retrieve and Modify the Standard Plans for New Parts Step1 to step 3 are often referred as preparatory work. Each time when a new part enters the systems, it is designed and coded based on its feature, using the coding and classification scheme, and than assigned to a part family. The part should be similar to its fellow parts in the same family. Also, family’s standard plan should represent the basic set of processes that the part has to go through. In order to generate detailed process routes and operation sheets to this part, the standard plan is retrieved from the data Advantages and Disadvantages of Variant CAPP Following advantages are associated with variant process planning approach: (i) Processing and evaluation of complicated activities and managerial issues are done in an efficient manner. Hence lead to the reduction of time and labour requirement. (ii) Structuring manufacturing knowledge of the process plans to company’s needs through standardized procedures. (iii) Reduced development and hardware cost and shorter development time. This is an essential issue for small and medium scale companies, where product variety is not so high and process planner are interested in establishing their own process planning research activities. Disadvantages of Variant Process Planning Approach Following disadvantages are associated with variant process planning approach (i) It is difficult to maintain consistency during editing. (ii) Proper accommodation of various combinations of attributes such as material, geometry, size, precision, quality, alternate processing sequence and machine loading among many other factors are difficult. (iii) The quality of the final process plan largely depends on the knowledge and experience of process planner. The dependency on process planner is one of the major shortcomings of variant process planning. The generative CAPP method In generative process planning, process plans are generated by means of decision logic, formulas, technology algorithms, and geometry based data to perform uniquely processing decisions. Main aim is to convert a part from raw material to finished state. Hence, generative process plan may be defined as a system that synthesizes process information in order to create a process plan for a new component automatically. Generative process plan mainly consists of two major components : (i) Geometry based coding scheme. (ii) Proportional knowledge in the form of decision logic and data. • Process plans are generated by means of decision logics, formulas, algorithms, and geometry based data that are built or fed as input to the system. • Format of input – Text input (interactive) – Graphical input (from CAD models)
  • 8. CAD/CAM MODULE IV AM/JA 8 Department of Mechanical Engineering, AJCE • First key: to develop decision rules appropriate for the part to be processed. These rules are specified using decision trees, logical statements, such as if-then-else, or artificial intelligence approaches with object oriented programming. • Second key: Finding out the data related to part to drive the planning. Simple forms of generative CAPP systems may be driven by GT codes.  A pure generative system can produce a complete process plan from part classification and other design data which does not require any further modification or manual interaction. • In generating such plans, initial state of the part (stock) must be defined in order to reach the final state i.e., finished part. • Forward or backward planning can be done. • Forward and backward planning apparently appear to be similar but they effect programming significantly. The requirement and the results in of a setup in forward planning are the results and requirements , respectively, of the set up in backward planning. • Forward planning suffers from conditioning problems; the results of a setup affects the next set up. • In backward planning, conditioning problems are eliminated because setups are selected to satisfy the initial requirements only. • The generative CAPP has all the advantages of variant CAPP however it has an additional advantage that it is fully automatic and a up-to-date process plan is generated at each time. • It requires major revisions if a new equipment or processing capabilities became available. • The development of the system in the beginning is a difficult. Geometry-based Coding Scheme All the geometric features for all process such as related surfaces, feature dimension, locations, on the features are defined by geometry based coding scheme. The level of detail is much greater in generative system than a variant system. For example, various details such as rough and finished state of the part are provided to transform into desired state. Proportional Knowledge in the Form of Decision Logic and Data Process knowledge in the form of decision logic and data are used for matching of part geometry requirement with the manufacturing capabilities. All the methods mentioned above is performed automatically. Operation instruction sets are automatically generated to help the operators to run the machines in case of manual operation. NC codes are automatically generated, when numerically controlled machines are used
  • 9. CAD/CAM MODULE IV AM/JA 9 Department of Mechanical Engineering, AJCE Manufacturing knowledge plays a vital role in process planning. The process of acquisition and documentation of manufacturing knowledge is a recurring dynamic phenomenon. In addition, there are various sources of manufacturing knowledge such experience of manufacturing personnel, handbooks, supplier of machine tools, tools, jigs and fixtures materials, inspection equipment and customers etc. Hence, in order to understand manufacturing information, ensuring its clarity and providing a framework for future modification, it is not only necessary but also inevitable to develop a good knowledge structure from wide spectrum of knowledge. Flowchart, decision trees, decision tables, algorithms, concepts of unit machined surfaces, pattern recognition techniques, and artificial intelligent based tools are used to serve the purpose. A brief discussion on decision table is given below. The basic elements of decision tables are condition, action and rules. They are represented in the form of allocation matrix. Figure 9.4 is one such representation where condition states the goal that we want to achieve and action states the operation that we have to perform. On the basis of experience the expert rules are formed by entry values to establish the relationship between condition and action. Table 9.1 is one such representation where entry are of Boolean-types (true, false, don’t care). Similarly, in Table 9.2, continuous value type entries are shown.
