Qualified civil Engineer offering 16+ years of qualitative experience including 9+ years in Gulf
PROFILE
• Highly accomplished professional with incredible experience acquired over the years in diverse areas
encompassing project management, installation & commissioning of site & construction management and execution
of civil engineering works for roads & bridges (cable stay), micro tunneling(3000mmØ), Sulphur tank, irrigation
system, Landscaping, Sewage, Drainage (Manhole, Catch pit, gully) Street Lighting, Duct (Electrical, Telephone,
Armed force) Road marking and residential & commercial buildings such as oil & gas and other infrastructure
works.
• Thorough understanding of Quality System Management, concepts and application of ISO, OHSAS, and 5S, etc. as
well as Health & Safety Standards and Quality Compliances.
• Professional competencies in mobilizing and judiciously managing available resources – men & materials; sound
understanding of Construction Methods & Implementation, preparing shop drawings, taking quantity measurement,
and preparing various reports.
• Articulate communicator, skilled at effectively collaborating with users/clients, architects, designers, technical
examiners, consultants as well as labor to smoothly commission projects on schedule
KEY STRENTH AREAS
Site Execution - Surveying (Expert in topographic & Bathymetric survey) well-known Leveling instrument, Total
station and GPS) - Quantity Survey - AutoCAD Drafting Site Management - Contract Management Quality - Health &
Safety - General Administration.
PROFESSIONAL EXPERIENCE AND ACCOMPLISHMENTS
• QDVC(Qatar Diar vinci construction) – Doha Qatar Since - Aug2014
Sr Engineer – Reporting to Section Engineer
• QP approved work site Supervisor
• Project: Design and construct New Orbital Highway & Truck Rout (P023)
Contract-2: Orbital Highway: Salwa Road to North Relief Road.
Providing 47 Km. complete design and construction of A new freeway including seven different grade-separate
interchanges with cross roads collectors distributors, truck lanes, over pass and under pass structures, retaining
walls, pedestrian and bicycle paths, traffic signs, ITS, landscape and hardscape and arts cape, street lighting all
related infrastructures, etc.
Client: ASHGHAL (Public Works Authorits Road Affairs- State of Qatar).
Project Value: 4.7 Billion Qatari riyal
• Solid General Construction LLC – Doha Qatar Oct-2012 – Aug2014
Project Engineer – Reporting to Project Manager
• Project: Peripheral & surrounding roads around new Qatar national museum in Doha. (Contact no DS 030)
Providing 2 Km. 4-lane main carriage way and Included 2 Km Micro tunneling 1200mm diameter RCJP W/ 10 nos.
Access Shaft, 3.0 Km, Street Lighting, underground utilities infrastructure drainage and irrigation system and
landscaping etc.
Client: ASHGHAL (Public Works Authority Road Affairs- State of Qatar).
Project Value: 74 Million Qatari riyal.
• Successfully completed Project: Construction of new road and upgrading of existing road in Dukhan. Contract no
(2398/ GC12104000)
(included 6.5km new and 1.5km upgrading two-way roads and (included 2nos substation building, 24nos pipeline
culverts, 14nos storm drainage culverts, 50nos electrical and telephone duct bank, street lighting, irrigation and
landscaping system and crash barriers)
Client: Qatar Petroleum (QP)
Project Valve: 54 million Qatari riyal.
Roles and Responsibilities:
- To be responsible for day to day site works.
- Follow up with site engineers of sub-contractor to ensure that work is being carried out as per the plan.
- Interact with Project Manager for clarification in design/ RFI etc.
- Report on daily basis about progress, non-compliance, delay in work to the Project Manager
- Ensure that communication regarding any changes in plan has reached the site Engineers & Sub-contractors.
- Conduct regular job site inspections.
- Actively monitor the work environment for hazards
- Assist in the quality and safety audit, Identify and highlight possible risk on project.
- Assist in necessary project documentation.
- Coordinate with the Store keeper for inventory of material thereby ensuring that the supplies are properly
maintained
- Coordinate for verification of extra claims raised by the contractor
- Monitor, evaluate and ensure that all work is being carried out safely
- Implement technical and safety requirements for the project
- Review and comment on project contractor’s method statement and risk assessment.
- Ensure that the HSE plan is being implemented and report all non-conformance to the QHSE manager
