Presented by:
Phil Laney,
Assistant City Manager
STAFF REPORT: DEMOLITION AND
REPLACEMENT STRUCTURE REVIEW
PROCESSES
ITEM # 7
APRIL 09, 2024
ADMINISTRATION
SUMMARY
 Potential updates to residential construction
development process & Architectural Review Board
responsibilities
 Currently, review of demolitions (significance) does
not also require review of proposed new/renovated
replacement structure (compatibility)
 Proposal would require demolition review request to
also include proposed replacement structure review
BACKGROUND
 Chapter 5 – Buildings and Building Regulations, Article
IX – Demolitions oversees demolition review procedures
 Per Code, demolition review process is intended to
complete both the determination of significance of
existing structures proposed for demolition and the
compatibility review of any replacement structures
within the same process
 However, by Code, significance (demolition) and
compatibility (replacement structure) may be completed
in separate processes if requested by owner
BACKGROUND
 Multiple discussions involving proposed demolitions
have included requests to view the proposed
replacement structure, but not available or required
 Feelings expressed that some concern about
demolition could be minimized if more information
was available on the replacement structure
POTENTIAL ARB PROPOSAL
 Amend demolition review procedures so that significance
and compatibility process may not be completed in
separate processes
 Demolition review application must also include all
compatibility review materials for the replacement
structure
 Both ARB & Council demolition review would include proposal for
replacement structure
 If replacement structure deemed incompatible with other
structures or replacement structure not proposed,
demolition delay may be necessary to revise and/or
develop design
NEXT STEPS
 4/1/2024 – Council staff report
 4/16/2024 – Architectural Review Board
 Recommendation on proposed process changes
 4/29/2024 – Council consideration of proposed
changes
 Ongoing – Council committee & staff continue
working to update ARB rules/roles/mission with
proposed amendments forthcoming

More Related Content

Similar to PPT Item # 7 - Demolition & Replacement Structure Processes

BS 1192-4 fulfilling employer’s information exchange requirements using COBie...
BS 1192-4 fulfilling employer’s information exchange requirements using COBie...BS 1192-4 fulfilling employer’s information exchange requirements using COBie...
BS 1192-4 fulfilling employer’s information exchange requirements using COBie...Applecore Designs Limited
 
Tiêu chuẩn BSI BS 1192_4_2014
Tiêu chuẩn BSI BS 1192_4_2014Tiêu chuẩn BSI BS 1192_4_2014
Tiêu chuẩn BSI BS 1192_4_2014Huytraining
 
Singapore Building Accessibility Code 2007
Singapore Building Accessibility Code 2007Singapore Building Accessibility Code 2007
Singapore Building Accessibility Code 2007Scott Rains
 
Inception Report
Inception ReportInception Report
Inception ReportDrowsy Fzh
 
IBS - Individual Assignment (Time comparison between IBS & traditional constr...
IBS - Individual Assignment (Time comparison between IBS & traditional constr...IBS - Individual Assignment (Time comparison between IBS & traditional constr...
IBS - Individual Assignment (Time comparison between IBS & traditional constr...Haziq1511
 

Similar to PPT Item # 7 - Demolition & Replacement Structure Processes (6)

BS 1192-4 fulfilling employer’s information exchange requirements using COBie...
BS 1192-4 fulfilling employer’s information exchange requirements using COBie...BS 1192-4 fulfilling employer’s information exchange requirements using COBie...
BS 1192-4 fulfilling employer’s information exchange requirements using COBie...
 
Tiêu chuẩn BSI BS 1192_4_2014
Tiêu chuẩn BSI BS 1192_4_2014Tiêu chuẩn BSI BS 1192_4_2014
Tiêu chuẩn BSI BS 1192_4_2014
 
BSI BS 1192_4_2014
BSI BS 1192_4_2014BSI BS 1192_4_2014
BSI BS 1192_4_2014
 
Singapore Building Accessibility Code 2007
Singapore Building Accessibility Code 2007Singapore Building Accessibility Code 2007
Singapore Building Accessibility Code 2007
 
Inception Report
Inception ReportInception Report
Inception Report
 
IBS - Individual Assignment (Time comparison between IBS & traditional constr...
IBS - Individual Assignment (Time comparison between IBS & traditional constr...IBS - Individual Assignment (Time comparison between IBS & traditional constr...
IBS - Individual Assignment (Time comparison between IBS & traditional constr...
 

