Stability to 2030s, 10%
of all Northern Powerhouse Growth in Furness, Capitalise on Dreadnought
class build, diversification, Need for huge
commitment to infrastructure, skills, entrepreneurship
3. FURNESS ECONOMIC DEVELOPMENT FORUM
OUR FOCUS
• INFRASTRUCTURE
• EDUCATION EMPLOYMENT SKILLS
• BUSINESS ENGAGEMENT
• SUPPLY CHAIN STRENGTHENING
• QUALITY OF LIFE
• Influencing Cumbria LEP Strategy, BEIS:
Building an industrial strategy Hooked into
Northern Powerhouse Strategy.
4. FEEDBACK FROM SUPPLIERS
What you need from us
• 88% information on
emerging contracts
• 76% discover who to contact
• 52% how to pre-qualify
2nd
priorities
• 36% How to do business with
large firms
• Address tender complexity
• 60% Access to finance
• 92% will share contact details
• 88% willing to help with directory
5. Energy Opportunities
•5WIND FARM O AND M BASES, HELICOPTER BASE
•CIVIL AND DEFENCE NUCLEAR: DESIGN, BUILD
•WORLDS LARGEST BATTERY STORAGE FACILITY
•GAS PROCESSING / EXPLORATION
•ONSHORE WIND,SOLAR ,HYDRO
•ENERGY MANUFACTURING: GSK POWER
•GLOBAL PRESENCE OF MANUFACTURERS
•SUPPORTING port, logistics, design, manufacturing, test commissioning
6. Defence Nuclear
• The Defence Nuclear Programme forms a critical 25% of the total current UK demand
for nuclear and nuclear related skills, there are a number of significant differences with
respect to the civil sector
• Defence nuclear capability has a large programme of planned construction and ongoing
operations.
• The power source for nuclear submarines is a unique application of a complex and safety
critical technology. Space is severely constrained, safety systems need to respond to
the operational status of the vessel and refuelling needs to be minimised
• 15,000 personnel in defence nuclear workforce
• More people are employed in the energy production in the defence sector than the civil.
9. CENTRALYARD COMPLEX & PAINT FACILITY
MORGAN SINDALL
Construction line
http://www.constructionline.co.uk/static
See
http://construction.morgansindall.com/s
To apply to join supply chain see
http://www.buildersprofile.co.uk/BP/mc-
and use
http://shop.bsigroup.com/en/Navigate-b
SEVERFIELD
NORTHERN CLADDING
ROBERT MCALPINE PAINT
FACILITY
r.parker@srm.com
13. 13
BAE Systems Supplier Forum Hierarchy
Submarine Supplier Forum
Continuous Improvement
Forum
General Forum
SUBMARINE SUPPLIERS NETWORKS
14. WATERFRONT Barrow BUSINESS PARK SERVING BAE AND
PORT – PHASE 1 COMPLETED, PHASE 2 IN BUILD
Richard Hargreaves, Project Manager RICHARD.HARGREAVES@VHE.CO.UK 01226 320150
15. DONG ENERGY NEW CONSTRUCTION BASE
GORPO@dongenergy.co.uk WWW.DONGENERGY.CO.UK
19. NATIONAL GRID
https://www.competefor.com/nationalgrid/national-grid/working-with-our-supply-chain/
MAIN WORKS CONTRACTS
400kV overhead line;
400kV undergrounding;
Substation works;
Tunnel construction
(Morecambe Bay); and
DNO works.
COMPETE FOR
National Grid will be requiringTier 1
contractors to use CompeteFor in
tendering for sub-contractor supplies and
services
http://www.northwestcoastconnections.co
m/docs/RouteAlignmentDocs/Volume
%202%20-%20Preliminary
%20Environmental%20Information/Volume
%202.7_Technical_Appendices/Chapter
%2017_Socio-
economics/Volume_2.7_Appendix_17F_Dra
ft_Employment_and_Skills_Framework.pdf
Tunnel Construction
a substantial civil engineering project in
its own right
a large relatively stable workforce
Located at each of the two tunnel heads
for most of the tunnel construction
period, estimated to be about 6 years in
total
allowing for enabling works (including
construction of shafts), cable installation
and commissioning.
20. NATIONAL GRID
It is National Grid’s policy to procure
goods and services competitively,
economically, ethically and efficiently
National Grid utilises the Achilles
UtilitiesVendor Database (UVDB) of
suppliers when compiling lists of
potential vendors for its goods and
services requirements.
Construction service Chris Hickey Services to support gas
and electricity construction
Engineering services SaraTibbatts Asset maintenance
and repairs
Global information systems (IS) servicesTam Curran
Tunnels Andy Smith
Substation construction Ben Adams Substation alliances
and contracts
Professional services (General management) Dan
Goodchild Consultancy legal
Switchgear Cathy Knight Switchgear contracts
21. NATIONAL GRID -
OUR ASK
• “maximising opportunity locally”
• A 400kv power supply from Moorside to
Roosecote gives scope to attract large energy
users into the Furness area after 2024/5.
• tunnelling and underground construction
academy
• work with FEDF skills/employment group and
Furness Education Skill Partnership to promote
skills opportunities.
• Supply chain strengthening
• accommodation strategy response network
and an Accommodation Hub at
www.fedf.co.uk/accommodation-hub/ in
2016 to help individuals and firms be aware
of accommodation demand and supply
• Legacy A595 improvement and multi-modal
facility