- Attend and review all benchmarking meetings
- Ensure construction QA/QC processes are being implemented by the sub-contractors
- Report any non-conforming work to the Project Manager
- Identify and report technical queries to Project Manager
- Responsible for all aspects related to Project quality assurance and quality control.
- Responsible for the completion of necessary documentation to verify the work performed.
- Ensure that inspection requests are implemented.
- Ensure that all test reports are verified to meet the contract requirements.
- Ensure all materials delivered to site are inspected and conform to specified requirements and approval.
- Responsible for the completion of final quality documentation in a presentable manner in accordance with the
conditions of contract.
- Control and sign ‘As built Drawings’.
• Consolidated contractors’ international co. Abu Dhabi, U.A.E. Feb 2012 - Oct 2012
Senior Site Engineer - Reporting to Construction Manager.
• Project: Shah sulphur station and pipe line, SC package no P1069-SC-03.
(included 6.5km 2 lane and 2 side shoulder Road & 12km pipe line, Pipe rake, substation, IES Building, overhead
Tower and (37.6m,42mØ) 12 no’s Sulphur & water Tanks.
Client: Al Hosan Gas (Abu Dhabi gas development company Ltd) (ADCO)
Site: Shah, Abu Dhabi, UAE.
Project value: 750 million USD.
Roles and Responsibilities:
- Execute the Work as per Dwg,s and standards both discipline (Structural, Architectural, All Works).
- Preparing BBS as per the dwg and specification.
- Liaising with clients and their representatives (architects, engineers and surveyors), including attending regular
meetings to keep them informed of progress.
- Familiar to read and understand technical drawings and translate / implement on site.
- Supervising for frame structural form work, steel, drainage, Sewage, irrigation system, concrete and Concrete.
Finishing Work (Block Work, Plaster, Every Kind of Flooring).
- Coordinating with Consultant & Construction Manager regarding Works and inspection.
- Take action and follow the instruction of Consultant and Construction Manager.
- Making the schemes for the daily work activities with respect to the manpower / equipment and required progress.
- Involving daily plans, cross checking being quantities and ensure that all material used are in accordance with
specification, work schedule and are supplied well in time.
- Supervised the site labor, foreman’s and Sub contractors Works and dealing with subcontractors.
- Experience in civil /structural works and preparation of progress Reports on the ongoing activities.
- Preparing bill of quantities and material requirements.
- Carrying out converse with / gain approvals, from consultants / clients.
- Calculate require level at site and give instructions to surveyor.
- Preparation of daily report with supervising.
Larsen & Toubro Ltd., Abu Dhabi, U.A.E. Dec 2010 - Nov 2011
Senior Engineer (survey) - Reporting to Construction Manager.
• Project: Design, Procurement and Construction of an Urban Island Crossing (Bridge 3) from Abu Dhabi to Al
Sowwah Island. Providing Mubadala Development Company PJSC Abu Dhabi UAE.
Client: Al sowwah square properties LLC.
Site: Abu Dhabi to Al sowwah Island bridge-3project, Abu Dhabi, UAE.
Project Value: 405.05 Million AED.
Roles and Responsibilities:
- Supervise staff and actively participate in all survey and setting out activities as required by the project
specification.
- Assuring equipment is calibrated as required and correctly maintained by use of preventative maintenance.
- Establishment and measurement of control points, GPS base station installations, transformations to project
datum, preparation of survey reports, survey calculations and setting out works.
- Involved in the Survey works including all setting out’s, leveling and calculation Quantities of earth cutting and
earth filling by using Auto level, Total Station and GPS.
- Perform all grade level and topography measurements and assist in preparing site plans with existing levels,
existing reference benchmarks, proposed benchmarks and temporary reference points.
- Managing survey personnel and equipment on site. Maintaining proper records of survey equipment inventory
- Prepare proposal sketches with the help of Design Engineer where required.
- Study the details about the foundation used (open foundation, pile foundation) drawings explain assistant.
Combined Group For Trading and Contracting W.L.L (Doha, Qatar). Oct 2007 – Jun 2010
Chief Land Surveyor cum Site Engineer Reporting to Project Engineer.
• Project: Construction Of Road Project (RA 0607C003G-Mesaimeer Street)
