SlideShare a Scribd company logo
1 of 36
October 25, 2016
OTEC 2016 Conference
Columbus, Ohio
Complete Streets for Akron’s
East End Redevelopment Project
Via Construction Manager At Risk
(CMAR)
Presented by H.R. Gray and Osborn Engineering
Presenters:
Bonnie Teeuwen
Director of Municipal and
Transportation Engineering,
Osborn Engineering
James Weber
Director of Construction,
H.R. Gray
1. Learn more about the public/private partnership
project between the City of Akron and California-
based developer Industrial Realty Group (IRG),
Objectives
2. Learn about the innovations implemented to
meet the goals for a Complete Street program, and
3. Learn how the project was delivered using the
Construction Manager at Risk project delivery
method to meet schedule deadlines and control
project costs.
Background Information
• The East End is a 1.4 million
square foot, mixed-use
redevelopment initiative in
Akron on the former
campus of the historic
Goodyear headquarters.
• Old Goodyear world
headquarters site – offices
on one side of street,
theater and arena
(Goodyear Hall) on other
The Project
The area offers an environment with new
apartments, state-of-the-art office spaces, and a
Hilton hotel along with restaurants, retail, a
theatre and more.
“Live, Work and Play”
The City of Akron received a grant to improve
the roadway.
Background Information
Anything spent above the grant money had to
be paid for by the developer who had a vision,
but also had a budget.
Project Vision
During this time, Akron elects a new mayor who
has a vision of complete streets—parking,
bicycling, buses, cars—a signature project for
the long-term vision of the city.
Project Vision
Complete streets are those that utilize design standards
to make streets safe for all users, including those who
walk, ride bikes and use public transportation.
Challenge: Parking
How can we meet
everyone’s goal? The
developer demanded on-
street parking. How can
we make this pedestrian-
and bicycle-friendly while
having on-street parking?
Project Vision
An important component of the project includes
a transformation of the six-lane East Market
Street using a complete street approach.
Project Vision
The goal for the project was to use traffic-
calming techniques such as traffic lights and
pedestrian crossways to slow traffic through the
area.
Project Vision
Streetscape enhancements include:
New Landscaping
Bike Lanes
Lighting
Paved Crosswalks
Installation of Gateway Arches
Addition of Street Parking
Project Delivery
The developer hired an architect and engineer
to do preliminary plans for the roadway.
The city’s initial plan was to give the developer
the money to do the roadway improvements.
Project Delivery
The funding source said no.
The city needed to bid the project and follow
public bidding procedures.
The plans were not developed to point to bid
them, and the IRG had a strict timeline. The City
of Akron decided to use the Construction
Manager at Risk (CMAR) delivery method for
this project, the first time it has ever been used
in Akron for a roadway project.
Project Delivery
A two-step selection process was used:
Project Delivery
(1) Multiple firms were asked to submit qualifications
(2) Shortlisted firms were asked to submit proposals
and make presentations
H.R. Gray was selected as the CMAR.
IRG wanted all work done by September 1, 2016
to accommodate the opening of the theatre.
Project Delivery
H.R. Gray recommended that we divide the
project into phases so we could complete the
work in front of the theatre, meeting the timeline
and reducing the need for acceleration.
H.R. Gray partnered with Osborn to provide
services during construction for the project, but
plans were not complete enough to construct
the project.
Project Delivery
Osborn took on the larger role of engineer of
record on the project. H.R. Gray selected Osborn
because of their experience with designing
projects similar to the “live, work, place” feel
needed for this project, a lot of which was
“design as you go.”
Design Considerations
The existing roadway had six lanes, narrow
sidewalks and no parking.
An important component of this project was
the transformation of the heavily-traveled
East Market Street using the complete street
approach.
Design Considerations
A traffic study was performed to
validate a reduction in lanes.
The goal of the project was to
slow traffic with lights and
pedestrian crossways with
development on either side of
the street.
A conceptual plan was
developed by KA Architect.
Design Considerations
Streetscape enhancements would include
new landscaping, lighting, bike lanes, paved
crosswalks, the installation of arches over a
quarter-mile stretch of East Market Street,
and the addition of more than 100 parking
stalls for street parking.
Design Considerations
Street lighting and signalization designs were
performance specification-based, led by the
contractor using design assist.
Design Considerations
This unique approach reduced the overall cost
and schedule for the design of these features.
Design elements include stamped concrete,
LED lights, street trees and new signals.
Why was the timeline so tight?
Design Considerations
Communication and teamwork were key.
Osborn, H.R. Gray, subs and the owner had to
work together and communicate to ensure
project success.
Design Considerations
The roadway structure will consist of one lane for traffic,
one lane for bicycles and one lane for parallel parking.
Construction
Construction
Subcontractors were prequalified and
submitted bids for the work.
Construction
Signature parts of the project are arches, which
meant the project had to be designed around
the foundation to deal with conflicts such as
working around sewers, waterlines and other
underground utilities.
Construction
Further challenges included:
The bump outs for crosswalks—getting the drainage
right is a constant battle with these flat areas
A utility tunnel
An AT&T duct bank that went down the middle of the
project, which was a main East/West connector in the
US—there was no slack in the wires so there was zero
tolerance in moving
Construction
Design/Assist was utilized with electrical to help
reduce the overall cost of making the electrical
contractor design the electrical system.
Ohio Edison does not recognize LED lights, which had
to be metered separately.
Project Success
We should save over half a million dollars by meeting
goals while H.R. Gray controlled the budget.
The City of Akron, IRG, Osborn Engineers and H.R.
Gray worked together as a team to complete the
project on time and under budget.
Project Success
Project Success
Questions