  • 10. CAD/CAM MODULE IV AM/JA 10 Department of Mechanical Engineering, AJCE The decision making process works as follow. For a particular set of condition entries, look for its corresponding rule from that rule determine the action. Advantages of Generative Process Plan Generative process plans have a number of advantages. Among the major ones are the following : (i) They rely less on group technology code numbers since the process, usually uses decision tree to categorize parts into families. (ii) Maintenance and updating of stored process plans are largely unnecessary. Since, any plan may be quickly regenerated by processing through the tree. Indeed, many argue that with generable systems, process plans should not be stored since if the process is changed, and out-of-dated process plan might find its way back into the system. (iii) The process logic rules however must be maintained up to dated and ready for use. This provides the process planner with an assurance that the processes generated will reflect state-of-the-art technology.
  • 11. CAD/CAM MODULE IV AM/JA 11 Department of Mechanical Engineering, AJCE Variant or Generative, Which to Use? What CAPP approach (Variant or Generative) is better? This question has been constantly asked but, there is no definite answer to it. Generally speaking, a variant system is better for manufacturing setting where similar parts are manufactured repetitively. Because parts are similar, Group Technology can easily be implemented and shows quick and significant return on investment (ROI). Because similar parts are produced repetitively, process plan can be retrieved, slightly modified and used, without going through too much trouble. On the other hand, generative process planning is better suited for a manufacturing environment in which part does not exhibit too much similarity and new part are introduced on a regular basis. In this case, benefits cannot be gained from Group Technology due to dissimilarity of parts. Because, new parts are regularly introduced, historical data does not have too much value to the process planner. However, aforementioned approach is a rough guideline for selecting the appropriate CAPP approach.
  • 12. CAD/CAM MODULE IV AM/JA 12 Department of Mechanical Engineering, AJCE GROUP TECHNOLOGY Group technology is a manufacturing philosophy in which similar parts are identified and grouped together to take advantage of their similarities in manufacturing and design. Similar parts are arranged into part families. Each family would possess similar design and manufacturing characteristics. Hence processing of each member of a given family would be similar and this results in manufacturing efficiencies. These efficiencies are achieved in the form of reduced set-up times, lower in-process inventories, better scheduling, improved tool control and the use of standardized process plans. The design retrieval system is a manifestation of group technology principle applied to the design function. To implement such a system some form of parts classification and coding is required. Part classification and coding is concerned with identifying the similarities among parts and relating these similarities to a coding system. Part similarities are of three types: i. Design attributes (such as geometric shape and size) ii. Manufacturing attributes (sequence of processing steps required to make the part) iii. Design and manufacturing attributes (combination of the design and manufacturing attributes) When implementing a parts classification and coding system most companies elect to purchase a commercially available package rather than develop their own. The following factors are considered in selecting a parts coding and classification system:  Objective  Scope and application  Costs and time  Adaptability to other systems  Management problems Overview of Group Technology (GT)  Parts in the medium production quantity range are usually made in batches  Disadvantages of batch production:  Downtime for changeovers  High inventory carrying costs  GT minimizes these disadvantages by recognizing that although the parts are different, there  are groups of parts that possess similarities
  • 13. CAD/CAM MODULE IV AM/JA 13 Department of Mechanical Engineering, AJCE  GT exploits the part similarities by utilizing similar processes and tooling to produce them  GT can be implemented by manual or automated techniques  When automated, the term flexible manufacturing system is often applied Group Technology Defined  An approach to manufacturing in which similar parts are identified and grouped together in order to take advantage of their similarities in design and production  Similarities among parts permit them to be classified into part families  In each part family, processing steps are similar  The improvement is typically achieved by organizing the production facilities into  manufacturing cells that specialize in production of certain part families Part Family  A group of parts that possess similarities in geometric shape and size, or in the processing steps  used in their manufacture  Part families are a central feature of group technology  There are always differences among parts in a family  But the similarities are close enough that the parts can be grouped into the same family MANUFACTURINGRESOURCE,GROUPS ANDTHEIRCHARACTERISTICS Following are the six characteristics for effective grouping 1. The Team. Groups contain a specified team of workers who solely or generally form the group. 