Providing 3.0 Km.6-lane main carriage way and 2 lane Right and Left Service Roads, Included 4 Km Micro tunneling
3000mm diameter RCJP W/ 10 nos. Access Shaft, 3.0 Km Potable D.I Pipe 1400mm diameter, Street Lighting,
underground utilities infrastructure drainage and irrigation system and landscaping etc.
Client: ASHGHAL (Public Works Authority Road Affairs- State of Qatar).
Site: Mesaimeer Street at Doha.
Project Value: 277 Million QRS.
Role & Responsibilities:
- Preparation of site plan and contour map and establishing the chain age board every 100m.
- Submit the Existing Conditions survey details and take approval from Client.
- Direct participate in surveying to lay out installations and establish reference points, grades, and elevation to
guide to construction.
- At the road works making level for cutting & filling areas, sub grade, sub base, base course, and wearing course.
Making level & alignment for kerb stone & foundations and take approval with consultant
- Prior to excavation all safety arrangement submit all certification take approval from client.
- Micro tunneling works, setting out for shaft area & monitoring the Excavation.
- Setting out the level and guide beam direction, launch seal, back plate
- Fixing laser prior to boring & every day monitoring drive follow keeping drive records.
- During the boring monitoring every 20 m checking the Direction, Elevation prepare daily status & reporting to
concerned engineers.
- Resolve any unexpected technical difficulties and other problem that may arise at any time.
- Involving daily plans and their implementation on the site and distributing work every day to assistance.
- Regularly monitoring the air ventilation system, jack, lesser, Hydraulic, dewatering all site activities.
- Conduct regular job site inspections.
- Monitor the work environment for hazards
- Assist in the quality and safety audit, Identify and highlight possible risk on project.
- Taking approval form consultant after completion approval.
- Preparing as built when completion of work.
• Project: Construction of Five (5) New Schools around Doha and Villages – Package-1(Contract no-C2009/52). At
Umm Salal , Al duhail , Al Sailiya.
Client: ASHGHAL (Public Works Authority Building Affairs- State of Qatar).
Project Value: 229.0 Million Qatar Riyal.
Roles and Responsibilities:
- Execute all type of civil works (RC foundation, grade beams, columns, water tanks, roof slap, and finishing works.
- Inspect all the works and get approval from consultants.
- Checking shuttering and layouts &supervising the whole work
- Arrange formal checking of setting out and ensure check request form is completed
- Preparation of Daily Progress Report in accordance with BOQ.
EARLIER EXPERIENCE
Combined Group For Trading and Contracting W.L.L (State of Kuwait). Oct 2006 – Oct 2007
Site Engineer Reporting To Deputy Project Manager
• Project: Construction completion, Operation and maintenance of the pumping Station at DMC, Kabad and Wafra.
(contract No : SE/97a), it includes pumping station, service reservoir, substation, Guard house, over flow lagoon,
transformer house, installation of pipe line, lab, administrative, chlorine building & Internal, External road work.
Client: Ministry of public work.
Site: DMC (Data monitoring center)
Project Value: 16 Million KD
Ray Construction Ltd Mumbai, India Jan 2003 – Oct 2006
Asst Engineer – Reporting to senior Engineer.
• Project: Construction of Power plant & Office Buildings at JSW Steel LTD, Torangal, Bellari, Karnataka, INDIA.
Client and Site: Jsw Steel Ltd.
Project Value’s 10.0 Million
T J Raam Engineering & Builders Tamil Nadu, India. May 1999 – Apr 2002
Site Supervisor Reporting to Site Engineer
• Project: RCC Road work
Client and Site: E I D (Parris) India Ltd.
Project value: 3 million Indian Rupees
EDUCATION
B Tech Civil Engineer -2012
Civil Engineering (Diploma) -1999.
State Board of Chennai, India.
Computer Certificates & Knowledge:
Auto Cad all Version.
MS Office Tools (Word, Excel, Power Point, Outlook Express, Internet.
Diploma in E-Commerce.
Safety Training Certificates
Permit to work system (PTW) at Qatar petroleum.
H₂S/BA Course certificate.
Suspension Trauma Training Certificate.
PERSONAL DETAILS
Date of Birth : July 17th
1979
Nationality / Religion : Indian / Islam.
Married status : Married
Driving Licenses : Holds Indian, and Qatar Driving Licenses
Languages : English, Tamil, Hindi and Malayalam.
Passport No. : J7410383
Valid up to : 03-08-2021
Please of issue : Abu Dhabi
References & Supporting Documents Available upon Request

