CONSTRUCTION SAFETY PART II
AVINASH KUMAR GUPTA
EE (TRANING)
CCW
SCAFFOLDING
• Temporary structures to support platforms as a
workplace/storage of materials.
• prevent fall of workers and materials.
• Properly constructed of sound material of
adequate strength to support weight and stress.
• Securely anchored and stable
• Erected ,altered or dismantled by competent
persons
• Inspected at least once a week , written report of
inspection to be kept.
Independent tied scaffolds
An independent tied scaffold which does not rely on the building for its
strength. It has inner and outer rows of uprights or standards
Independent tied scaffolds
• It must be tied to the building but does not rely
on its strength.
• Consists of uprights/standards, ledgers( parallel
to building),and transoms(90degree to building
face)
• Uprights be placed on firm and level ground, base
plates should rest on timber sole boards. Never
use bricks, broken paving stones.
• Uprights to be equidistant, ledgers to be fixed
inside ,joints in ledgers to be staggered.
transoms on top of ledgers
continued
• For 38 mm boards ,transoms to be so spaced
that no scaffold board overlaps more than
150mm or less than 50 mm.
• Ledgers and transoms should not project
beyond the outline of scaffold to cause danger
to pedestrian or passing vehicles.
• Bracing is essential to stiffen the scaffold.
• Removing of bracing only within one lift if
required for passage of workers.
TIES
• Scaffold is to be tied to building to prevent
movement /collapse.
• Area of scaffold should not be more than 32
sqm per tie.
Working platforms and gangways
• Each board should have three support to prevent
bending or sagging.
• Where the ends of board meet, transoms must
be doubled, no board overhangs four times its
thickness.
• Width of platform ,
i. 60 cm for footings
ii. 80 cm for stacking of materials
iii.110cm for supporting a trestle platform
Guard rails and toe boards
Working platform showing guard-rail and toe board with wire mesh
filling between them and the closely boarded platform
Continued
• Where fall is more than 2m provide guard rails
and toe boards
• Guard rails 90cm to 115cm , toe board 15 cm
• Prevents falling accidents
Single pole/putlog scaffold
A single pole or putlog scaffold, with a single outer row of uprights or
standards and which is partly supported by the building
• For small jobs, platform resting on horizontal putlogs fixed at 90
degree to wall.
• Flattened inner of putlog rests on the wall/holes in the wall.
Scaffold can not stand without support of structure.
• Mostly in use for brickwork.
• Base plate of upright rests on timber sole board. Sole board to
support at least 2 uprights.
• Uprights not more than 2 m apart, and 1.3 m from wall to support
5 board platform.
• distance between ledgers not more than 2 m. Distance between
putlogs not to exceed 1.5m
• Tying to building and bracing to full height is required.
• Prevent children from climbing a scaffold after close of the working
day.
Protection From falling Materials
Protection of scaffold from falling
materials – scaffold fan and debris
netting
continued
• Provide sheeting,
boarding,netting, fans or brick
guards to prevent materials
falling from the scaffold into
street or public place
DEBBIGUARD
Brickguard
• Mobile tower
scaffold-wheels
should belocked when
in use; ladder access
shouldbe inside the
tower
Mobile TOWER
Tower Scaffold
o Consists of a platform resting on horizontal ledges connected
to four uprights
o Devised for painters.
o Accident happen when tower topples over.
• Ratio of the height of the tower to the width of the base in
excessive.
• Top of working platform is overloaded.
• Ladder is placed on top of platform.
• Mobile tower is moved with persons/ materials on top of
platform.
• Tower is not tied to building.
• Access to the platform is via outside of the tower.
Tower Scaffold
o Height – ratio of Ht : base, (indoor) 4:1≯
(outdoor) 3:1≯
Static free Standing Height 12m≯
Mobile free standing 9.6≯
Tied to building 12.0m≯
o Structure –
• Vertical, single platform, firm & level base (base plates)
• Corner standards 1.2m.≮
• Caster wheels die 125mm.≮
• Wheels with locks & breaks.
• Breaks applied when stationery.
Tower Scaffold
o Platform –
• Cover on the opening with a latch.
• Handhold on cover.
• Guard rails & toe boards.
• Ladder inside.
o Movement – Never move when persons or
materials on platform.
TRESTLE SCAFFOLD
A trestle scaffold suitable
only for light work such as
cleaning or painting
Trestle Scaffold
• Light work of short duration
• Working platform 430mm inside.≮
• 1/3 of height of trestles should be above
platform.
• When working platform > 2m, provide guardrail
& toe board.
• Adequate bracing.
• Board 38mm, distance 1.35≯
• Board 5mm distance 2.45m≯
SUSPENSION SCAFFOLD
Suspended scaffold
Suspension Scaffold
- Tall buildings
- Suspended platforms (hinged/ independent)
- Cradles
- Suspended form building/ structure by means of
outriggers, tracks and parapet hooks.
Accidents
- Difficulties in getting in/ out
- In sufficient counter weight/ secured.
- Failure of ropes.
- Poor maintenance.
UNSAFE Cradles
Safe cradles
Construction safety ii