2. Product. Groups produce a specified family or set of products. In an assembly department, the products are assembled. In a machine shop these products will be machine parts e.g. in foundry products will be casting. 3. Facilities. Groups are equipped with a specified set of machines and/or other production equipment, which are used solely or generally in group. 4. Group layout. The facilities are laid out together in one area reserved for the group. 5. Independence. The group should, as far as possible, be independent of each other. 6. Size. The group should be limited to restrict the number of workers per group of 6 to 15 workers has been widely recommended. Larger group up to 35 workers may be necessary for technology reasons in some cases. GROUPING PARTS INTO FAMILIES The biggest single obstacle in changing over to group technology from a traditional shop is the problem of grouping parts into families. There are three general methods for solving this problem. All the three methods are time consuming and involve the analysis of much data by properly trained personnel. The methods are (i) Visual inspection (ii) Production flow analysis (PFA) (iii) Component classification and coding system (a) By design features (b) By production features (i) Visual Inspection. The visual inspection method is the least sophisticated and least expensive method. It involves the classification of parts into families by looking at either the physical parts or photographs and arranging them into similar groupings. This method is generally considered to be the least accurate of the three.
  • 14. CAD/CAM MODULE IV AM/JA 14 Department of Mechanical Engineering, AJCE (ii) Production Flow Analysis (11 FA). Production flow analysis (PFA) method, was developed by J.L. Burbidge. PFA is a method of indentifying part families and associated machine tool groupings by analyzing the route sheets for parts produced in a given shop. It groups together the parts that have similar operation sequences and machine routings. The disadvantage of PFA is that it accepts the validity of existing route sheets, with no consideration given to whether these process plans are logical or consistent.
  • 15. CAD/CAM MODULE IV AM/JA 15 Department of Mechanical Engineering, AJCE The classical GT cell allows parts to move from any machine to any other machine. Flow is not Unidirectional. However, since machines are located in close proximity short and fast transfer is possible. The GT center may be appropriate when large machines have already been located and cannot be moved, or product mix and part families are dynamic and would require frequent relayout. Then, machines may be located as in a process layout by using functional departments (job shops), but each machine is dedicated to producing only certain Part families. This way, only the tooling and control advantages of GT can be achieved. Compared to a GT cell layout, increased material handling is necessary. (iii) Components classification and coding system. This method is the most time con- suming and complicated of the three methods. However, it is the most frequently applied method and is generally recognised to be the most powerful of the three. This method of grouping parts into families involves an examinations of the individual design and/or manufacturing attributes of each part. The attributes of the parts are uniquely identified by means of a code number. This classification and coding may be carried out on the entire list of active parts of the firm, or a sampling process may be used to establish the part families. Many parts classification and coding system have been developed throughout the world, and there are several commercially available packages being sold to industrial concerns. It should be noted that none of them has been universally adopted. One of the reason for this is that a classification and coding system should be custom - engineered for a given company or industry. One system may be best for one company while another system is more suited to another company. (a) The Opitz Classification System. This classification and coding system for parts was developed by H. Opitz of the University of Aachen in West Germany. It represents one of the pioneering efforts in the GT area and is perhaps the best known of the classification and coding schemes. The Opitz coding system has the following digit sequence :
  • 16. CAD/CAM MODULE IV AM/JA 16 Department of Mechanical Engineering, AJCE The basic code consists of 9 digit, which can be extended by adding four more digits. The first nine digits are intended to convey both design and manufacturing data. The first five digits, 12345, are called the "Form Code" and describe the primary design attribute of the part. The next four digits, 6789, constitute the "Supplementary Code". It indicates some of the at¬tribute that would be of use to manufacturing (Dimensions. Work Material, Starting Raw Work Piece Shape and Accuracy).The extra four digits. ABCD are referred to as the "Secondary Code" and are intended to identify the production operation type and sequence. The secondary code can be designed by the firm to serve its own particular needs.