More Related Content

What's hot

Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015Crosstown TO
 
Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open HouseCrosstown TO
 
Diverging Diamond Interchange: I-66 and Route 15
Diverging Diamond Interchange: I-66 and Route 15Diverging Diamond Interchange: I-66 and Route 15
Diverging Diamond Interchange: I-66 and Route 15VDOT Northern Virginia
 
Chaplin slide deck final
Chaplin slide deck finalChaplin slide deck final
Chaplin slide deck finalCrosstown TO
 
King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentationguest2d44ee
 
Demery and assoc madison and yount street community presentation 3 4-14
Demery and assoc madison and yount street community presentation 3 4-14Demery and assoc madison and yount street community presentation 3 4-14
Demery and assoc madison and yount street community presentation 3 4-14kristinemassey
 
Applications of EPS Geofoam in Civil Engineering
Applications of EPS Geofoam in Civil EngineeringApplications of EPS Geofoam in Civil Engineering
Applications of EPS Geofoam in Civil EngineeringLawrence Le Roux
 
Avenue station open house
Avenue station open house Avenue station open house
Avenue station open house Crosstown TO
 
Sound Transit 6/17/09 Noise And Construction Meeting
Sound Transit 6/17/09 Noise And Construction MeetingSound Transit 6/17/09 Noise And Construction Meeting
Sound Transit 6/17/09 Noise And Construction Meetingjseattle
 
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14Adam Cohen
 
Express city plots sonipat 9811237690
Express city plots sonipat  9811237690Express city plots sonipat  9811237690
Express city plots sonipat 9811237690Saya Properties
 
Urban Planner Portfolio
Urban Planner PortfolioUrban Planner Portfolio
Urban Planner Portfoliojanderson33
 
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21CramondandBarntonCom
 

What's hot (20)

Presentation Master
Presentation MasterPresentation Master
Presentation Master
 
Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015
 
Cold-in-Place Asphalt Recycling in Corona, CA
Cold-in-Place Asphalt Recycling in Corona, CACold-in-Place Asphalt Recycling in Corona, CA
Cold-in-Place Asphalt Recycling in Corona, CA
 
Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open House
 
Diverging Diamond Interchange: I-66 and Route 15
Diverging Diamond Interchange: I-66 and Route 15Diverging Diamond Interchange: I-66 and Route 15
Diverging Diamond Interchange: I-66 and Route 15
 
Chaplin slide deck final
Chaplin slide deck finalChaplin slide deck final
Chaplin slide deck final
 
King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentation
 
Demery and assoc madison and yount street community presentation 3 4-14
Demery and assoc madison and yount street community presentation 3 4-14Demery and assoc madison and yount street community presentation 3 4-14
Demery and assoc madison and yount street community presentation 3 4-14
 
Applications of EPS Geofoam in Civil Engineering
Applications of EPS Geofoam in Civil EngineeringApplications of EPS Geofoam in Civil Engineering
Applications of EPS Geofoam in Civil Engineering
 