More Related Content

What's hot

Ladder Safety- Safety First!
Ladder Safety- Safety First!Ladder Safety- Safety First!
Ladder Safety- Safety First!davidhongwei
 
Construction Safety Training_Session 05_Access Equipment and Fall Protection
Construction Safety Training_Session 05_Access Equipment and Fall ProtectionConstruction Safety Training_Session 05_Access Equipment and Fall Protection
Construction Safety Training_Session 05_Access Equipment and Fall ProtectionMuizz Anibire
 
Conveyor Safety
Conveyor SafetyConveyor Safety
Conveyor Safetyvtsiri
 
Work at Height Training 3146- 23 Jan 2022
Work at Height Training 3146- 23 Jan 2022Work at Height Training 3146- 23 Jan 2022
Work at Height Training 3146- 23 Jan 2022Syed Neyaz Ahmad
 
Safe Material Handling
Safe Material Handling Safe Material Handling
Safe Material Handling Reliance
 
Work at-height-procedure-aug-2017-v1.3
Work at-height-procedure-aug-2017-v1.3Work at-height-procedure-aug-2017-v1.3
Work at-height-procedure-aug-2017-v1.3sawkariqbal
 
Construction Excavation Health and Safety Toolbox Talk
Construction Excavation Health and Safety Toolbox TalkConstruction Excavation Health and Safety Toolbox Talk
Construction Excavation Health and Safety Toolbox TalkInfinite Safety Ltd
 
Working at-height
Working at-height Working at-height
Working at-height Reliance
 
Safe work-at-heights-presentation
Safe work-at-heights-presentationSafe work-at-heights-presentation
Safe work-at-heights-presentationJulianElbu
 
SG4:10 presentation
SG4:10 presentationSG4:10 presentation
SG4:10 presentationAlan Bate
 
049 Working at Heights.ppt
049 Working at Heights.ppt049 Working at Heights.ppt
049 Working at Heights.pptPremPratap5
 
20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...Dwarika Bhushan Sharma
 

What's hot (20)

Ladder Safety- Safety First!
Ladder Safety- Safety First!Ladder Safety- Safety First!
Ladder Safety- Safety First!
 
Toolbox Talk-Working at height
Toolbox Talk-Working at height Toolbox Talk-Working at height
Toolbox Talk-Working at height
 
Construction Safety Training_Session 05_Access Equipment and Fall Protection
Construction Safety Training_Session 05_Access Equipment and Fall ProtectionConstruction Safety Training_Session 05_Access Equipment and Fall Protection
Construction Safety Training_Session 05_Access Equipment and Fall Protection
 
Conveyor Safety
Conveyor SafetyConveyor Safety
Conveyor Safety
 
Work at Height Training 3146- 23 Jan 2022
Work at Height Training 3146- 23 Jan 2022Work at Height Training 3146- 23 Jan 2022
Work at Height Training 3146- 23 Jan 2022
 
Safe Material Handling
Safe Material Handling Safe Material Handling
Safe Material Handling
 
