SlideShare a Scribd company logo
1 of 4
COMPUTER- GENERATED TIME
STANDARDS
PREPARED BY
B.VENU M.Tech
ASST.PROFESSOR,MeRITS
• Work measurement can be defined as the development of a time
standard to indicate the value of a work task.
• According to a survey conducted by industrial engineering magazine
and patton consultants, inc., 95% of the manufacturing firms
responding to the survey use work measurement.
• There are various purposes for which work measurement is used.
Among these are:
 Wage incentives
 Estimating and job costing
 Production scheduling and capacity planning
 Measurement of worker performance
• The techniques used to determine time standards in
manufacturing include the following:
 Direct time study
 The use of standard data
 Predetermined time standard systems
 Estimates based on previous experience
 Work sampling
• Advantages of computerized time standard
systems:
 Reduction in time required by the time study analyst to set the
standard.
 Greater accuracy and uniformity in the time standards.
 Ease of maintaining the methods and standards file when
engineering and methods changes occur.
 Elimination of the controversial performance rating step.
 Time standards can often be set before the job gets into
production.
 Improved manufacturing data base for PP, Scheduling, Forecasting
labor requirements, tool control, and so on.

More Related Content

What's hot

Computer Aided Process Planning (CAPP)
Computer Aided Process Planning (CAPP)Computer Aided Process Planning (CAPP)
Computer Aided Process Planning (CAPP)Pratik Gandhi
 
Group technology
Group technologyGroup technology
Group technologyjntuhcej
 
Numerical control machines tool
Numerical control machines toolNumerical control machines tool
Numerical control machines tooljntuhcej
 
CNC part programming
CNC part programmingCNC part programming
CNC part programmingjntuhcej
 
Group Technology, coding and cell design
Group Technology, coding and cell designGroup Technology, coding and cell design
Group Technology, coding and cell designNauman khan
 
Flexible manufacturing systems (FMS)
Flexible manufacturing systems (FMS)Flexible manufacturing systems (FMS)
Flexible manufacturing systems (FMS)jntuhcej
 
CNC Turning and Milling centres
CNC Turning and Milling centresCNC Turning and Milling centres
CNC Turning and Milling centresAchyuth Padmanabh
 
GROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPPGROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPPmanimaran m
 
Computer application for testing (contact and non-contact)
Computer application for testing (contact and non-contact)Computer application for testing (contact and non-contact)
Computer application for testing (contact and non-contact)Ghassan Alshahiri
 
Numerical control machines
Numerical control machines Numerical control machines
Numerical control machines jntuhcej
 
Computer Aided Process Planning (CAPP)
Computer Aided Process Planning (CAPP)Computer Aided Process Planning (CAPP)
Computer Aided Process Planning (CAPP)Bhushan Tawade
 
Geometric modeling111431635 geometric-modeling-glad (1)
Geometric modeling111431635 geometric-modeling-glad (1)Geometric modeling111431635 geometric-modeling-glad (1)
Geometric modeling111431635 geometric-modeling-glad (1)manojg1990
 
CIM Computer Integrated Manufacturing
CIM Computer Integrated ManufacturingCIM Computer Integrated Manufacturing
CIM Computer Integrated ManufacturingTanuVerma39
 
DNC machines tools
DNC machines toolsDNC machines tools
DNC machines toolsjntuhcej
 
Cnc axis and motion nomenclature
Cnc axis and motion nomenclatureCnc axis and motion nomenclature
Cnc axis and motion nomenclaturemeet shah
 

What's hot (20)

Computer Aided Process Planning (CAPP)
Computer Aided Process Planning (CAPP)Computer Aided Process Planning (CAPP)
Computer Aided Process Planning (CAPP)
 
Group technology
Group technologyGroup technology
Group technology
 
Numerical control machines tool
Numerical control machines toolNumerical control machines tool
Numerical control machines tool
 
CNC part programming
CNC part programmingCNC part programming
CNC part programming
 
Group Technology, coding and cell design
Group Technology, coding and cell designGroup Technology, coding and cell design
Group Technology, coding and cell design
 
Flexible manufacturing systems (FMS)
Flexible manufacturing systems (FMS)Flexible manufacturing systems (FMS)
Flexible manufacturing systems (FMS)
 