More Related Content

What's hot (20)

En c.v
En c.v En c.v
En c.v
 
TAHRER C.V on 30-07-2015 -link
TAHRER C.V  on 30-07-2015 -linkTAHRER C.V  on 30-07-2015 -link
TAHRER C.V on 30-07-2015 -link
 
CV QS AKHTAR RASUL
CV QS AKHTAR RASULCV QS AKHTAR RASUL
CV QS AKHTAR RASUL
 
CV M.Ilyas - 1
CV M.Ilyas - 1CV M.Ilyas - 1
CV M.Ilyas - 1
 
CV -BOSE
CV -BOSECV -BOSE
CV -BOSE
 
Zafarullah CV.doc-001
Zafarullah CV.doc-001Zafarullah CV.doc-001
Zafarullah CV.doc-001
 
CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.CV for Civil Engineer Zaid Abbas.
CV for Civil Engineer Zaid Abbas.
 
HUM-Surveyor-CV
HUM-Surveyor-CVHUM-Surveyor-CV
HUM-Surveyor-CV
 
CV1
CV1CV1
CV1
 
shishir_cv
shishir_cvshishir_cv
shishir_cv
 
RANJI -CV
RANJI -CVRANJI -CV
RANJI -CV
 
Civil Engineer Updated CV Fernando Villarojo
Civil Engineer Updated CV Fernando VillarojoCivil Engineer Updated CV Fernando Villarojo
Civil Engineer Updated CV Fernando Villarojo
 
S.L Madlala May 2015
S.L Madlala May 2015S.L Madlala May 2015
S.L Madlala May 2015
 
Mohab Samoil_Resume
Mohab Samoil_ResumeMohab Samoil_Resume
Mohab Samoil_Resume
 
Cv 01
Cv 01Cv 01
Cv 01
 
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
UPDATE CV 2015
UPDATE CV 2015UPDATE CV 2015
UPDATE CV 2015
 
Muhammad Qasim Zaib C.V
Muhammad Qasim Zaib C.VMuhammad Qasim Zaib C.V
Muhammad Qasim Zaib C.V
 
new cv ali - Copy
new cv ali - Copynew cv ali - Copy
new cv ali - Copy
 
Civil engineer strategic
Civil engineer strategicCivil engineer strategic
Civil engineer strategic
 

Viewers also liked

Congelamiento de precios productos en wal mart
Congelamiento de precios   productos en wal martCongelamiento de precios   productos en wal mart
Congelamiento de precios productos en wal martDiario Elcomahueonline
 
Periodismo chiquinquireño
Periodismo chiquinquireñoPeriodismo chiquinquireño
Periodismo chiquinquireñoErikaSeb
 
Congelamiento de precios productos en carrefour
Congelamiento de precios   productos en carrefourCongelamiento de precios   productos en carrefour
Congelamiento de precios productos en carrefourDiario Elcomahueonline
 
O Melhor do Direito:Material de Assimilação - Lei 4.717
O Melhor do Direito:Material de Assimilação - Lei 4.717O Melhor do Direito:Material de Assimilação - Lei 4.717
O Melhor do Direito:Material de Assimilação - Lei 4.717omelhordodireito
 