  • 17. CAD/CAM MODULE IV AM/JA 17 Department of Mechanical Engineering, AJCE
  • 18. CAD/CAM MODULE IV AM/JA 18 Department of Mechanical Engineering, AJCE (b) The MICLASS System: MICLASS stand for Metal Institute Classification System arid was developed by TNO, the Netherland's Organisation for Applied Scientific Research. It was started in Europe in 1969. The MICLASS system was developed to help automation and standardize a number of designs, production, and management functions. These include  Standardization of engineering drawings  Retries al of drawings according to classification number  Standardization of process routing  Automated process planning  Selection of parts for processing on particular groups of machine tools  Machine tool investment analysis The MICLASS classification number can range from 12 to 30 digits. The first 12 digits are a universal code that can be applied to any part and up to 18 additional digits can be used to code data that are specific to the particular company or industry. For example, lot size, company drawing no., piece time, machine tool te be used, cost data and operation sequence might be included in the 18 supplementary digits. The work part attributes coded in the first 18 digits of the MICLASS number are as follows. One of the unique features of the MICLASS system is that parts can be coded using a computer interactively. To classify a given part design, the user responds to a series of questions asked by the computer. The number of questions depends on the complexity of the part. For a simple part, as few as seven questions are needed to classify the part. For an average part, number of questions ranges between 10 and 20. On the basis of the responses to its questions, the computer assigns a code number to the part.
  • 19. CAD/CAM MODULE IV AM/JA 19 Department of Mechanical Engineering, AJCE
  • 20. CAD/CAM MODULE IV AM/JA 20 Department of Mechanical Engineering, AJCE (c) The CODE System. The CODE system is a parts classification and coding system developed and marketed by Manufacturing Data System. Inc. (MDSI) of Ann Arbor, Michigan. Its most universal application is in design engineering for retrieval of part design data, but it also has applications in manufacturing process planning, purchasing, tool design, and inventory control. The CODE number has eight digits. For each digit there are 16 possible values (Zero through 9 and A through F) which are used to describe the part's design and manufacturing characteristics. 1st Digit indicates the basic geometry of the part and is called the major division of the CODE system. This digit would be used to specify whether the shape was a cylinder, flat piece, block, or other. The interpretation of the remaining seven digits depends on the value of first digit, but these remaining digits from a chain-type structure. Hence the CODE system possesses a hybrid structure. 2nd and 3rd Digit provide additional information concerning the basic geometry and manufacturing process for the part. 4th 5 th and 6th digits specify secondary manufacturing processes such as threads grooves, slots and so forth. 7 th and 8th Digits are used to indicate overall size of the part (e .g .Diameter and Length of the turned part) by classifying it into one of 16 size ranges for each of two dimension. Fig. 19.3.Coding a component by the CODE system. For example : Coding the component given in Fig. 19.3 is to be found out by code system and is given as under : So that the code for a given component is 13188D75 19.4.1. (i) Coding System Structure. Parts coding scheme consists of a sequence of symbols that identify the part's design and/or manufacturing attributes. The symbols in the code can be all numeric,
  • 21. CAD/CAM MODULE IV AM/JA 21 Department of Mechanical Engineering, AJCE all alphabetic, or a combination of both types. However, most of the classification and coding system use number digits only. There are three basics code structures used in GT application: (a) Hierarchical Code Structure (b) Poly Code Structure (c) Hybrid Code Structure, a combination of hierarchical and polycode structures known as decision - Tree coding. (a) Hierarchical Code Structure. With the hierarchical structure, the interpretation of each succeeding symbol depends on the value of the preceding symbols. Other names commonly used for this structure are monocode and tree structure. The hierarchical code provides a relatively compact structure which conveys much information about the part in a limited number of digits. (b) Poly Code Structure. In the poly code structure, the interpretation