SlideShare a Scribd company logo
1 of 7
NEERAJ KUMAR
Phone No.: 09811201342 ; E Mail Id: neerajcoumar@yahoo.com; neerajcoumar@gmail.com
Professional Synopsis
⊗ Approximately 22 years of experience in totality. Project Planning, Audit, Billing, Contracts, Design
management, Procurement and Team Management of housing, commercial and Hotel property and
maintenance of Hotel and flight kitchens.
⊗ PRESENTLY ASSOCIATED WITH TDI INFRACORP LTD. NEW DELHI DESIGNATED AS DGM-
SERVICES (PLANNING AND AUDIT)
Planning and execution of a 29 acres housing project with all MEP tender evaluation and processing for
award of work.
Auditing of bills.
TDI City, Panipat – 125 acres project.
Development of Low rise and high rise Floors. Club, Town Centre, Villa etc.
Lake Grove City, Kundli
Development of Low Rise & High Rise and Iconic Tower.
Development of a lake.
Coordination with architect, consultant and execution team.
First time Fire system proposed for Low Rise blocks as central firefighting station – a deviation from
NBC.
Working on LEED / GRIHA certification.
Successfully executed Projects like:
Transit Camp (In collaboration with DDA) of 2800 unit accommodation - single room PRE
FAB units (cemented and PUFF panel walls) with common toilet and bath facility) for
Kathputli Colony rehabilitation project at Shadipur, New Delhi . Single storey and G + 1 structure.
A 17 acre project with 2800 dwelling single room units for under privileged families. (Transit camp
has above ground water storage 200 KL arrangement, 4 active borewells, 10 KLD RO plant, 2800
KW electricity connection with a sub city like individual electricity connection based distribution,
Prepaid metering system, CCTV system, Street lights and boundary with 200 KLD Sewerage
Treatment Plant and extensive Drainage System) Project cost – 35 cr
⊗ RAHEJA ATHARVA G + 18 - 11 TOWERS AND 6 BLOCKS LOW RISE, HANDED OVER. COMPLETED.
⊗ RAHEJA VEDAANTA HOUSING PROJECT. MEP ACTIVITIES. COMPLETED.
⊗ RAHEJA NAVODAYA HOUSING PROJECT. MEP ACTIVITIES. Under completion.
⊗ RAHEJA MALL by Raheja Developers Ltd – ENTIRE MEP services. Completed and handed over
project.
⊗ 3 Star RAHEJA GINGER 100 Keys Budget Hotel under the banner of Ginger Hotels at
Raheja Square, Manesar. Hotel COMPLETED , made operational and handed over.
⊗ Westgate Mall (HVAC aspect), Rajouri Garden. Completed Handed over.
⊗ Taj Palace Hotel – Durbar Hall HVAC, Plumbing plus Fire Fighting renovation work,
Electrical lighting and control, Audio Video arrangement, Fire detection system.
⊗ Taj palace Hotel – Floor renovation work. Five Star set up.
⊗ Lift, Escalator and air conditioning work at Promenade Mall, Vasant Kunj, New Delhi.
Under DLF.
⊗ Expertise in planning, controlling & managing the design issues. Skills in conceptualizing
and effecting process initiatives to enhance the operational efficiency.
⊗ An effective communicator with excellent relationship management skills and strong analytical,
problem solving & organizational abilities. Possess a flexible & detail oriented attitude.
Areas of Expertise
Strategy Planning
⊗ Managing overall profitability of operations and accountable for strategic utilisation and deployment
of available resources to achieve organisational objectives.
⊗ Planning and ensuring adherence to the allotted budgets.
⊗ Alternate resources to control budget.
Design Engineering
⊗ Managing the design and planning of layout of various projects including requirement analysis,
concept review and finalizing specifications with consultants.
⊗ Interpreting drawings of the projects on the worksites and ensuring compliance of drawings with
statutory and regulatory requirements.
Site & Construction Management
⊗ Supervising all construction activities including providing technical assistance & methodologies of
construction & coordination with site management team.
⊗ Leading and motivating teams of workers and professionals and handling allocation of tasks within
teams based on skills profile.
⊗ Identifying & developing a vendor source for achieving cost effective purchase of equipment,
accessories & timely delivery so as to minimize project cost.
Contract Management