Work at-height-procedure-aug-2017-v1.3
Work at-height-procedure-aug-2017-v1.3Work at-height-procedure-aug-2017-v1.3
Work at-height-procedure-aug-2017-v1.3
 
Construction Excavation Health and Safety Toolbox Talk
Construction Excavation Health and Safety Toolbox TalkConstruction Excavation Health and Safety Toolbox Talk
Construction Excavation Health and Safety Toolbox Talk
 
Working at-height
Working at-height Working at-height
Working at-height
 
Safe work-at-heights-presentation
Safe work-at-heights-presentationSafe work-at-heights-presentation
Safe work-at-heights-presentation
 
Mobile Scaffold Training by UAF
Mobile Scaffold Training by UAFMobile Scaffold Training by UAF
Mobile Scaffold Training by UAF
 
Lifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptxLifting Operation Safety ppt.pptx
Lifting Operation Safety ppt.pptx
 
Hot Work Permits Training by ELCOSH
Hot Work Permits Training by ELCOSHHot Work Permits Training by ELCOSH
Hot Work Permits Training by ELCOSH
 
CRANE SAFETY HANDBOOK
CRANE SAFETY HANDBOOK CRANE SAFETY HANDBOOK
CRANE SAFETY HANDBOOK
 
working at hight
working at  hightworking at  hight
working at hight
 
SG4:10 presentation
SG4:10 presentationSG4:10 presentation
SG4:10 presentation
 
049 Working at Heights.ppt
049 Working at Heights.ppt049 Working at Heights.ppt
049 Working at Heights.ppt
 
Working at height slides
Working at height slidesWorking at height slides
Working at height slides
 
20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...20 use of suspended access cradles and platforms (temporary works) risk asses...
20 use of suspended access cradles and platforms (temporary works) risk asses...
 
A fall protection
A fall protectionA fall protection
A fall protection
 

Viewers also liked

CONCRETE MIX DESIGN AS PER IS 10262:2009
 CONCRETE MIX DESIGN AS PER IS 10262:2009  CONCRETE MIX DESIGN AS PER IS 10262:2009
CONCRETE MIX DESIGN AS PER IS 10262:2009 Avinash Kumar Gupta
 
Presentation RTI ACT 2005 PART -I
Presentation RTI ACT 2005 PART -IPresentation RTI ACT 2005 PART -I
Presentation RTI ACT 2005 PART -IAvinash Kumar Gupta
 
Payments provisions in CPWD CONTRACT
Payments provisions in CPWD CONTRACTPayments provisions in CPWD CONTRACT
Payments provisions in CPWD CONTRACTAvinash Kumar Gupta
 
New Building Materials
New Building MaterialsNew Building Materials
New Building MaterialsDr K M SONI
 
Conditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIAConditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIAAvinash Kumar Gupta
 
Avoidance of waste and recycling of construction and demolition waste
Avoidance of waste and recycling of construction and demolition waste Avoidance of waste and recycling of construction and demolition waste
Avoidance of waste and recycling of construction and demolition waste Dr K M SONI
 
Safety management in construction
Safety management in construction   Safety management in construction
Safety management in construction Dr K M SONI
 
Contract Management in Civil Engineering Works
Contract Management in Civil Engineering WorksContract Management in Civil Engineering Works
Contract Management in Civil Engineering WorksDr K M SONI
 

Viewers also liked (20)

Integrity pact
Integrity pactIntegrity pact
Integrity pact
 
CONCRETE MIX DESIGN AS PER IS 10262:2009
 CONCRETE MIX DESIGN AS PER IS 10262:2009  CONCRETE MIX DESIGN AS PER IS 10262:2009
CONCRETE MIX DESIGN AS PER IS 10262:2009
 
Construction safety PART IV
Construction safety PART IVConstruction safety PART IV
Construction safety PART IV
 
Construction safety VI
Construction safety VIConstruction safety VI
Construction safety VI
 
Presentation RTI ACT 2005 PART -I
Presentation RTI ACT 2005 PART -IPresentation RTI ACT 2005 PART -I
Presentation RTI ACT 2005 PART -I
 