Unit 2.1 cim
Unit 2.1 cimUnit 2.1 cim
Unit 2.1 cim
 
CNC Turning and Milling centres
CNC Turning and Milling centresCNC Turning and Milling centres
CNC Turning and Milling centres
 
GROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPPGROUP TECHNOLOGY AND CAPP
GROUP TECHNOLOGY AND CAPP
 
Numeric control
Numeric controlNumeric control
Numeric control
 
Computer application for testing (contact and non-contact)
Computer application for testing (contact and non-contact)Computer application for testing (contact and non-contact)
Computer application for testing (contact and non-contact)
 
Numerical control machines
Numerical control machines Numerical control machines
Numerical control machines
 
CNC Machines and its Components
CNC Machines and its ComponentsCNC Machines and its Components
CNC Machines and its Components
 
Cnc feed drives
Cnc feed drivesCnc feed drives
Cnc feed drives
 
Introduction to CAD/CAM
Introduction to CAD/CAMIntroduction to CAD/CAM
Introduction to CAD/CAM
 
Computer Aided Process Planning (CAPP)
Computer Aided Process Planning (CAPP)Computer Aided Process Planning (CAPP)
Computer Aided Process Planning (CAPP)
 
Geometric modeling111431635 geometric-modeling-glad (1)
Geometric modeling111431635 geometric-modeling-glad (1)Geometric modeling111431635 geometric-modeling-glad (1)
Geometric modeling111431635 geometric-modeling-glad (1)
 
CIM Computer Integrated Manufacturing
CIM Computer Integrated ManufacturingCIM Computer Integrated Manufacturing
CIM Computer Integrated Manufacturing
 
DNC machines tools
DNC machines toolsDNC machines tools
DNC machines tools
 
Cnc axis and motion nomenclature
Cnc axis and motion nomenclatureCnc axis and motion nomenclature
Cnc axis and motion nomenclature
 

Similar to Computer generated time standards

Introduction to Work Study .ppt
Introduction to Work Study  .pptIntroduction to Work Study  .ppt
Introduction to Work Study .pptAryaRukmana1
 
10 Reasons Why We Need I.E Department In A Garment Factory
10 Reasons Why We Need I.E Department In A Garment Factory10 Reasons Why We Need I.E Department In A Garment Factory
10 Reasons Why We Need I.E Department In A Garment FactoryThreadSol
 
Quality By Design Total Quality Management
Quality By Design Total Quality ManagementQuality By Design Total Quality Management
Quality By Design Total Quality ManagementBint E Asif
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & ControlKunalJagtap5
 
Time and Motion Study
Time and Motion StudyTime and Motion Study
Time and Motion Studylearnito
 
MIn-218_chap 1.pptx
MIn-218_chap 1.pptxMIn-218_chap 1.pptx
MIn-218_chap 1.pptxArpanKumar79
 
Using eam to avoid the consequences of missing preventative maintenance
Using eam to avoid the consequences of missing preventative maintenanceUsing eam to avoid the consequences of missing preventative maintenance
Using eam to avoid the consequences of missing preventative maintenanceProjetech
 
Using Maximo EAM to Avoid the Consequences of Missing PM Work
Using Maximo EAM to Avoid the Consequences of Missing PM WorkUsing Maximo EAM to Avoid the Consequences of Missing PM Work
Using Maximo EAM to Avoid the Consequences of Missing PM WorkJacquie (Keith) Chischillie
 
Miliken Performance system.pdf
Miliken Performance system.pdfMiliken Performance system.pdf
Miliken Performance system.pdfEkoSarwono5
 
Pranshu Resume (Jan16)
Pranshu Resume (Jan16)Pranshu Resume (Jan16)
Pranshu Resume (Jan16)Pranshu Negi
 

Similar to Computer generated time standards (20)

Workstudy
WorkstudyWorkstudy
Workstudy
 
Workstudy
WorkstudyWorkstudy
Workstudy
 
Engineering
EngineeringEngineering
Engineering
 
Approach Plant Startup 11302007
Approach Plant Startup 11302007Approach Plant Startup 11302007
Approach Plant Startup 11302007
 
Introduction to Work Study .ppt
Introduction to Work Study  .pptIntroduction to Work Study  .ppt
Introduction to Work Study .ppt
 