⊗ DBR approval, managing pre-tender obligations like reviewing pre-qualifications, studying of
contractual conditions and approval, project cost analysis including considering cost impact of
techno commercial conditions.
⊗ Floating tender in the market, vendor selection, Tender negotiation. Equipment selection, Final
negotiation and award of contract. Mobilization of contractor at site.
⊗ Reviewing contract documents for various work items including contractual terms and conditions,
technical specifications and commercial terms.
Project in Progress :
TDI LAKE GROVE CITY, KUNDLI (29 acre township)
TDI CITY, PANIPAT – 125 acre township
Business District, Connaught Place
GROWTH PATH
From To Company Post Held
22.12.2014 Till date TDI INFRACORP LTD DGM – Services
(Planning & Audit)
16.10.2008 21.12.2014 RAHEJA DEVELOPERS LTD AGM – Services
promoted from Sr.
Manager – services
01.12.2007 15.10.2008 DLF LTD Dy. Project Manager
( Mechanical )
16.01.2007 31.11.2007 INDIAN HOTELS CO. LTD Site Engineer
July 2005 15.01.2007 Today Homes & Infra Structure
Pvt Ltd
Sr. Engineer – HVAC
August 2002 June 2005 TAJ PALACE HOTEL, NEW
DELHI.
Guest Service Officer
August 2000 July 2002 TAJ AIR CATERERS, NEW DELHI. Engineering Asstt.
April 1994 July 2000 NEPTUNE ENGINEERING PVT
LTD. NEW DELHI
Service Engineer
Oct 1992 March 1994 S. K. INDUSTRIES, PATNA. Quality control cum
assurance engineer
KNOWLEDGE ACCRUED OVER 22 YEARS OF CAREER SPAN
1 Engineering, Design Management, project co ordination,
liaison with govt. agencies. Design briefing with Consultants
and Architects.
2 Equipment selection in coordination with Consultants and
contracting agencies.
3 Tender evaluation, floating, negotiation, award of work and
site mobilization for execution for all MEP services.
4 Execution of HVAC works. ( Done 1200 TR installation at
West Gate project – Today Homes and 1100 TR at Raheja
Mall)
5 Installation of LT & HT System.
6 Complete Electrical installation of a shopping mall and a
Highrise housing project.
7 Fire Fighting and Fire Detection Systems
8 Water Treatment Systems.
9 Knowledge of installation and operation of Sewage Treatment
Plant.
1
0
Plumbing system of a commercial and a High rise housing
project.
1
1
Plumbing system of Green Field Infrastructure development.
1
2
DG Sets installation.
1
3
Tendering, negotiation, Ordering, party mobilization at site,
Installation, coordination of Lift work with civil right from
planning stage.
1
4
Installation and coordination of Escalator work.
1
5
Rain Water harvesting.
1
6
SOLAR WATER HEATER installation.
1
7
Bore well and Storm Water drainage system.
1
8
Coordination of all the related services for interior finishing
work.
1
9
Renovation of Banquet halls and 5 star hotel rooms of a 5 star
hotel facility. Public area maintenance of a 5 start hotel
facility including carpentry, painting, civil works and minor
office maintenance etc.
2
0
Installation, Commissioning and commissioning of Vapour
Absorption System. Imparting training to the operators over
the subject. Spare parts sale and management.
2
1
Design management, selection, installation and
commissioning of a Pump room.
2
2
Maintenance of ventilation system of high end kitchen facility.
2
3
Maintenance of non IBR boiler set up.
2
4
Production and quality assurance of Centrifugal pumps and
Deep well hand pumps.
.
QUALIFICATION :
1. Diploma in Mechanical Engineering from New Govt. Polytechnic, Patna – 13 in 1992
2. Degree in Mechanical Engineering from Delhi Institute of Engineering Studies, New
Delhi in 2010.
TRAINING ATTENDED :
1. Trained Fire Fighter from Fire Fighting Training Institute, Goa.
2. Certified Departmental Trainer At Taj Palace Hotel, Engineering Deptt.
Date of Birth:
30 th May,
1972
PERMANENT ADDRESS Present Address
Neeraj Kumar,
S/o Late Sri Baij Nath
Prasad,
Moh – Sultanpur
P. O. – Danapur Cantt
Distt – Patna
Pin – 801503
Res Ph – 09431602813
Neeraj Kumar,
RZF-477, UGF-002,
Mahatma Gandhi Marg,
Raj Nagar Part - II,
Palam Colony,
New Delhi - 110045
PASSPORT DETAIL
J 3881690 issued at PATNA valid until
20.10.2020
Date : Signature
J 3881690 issued at PATNA valid until
20.10.2020
Date : Signature