More from ahcitycouncil

PPT Item # 4 - 525 Argo Avenue ARB Case # 926F
PPT Item # 4 - 525 Argo Avenue ARB Case # 926FPPT Item # 4 - 525 Argo Avenue ARB Case # 926F
PPT Item # 4 - 525 Argo Avenue ARB Case # 926Fahcitycouncil
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpointahcitycouncil
 
Item # 1a -- May 13, 2024 City Council Meeting Minutes
Item # 1a -- May 13, 2024 City Council Meeting MinutesItem # 1a -- May 13, 2024 City Council Meeting Minutes
Item # 1a -- May 13, 2024 City Council Meeting Minutesahcitycouncil
 
Item # 4 -- 525 Argo Avenue ARB Case 926F
Item # 4 -- 525 Argo Avenue ARB Case 926FItem # 4 -- 525 Argo Avenue ARB Case 926F
Item # 4 -- 525 Argo Avenue ARB Case 926Fahcitycouncil
 
Item # 5 - 5330 Broadway ARB Case # 930F
Item # 5 - 5330 Broadway ARB Case # 930FItem # 5 - 5330 Broadway ARB Case # 930F
Item # 5 - 5330 Broadway ARB Case # 930Fahcitycouncil
 
Item # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance ReviewItem # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance Reviewahcitycouncil
 
Item # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services AgreementItem # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services Agreementahcitycouncil
 
Item # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way StopItem # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way Stopahcitycouncil
 
Item # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
Item # 9 - 2024 Street Maintenance Plan (SMP) AmdmntItem # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
Item # 9 - 2024 Street Maintenance Plan (SMP) Amdmntahcitycouncil
 
PPT Item # 5 -- Announcements Powerpoint
PPT Item # 5 -- Announcements PowerpointPPT Item # 5 -- Announcements Powerpoint
PPT Item # 5 -- Announcements Powerpointahcitycouncil
 
PPT Item # 9 2ndQTR Financial & Inv. Report
PPT Item # 9 2ndQTR Financial & Inv. ReportPPT Item # 9 2ndQTR Financial & Inv. Report
PPT Item # 9 2ndQTR Financial & Inv. Reportahcitycouncil
 
Item # 9- 2nd Qtr Financial & Inv. Report
Item # 9- 2nd Qtr Financial & Inv. ReportItem # 9- 2nd Qtr Financial & Inv. Report
Item # 9- 2nd Qtr Financial & Inv. Reportahcitycouncil
 
PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438ahcitycouncil
 
Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438ahcitycouncil
 
Item ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM MinutesItem ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM Minutesahcitycouncil
 
PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23ahcitycouncil
 
Item # 8 - FY23 Annual Comprehensive Financial Report
Item # 8 - FY23 Annual Comprehensive Financial ReportItem # 8 - FY23 Annual Comprehensive Financial Report
Item # 8 - FY23 Annual Comprehensive Financial Reportahcitycouncil
 
Item # 7 - Adoption of Bexar County Hazard Mitigation Plan
Item # 7 - Adoption of Bexar County Hazard Mitigation PlanItem # 7 - Adoption of Bexar County Hazard Mitigation Plan
Item # 7 - Adoption of Bexar County Hazard Mitigation Planahcitycouncil
 
PPT Item # 7 - Bexar County Hazard Mitigation Plan
PPT Item # 7 - Bexar County Hazard Mitigation PlanPPT Item # 7 - Bexar County Hazard Mitigation Plan
PPT Item # 7 - Bexar County Hazard Mitigation Planahcitycouncil
 
PPT Item # 6 - Designation of Health Authority.pdf
PPT Item # 6 - Designation of Health Authority.pdfPPT Item # 6 - Designation of Health Authority.pdf
PPT Item # 6 - Designation of Health Authority.pdfahcitycouncil
 

More from ahcitycouncil (20)

PPT Item # 4 - 525 Argo Avenue ARB Case # 926F
PPT Item # 4 - 525 Argo Avenue ARB Case # 926FPPT Item # 4 - 525 Argo Avenue ARB Case # 926F
PPT Item # 4 - 525 Argo Avenue ARB Case # 926F
 
PPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements PowerpointPPT Item # 2 -- Announcements Powerpoint
PPT Item # 2 -- Announcements Powerpoint
 
Item # 1a -- May 13, 2024 City Council Meeting Minutes
Item # 1a -- May 13, 2024 City Council Meeting MinutesItem # 1a -- May 13, 2024 City Council Meeting Minutes
Item # 1a -- May 13, 2024 City Council Meeting Minutes
 
Item # 4 -- 525 Argo Avenue ARB Case 926F
Item # 4 -- 525 Argo Avenue ARB Case 926FItem # 4 -- 525 Argo Avenue ARB Case 926F
Item # 4 -- 525 Argo Avenue ARB Case 926F
 