RTI ACT 2005 PART IV
RTI ACT 2005 PART IVRTI ACT 2005 PART IV
RTI ACT 2005 PART IV
 
RTI ACT 2005 PART-III
RTI ACT 2005 PART-IIIRTI ACT 2005 PART-III
RTI ACT 2005 PART-III
 
Use of Glass
Use of GlassUse of Glass
Use of Glass
 
Payments provisions in CPWD CONTRACT
Payments provisions in CPWD CONTRACTPayments provisions in CPWD CONTRACT
Payments provisions in CPWD CONTRACT
 
CCS CONDUCT RULES
CCS CONDUCT RULESCCS CONDUCT RULES
CCS CONDUCT RULES
 
RTI ACT 2005 PART V
RTI ACT 2005 PART VRTI ACT 2005 PART V
RTI ACT 2005 PART V
 
Construction safety v
Construction safety vConstruction safety v
Construction safety v
 
WORKS MANAGEMENT IN CPWD PART-I
WORKS MANAGEMENT IN CPWD PART-IWORKS MANAGEMENT IN CPWD PART-I
WORKS MANAGEMENT IN CPWD PART-I
 
Construction safety PART III
Construction safety PART IIIConstruction safety PART III
Construction safety PART III
 
New Building Materials
New Building MaterialsNew Building Materials
New Building Materials
 
Ready mix concrete
Ready mix concreteReady mix concrete
Ready mix concrete
 
Conditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIAConditions of CPWD contract in INDIA
Conditions of CPWD contract in INDIA
 
Avoidance of waste and recycling of construction and demolition waste
Avoidance of waste and recycling of construction and demolition waste Avoidance of waste and recycling of construction and demolition waste
Avoidance of waste and recycling of construction and demolition waste
 
Safety management in construction
Safety management in construction   Safety management in construction
Safety management in construction
 
Contract Management in Civil Engineering Works
Contract Management in Civil Engineering WorksContract Management in Civil Engineering Works
Contract Management in Civil Engineering Works
 

Similar to Construction safety ii

HSE-9523-TECSM02-Safe-Scaffolding-01 06-SEP-2022.pdf
HSE-9523-TECSM02-Safe-Scaffolding-01 06-SEP-2022.pdfHSE-9523-TECSM02-Safe-Scaffolding-01 06-SEP-2022.pdf
HSE-9523-TECSM02-Safe-Scaffolding-01 06-SEP-2022.pdfpatelalok2
 
Scaffolding by chakamba j
Scaffolding by chakamba jScaffolding by chakamba j
Scaffolding by chakamba jJohn Chakamba
 
DOC-20231115-WA0057..pdf
DOC-20231115-WA0057..pdfDOC-20231115-WA0057..pdf
DOC-20231115-WA0057..pdfrajaahmed49
 
Tutor core 01 working at height
Tutor core 01  working at heightTutor core 01  working at height
Tutor core 01 working at heightLuke D'Arcy
 
rapid walls- modular construction technology
rapid walls- modular construction technologyrapid walls- modular construction technology
rapid walls- modular construction technologyAnjith Augustine
 
Working at Hieght - Scaffold and Grating Platforms
Working at Hieght - Scaffold and Grating PlatformsWorking at Hieght - Scaffold and Grating Platforms
Working at Hieght - Scaffold and Grating PlatformsRudi Nieuwoudt
 
Building components.pptx
Building components.pptxBuilding components.pptx
Building components.pptxUjasPandya2
 
scaffolding safety.pdf
scaffolding safety.pdfscaffolding safety.pdf
scaffolding safety.pdfShahzadaGull1
 
6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTUVATSAL PATEL
 
Scaffold safety email
Scaffold safety emailScaffold safety email
Scaffold safety emailvtsiri
 
Safety while Working at Height
Safety while Working at HeightSafety while Working at Height
Safety while Working at HeightBimal Chandra Das
 

Similar to Construction safety ii (20)