of each symbol in the sequence is fixed and does not depend on the value of preceding digits. Another name commonly given to this structure is chain type structure. The problem associated with poly code is that they tend to be relatively long. On the other hand, the use of a polycode allows for convenient identification of specific part attributes. This can be helpful in recognizing parts with similar processing requirements. To illustrate the difference between the hierarchical structure and chain-type structure, consider a two- digit code, such as 15 or 25. Suppose that the first digit stands for the general part shape. The symbol, 1 means round work part and 2 means flat rectangular geometry. In a hierarchical code structure, the interpretation of the second digit would depend on the value of first digit. If, preceded by 1, the 5 might indicate some length/diameter ratio, and by 2, the 5 might be interpreted to specify some overall length. In the chain-type code structure, the symbol 5 would be interpreted the same way regardless of the value of the first digit. For example, it might indicate overall part length, or whether the part is rotational or rectangular. (c) Decision - Tree Codes. Most of the commercial parts coding system used in industry are a combination of two pure structures. The hybrid structure is an attempt to achieve the best features of monocodes and polycodes. Within each of these shorter chains, the digits are independent, but one or more symbols in the complete code number are used to classify the part population into groups, as in the hierarchical structure. This hybrid coding seems to best serve the needs of both design and production. Part Design Attributes  Major dimensions  Basic external shape  Basic internal shape  Length/diameter ratio  Material type  Part function  Tolerances  Surface finish
  • 22. CAD/CAM MODULE IV AM/JA 22 Department of Mechanical Engineering, AJCE Part Manufacturing Attributes  Major process  Operation sequence  Batch size  Annual production  Machine tools  Cutting tools  Material type Benefits of Group Technology  Standardization of tooling, fixtures, and setups is encouraged  Material handling is reduced  Parts are moved within a machine cell rather than entire factory  Process planning and production scheduling are simplified  Work-in-process and manufacturing lead time are reduced  Improved worker satisfaction in a GT cell  Higher quality work Problems in Group Technology  Identifying the part families (the biggest problem)  If the plant makes 10,000 different parts, reviewing all of the part drawings and grouping  the parts into families is a substantial task  Rearranging production machines in the plant into the appropriate machine cells  It takes time to plan and accomplish this rearrangement, and the machines are not  producing during the changeover Artificial Intelligence in Process Planning Artificial Intelligence Artificial Intelligence (AI) is the area of computer science focusing on creating machines that can engage on behaviors that humans consider intelligent. The ability to create intelligent machines has intrigued humans since ancient times, and today with the advent of the computer and 50 years of research into AI programming techniques, the dream of smart machines is becoming a reality. Researchers are creating systems which can mimic human thought, understand speech, beat the best human chessplayer, and countless other feats never before possible. Find out how the military is applying AI logic to its hi-tech systems, and how in the near future Artificial Intelligence may impact our lives. AI textbooks define the field as "the study and design of intelligent agents" where an intelligent agent is a system that perceives its environment and takes actions that maximize its chances of success. John McCarthy, who coined the term in 1956, defines it as "the science and engineering of making intelligent machines." Artificial intelligence takes the intelligence of humans, such as perception, natural language processing, problem solving and planning,