A replication study of the top performing systems in SemEval twitter sentimen...
A replication study of the top performing systems in SemEval twitter sentimen...A replication study of the top performing systems in SemEval twitter sentimen...
A replication study of the top performing systems in SemEval twitter sentimen...Raphael Troncy
 
Budget Cuts And Their Effects
Budget Cuts And Their EffectsBudget Cuts And Their Effects
Budget Cuts And Their Effectsendre1mr
 
Compuertas técnicas avanzadas parte 2
Compuertas   técnicas avanzadas parte 2Compuertas   técnicas avanzadas parte 2
Compuertas técnicas avanzadas parte 2Andrés Cuervo
 
Aprendiendo sobre las emociones de los pacientes mediante obras artísticas
Aprendiendo sobre las emociones de los pacientes mediante obras artísticasAprendiendo sobre las emociones de los pacientes mediante obras artísticas
Aprendiendo sobre las emociones de los pacientes mediante obras artísticasRafa Cofiño
 
2012 DuPage Environmental Summit
2012 DuPage Environmental Summit2012 DuPage Environmental Summit
2012 DuPage Environmental SummitNapervilleNCEC
 
Lectura taller virtual los dos gallos
Lectura taller virtual los dos gallosLectura taller virtual los dos gallos
Lectura taller virtual los dos gallosAnzoategui Docente
 
Ahead Week 1 Key Slides
Ahead Week 1 Key SlidesAhead Week 1 Key Slides
Ahead Week 1 Key Slidesaltonbaird
 
How to Add an App to Your LinkedIn Profile
How to Add an App to Your LinkedIn ProfileHow to Add an App to Your LinkedIn Profile
How to Add an App to Your LinkedIn ProfileNET:101
 

Viewers also liked (19)

Congelamiento de precios productos en wal mart
Congelamiento de precios   productos en wal martCongelamiento de precios   productos en wal mart
Congelamiento de precios productos en wal mart
 
Taller de primer semestre
Taller de primer semestreTaller de primer semestre
Taller de primer semestre
 
Agribusiness
AgribusinessAgribusiness
Agribusiness
 
Periodismo chiquinquireño
Periodismo chiquinquireñoPeriodismo chiquinquireño
Periodismo chiquinquireño
 
Congelamiento de precios productos en carrefour
Congelamiento de precios   productos en carrefourCongelamiento de precios   productos en carrefour
Congelamiento de precios productos en carrefour
 
O Melhor do Direito:Material de Assimilação - Lei 4.717
O Melhor do Direito:Material de Assimilação - Lei 4.717O Melhor do Direito:Material de Assimilação - Lei 4.717
O Melhor do Direito:Material de Assimilação - Lei 4.717
 
certificate
certificatecertificate
certificate
 
A replication study of the top performing systems in SemEval twitter sentimen...
A replication study of the top performing systems in SemEval twitter sentimen...A replication study of the top performing systems in SemEval twitter sentimen...
A replication study of the top performing systems in SemEval twitter sentimen...
 
Budget Cuts And Their Effects
Budget Cuts And Their EffectsBudget Cuts And Their Effects
Budget Cuts And Their Effects
 
Compuertas técnicas avanzadas parte 2
Compuertas   técnicas avanzadas parte 2Compuertas   técnicas avanzadas parte 2
Compuertas técnicas avanzadas parte 2
 
Resume
ResumeResume
Resume
 
Aprendiendo sobre las emociones de los pacientes mediante obras artísticas
Aprendiendo sobre las emociones de los pacientes mediante obras artísticasAprendiendo sobre las emociones de los pacientes mediante obras artísticas
Aprendiendo sobre las emociones de los pacientes mediante obras artísticas
 
2012 DuPage Environmental Summit
2012 DuPage Environmental Summit2012 DuPage Environmental Summit
2012 DuPage Environmental Summit
 
Lectura taller virtual los dos gallos
Lectura taller virtual los dos gallosLectura taller virtual los dos gallos
Lectura taller virtual los dos gallos
 