Item # 5 - 5330 Broadway ARB Case # 930F
Item # 5 - 5330 Broadway ARB Case # 930FItem # 5 - 5330 Broadway ARB Case # 930F
Item # 5 - 5330 Broadway ARB Case # 930F
 
Item # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance ReviewItem # 6 - 7001 Broadway Significance Review
Item # 6 - 7001 Broadway Significance Review
 
Item # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services AgreementItem # 7 - BB Inspection Services Agreement
Item # 7 - BB Inspection Services Agreement
 
Item # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way StopItem # 8 -- Tuxedo Columbine 3--way Stop
Item # 8 -- Tuxedo Columbine 3--way Stop
 
Item # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
Item # 9 - 2024 Street Maintenance Plan (SMP) AmdmntItem # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
Item # 9 - 2024 Street Maintenance Plan (SMP) Amdmnt
 
PPT Item # 5 -- Announcements Powerpoint
PPT Item # 5 -- Announcements PowerpointPPT Item # 5 -- Announcements Powerpoint
PPT Item # 5 -- Announcements Powerpoint
 
PPT Item # 9 2ndQTR Financial & Inv. Report
PPT Item # 9 2ndQTR Financial & Inv. ReportPPT Item # 9 2ndQTR Financial & Inv. Report
PPT Item # 9 2ndQTR Financial & Inv. Report
 
Item # 9- 2nd Qtr Financial & Inv. Report
Item # 9- 2nd Qtr Financial & Inv. ReportItem # 9- 2nd Qtr Financial & Inv. Report
Item # 9- 2nd Qtr Financial & Inv. Report
 
PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438PPT Item # 7&8 6900 Broadway P&Z Case # 438
PPT Item # 7&8 6900 Broadway P&Z Case # 438
 
Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438Item # 7-8 - 6900 Broadway P&Z Case # 438
Item # 7-8 - 6900 Broadway P&Z Case # 438
 
Item ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM MinutesItem ## 4a -- April 29, 2024 CCM Minutes
Item ## 4a -- April 29, 2024 CCM Minutes
 
PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23PPT Item # 8 - Annual Comprehensive Financial Report FY23
PPT Item # 8 - Annual Comprehensive Financial Report FY23
 
Item # 8 - FY23 Annual Comprehensive Financial Report
Item # 8 - FY23 Annual Comprehensive Financial ReportItem # 8 - FY23 Annual Comprehensive Financial Report
Item # 8 - FY23 Annual Comprehensive Financial Report
 
Item # 7 - Adoption of Bexar County Hazard Mitigation Plan
Item # 7 - Adoption of Bexar County Hazard Mitigation PlanItem # 7 - Adoption of Bexar County Hazard Mitigation Plan
Item # 7 - Adoption of Bexar County Hazard Mitigation Plan
 
PPT Item # 7 - Bexar County Hazard Mitigation Plan
PPT Item # 7 - Bexar County Hazard Mitigation PlanPPT Item # 7 - Bexar County Hazard Mitigation Plan
PPT Item # 7 - Bexar County Hazard Mitigation Plan
 
PPT Item # 6 - Designation of Health Authority.pdf
PPT Item # 6 - Designation of Health Authority.pdfPPT Item # 6 - Designation of Health Authority.pdf
PPT Item # 6 - Designation of Health Authority.pdf
 

Recently uploaded

Minority economic forum Executive Summary
Minority economic forum Executive SummaryMinority economic forum Executive Summary
Minority economic forum Executive SummaryRDE GROUP CORP
 
30th anniversary of the International Year of Families.
30th anniversary of the International Year of Families.30th anniversary of the International Year of Families.
30th anniversary of the International Year of Families.Christina Parmionova
 
Program Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptxProgram Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptxScottMeyers35
 
“Bee engaged with Youth”. World Bee Day 2024; May. 20th.
“Bee engaged with Youth”. World Bee Day 2024; May. 20th.“Bee engaged with Youth”. World Bee Day 2024; May. 20th.
“Bee engaged with Youth”. World Bee Day 2024; May. 20th.Christina Parmionova
 
16 may, International Day of Living together in peace 2024
16 may, International Day of Living together in peace 202416 may, International Day of Living together in peace 2024
16 may, International Day of Living together in peace 2024Christina Parmionova
 
Who are the Sherden Yale Historical Review
Who are the Sherden Yale Historical ReviewWho are the Sherden Yale Historical Review
Who are the Sherden Yale Historical Reviewyalehistoricalreview
 