Sustainable Sunnyvale
Sustainable SunnyvaleSustainable Sunnyvale
Sustainable Sunnyvale
 
Avenue station open house
Avenue station open house Avenue station open house
Avenue station open house
 
Sound Transit 6/17/09 Noise And Construction Meeting
Sound Transit 6/17/09 Noise And Construction MeetingSound Transit 6/17/09 Noise And Construction Meeting
Sound Transit 6/17/09 Noise And Construction Meeting
 
WORK SAMPLE TFT
WORK SAMPLE TFTWORK SAMPLE TFT
WORK SAMPLE TFT
 
Invigorating Infrastructure: Sunnyvale 2100
Invigorating Infrastructure: Sunnyvale 2100Invigorating Infrastructure: Sunnyvale 2100
Invigorating Infrastructure: Sunnyvale 2100
 
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
Planning Staff Report Elizabeth Ann Seton 2010 Oct 14
 
Express city plots sonipat 9811237690
Express city plots sonipat  9811237690Express city plots sonipat  9811237690
Express city plots sonipat 9811237690
 
Urban Planner Portfolio
Urban Planner PortfolioUrban Planner Portfolio
Urban Planner Portfolio
 
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21Edinburgh proposed City plan 2030   C&BCC presentation 7 12 21
Edinburgh proposed City plan 2030 C&BCC presentation 7 12 21
 
RP CONSTRUCTION.ppt 1
RP CONSTRUCTION.ppt 1RP CONSTRUCTION.ppt 1
RP CONSTRUCTION.ppt 1
 
Stirling Station Delegation
Stirling Station DelegationStirling Station Delegation
Stirling Station Delegation
 

Similar to OTEC Presentation: Complete Streets for Akron's East End Development

Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015Nicholas DiFrank
 
Torrey pines road corridor study final
Torrey pines road corridor study finalTorrey pines road corridor study final
Torrey pines road corridor study finalkday1
 
Hooverdambypassbridge 151003030959-lva1-app6891
Hooverdambypassbridge 151003030959-lva1-app6891Hooverdambypassbridge 151003030959-lva1-app6891
Hooverdambypassbridge 151003030959-lva1-app6891Soumalya Bag
 
Item # 4 - Overland Partners -Professional Services Agmnt
Item # 4 - Overland Partners -Professional Services AgmntItem # 4 - Overland Partners -Professional Services Agmnt
Item # 4 - Overland Partners -Professional Services Agmntahcitycouncil
 
APWA Award Winning Roundabout in Ann Arbor
APWA Award Winning Roundabout in Ann ArborAPWA Award Winning Roundabout in Ann Arbor
APWA Award Winning Roundabout in Ann ArborOHM Advisors
 
Urban Design Works_Mayur Naik.pdf
Urban Design Works_Mayur Naik.pdfUrban Design Works_Mayur Naik.pdf
Urban Design Works_Mayur Naik.pdfMayurNaik35
 
Item # 1a - August 18, 2021 Workshop Minutes
Item # 1a - August 18, 2021 Workshop MinutesItem # 1a - August 18, 2021 Workshop Minutes
Item # 1a - August 18, 2021 Workshop Minutesahcitycouncil
 
SIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGSIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGWilliam Wieners
 
Walton Boulevard Reconstruction, APWA Project of the Year
Walton Boulevard Reconstruction, APWA Project of the YearWalton Boulevard Reconstruction, APWA Project of the Year
Walton Boulevard Reconstruction, APWA Project of the YearOHM Advisors
 
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Adam Berry
 
Project Complexity (Case study)
Project Complexity (Case study)Project Complexity (Case study)
Project Complexity (Case study)Sunny Mahajan
 
Belmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingBelmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingVDOT Northern Virginia
 
228 congressparkway overview_jan2010
228 congressparkway overview_jan2010228 congressparkway overview_jan2010
228 congressparkway overview_jan2010Daniel X. O'Neil
 
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdfPPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdfahcitycouncil
 
"News and Views" newsletter
"News and Views" newsletter "News and Views" newsletter
"News and Views" newsletter Maribel Castillo
 

Similar to OTEC Presentation: Complete Streets for Akron's East End Development (20)

Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015Nicholas DiFrank - Professional Portfolio 2015
Nicholas DiFrank - Professional Portfolio 2015
 