More Related Content

What's hot (18)

JAY CV 2016
JAY CV 2016JAY CV 2016
JAY CV 2016
 
Beach house construction desktop 02 29
Beach house construction desktop 02 29Beach house construction desktop 02 29
Beach house construction desktop 02 29
 
Resume updated
Resume updatedResume updated
Resume updated
 
Amr. 2015....
Amr. 2015....Amr. 2015....
Amr. 2015....
 
Jahangir.Contractor
Jahangir.ContractorJahangir.Contractor
Jahangir.Contractor
 
hdebelenjr-latest-CV
hdebelenjr-latest-CVhdebelenjr-latest-CV
hdebelenjr-latest-CV
 
Tauseef_CV PP_Rev2
Tauseef_CV PP_Rev2Tauseef_CV PP_Rev2
Tauseef_CV PP_Rev2
 
CV 11.10.16
CV 11.10.16CV 11.10.16
CV 11.10.16
 
Vimal, Civil Engr CV
Vimal, Civil Engr CVVimal, Civil Engr CV
Vimal, Civil Engr CV
 
CV 2014 WEB UPLOAD
CV 2014 WEB UPLOADCV 2014 WEB UPLOAD
CV 2014 WEB UPLOAD
 
Ateeq cv d
Ateeq cv dAteeq cv d
Ateeq cv d
 
Resume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - GowrijayashankarResume-Civil - QC Engineer - Gowrijayashankar
Resume-Civil - QC Engineer - Gowrijayashankar
 
Bonny Resume ( Proc)
Bonny Resume ( Proc)Bonny Resume ( Proc)
Bonny Resume ( Proc)
 
Application of Project Manager-Peng Sher Seong
Application of Project Manager-Peng Sher SeongApplication of Project Manager-Peng Sher Seong
Application of Project Manager-Peng Sher Seong
 
CV sultan(Q)
CV sultan(Q)CV sultan(Q)
CV sultan(Q)
 
Peter L. Cabbab.
Peter L. Cabbab.Peter L. Cabbab.
Peter L. Cabbab.
 
Ateeq cv
Ateeq cv Ateeq cv
Ateeq cv
 
CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)CV Abdul Gaffer.docx revised (3)
CV Abdul Gaffer.docx revised (3)
 

Similar to neeraj kumar - resume (1)

Similar to neeraj kumar - resume (1) (20)

Resume
ResumeResume
Resume
 
Waseem siddique (li)
Waseem siddique (li)Waseem siddique (li)
Waseem siddique (li)
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
jafar hussain 07-06-2014
jafar hussain 07-06-2014jafar hussain 07-06-2014
jafar hussain 07-06-2014
 
CV- Abdullah Reddy Baddam
CV- Abdullah Reddy BaddamCV- Abdullah Reddy Baddam
CV- Abdullah Reddy Baddam
 
PREMENDRA CV Apr 6
PREMENDRA CV Apr 6PREMENDRA CV Apr 6
PREMENDRA CV Apr 6
 
Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019Sandeep kumar pandey updated 2019
Sandeep kumar pandey updated 2019
 
Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_
 
CV
CVCV
CV
 
guptapranay20072016
guptapranay20072016guptapranay20072016
guptapranay20072016
 
M New
M NewM New
M New
 
RESUME - AMB- N
RESUME - AMB- NRESUME - AMB- N
RESUME - AMB- N
 
M New
M NewM New
M New
 
Sheikh Mohammed Muntazer Resume
Sheikh Mohammed Muntazer Resume Sheikh Mohammed Muntazer Resume
Sheikh Mohammed Muntazer Resume
 
Sheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - FinalSheikh Mohammed Muntazer- Resume - Final
Sheikh Mohammed Muntazer- Resume - Final
 
satheesh Resume
satheesh Resumesatheesh Resume
satheesh Resume
 
Waseem siddique Resume
Waseem siddique ResumeWaseem siddique Resume
Waseem siddique Resume
 
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)Imteyaz ahmad   12 yrs exp in MEP (Site / Project Management)
Imteyaz ahmad 12 yrs exp in MEP (Site / Project Management)
 
CV- bala qa
CV- bala qaCV- bala qa
CV- bala qa
 
Mohit Sharma C.V -
Mohit Sharma C.V - Mohit Sharma C.V -
Mohit Sharma C.V -
 

neeraj kumar - resume (1)

