CITY OF ALAMO HEIGHTS
ADMINISTRATION AND FINANCE DEPARTMENT
CITY COUNCIL AGENDA MEMORANDUM
TO: Mayor and City Council
FROM: Phil Laney, Assistant City Manager
SUBJECT: Staff report on Demolition and Replacement Structure Review Processes
DATE: April 9, 2024
SUMMARY
Staff report on demolition and replacement structure review processes.
BACKGROUND INFORMATION
Chapter 5 – Buildings and Building Regulations, Article IX – Demolitions of the City Code
oversees the demolition review procedures. Per Code, the demolition review process is intended
to complete both the determination of significance of existing structures proposed for demolition
and the compatibility review of any replacement structures within the same process. However, by
Code, the significance review for proposed demolitions and compatibility review of the proposed
replacement structure may be completed in separate processes, if requested by the owner. In recent
months, the City Council and Architectural Review Board, who provides recommendations for
significance and compatibility to Council, have had multiple discussions involving proposed
demolitions that have included requests to view the proposed replacement structure, but it was not
available or required per the referenced provision in the City Code.
The staff report will provide information on the current demolition and compatibility review
processes, as well as provide potential Code updates that may address the concerns expressed.
_____________________
Phil Laney
Assistant City Manager
______________________
Buddy Kuhn
City Manager

More Related Content

Similar to Item # 7 - Demolition & Replacement Structure Processes

AIA City processes presentation 092514
AIA City processes presentation 092514AIA City processes presentation 092514
AIA City processes presentation 092514
Mary Kell
 
Architecture practice- arbitration and conciliation
Architecture practice- arbitration and conciliationArchitecture practice- arbitration and conciliation
Architecture practice- arbitration and conciliation
Aditi Garg
 
Comparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode II
Comparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode IIComparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode II
Comparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode II
ijtsrd
 
South Orange Valley and Third Street Redevelopment Plan
South Orange Valley and Third Street Redevelopment PlanSouth Orange Valley and Third Street Redevelopment Plan
South Orange Valley and Third Street Redevelopment Plan
Alex Torpey
 

Similar to Item # 7 - Demolition & Replacement Structure Processes (20)

AIA City processes presentation 092514
AIA City processes presentation 092514AIA City processes presentation 092514
AIA City processes presentation 092514
 
Item #s 5.6 - Dangerous Structures
Item #s 5.6 - Dangerous StructuresItem #s 5.6 - Dangerous Structures
Item #s 5.6 - Dangerous Structures
 
Item #s 3.4 - Contractor Compliance Regulations
Item #s 3.4 - Contractor Compliance RegulationsItem #s 3.4 - Contractor Compliance Regulations
Item #s 3.4 - Contractor Compliance Regulations
 
Item # 11 - Update on ARB
Item # 11 - Update on ARBItem # 11 - Update on ARB
Item # 11 - Update on ARB
 
Item # 5 - 2024 SMP Agmt Freese & Nichols
Item # 5 - 2024 SMP Agmt Freese & NicholsItem # 5 - 2024 SMP Agmt Freese & Nichols
Item # 5 - 2024 SMP Agmt Freese & Nichols
 
Item # 13 - Plan Review Process Revisions
Item # 13 - Plan Review Process RevisionsItem # 13 - Plan Review Process Revisions
Item # 13 - Plan Review Process Revisions
 
PM tools and techniques
PM tools and techniquesPM tools and techniques
PM tools and techniques
 
The Merits of Moving to the IBC
The Merits of Moving to the IBCThe Merits of Moving to the IBC
The Merits of Moving to the IBC
 
Community Access Project re Wayne Apartments Project May 2012
Community Access Project re Wayne Apartments Project May 2012Community Access Project re Wayne Apartments Project May 2012
Community Access Project re Wayne Apartments Project May 2012
 
Item # 7 - Katherine Ct (Final Review)
Item # 7 - Katherine Ct (Final Review)Item # 7 - Katherine Ct (Final Review)
Item # 7 - Katherine Ct (Final Review)
 
Architecture practice- arbitration and conciliation
Architecture practice- arbitration and conciliationArchitecture practice- arbitration and conciliation
Architecture practice- arbitration and conciliation
 
Untold story of chandigarh
Untold story of chandigarhUntold story of chandigarh
Untold story of chandigarh
 
Berg Ansaldo Resolution
Berg Ansaldo ResolutionBerg Ansaldo Resolution
Berg Ansaldo Resolution
 
