Item #11 ppt 2018 SMP Contract
1. 1
Presented By: Patrick Sullivan
Public Works Director
Item # 11
August 13, 2018
Acceptance of “Low Bid Proposal” for
2018 Street Maintenance Program
(SMP)
2. 2
• Staff seeks Council’s authorization in accepting a
low bid for the 2018 Street Maintenance Program
(SMP)
SUMMARY
3. 3
BACKGROUND INFORMATION
• The Public Works Department requested Freese and
Nichols Inc. provide engineering services in securing bids
for the 2018 SMP at a cost of $58,898.
• The bid was published in the San Antonio Express-News
on July 4th and July 14th.
4. 4
BACKGROUND INFORMATION
On July 25, 2018, the City received and opened four bids:
• Fuquay, Inc. in the amount of $991,320.20
• Oldcastle Materials in the amount of $1,021,043.84
• Lone Star Paving in the amount of $1,104,271.08
• Clark Construction in the amount of $1,109,575.95
5. 5
BACKGROUND INFORMATION
Streets included in this year’s base bids are:
• Blue Bonnet, Broadway to N. New Braunfels
• Columbine, Abiso to Argo
• Argo, Townsend to AH Blvd.
• Greely, Ogden to Argo
• Arbutus, Abiso to Argo
• Acacia, Ogden to Harrison
• Alamo Heights Blvd., Tuxedo to Corona
• Grandview Pl., Broadway to N. New Braunfels
6. 6
BACKGROUND INFORMATION
Additional streets
• Grove Pl., Broadway to N. New Braunfels
• Cleveland Ct. Kampmann to Broadway
• Hubbard, Broadway to Mayflower
• Harrison, Morse to Townsend
• Barilla, Cleveland Ct. to N. New Braunfels
7. 7
BACKGROUND INFORMATION
• Project consists of approximately 73,000 sy. of roadway
improvements, utilizing both milling and overlay of existing
surfaces as well as some full depth reconstruction.
• The bids were evaluated by staff and Freese and Nichols
Inc.
8. 8
POLICY ANALYSIS
• Freese and Nichols Inc. recommends the bid
contract be awarded to Fuquay Inc. as being the
lowest bid.
9. 9
FISCAL IMPACT
• The contract cost is $991,320.20. A recommendation
with approval of a 5% Contingency of $49,566.01
totaling $1,040,886.21 currently available in the Capital
Expense for SMP.