  • 1. NEERAJ KUMAR Phone No.: 09811201342 ; E Mail Id: neerajcoumar@yahoo.com; neerajcoumar@gmail.com Professional Synopsis ⊗ Approximately 22 years of experience in totality. Project Planning, Audit, Billing, Contracts, Design management, Procurement and Team Management of housing, commercial and Hotel property and maintenance of Hotel and flight kitchens. ⊗ PRESENTLY ASSOCIATED WITH TDI INFRACORP LTD. NEW DELHI DESIGNATED AS DGM- SERVICES (PLANNING AND AUDIT) Planning and execution of a 29 acres housing project with all MEP tender evaluation and processing for award of work. Auditing of bills. TDI City, Panipat – 125 acres project. Development of Low rise and high rise Floors. Club, Town Centre, Villa etc. Lake Grove City, Kundli Development of Low Rise & High Rise and Iconic Tower. Development of a lake. Coordination with architect, consultant and execution team. First time Fire system proposed for Low Rise blocks as central firefighting station – a deviation from NBC. Working on LEED / GRIHA certification. Successfully executed Projects like: Transit Camp (In collaboration with DDA) of 2800 unit accommodation - single room PRE FAB units (cemented and PUFF panel walls) with common toilet and bath facility) for Kathputli Colony rehabilitation project at Shadipur, New Delhi . Single storey and G + 1 structure. A 17 acre project with 2800 dwelling single room units for under privileged families. (Transit camp has above ground water storage 200 KL arrangement, 4 active borewells, 10 KLD RO plant, 2800 KW electricity connection with a sub city like individual electricity connection based distribution, Prepaid metering system, CCTV system, Street lights and boundary with 200 KLD Sewerage Treatment Plant and extensive Drainage System) Project cost – 35 cr ⊗ RAHEJA ATHARVA G + 18 - 11 TOWERS AND 6 BLOCKS LOW RISE, HANDED OVER. COMPLETED. ⊗ RAHEJA VEDAANTA HOUSING PROJECT. MEP ACTIVITIES. COMPLETED. ⊗ RAHEJA NAVODAYA HOUSING PROJECT. MEP ACTIVITIES. Under completion. ⊗ RAHEJA MALL by Raheja Developers Ltd – ENTIRE MEP services. Completed and handed over project. ⊗ 3 Star RAHEJA GINGER 100 Keys Budget Hotel under the banner of Ginger Hotels at Raheja Square, Manesar. Hotel COMPLETED , made operational and handed over. ⊗ Westgate Mall (HVAC aspect), Rajouri Garden. Completed Handed over. ⊗ Taj Palace Hotel – Durbar Hall HVAC, Plumbing plus Fire Fighting renovation work, Electrical lighting and control, Audio Video arrangement, Fire detection system. ⊗ Taj palace Hotel – Floor renovation work. Five Star set up. ⊗ Lift, Escalator and air conditioning work at Promenade Mall, Vasant Kunj, New Delhi. Under DLF. ⊗ Expertise in planning, controlling & managing the design issues. Skills in conceptualizing and effecting process initiatives to enhance the operational efficiency.
  • 2. ⊗ An effective communicator with excellent relationship management skills and strong analytical, problem solving & organizational abilities. Possess a flexible & detail oriented attitude. Areas of Expertise Strategy Planning ⊗ Managing overall profitability of operations and accountable for strategic utilisation and deployment of available resources to achieve organisational objectives. ⊗ Planning and ensuring adherence to the allotted budgets. ⊗ Alternate resources to control budget. Design Engineering ⊗ Managing the design and planning of layout of various projects including requirement analysis, concept review and finalizing specifications with consultants. ⊗ Interpreting drawings of the projects on the worksites and ensuring compliance of drawings with statutory and regulatory requirements. Site & Construction Management ⊗ Supervising all construction activities including providing technical assistance & methodologies of construction & coordination with site management team. ⊗ Leading and motivating teams of workers and professionals and handling allocation of tasks within teams based on skills profile. ⊗ Identifying & developing a vendor source for achieving cost effective purchase of equipment, accessories & timely delivery so as to minimize project cost. Contract Management ⊗ DBR approval, managing pre-tender