Summary of NBC 2016
Summary of NBC 2016Summary of NBC 2016
Summary of NBC 2016
 
Comparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode II
Comparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode IIComparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode II
Comparision of Design Codes ACI 318-11, IS 456 2000 and Eurocode II
 
Untold Story of Chandigarh Master Plan
Untold Story of Chandigarh Master PlanUntold Story of Chandigarh Master Plan
Untold Story of Chandigarh Master Plan
 
MEASUREMENT PDF
MEASUREMENT PDFMEASUREMENT PDF
MEASUREMENT PDF
 
Item # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdfItem # 4 - 231 Encino Ave (Significance Only).pdf
Item # 4 - 231 Encino Ave (Significance Only).pdf
 
Building laws
Building lawsBuilding laws
Building laws
 
South Orange Valley and Third Street Redevelopment Plan
South Orange Valley and Third Street Redevelopment PlanSouth Orange Valley and Third Street Redevelopment Plan
South Orange Valley and Third Street Redevelopment Plan
 

More from ahcitycouncil

More from ahcitycouncil (20)

PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
 
PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
 
PPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services AgmtPPT Item # 7 - BB Inspection Services Agmt
PPT Item # 7 - BB Inspection Services Agmt
 
PPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933FPPT Item # 6 - 7001 Broadway ARB Case # 933F
PPT Item # 6 - 7001 Broadway ARB Case # 933F
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
 
PPT Item # 4 - 525 Argo Avenue ARB Case # 926F
PPT Item # 4 - 525 Argo Avenue ARB Case # 926FPPT Item # 4 - 525 Argo Avenue ARB Case # 926F
PPT Item # 4 - 525 Argo Avenue ARB Case # 926F
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpoint
 
Item # 1a -- May 13, 2024 City Council Meeting Minutes
Item # 1a -- May 13, 2024 City Council Meeting MinutesItem # 1a -- May 13, 2024 City Council Meeting Minutes
Item # 1a -- May 13, 2024 City Council Meeting Minutes
 
Item # 4 -- 525 Argo Avenue ARB Case 926F
Item # 4 -- 525 Argo Avenue ARB Case 926FItem # 4 -- 525 Argo Avenue ARB Case 926F
Item # 4 -- 525 Argo Avenue ARB Case 926F
 
Item # 5 - 5330 Broadway ARB Case # 930F
Item # 5 - 5330 Broadway ARB Case # 930FItem # 5 - 5330 Broadway ARB Case # 930F
Item # 5 - 5330 Broadway ARB Case # 930F
 
Item # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance ReviewItem # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance Review
 
Item # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services AgreementItem # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services Agreement
 
Item # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way StopItem # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way Stop
 
Item # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
Item # 9 - 2024 Street Maintenance Plan (SMP) AmdmntItem # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
Item # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
 
PPT Item # 5 -- Announcements Powerpoint
PPT Item # 5 -- Announcements PowerpointPPT Item # 5 -- Announcements Powerpoint
PPT Item # 5 -- Announcements Powerpoint
 
PPT Item # 9 2ndQTR Financial & Inv. Report
PPT Item # 9 2ndQTR Financial & Inv. ReportPPT Item # 9 2ndQTR Financial & Inv. Report
PPT Item # 9 2ndQTR Financial & Inv. Report
 
Item # 9- 2nd Qtr Financial & Inv. Report
Item # 9- 2nd Qtr Financial & Inv. ReportItem # 9- 2nd Qtr Financial & Inv. Report
Item # 9- 2nd Qtr Financial & Inv. Report
 
PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438
 
Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438
 
Item ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM MinutesItem ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM Minutes
 

Recently uploaded

一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
aveka1
 
一比一原版(IC毕业证)帝国理工大学毕业证成绩单
一比一原版(IC毕业证)帝国理工大学毕业证成绩单一比一原版(IC毕业证)帝国理工大学毕业证成绩单
一比一原版(IC毕业证)帝国理工大学毕业证成绩单
exuyk
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
enbam
 
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our OrganizationUp the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
uptheratios
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
enbam
 

Recently uploaded (20)

Who are the Sherden Yale Historical Review
Who are the Sherden Yale Historical ReviewWho are the Sherden Yale Historical Review
Who are the Sherden Yale Historical Review
 
sarkarijobswork.online-bsf-si-vehicle-mechanic-and-constable-technical-may24.pdf
sarkarijobswork.online-bsf-si-vehicle-mechanic-and-constable-technical-may24.pdfsarkarijobswork.online-bsf-si-vehicle-mechanic-and-constable-technical-may24.pdf
sarkarijobswork.online-bsf-si-vehicle-mechanic-and-constable-technical-may24.pdf
 
Inflation scarring: How has the cost-of-living crisis changed Britain?
Inflation scarring: How has the cost-of-living crisis changed Britain?Inflation scarring: How has the cost-of-living crisis changed Britain?
Inflation scarring: How has the cost-of-living crisis changed Britain?
 