Ahead Week 1 Key Slides
Ahead Week 1 Key SlidesAhead Week 1 Key Slides
Ahead Week 1 Key Slides
 
Presentacion departamentales
Presentacion departamentalesPresentacion departamentales
Presentacion departamentales
 
GMS Post - Company Profile
GMS Post - Company ProfileGMS Post - Company Profile
GMS Post - Company Profile
 
How to Add an App to Your LinkedIn Profile
How to Add an App to Your LinkedIn ProfileHow to Add an App to Your LinkedIn Profile
How to Add an App to Your LinkedIn Profile
 
Green it
Green itGreen it
Green it
 

Similar to hidayath cv 2016

Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3Moayad Qblawi
 
Cv civil engineer ahmed mansour
Cv civil engineer ahmed mansourCv civil engineer ahmed mansour
Cv civil engineer ahmed mansourahmed mansour
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansourahmed mansour
 
Cv civil ahmed mansour
Cv civil ahmed mansourCv civil ahmed mansour
Cv civil ahmed mansourahmed mansour
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSOHAIL SHAH
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al Kurdi
 
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4Atif Ashraf
 
Resume-Mubbasher-Railway
Resume-Mubbasher-RailwayResume-Mubbasher-Railway
Resume-Mubbasher-RailwayMubasher Malik
 
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCECV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCEAbdoo Sowar
 

Similar to hidayath cv 2016 (20)

Ahmed_c.v
Ahmed_c.vAhmed_c.v
Ahmed_c.v
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
Cv civil engineer ahmed mansour
Cv civil engineer ahmed mansourCv civil engineer ahmed mansour
Cv civil engineer ahmed mansour
 
cv civil ahmed mansour
cv civil ahmed mansourcv civil ahmed mansour
cv civil ahmed mansour
 
Cv civil ahmed mansour
Cv civil ahmed mansourCv civil ahmed mansour
Cv civil ahmed mansour
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
 
Markfel S. Lamban CV
Markfel S. Lamban CVMarkfel S. Lamban CV
Markfel S. Lamban CV
 
CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
 
Babar Sohail Khan (1)
Babar Sohail Khan (1)Babar Sohail Khan (1)
Babar Sohail Khan (1)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Abdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C VAbdelrazek Mustafa Korshom C V
Abdelrazek Mustafa Korshom C V
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016Azem Al-Kurdi CV - 4.9.2016
Azem Al-Kurdi CV - 4.9.2016
 
majdi C.V
majdi C.Vmajdi C.V
majdi C.V
 
CV-Atif_Ashraf-4
CV-Atif_Ashraf-4CV-Atif_Ashraf-4
CV-Atif_Ashraf-4
 
Resume-Mubbasher-Railway
Resume-Mubbasher-RailwayResume-Mubbasher-Railway
Resume-Mubbasher-Railway
 
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCECV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
CV-ABDELKHALIG 2016 - CONSTRUCTION &MAINTENA NCE
 