  • 23. CAD/CAM MODULE IV AM/JA 23 Department of Mechanical Engineering, AJCE learning and adaptation, and acting on the environment and applies them with machines, systems, and virtual objects. Use of AI in PP The use of artificial intelligence has proved to be beneficial in various areas since the mid- 1960s. Recently, more and more studies on AI applications to manufacturing systems have been reported. Process planning is one of the areas to which artificial intelligence can be successfully applied. AI techniques which may have a substantial influence on process planning include: Natural language processing Voice/speech recognition Pattern recognition and Expert systems Natural Language Processing Formal communication between users and computers is designed to be more considerate of computers than humans. Users must enter data in a pre-defined, rigid format without any flexibility. Therefore even a minor error in data entry may lead to a confusing result. Natural language processors have been developed to solve this problem, by allowing humans to communicate with computers in formal English. Natural language understanding could be applied to both variant and generative process planning systems. In a variant system, a natural language interface would be convenient to the user in entering, retrieving and editing the data and process plans. For instance, a user may request: • Give me all the parts in part family 1. • What are those parts in part family 1? • List all the parts which belong to part family 1. The computer should be able to interpret these lexically different sentences as having the same meaning. As to a generative system, although in the long run the shape, tolerance, and surface finish for a part can be directed from a CAD's database, it would be advantageous if the user could enter the required data in English. Pattern Recognition Pattern recognition is another AI technique that can contribute to process planning. One can use this technique to design a pattern-directed expert system[29], or apply it to design an interface scheme to communicate with a CAD's database such that the computer can access the position, the dimension and machining requirements of each shape entity in order to recognise the work piece that it is going to plan. Several different schemes are being used to resolve the pattern recognition problem. Algorithms have been developed which can construct a 3D object from 2D drawings under certain assumptions. These algorithms, however, work well only within narrow ranges; there is no universal algorithm to resolve this type of problem.
  • 24. CAD/CAM MODULE IV AM/JA 24 Department of Mechanical Engineering, AJCE Speech/Voice Recognition Speech recognition, also known as voice data entry, involves translating spoken languages into machine-readable forms[30]. Because speech is the natural method of communication amongst human beings, the use of speech I/O technology at the man-machine interface accommodates the machine to the user rather than forcing the user to conform to the computer. Therefore, voice recognition will very probably surpass mouse interface and CRT usage in the near future. Process planning would then benefit more from this technique than from natural language processing. Expert Systems Expert systems are probably the most promising AI technique for process planners. An expert system gains its name from the fact that the system contains massive domain-specific knowledge designed to successfully solve problems in a field which would normally be thought of as requiring a human expert. An expert system approach is ideally suited to[31]: • ill-structured problems; • problems which can be formulated analytically but for which the number of alternative solutions is large; • situations where the domain knowledge is vast and relevant knowledge must be used selectively; • problems where the solution is related to human expertise. An ideal process planning expert system should be equipped with domain knowledge such that it can behave like an experienced process planner in preparing plans. Expert Systems Approach to Process Planning Early research in APP has provided a basic structure for process planning analysis. However, an expert system technique may replace traditional approaches for the following reasons: (1) Various factors influence process selection and sequencing; currently, it is not obvious what all of these factors are, nor what their effects might be. (2) During the development of an APP system, it would be necessary to make extensive modification of the facts and decision logic. This can be done more easily in an expert system structure than in a conventional program. (3) Decision trees and decision tables, as usually used in a traditional generative APP system, work effectively only for simple processes. If one wants a fully automated process planning function, intelligent reasoning must be performed. (4) Expert process planning systems can be designed to accumulate knowledge as time goes by, which is more appropriate for a process planning function that requires considerable experiential knowledge.