obligations like reviewing pre-qualifications, studying of contractual conditions and approval, project cost analysis including considering cost impact of techno commercial conditions. ⊗ Floating tender in the market, vendor selection, Tender negotiation. Equipment selection, Final negotiation and award of contract. Mobilization of contractor at site. ⊗ Reviewing contract documents for various work items including contractual terms and conditions, technical specifications and commercial terms. Project in Progress : TDI LAKE GROVE CITY, KUNDLI (29 acre township) TDI CITY, PANIPAT – 125 acre township Business District, Connaught Place
  • 3. GROWTH PATH From To Company Post Held 22.12.2014 Till date TDI INFRACORP LTD DGM – Services (Planning & Audit) 16.10.2008 21.12.2014 RAHEJA DEVELOPERS LTD AGM – Services promoted from Sr. Manager – services 01.12.2007 15.10.2008 DLF LTD Dy. Project Manager ( Mechanical ) 16.01.2007 31.11.2007 INDIAN HOTELS CO. LTD Site Engineer July 2005 15.01.2007 Today Homes & Infra Structure Pvt Ltd Sr. Engineer – HVAC August 2002 June 2005 TAJ PALACE HOTEL, NEW DELHI. Guest Service Officer August 2000 July 2002 TAJ AIR CATERERS, NEW DELHI. Engineering Asstt. April 1994 July 2000 NEPTUNE ENGINEERING PVT LTD. NEW DELHI Service Engineer Oct 1992 March 1994 S. K. INDUSTRIES, PATNA. Quality control cum assurance engineer KNOWLEDGE ACCRUED OVER 22 YEARS OF CAREER SPAN 1 Engineering, Design Management, project co ordination, liaison with govt. agencies. Design briefing with Consultants and Architects. 2 Equipment selection in coordination with Consultants and contracting agencies. 3 Tender evaluation, floating, negotiation, award of work and site mobilization for execution for all MEP services. 4 Execution of HVAC works. ( Done 1200 TR installation at West Gate project – Today Homes and 1100 TR at Raheja Mall) 5 Installation of LT & HT System. 6 Complete Electrical installation of a shopping mall and a Highrise housing project. 7 Fire Fighting and Fire Detection Systems 8 Water Treatment Systems.
  • 4. 9 Knowledge of installation and operation of Sewage Treatment Plant. 1 0 Plumbing system of a commercial and a High rise housing project. 1 1 Plumbing system of Green Field Infrastructure development. 1 2 DG Sets installation. 1 3 Tendering, negotiation, Ordering, party mobilization at site, Installation, coordination of Lift work with civil right from planning stage. 1 4 Installation and coordination of Escalator work. 1 5 Rain Water harvesting. 1 6 SOLAR WATER HEATER installation. 1 7 Bore well and Storm Water drainage system. 1 8 Coordination of all the related services for interior finishing work. 1 9 Renovation of Banquet halls and 5 star hotel rooms of a 5 star hotel facility. Public area maintenance of a 5 start hotel facility including carpentry, painting, civil works and minor office maintenance etc. 2 0 Installation, Commissioning and commissioning of Vapour Absorption System. Imparting training to the operators over
  • 5. the subject. Spare parts sale and management. 2 1 Design management, selection, installation and commissioning of a Pump room. 2 2 Maintenance of ventilation system of high end kitchen facility. 2 3 Maintenance of non IBR boiler set up. 2 4 Production and quality assurance of Centrifugal pumps and Deep well hand pumps. . QUALIFICATION : 1. Diploma in Mechanical Engineering from New Govt. Polytechnic, Patna – 13 in 1992 2. Degree in Mechanical Engineering from Delhi Institute of Engineering Studies, New Delhi in 2010. TRAINING ATTENDED : 1. Trained Fire Fighter from Fire Fighting Training Institute, Goa. 2. Certified Departmental Trainer At Taj Palace Hotel, Engineering Deptt. Date of Birth: 30 th May, 1972 PERMANENT ADDRESS Present Address Neeraj Kumar, S/o Late Sri Baij Nath Prasad, Moh – Sultanpur P. O. – Danapur Cantt Distt – Patna Pin – 801503 Res Ph – 09431602813 Neeraj Kumar, RZF-477, UGF-002, Mahatma Gandhi Marg, Raj Nagar Part - II, Palam Colony, New Delhi - 110045 PASSPORT DETAIL
  • 6. J 3881690 issued at PATNA valid until 20.10.2020 Date : Signature
  • 7. J 3881690 issued at PATNA valid until 20.10.2020 Date : Signature