Adly CV111
Adly CV111Adly CV111
Adly CV111
 
Umer CV
Umer CVUmer CV
Umer CV
 

hidayath cv 2016

  • 1. Mobile-Qatar: +974 30188757 India: +9194888 08480. Email- hidayath28@gmail.com R HIDAYATHULLAH Skype ID-hidayath888 Qualified civil Engineer offering 16+ years of qualitative experience including 9+ years in Gulf PROFILE • Highly accomplished professional with incredible experience acquired over the years in diverse areas encompassing project management, installation & commissioning of site & construction management and execution of civil engineering works for roads & bridges (cable stay), micro tunneling(3000mmØ), Sulphur tank, irrigation system, Landscaping, Sewage, Drainage (Manhole, Catch pit, gully) Street Lighting, Duct (Electrical, Telephone, Armed force) Road marking and residential & commercial buildings such as oil & gas and other infrastructure works. • Thorough understanding of Quality System Management, concepts and application of ISO, OHSAS, and 5S, etc. as well as Health & Safety Standards and Quality Compliances. • Professional competencies in mobilizing and judiciously managing available resources – men & materials; sound understanding of Construction Methods & Implementation, preparing shop drawings, taking quantity measurement, and preparing various reports. • Articulate communicator, skilled at effectively collaborating with users/clients, architects, designers, technical examiners, consultants as well as labor to smoothly commission projects on schedule KEY STRENTH AREAS Site Execution - Surveying (Expert in topographic & Bathymetric survey) well-known Leveling instrument, Total station and GPS) - Quantity Survey - AutoCAD Drafting Site Management - Contract Management Quality - Health & Safety - General Administration. PROFESSIONAL EXPERIENCE AND ACCOMPLISHMENTS • QDVC(Qatar Diar vinci construction) – Doha Qatar Since - Aug2014 Sr Engineer – Reporting to Section Engineer • QP approved work site Supervisor • Project: Design and construct New Orbital Highway & Truck Rout (P023) Contract-2: Orbital Highway: Salwa Road to North Relief Road. Providing 47 Km. complete design and construction of A new freeway including seven different grade-separate interchanges with cross roads collectors distributors, truck lanes, over pass and under pass structures, retaining walls, pedestrian and bicycle paths, traffic signs, ITS, landscape and hardscape and arts cape, street lighting all related infrastructures, etc. Client: ASHGHAL (Public Works Authorits Road Affairs- State of Qatar). Project Value: 4.7 Billion Qatari riyal • Solid General Construction LLC – Doha Qatar Oct-2012 – Aug2014 Project Engineer – Reporting to Project Manager • Project: Peripheral & surrounding roads around new Qatar national museum in Doha. (Contact no DS 030) Providing 2 Km. 4-lane main carriage way and Included 2 Km Micro tunneling 1200mm diameter RCJP W/ 10 nos. Access Shaft, 3.0 Km, Street Lighting, underground utilities infrastructure drainage and irrigation system and landscaping etc. Client: ASHGHAL (Public Works Authority Road Affairs- State of Qatar). Project Value: 74 Million Qatari riyal. • Successfully completed Project: Construction of new road and upgrading of existing road in Dukhan. Contract no (2398/ GC12104000) (included 6.5km new and 1.5km upgrading two-way roads and (included 2nos substation building, 24nos pipeline culverts, 14nos storm drainage culverts, 50nos electrical and telephone duct bank, street lighting, irrigation and landscaping system and crash barriers) Client: Qatar Petroleum (QP) Project Valve: 54 million Qatari riyal. Roles and Responsibilities:
  • 2. - To be responsible for day to day site works. - Follow up with site engineers of sub-contractor to ensure that work is being carried out as per the plan. - Interact with Project Manager for clarification in design/ RFI etc. - Report on daily basis about progress, non-compliance, delay in work to the Project Manager - Ensure that communication regarding any changes in plan has reached the site Engineers & Sub-contractors. - Conduct regular job site inspections. - Actively monitor the work environment for hazards - Assist in the quality and safety audit, Identify and highlight possible risk on project. - Assist in necessary project documentation. - Coordinate with the Store keeper for inventory of material thereby ensuring that the supplies are properly maintained - Coordinate for verification of extra claims raised by the contractor - Monitor, evaluate and ensure that all work is being carried out safely - Implement technical and safety requirements for the project - Review and comment on project contractor’s method statement and risk assessment. - Ensure that the HSE plan is being implemented and report all non-conformance to the QHSE manager - Attend and review all benchmarking meetings - Ensure construction QA/QC processes are being implemented by the sub-contractors - Report any