  • 25. CAD/CAM MODULE IV AM/JA 25 Department of Mechanical Engineering, AJCE Ideally, an expert system, able to emulate human thinking, reasoning, and behavior, should consist of most of the following components : • a language processor that manages user-system inferences; • domain-related facts; • domain-related rules for drawing inferences; • an interpreter that controls and executes the rules; • a justifier that explains the system's action or reasoning; • a consistency enforcer that maintains a consistent representation of the emerging solution; • a scheduler that arranges the order of rules to be executed; • a blackboard or working space where intermediate hypotheses and decision making that the system manipulates can be stored. The actual system architecture depends on the special needs of each application arena. For example, in order to design a perfect APP system, a CAD database, a machining database, a CAD interpreter, and a process plan generator should be included in the system. A conceptual framework for designing such an expert system for process planning purposes is given in Figure F, where: • a CAD interpreter extracts geometric data from a CAD data base; • a machining database is used to store the machine tool and tooling information; • domain-specific facts and rules are stored in a knowledge base; • an inference/control module serves as the mechanism to interpret, schedule
  • 26. CAD/CAM MODULE IV AM/JA 26 Department of Mechanical Engineering, AJCE and resolve conflicts among candidate rules; and • a queries/answers processor manages the interaction between users and the system. For a computer to emulate human experience and access domain-specific facts, the experts' knowledge and facts must be extracted, represented and organized in a specific format that the computer can recognize. One of the popular representing methods is production rule or production system. The basic idea of production systems is that the database (or rule base) consists of rules, called productions, in the form of IF-THEN or CONDITION-ACTION pairs. Three components are normally required for a product system: • rule bases, which are a set of productions; • context; a short-term memory buffer-like data structure, which is to be matched by the left-hand side of productions; and • inference engine (or interpreter), which controls the system's activities. Figure F A typical system built according to the above framework, using a rule-based approach, should be able to function as follows: (1) Knowledge is extracted from experienced process planners and stored in a rule base in CONDITION-ACTION pairs. (2) When one starts the system, the control program will first examine the left-hand side of a rule. If the condition matches the input, the right-hand side of this rule is triggered, i.e. put
  • 27. CAD/CAM MODULE IV AM/JA 27 Department of Mechanical Engineering, AJCE into action. At the same time, this piece of action is accumulated with inputs and the condition-match procedure continues. (3) The inference terminates whenever a satisfactory result (succeeded) or a conflict (failed) is generated. (4) A process plan based on the successful result is prepared and displayed (or printed). Process Planning Software Programming Language The choice of language for expert systems, although not as critical as other issues because of the variety of programming languages available [37], should not be neglected. At the lowest level, an expert system can be programmed in a high-level programming language, such as FORTRAN, PASCAL, BASIC or C. A builder using this type of tool must write everything from scratch which is very time consuming; however, some sort of flexibility is retained. At the other extreme, an expert system can be built via an environment called an expert system shell (EMYCIN and OPS5 are examples). This type of tool, which has blocks or subroutines built in internally, can save time for the system builder, but does not offer much flexibility for selection. Their functions are normally limited to certain specific systems that can be constructed. At the middle of the range are those AI-oriented languages such as LISP or PROLOG, which usually provide the logic for facilitating the tasks of acquiring knowledge and building an inference engine. Many early expert systems were constructed using this type of language. Among the existing expert APP systems, GARI uses LISP, and SIPP and AGMPO utilize PROLOG. TOM and EXCAP are coded in PASCAL, and the system used by Preiss and Kaplansky is written in FORTRAN 77. Manufacturing Software: Scheduling & Production Planning The PIMSS production software toolset provides advanced planning and optimization functionality, including manufacturing capacity planning, master production scheduling and factory scheduling: Production Planning Systems manufacturing software - factory planning systems - production scheduler Advanced Manufacturing Planning real-time production planning system - JIT manufacturing planning Production Capacity Planning master schedule - capacity planning - batch scheduling - capacity planner Material Planning & MRP material planning - MRP systems - production order scheduling Strategic Production System strategic optimization - production schedule analysis - plant planning