Torrey pines road corridor study final
Torrey pines road corridor study finalTorrey pines road corridor study final
Torrey pines road corridor study final
 
Hooverdambypassbridge 151003030959-lva1-app6891
Hooverdambypassbridge 151003030959-lva1-app6891Hooverdambypassbridge 151003030959-lva1-app6891
Hooverdambypassbridge 151003030959-lva1-app6891
 
Item # 4 - Overland Partners -Professional Services Agmnt
Item # 4 - Overland Partners -Professional Services AgmntItem # 4 - Overland Partners -Professional Services Agmnt
Item # 4 - Overland Partners -Professional Services Agmnt
 
APWA Award Winning Roundabout in Ann Arbor
APWA Award Winning Roundabout in Ann ArborAPWA Award Winning Roundabout in Ann Arbor
APWA Award Winning Roundabout in Ann Arbor
 
Urban Design Works_Mayur Naik.pdf
Urban Design Works_Mayur Naik.pdfUrban Design Works_Mayur Naik.pdf
Urban Design Works_Mayur Naik.pdf
 
Item # 1a - August 18, 2021 Workshop Minutes
Item # 1a - August 18, 2021 Workshop MinutesItem # 1a - August 18, 2021 Workshop Minutes
Item # 1a - August 18, 2021 Workshop Minutes
 
WALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom CompWALID_TANBEDAWY_2016 R Dom Comp
WALID_TANBEDAWY_2016 R Dom Comp
 
SIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERINGSIMON DESIGN ENGINEERING
SIMON DESIGN ENGINEERING
 
Walton Boulevard Reconstruction, APWA Project of the Year
Walton Boulevard Reconstruction, APWA Project of the YearWalton Boulevard Reconstruction, APWA Project of the Year
Walton Boulevard Reconstruction, APWA Project of the Year
 
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
Multifunctional Stormwater Projects - An Innovative Technical Design and Part...
 
Project Complexity (Case study)
Project Complexity (Case study)Project Complexity (Case study)
Project Complexity (Case study)
 
Belmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meetingBelmont Ridge Road Pardon Our Dust meeting
Belmont Ridge Road Pardon Our Dust meeting
 
228 congressparkway overview_jan2010
228 congressparkway overview_jan2010228 congressparkway overview_jan2010
228 congressparkway overview_jan2010
 
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdfPPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
PPT Item # 6 - TBG Partners Landscape Architectural Design Services.pdf
 
Brad_Jones.ppt
Brad_Jones.pptBrad_Jones.ppt
Brad_Jones.ppt
 
IBC1677
IBC1677IBC1677
IBC1677
 
Paquette, Jason 2016 CV
Paquette, Jason 2016 CVPaquette, Jason 2016 CV
Paquette, Jason 2016 CV
 
Removing Toronto's Expressway One Piece at a Time
Removing Toronto's Expressway One Piece at a TimeRemoving Toronto's Expressway One Piece at a Time
Removing Toronto's Expressway One Piece at a Time
 
"News and Views" newsletter
"News and Views" newsletter "News and Views" newsletter
"News and Views" newsletter
 

Recently uploaded

VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 

Recently uploaded (20)

VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 

OTEC Presentation: Complete Streets for Akron's East End Development

  • 1. October 25, 2016 OTEC 2016 Conference Columbus, Ohio
  • 2. Complete Streets for Akron’s East End Redevelopment Project Via Construction Manager At Risk (CMAR)
  • 3. Presented by H.R. Gray and Osborn Engineering
  • 4. Presenters: Bonnie Teeuwen Director of Municipal and Transportation Engineering, Osborn Engineering James Weber Director of Construction, H.R. Gray
  • 5. 1. Learn more about the public/private partnership project between the City of Akron and California- based developer Industrial Realty Group (IRG), Objectives 2. Learn about the innovations implemented to meet the goals for a Complete Street program, and 3. Learn how the project was delivered using the Construction Manager at Risk project delivery method to meet schedule deadlines and control project costs.
  • 7.
  • 8. • The East End is a 1.4 million square foot, mixed-use redevelopment initiative in Akron on the former campus of the historic Goodyear headquarters. • Old Goodyear world headquarters site – offices on one side of street, theater and arena (Goodyear Hall) on other The Project
  • 9. The area offers an environment with new apartments, state-of-the-art office spaces, and a Hilton hotel along with restaurants, retail, a theatre and more. “Live, Work and Play”
  • 10. The City of Akron received a grant to improve the roadway. Background Information Anything spent above the grant money had to be paid for by the developer who had a vision, but also had a budget.
  • 12. During this time, Akron elects a new mayor who has a vision of complete streets—parking, bicycling, buses, cars—a signature project for the long-term vision of the city. Project Vision Complete streets are those that utilize design standards to make streets safe for all users, including those who walk, ride bikes and use public transportation.
  • 13. Challenge: Parking How can we meet everyone’s goal? The developer demanded on- street parking. How can we make this pedestrian- and bicycle-friendly while having on-street parking? Project Vision
  • 14. An important component of the project includes a transformation of the six-lane East Market Street using a complete street approach. Project Vision The goal for the project was to use traffic- calming techniques such as traffic lights and pedestrian crossways to slow traffic through the area.
  • 15. Project Vision Streetscape enhancements include: New Landscaping Bike Lanes Lighting Paved Crosswalks Installation of Gateway Arches Addition of Street Parking
  • 17. The developer hired an architect and engineer to do preliminary plans for the roadway. The city’s initial plan was to give the developer the money to do the roadway improvements. Project Delivery The funding source said no. The city needed to bid the project and follow public bidding procedures.
  • 18. The plans were not developed to point to bid them, and the IRG had a strict timeline. The City of Akron decided to use the Construction Manager at Risk (CMAR) delivery method for this project, the first time it has ever been used in Akron for a roadway project. Project Delivery
  • 19. A two-step selection process was used: Project Delivery (1) Multiple firms were asked to submit qualifications (2) Shortlisted firms were asked to submit proposals and make presentations H.R. Gray was selected as the CMAR.
  • 20. IRG wanted all work done by September 1, 2016 to accommodate the opening of the theatre. Project Delivery H.R. Gray recommended that we divide the project into phases so we could complete the work in front of the theatre, meeting the timeline and reducing the need for acceleration.
  • 21. H.R. Gray partnered with Osborn to provide services during construction for the project, but plans were not complete enough to construct the project. Project Delivery Osborn took on the larger role of engineer of record on the project. H.R. Gray selected Osborn because of their experience with designing projects similar to the “live, work, place” feel needed for this project, a lot of which was “design as you go.”
  • 23. The existing roadway had six lanes, narrow sidewalks and no parking. An important component of this project was the transformation of the heavily-traveled East Market Street using the complete street approach. Design Considerations
  • 24. A traffic study was performed to validate a reduction in lanes. The goal of the project was to slow traffic with lights and pedestrian crossways with development on either side of the street. A conceptual plan was developed by KA Architect. Design Considerations
  • 25. Streetscape enhancements would include new landscaping, lighting, bike lanes, paved crosswalks, the installation of arches over a quarter-mile stretch of East Market Street, and the addition of more than 100 parking stalls for street parking. Design Considerations
  • 26. Street lighting and signalization designs were performance specification-based, led by the contractor using design assist. Design Considerations This unique approach reduced the overall cost and schedule for the design of these features. Design elements include stamped concrete, LED lights, street trees and new signals.
  • 27. Why was the timeline so tight? Design Considerations Communication and teamwork were key. Osborn, H.R. Gray, subs and the owner had to work together and communicate to ensure project success.
  • 28. Design Considerations The roadway structure will consist of one lane for traffic, one lane for bicycles and one lane for parallel parking.
  • 30. Construction Subcontractors were prequalified and submitted bids for the work.
  • 31. Construction Signature parts of the project are arches, which meant the project had to be designed around the foundation to deal with conflicts such as working around sewers, waterlines and other underground utilities.
  • 32. Construction Further challenges included: The bump outs for crosswalks—getting the drainage right is a constant battle with these flat areas A utility tunnel An AT&T duct bank that went down the middle of the project, which was a main East/West connector in the US—there was no slack in the wires so there was zero tolerance in moving
  • 33. Construction Design/Assist was utilized with electrical to help reduce the overall cost of making the electrical contractor design the electrical system. Ohio Edison does not recognize LED lights, which had to be metered separately.
  • 34. Project Success We should save over half a million dollars by meeting goals while H.R. Gray controlled the budget. The City of Akron, IRG, Osborn Engineers and H.R. Gray worked together as a team to complete the project on time and under budget. Project Success