Ghana High Commission on list of diplomats including US & China who owe £143m...
Ghana High Commission on list of diplomats including US & China who owe £143m...Ghana High Commission on list of diplomats including US & China who owe £143m...
Ghana High Commission on list of diplomats including US & China who owe £143m...Kweku Zurek
 
Happy International Day of light - SPIE.
Happy International Day of light - SPIE.Happy International Day of light - SPIE.
Happy International Day of light - SPIE.Christina Parmionova
 
2024: The FAR - Federal Acquisition Regulations, Part 34
2024: The FAR - Federal Acquisition Regulations, Part 342024: The FAR - Federal Acquisition Regulations, Part 34
2024: The FAR - Federal Acquisition Regulations, Part 34JSchaus & Associates
 
Pitch Presentation for b2.pptxsssssssssssssssssssssss
Pitch Presentation for b2.pptxsssssssssssssssssssssssPitch Presentation for b2.pptxsssssssssssssssssssssss
Pitch Presentation for b2.pptxsssssssssssssssssssssssDanielOliver74
 
bee engaged with youth - World Bee Day 2024
bee engaged with youth - World Bee Day 2024bee engaged with youth - World Bee Day 2024
bee engaged with youth - World Bee Day 2024Christina Parmionova
 
“Be part of the Plan” International Day For Biological Diversity 2024.
“Be part of the Plan” International Day For Biological Diversity 2024.“Be part of the Plan” International Day For Biological Diversity 2024.
“Be part of the Plan” International Day For Biological Diversity 2024.Christina Parmionova
 
Rocky Mount | Wilson | Greenville Regional Transit Plan Executive Summary
Rocky Mount | Wilson | Greenville Regional Transit Plan Executive SummaryRocky Mount | Wilson | Greenville Regional Transit Plan Executive Summary
Rocky Mount | Wilson | Greenville Regional Transit Plan Executive SummaryRobert Hiett
 
Geate Advertising Agency by Slidesgo.pptx
Geate Advertising Agency by Slidesgo.pptxGeate Advertising Agency by Slidesgo.pptx
Geate Advertising Agency by Slidesgo.pptxnouralhuda2210173
 
Sponsoring a Girl Child's Education in kurnool
Sponsoring a Girl Child's Education in kurnoolSponsoring a Girl Child's Education in kurnool
Sponsoring a Girl Child's Education in kurnoolSERUDS INDIA
 
Ian Bremmer's message for those graduating in toxic times.pdf
Ian Bremmer's message for those graduating in toxic times.pdfIan Bremmer's message for those graduating in toxic times.pdf
Ian Bremmer's message for those graduating in toxic times.pdfEnergy for One World
 
Finland's mental health policy and its implementation: a CSO perspective
Finland's mental health policy and its implementation: a CSO perspectiveFinland's mental health policy and its implementation: a CSO perspective
Finland's mental health policy and its implementation: a CSO perspectiveKristian Wahlbeck
 

Recently uploaded (20)

Minority economic forum Executive Summary
Minority economic forum Executive SummaryMinority economic forum Executive Summary
Minority economic forum Executive Summary
 
07/03/2024 Publiekdomeindag - namiddag
07/03/2024 Publiekdomeindag - namiddag07/03/2024 Publiekdomeindag - namiddag
07/03/2024 Publiekdomeindag - namiddag
 
30th anniversary of the International Year of Families.
30th anniversary of the International Year of Families.30th anniversary of the International Year of Families.
30th anniversary of the International Year of Families.
 
Program Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptxProgram Kickoff- Cohort 4______ (2).pptx
Program Kickoff- Cohort 4______ (2).pptx
 
“Bee engaged with Youth”. World Bee Day 2024; May. 20th.
“Bee engaged with Youth”. World Bee Day 2024; May. 20th.“Bee engaged with Youth”. World Bee Day 2024; May. 20th.
“Bee engaged with Youth”. World Bee Day 2024; May. 20th.
 
16 may, International Day of Living together in peace 2024
16 may, International Day of Living together in peace 202416 may, International Day of Living together in peace 2024
16 may, International Day of Living together in peace 2024
 
Who are the Sherden Yale Historical Review
Who are the Sherden Yale Historical ReviewWho are the Sherden Yale Historical Review
Who are the Sherden Yale Historical Review
 
Ghana High Commission on list of diplomats including US & China who owe £143m...
Ghana High Commission on list of diplomats including US & China who owe £143m...Ghana High Commission on list of diplomats including US & China who owe £143m...
Ghana High Commission on list of diplomats including US & China who owe £143m...
 
Happy International Day of light - SPIE.
Happy International Day of light - SPIE.Happy International Day of light - SPIE.
Happy International Day of light - SPIE.
 