HSE-9523-TECSM02-Safe-Scaffolding-01 06-SEP-2022.pdf
HSE-9523-TECSM02-Safe-Scaffolding-01 06-SEP-2022.pdfHSE-9523-TECSM02-Safe-Scaffolding-01 06-SEP-2022.pdf
HSE-9523-TECSM02-Safe-Scaffolding-01 06-SEP-2022.pdf
 
SCAFFOLDING.pptx
SCAFFOLDING.pptxSCAFFOLDING.pptx
SCAFFOLDING.pptx
 
Scaffolding by chakamba j
Scaffolding by chakamba jScaffolding by chakamba j
Scaffolding by chakamba j
 
DOC-20231115-WA0057..pdf
DOC-20231115-WA0057..pdfDOC-20231115-WA0057..pdf
DOC-20231115-WA0057..pdf
 
Stairs
StairsStairs
Stairs
 
Walking and Working Surfaces by FHMIC
Walking and Working Surfaces by FHMICWalking and Working Surfaces by FHMIC
Walking and Working Surfaces by FHMIC
 
Scaffolding safety at construction site
Scaffolding safety at construction siteScaffolding safety at construction site
Scaffolding safety at construction site
 
Scaffolding
ScaffoldingScaffolding
Scaffolding
 
Tutor core 01 working at height
Tutor core 01  working at heightTutor core 01  working at height
Tutor core 01 working at height
 
Scaffolding2. CO3.ppt
Scaffolding2. CO3.pptScaffolding2. CO3.ppt
Scaffolding2. CO3.ppt
 
rapid walls- modular construction technology
rapid walls- modular construction technologyrapid walls- modular construction technology
rapid walls- modular construction technology
 
Working at Hieght - Scaffold and Grating Platforms
Working at Hieght - Scaffold and Grating PlatformsWorking at Hieght - Scaffold and Grating Platforms
Working at Hieght - Scaffold and Grating Platforms
 
Building components.pptx
Building components.pptxBuilding components.pptx
Building components.pptx
 
scaffolding safety.pdf
scaffolding safety.pdfscaffolding safety.pdf
scaffolding safety.pdf
 
Supported Scaffold Safety
Supported Scaffold SafetySupported Scaffold Safety
Supported Scaffold Safety
 
Stairs
StairsStairs
Stairs
 
6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU6. FORMWORK (ACE) 2160601 GTU
6. FORMWORK (ACE) 2160601 GTU
 
Scaffold safety email
Scaffold safety emailScaffold safety email
Scaffold safety email
 
Safety while Working at Height
Safety while Working at HeightSafety while Working at Height
Safety while Working at Height
 
Scaffoldings
ScaffoldingsScaffoldings
Scaffoldings
 

More from Avinash Kumar Gupta

Time schedule for preparation &and completion of APAR
Time schedule for preparation &and completion of APARTime schedule for preparation &and completion of APAR
Time schedule for preparation &and completion of APARAvinash Kumar Gupta
 
Engaging consultants, service providers in govrnment part i
Engaging consultants, service providers in govrnment part iEngaging consultants, service providers in govrnment part i
Engaging consultants, service providers in govrnment part iAvinash Kumar Gupta
 
Procurement of goods , GFR provisions
Procurement of goods , GFR provisionsProcurement of goods , GFR provisions
Procurement of goods , GFR provisionsAvinash Kumar Gupta
 
Construction and repair chemicals
Construction and repair  chemicalsConstruction and repair  chemicals
Construction and repair chemicalsAvinash Kumar Gupta
 
Illustrations. repairing of structures
Illustrations. repairing of structuresIllustrations. repairing of structures
Illustrations. repairing of structuresAvinash Kumar Gupta
 
Condition survey and non destructive evalution of concrete
Condition survey and non destructive evalution of concreteCondition survey and non destructive evalution of concrete
Condition survey and non destructive evalution of concreteAvinash Kumar Gupta
 
Materials for rcc repairs and rehabilitation
Materials for rcc repairs and rehabilitationMaterials for rcc repairs and rehabilitation
Materials for rcc repairs and rehabilitationAvinash Kumar Gupta
 
Suspensions and Delays in Construction Contract
Suspensions and Delays in Construction ContractSuspensions and Delays in Construction Contract
Suspensions and Delays in Construction ContractAvinash Kumar Gupta
 