Standard
StandardStandard
Standard
 
Resume
ResumeResume
Resume
 
10 Reasons Why We Need I.E Department In A Garment Factory
10 Reasons Why We Need I.E Department In A Garment Factory10 Reasons Why We Need I.E Department In A Garment Factory
10 Reasons Why We Need I.E Department In A Garment Factory
 
Quality By Design Total Quality Management
Quality By Design Total Quality ManagementQuality By Design Total Quality Management
Quality By Design Total Quality Management
 
Production Planning & Control
Production Planning & ControlProduction Planning & Control
Production Planning & Control
 
Time and Motion Study
Time and Motion StudyTime and Motion Study
Time and Motion Study
 
Unit 1 cim
Unit 1 cimUnit 1 cim
Unit 1 cim
 
MIn-218_chap 1.pptx
MIn-218_chap 1.pptxMIn-218_chap 1.pptx
MIn-218_chap 1.pptx
 
Bhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.EngBhattacharyya_Keya-Elec.Eng
Bhattacharyya_Keya-Elec.Eng
 
CV Mohan
CV MohanCV Mohan
CV Mohan
 
Using eam to avoid the consequences of missing preventative maintenance
Using eam to avoid the consequences of missing preventative maintenanceUsing eam to avoid the consequences of missing preventative maintenance
Using eam to avoid the consequences of missing preventative maintenance
 
Using Maximo EAM to Avoid the Consequences of Missing PM Work
Using Maximo EAM to Avoid the Consequences of Missing PM WorkUsing Maximo EAM to Avoid the Consequences of Missing PM Work
Using Maximo EAM to Avoid the Consequences of Missing PM Work
 
Miliken Performance system.pdf
Miliken Performance system.pdfMiliken Performance system.pdf
Miliken Performance system.pdf
 
Pranshu Resume (Jan16)
Pranshu Resume (Jan16)Pranshu Resume (Jan16)
Pranshu Resume (Jan16)
 
Mfg process management
Mfg process managementMfg process management
Mfg process management
 

Recently uploaded

UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxkalpana413121
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...ronahami
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelDrAjayKumarYadav4
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesChandrakantDivate1
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxMustafa Ahmed
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdfKamal Acharya
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxNANDHAKUMARA10
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwaitjaanualu31
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 

Recently uploaded (20)

UNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptxUNIT 4 PTRP final Convergence in probability.pptx
UNIT 4 PTRP final Convergence in probability.pptx
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Path loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata ModelPath loss model, OKUMURA Model, Hata Model
Path loss model, OKUMURA Model, Hata Model
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
Computer Graphics Introduction To Curves
Computer Graphics Introduction To CurvesComputer Graphics Introduction To Curves
Computer Graphics Introduction To Curves
 
Augmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptxAugmented Reality (AR) with Augin Software.pptx
Augmented Reality (AR) with Augin Software.pptx
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
Post office management system project ..pdf
Post office management system project ..pdfPost office management system project ..pdf
Post office management system project ..pdf
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills KuwaitKuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
Kuwait City MTP kit ((+919101817206)) Buy Abortion Pills Kuwait
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 

Computer generated time standards

  • 1. COMPUTER- GENERATED TIME STANDARDS PREPARED BY B.VENU M.Tech ASST.PROFESSOR,MeRITS
  • 2. • Work measurement can be defined as the development of a time standard to indicate the value of a work task. • According to a survey conducted by industrial engineering magazine and patton consultants, inc., 95% of the manufacturing firms responding to the survey use work measurement. • There are various purposes for which work measurement is used. Among these are:  Wage incentives  Estimating and job costing  Production scheduling and capacity planning  Measurement of worker performance
  • 3. • The techniques used to determine time standards in manufacturing include the following:  Direct time study  The use of standard data  Predetermined time standard systems  Estimates based on previous experience  Work sampling
  • 4. • Advantages of computerized time standard systems:  Reduction in time required by the time study analyst to set the standard.  Greater accuracy and uniformity in the time standards.  Ease of maintaining the methods and standards file when engineering and methods changes occur.  Elimination of the controversial performance rating step.  Time standards can often be set before the job gets into production.  Improved manufacturing data base for PP, Scheduling, Forecasting labor requirements, tool control, and so on.