2024: The FAR - Federal Acquisition Regulations, Part 34
2024: The FAR - Federal Acquisition Regulations, Part 342024: The FAR - Federal Acquisition Regulations, Part 34
2024: The FAR - Federal Acquisition Regulations, Part 34
 
Pitch Presentation for b2.pptxsssssssssssssssssssssss
Pitch Presentation for b2.pptxsssssssssssssssssssssssPitch Presentation for b2.pptxsssssssssssssssssssssss
Pitch Presentation for b2.pptxsssssssssssssssssssssss
 
How to Save a Place: How to Fund Your Preservation Project
How to Save a Place: How to Fund Your Preservation ProjectHow to Save a Place: How to Fund Your Preservation Project
How to Save a Place: How to Fund Your Preservation Project
 
bee engaged with youth - World Bee Day 2024
bee engaged with youth - World Bee Day 2024bee engaged with youth - World Bee Day 2024
bee engaged with youth - World Bee Day 2024
 
“Be part of the Plan” International Day For Biological Diversity 2024.
“Be part of the Plan” International Day For Biological Diversity 2024.“Be part of the Plan” International Day For Biological Diversity 2024.
“Be part of the Plan” International Day For Biological Diversity 2024.
 
07/03/2024 Publiekdomeindag - voormiddag
07/03/2024 Publiekdomeindag - voormiddag07/03/2024 Publiekdomeindag - voormiddag
07/03/2024 Publiekdomeindag - voormiddag
 
Rocky Mount | Wilson | Greenville Regional Transit Plan Executive Summary
Rocky Mount | Wilson | Greenville Regional Transit Plan Executive SummaryRocky Mount | Wilson | Greenville Regional Transit Plan Executive Summary
Rocky Mount | Wilson | Greenville Regional Transit Plan Executive Summary
 
Geate Advertising Agency by Slidesgo.pptx
Geate Advertising Agency by Slidesgo.pptxGeate Advertising Agency by Slidesgo.pptx
Geate Advertising Agency by Slidesgo.pptx
 
Sponsoring a Girl Child's Education in kurnool
Sponsoring a Girl Child's Education in kurnoolSponsoring a Girl Child's Education in kurnool
Sponsoring a Girl Child's Education in kurnool
 
Ian Bremmer's message for those graduating in toxic times.pdf
Ian Bremmer's message for those graduating in toxic times.pdfIan Bremmer's message for those graduating in toxic times.pdf
Ian Bremmer's message for those graduating in toxic times.pdf
 
Finland's mental health policy and its implementation: a CSO perspective
Finland's mental health policy and its implementation: a CSO perspectiveFinland's mental health policy and its implementation: a CSO perspective
Finland's mental health policy and its implementation: a CSO perspective
 

PPT Item # 7 - Demolition & Replacement Structure Processes

  • 1. Presented by: Phil Laney, Assistant City Manager STAFF REPORT: DEMOLITION AND REPLACEMENT STRUCTURE REVIEW PROCESSES ITEM # 7 APRIL 09, 2024 ADMINISTRATION
  • 2. SUMMARY  Potential updates to residential construction development process & Architectural Review Board responsibilities  Currently, review of demolitions (significance) does not also require review of proposed new/renovated replacement structure (compatibility)  Proposal would require demolition review request to also include proposed replacement structure review
  • 3. BACKGROUND  Chapter 5 – Buildings and Building Regulations, Article IX – Demolitions oversees demolition review procedures  Per Code, demolition review process is intended to complete both the determination of significance of existing structures proposed for demolition and the compatibility review of any replacement structures within the same process  However, by Code, significance (demolition) and compatibility (replacement structure) may be completed in separate processes if requested by owner
  • 4. BACKGROUND  Multiple discussions involving proposed demolitions have included requests to view the proposed replacement structure, but not available or required  Feelings expressed that some concern about demolition could be minimized if more information was available on the replacement structure
  • 5. POTENTIAL ARB PROPOSAL  Amend demolition review procedures so that significance and compatibility process may not be completed in separate processes  Demolition review application must also include all compatibility review materials for the replacement structure  Both ARB & Council demolition review would include proposal for replacement structure  If replacement structure deemed incompatible with other structures or replacement structure not proposed, demolition delay may be necessary to revise and/or develop design
  • 6. NEXT STEPS  4/1/2024 – Council staff report  4/16/2024 – Architectural Review Board  Recommendation on proposed process changes  4/29/2024 – Council consideration of proposed changes  Ongoing – Council committee & staff continue working to update ARB rules/roles/mission with proposed amendments forthcoming