  • 28. CAD/CAM MODULE IV AM/JA 28 Department of Mechanical Engineering, AJCE Lean Manufacturing Software manufacturing ERP software - factory & production optimization PIMSS (Process Industry Manufacturing Scheduling System) offers an integrated solution spanning the manufacturing supply chain, ranging from long term strategic optimization to real-time manufacturing scheduling. PIMSS is the fastest production scheduler on the market and is capable of automatically planning and optimizing very large manufacturing operations in seconds. Its flexibility enables it to model highly complex production processes accurately without the need for approximation or compromise on performance. PIMSS maintains high customer service levels while minimizing inventory and maximizing manufacturing efficiency. PIMSS is designed for manufacturing operations that process 1000s of products in an environment where minimizing changeovers and balancing resource usage are vital. MJC²'s advanced manufacturing software is particularly applicable to operations which produce short shelf-life or fast-turnover goods against a backdrop of tight order fulfillment windows and increased demand for flexibility from the customer. The PIMSS production planning software takes into account:  Demands & orders: actual or forecast orders by customer and due date(s); branded & own label volumes;  Ideal stock levels: taken as a constraint or calculated by the production system;  Materials planning: raw materials planning requirements, as a constraint or calculated by PIMSS;  Labour planning: shift patterns, break cover, rosters, skills, teams, working time constraints, cost calculation;  Process capacities: by product/type, machines & packing/bottling areas, plant scheduling constraints;  Machine routing: links to secondary processes, fixed production order scheduling, product scheduling sequences;  Work in progress: intermediate products, core blends, inter-factory, on-line/off-line packing, assembly planning;  Master scheduling: batch planning, master production schedule constraints (color, formers, moulds, etc.);  Factory scheduling constraints: product mix changes, plan size, pack size, packaging material, product type, etc. MJC²- Process Planning & Optimization MJC²'s process planning software is designed for large production and manufacturing operations which need to manage complex processing lines and facilities. Our manufacturing process optimization tools include:  Advanced process control software: real-time planning of manufacturing operations taking account of feedback from production control (e.g. SCADA), process automation software and inventory management systems.
  • 29. CAD/CAM MODULE IV AM/JA 29 Department of Mechanical Engineering, AJCE  Process planning tools: automated scheduling of manufacturing lines and factories, keeping stock levels within defined limits while optimizing production capacity and throughput.  Capacity planning: strategic forward planning of production and related process control to assess long-term throughput and availability profiles along the supply chain.  Process scheduling: modelling and production process optimization to improve efficiency and customer service levels. Our process control software is applicable to all large manufacturing operations, particularly those which produce high-turnover or short shelf life goods. The planning tools can model complex multi-stage (and multi-site) automated processes and inter-linking lines. Aras Solutions | Manufacturing Process Planning Aras Manufacturing Process Planning ensures information accuracy and quality for manufacturing processes by providing a reliable, single version of the truth in a secure, online location. Users throughout Engineering, Production Control, Manufacturing and Quality rely on Aras as the source of official, released information about production processes and related technical data. Manufacturing Process Planning:  Automates and manages all the information and processes required to manufacture parts, assemble final products and conduct product quality inspections  Provides revision and version control of manufacturing process plans, production routing, product descriptions, operation sequencing, tooling assets, and set-up and run-time instructions  Ensures the accuracy of Lean Six Sigma methods and integrates with ERP systems for business analytics and more SMARTer Manager's SMARTer Manager offers a wide range of capabilities and a more complete manufacturing management software solution than any other manufacturing software technology. Unparalleled functionality at a fraction of the cost and the ability to implement, execute and operate across any manufacturing enterprise with one single solution. SMARTer Manager's innovative applications are completely scalable for job shops or larger product oriented organizations. Reference: 1. Principles of Automation and Advanced Manufacturing Systems- Dr. K.C. Jain 2. CAD/CAM-Concepts and Applications- Chennakesava R. Alavala 3. CAD/CAM- M Groover, E. Zinners 4. Computer Aided Manufacturing-P.N Rao, N.K. Tewari, T.K. Kundra 5. CAD/CAM-P.N Rao