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
一比一原版(QUT毕业证)昆士兰科技大学毕业证成绩单
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
 
Proposed Facility Types: Chesapeake Trails and Connectivity Plan
Proposed Facility Types: Chesapeake Trails and Connectivity PlanProposed Facility Types: Chesapeake Trails and Connectivity Plan
Proposed Facility Types: Chesapeake Trails and Connectivity Plan
 
07/03/2024 Publiekdomeindag - voormiddag
07/03/2024 Publiekdomeindag - voormiddag07/03/2024 Publiekdomeindag - voormiddag
07/03/2024 Publiekdomeindag - voormiddag
 
PACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdfPACT launching workshop presentation-Final.pdf
PACT launching workshop presentation-Final.pdf
 
Minority economic forum Executive Summary
Minority economic forum Executive SummaryMinority economic forum Executive Summary
Minority economic forum Executive Summary
 
Elderly Persons Midday Meal Program kurnool
Elderly Persons Midday Meal Program kurnoolElderly Persons Midday Meal Program kurnool
Elderly Persons Midday Meal Program kurnool
 
The MEL Toolkit Launch Webinar Presentation
The MEL Toolkit Launch Webinar PresentationThe MEL Toolkit Launch Webinar Presentation
The MEL Toolkit Launch Webinar Presentation
 
Setting a new path to greater, shared prosperity
Setting a new path to greater, shared prosperitySetting a new path to greater, shared prosperity
Setting a new path to greater, shared prosperity
 
一比一原版(IC毕业证)帝国理工大学毕业证成绩单
一比一原版(IC毕业证)帝国理工大学毕业证成绩单一比一原版(IC毕业证)帝国理工大学毕业证成绩单
一比一原版(IC毕业证)帝国理工大学毕业证成绩单
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
 
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our OrganizationUp the Ratios Bylaws - a Comprehensive Process of Our Organization
Up the Ratios Bylaws - a Comprehensive Process of Our Organization
 
CrossWalksInspirations for Brockville***
CrossWalksInspirations for Brockville***CrossWalksInspirations for Brockville***
CrossWalksInspirations for Brockville***
 
07/03/2024 Publiekdomeindag - namiddag
07/03/2024 Publiekdomeindag - namiddag07/03/2024 Publiekdomeindag - namiddag
07/03/2024 Publiekdomeindag - namiddag
 
CourseHero 9KLDFSKJKSJDFKSDKFJSDKSLFJKSJL
CourseHero 9KLDFSKJKSJDFKSDKFJSDKSLFJKSJLCourseHero 9KLDFSKJKSJDFKSDKFJSDKSLFJKSJL
CourseHero 9KLDFSKJKSJDFKSDKFJSDKSLFJKSJL
 
Ghana High Commission on list of diplomats including US & China who owe £143m...
Ghana High Commission on list of diplomats including US & China who owe £143m...Ghana High Commission on list of diplomats including US & China who owe £143m...
Ghana High Commission on list of diplomats including US & China who owe £143m...
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
 

Item # 7 - Demolition & Replacement Structure Processes

  • 1. CITY OF ALAMO HEIGHTS ADMINISTRATION AND FINANCE DEPARTMENT CITY COUNCIL AGENDA MEMORANDUM TO: Mayor and City Council FROM: Phil Laney, Assistant City Manager SUBJECT: Staff report on Demolition and Replacement Structure Review Processes DATE: April 9, 2024 SUMMARY Staff report on demolition and replacement structure review processes. BACKGROUND INFORMATION Chapter 5 – Buildings and Building Regulations, Article IX – Demolitions of the City Code oversees the demolition review procedures. Per Code, the demolition review process is intended to complete both the determination of significance of existing structures proposed for demolition and the compatibility review of any replacement structures within the same process. However, by Code, the significance review for proposed demolitions and compatibility review of the proposed replacement structure may be completed in separate processes, if requested by the owner. In recent months, the City Council and Architectural Review Board, who provides recommendations for significance and compatibility to Council, have had multiple discussions involving proposed demolitions that have included requests to view the proposed replacement structure, but it was not available or required per the referenced provision in the City Code. The staff report will provide information on the current demolition and compatibility review processes, as well as provide potential Code updates that may address the concerns expressed. _____________________ Phil Laney Assistant City Manager ______________________ Buddy Kuhn City Manager