AMENDMENT IN ARBITRATION LAW IN INDIA 2016
AMENDMENT IN ARBITRATION LAW IN INDIA 2016AMENDMENT IN ARBITRATION LAW IN INDIA 2016
AMENDMENT IN ARBITRATION LAW IN INDIA 2016Avinash Kumar Gupta
 

More from Avinash Kumar Gupta (20)

Principles of natural justice
Principles of natural justicePrinciples of natural justice
Principles of natural justice
 
Time schedule for preparation &and completion of APAR
Time schedule for preparation &and completion of APARTime schedule for preparation &and completion of APAR
Time schedule for preparation &and completion of APAR
 
Orders regarding apar
Orders regarding apar Orders regarding apar
Orders regarding apar
 
APAR guidelines
APAR  guidelinesAPAR  guidelines
APAR guidelines
 
Total station
Total stationTotal station
Total station
 
GPS surveying/DIGITAL SURVEYING
GPS  surveying/DIGITAL SURVEYINGGPS  surveying/DIGITAL SURVEYING
GPS surveying/DIGITAL SURVEYING
 
Service contracts ii
Service contracts iiService contracts ii
Service contracts ii
 
Engaging consultants, service providers in govrnment part i
Engaging consultants, service providers in govrnment part iEngaging consultants, service providers in govrnment part i
Engaging consultants, service providers in govrnment part i
 
Procurement of goods , GFR provisions
Procurement of goods , GFR provisionsProcurement of goods , GFR provisions
Procurement of goods , GFR provisions
 
Procurement of services
Procurement of  servicesProcurement of  services
Procurement of services
 
GST on works contract
GST on  works contractGST on  works contract
GST on works contract
 
Soil penetration tests
Soil penetration testsSoil penetration tests
Soil penetration tests
 
Soil exploration part i
Soil exploration part  iSoil exploration part  i
Soil exploration part i
 
Construction and repair chemicals
Construction and repair  chemicalsConstruction and repair  chemicals
Construction and repair chemicals
 
Illustrations. repairing of structures
Illustrations. repairing of structuresIllustrations. repairing of structures
Illustrations. repairing of structures
 
Condition survey and non destructive evalution of concrete
Condition survey and non destructive evalution of concreteCondition survey and non destructive evalution of concrete
Condition survey and non destructive evalution of concrete
 
Materials for rcc repairs and rehabilitation
Materials for rcc repairs and rehabilitationMaterials for rcc repairs and rehabilitation
Materials for rcc repairs and rehabilitation
 
Rehabilitation methods
Rehabilitation methodsRehabilitation methods
Rehabilitation methods
 
Suspensions and Delays in Construction Contract
Suspensions and Delays in Construction ContractSuspensions and Delays in Construction Contract
Suspensions and Delays in Construction Contract
 
AMENDMENT IN ARBITRATION LAW IN INDIA 2016
AMENDMENT IN ARBITRATION LAW IN INDIA 2016AMENDMENT IN ARBITRATION LAW IN INDIA 2016
AMENDMENT IN ARBITRATION LAW IN INDIA 2016
 

Recently uploaded

Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 

Recently uploaded (20)

Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 

Construction safety ii

  • 1. CONSTRUCTION SAFETY PART II AVINASH KUMAR GUPTA EE (TRANING) CCW
  • 2. SCAFFOLDING • Temporary structures to support platforms as a workplace/storage of materials. • prevent fall of workers and materials. • Properly constructed of sound material of adequate strength to support weight and stress. • Securely anchored and stable • Erected ,altered or dismantled by competent persons • Inspected at least once a week , written report of inspection to be kept.
  • 3. Independent tied scaffolds An independent tied scaffold which does not rely on the building for its strength. It has inner and outer rows of uprights or standards
  • 4. Independent tied scaffolds • It must be tied to the building but does not rely on its strength. • Consists of uprights/standards, ledgers( parallel to building),and transoms(90degree to building face) • Uprights be placed on firm and level ground, base plates should rest on timber sole boards. Never use bricks, broken paving stones. • Uprights to be equidistant, ledgers to be fixed inside ,joints in ledgers to be staggered. transoms on top of ledgers
  • 5. continued • For 38 mm boards ,transoms to be so spaced that no scaffold board overlaps more than 150mm or less than 50 mm. • Ledgers and transoms should not project beyond the outline of scaffold to cause danger to pedestrian or passing vehicles. • Bracing is essential to stiffen the scaffold. • Removing of bracing only within one lift if required for passage of workers.
  • 6. TIES • Scaffold is to be tied to building to prevent movement /collapse. • Area of scaffold should not be more than 32 sqm per tie.
  • 7. Working platforms and gangways • Each board should have three support to prevent bending or sagging. • Where the ends of board meet, transoms must be doubled, no board overhangs four times its thickness. • Width of platform , i. 60 cm for footings ii. 80 cm for stacking of materials iii.110cm for supporting a trestle platform
  • 8. Guard rails and toe boards Working platform showing guard-rail and toe board with wire mesh filling between them and the closely boarded platform
  • 9. Continued • Where fall is more than 2m provide guard rails and toe boards • Guard rails 90cm to 115cm , toe board 15 cm • Prevents falling accidents
  • 10. Single pole/putlog scaffold A single pole or putlog scaffold, with a single outer row of uprights or standards and which is partly supported by the building
  • 11. • For small jobs, platform resting on horizontal putlogs fixed at 90 degree to wall. • Flattened inner of putlog rests on the wall/holes in the wall. Scaffold can not stand without support of structure. • Mostly in use for brickwork. • Base plate of upright rests on timber sole board. Sole board to support at least 2 uprights. • Uprights not more than 2 m apart, and 1.3 m from wall to support 5 board platform. • distance between ledgers not more than 2 m. Distance between putlogs not to exceed 1.5m • Tying to building and bracing to full height is required. • Prevent children from climbing a scaffold after close of the working day.
  • 12. Protection From falling Materials Protection of scaffold from falling materials – scaffold fan and debris netting
  • 13. continued • Provide sheeting, boarding,netting, fans or brick guards to prevent materials falling from the scaffold into street or public place
  • 16. • Mobile tower scaffold-wheels should belocked when in use; ladder access shouldbe inside the tower Mobile TOWER
  • 17. Tower Scaffold o Consists of a platform resting on horizontal ledges connected to four uprights o Devised for painters. o Accident happen when tower topples over. • Ratio of the height of the tower to the width of the base in excessive. • Top of working platform is overloaded. • Ladder is placed on top of platform. • Mobile tower is moved with persons/ materials on top of platform. • Tower is not tied to building. • Access to the platform is via outside of the tower.
  • 18. Tower Scaffold o Height – ratio of Ht : base, (indoor) 4:1≯ (outdoor) 3:1≯ Static free Standing Height 12m≯ Mobile free standing 9.6≯ Tied to building 12.0m≯ o Structure – • Vertical, single platform, firm & level base (base plates) • Corner standards 1.2m.≮ • Caster wheels die 125mm.≮ • Wheels with locks & breaks. • Breaks applied when stationery.
  • 19. Tower Scaffold o Platform – • Cover on the opening with a latch. • Handhold on cover. • Guard rails & toe boards. • Ladder inside. o Movement – Never move when persons or materials on platform.
  • 20. TRESTLE SCAFFOLD A trestle scaffold suitable only for light work such as cleaning or painting
  • 21. Trestle Scaffold • Light work of short duration • Working platform 430mm inside.≮ • 1/3 of height of trestles should be above platform. • When working platform > 2m, provide guardrail & toe board. • Adequate bracing. • Board 38mm, distance 1.35≯ • Board 5mm distance 2.45m≯
  • 24. Suspension Scaffold - Tall buildings - Suspended platforms (hinged/ independent) - Cradles - Suspended form building/ structure by means of outriggers, tracks and parapet hooks. Accidents - Difficulties in getting in/ out - In sufficient counter weight/ secured. - Failure of ropes. - Poor maintenance.