non-conforming work to the Project Manager - Identify and report technical queries to Project Manager - Responsible for all aspects related to Project quality assurance and quality control. - Responsible for the completion of necessary documentation to verify the work performed. - Ensure that inspection requests are implemented. - Ensure that all test reports are verified to meet the contract requirements. - Ensure all materials delivered to site are inspected and conform to specified requirements and approval. - Responsible for the completion of final quality documentation in a presentable manner in accordance with the conditions of contract. - Control and sign ‘As built Drawings’. • Consolidated contractors’ international co. Abu Dhabi, U.A.E. Feb 2012 - Oct 2012 Senior Site Engineer - Reporting to Construction Manager. • Project: Shah sulphur station and pipe line, SC package no P1069-SC-03. (included 6.5km 2 lane and 2 side shoulder Road & 12km pipe line, Pipe rake, substation, IES Building, overhead Tower and (37.6m,42mØ) 12 no’s Sulphur & water Tanks. Client: Al Hosan Gas (Abu Dhabi gas development company Ltd) (ADCO) Site: Shah, Abu Dhabi, UAE. Project value: 750 million USD. Roles and Responsibilities: - Execute the Work as per Dwg,s and standards both discipline (Structural, Architectural, All Works). - Preparing BBS as per the dwg and specification. - Liaising with clients and their representatives (architects, engineers and surveyors), including attending regular meetings to keep them informed of progress. - Familiar to read and understand technical drawings and translate / implement on site. - Supervising for frame structural form work, steel, drainage, Sewage, irrigation system, concrete and Concrete. Finishing Work (Block Work, Plaster, Every Kind of Flooring). - Coordinating with Consultant & Construction Manager regarding Works and inspection. - Take action and follow the instruction of Consultant and Construction Manager. - Making the schemes for the daily work activities with respect to the manpower / equipment and required progress. - Involving daily plans, cross checking being quantities and ensure that all material used are in accordance with specification, work schedule and are supplied well in time. - Supervised the site labor, foreman’s and Sub contractors Works and dealing with subcontractors. - Experience in civil /structural works and preparation of progress Reports on the ongoing activities. - Preparing bill of quantities and material requirements. - Carrying out converse with / gain approvals, from consultants / clients. - Calculate require level at site and give instructions to surveyor. - Preparation of daily report with supervising. Larsen & Toubro Ltd., Abu Dhabi, U.A.E. Dec 2010 - Nov 2011 Senior Engineer (survey) - Reporting to Construction Manager.
  • 3. • Project: Design, Procurement and Construction of an Urban Island Crossing (Bridge 3) from Abu Dhabi to Al Sowwah Island. Providing Mubadala Development Company PJSC Abu Dhabi UAE. Client: Al sowwah square properties LLC. Site: Abu Dhabi to Al sowwah Island bridge-3project, Abu Dhabi, UAE. Project Value: 405.05 Million AED. Roles and Responsibilities: - Supervise staff and actively participate in all survey and setting out activities as required by the project specification. - Assuring equipment is calibrated as required and correctly maintained by use of preventative maintenance. - Establishment and measurement of control points, GPS base station installations, transformations to project datum, preparation of survey reports, survey calculations and setting out works. - Involved in the Survey works including all setting out’s, leveling and calculation Quantities of earth cutting and earth filling by using Auto level, Total Station and GPS. - Perform all grade level and topography measurements and assist in preparing site plans with existing levels, existing reference benchmarks, proposed benchmarks and temporary reference points. - Managing survey personnel and equipment on site. Maintaining proper records of survey equipment inventory - Prepare proposal sketches with the help of Design Engineer where required. - Study the details about the foundation used (open foundation, pile foundation) drawings explain assistant. Combined Group For Trading and Contracting W.L.L (Doha, Qatar). Oct 2007 – Jun 2010 Chief Land Surveyor cum Site Engineer Reporting to Project Engineer. • Project: Construction Of Road Project (RA 0607C003G-Mesaimeer Street) Providing 3.0 Km.6-lane main carriage way and 2 lane Right and Left Service Roads, Included 4 Km Micro tunneling 3000mm diameter RCJP W/ 10 nos. Access Shaft, 3.0 Km Potable D.I Pipe 1400mm diameter, Street Lighting, underground utilities infrastructure drainage and irrigation system and landscaping etc. Client: ASHGHAL (Public Works Authority Road Affairs- State of Qatar). Site: Mesaimeer Street at Doha. Project Value: 277 Million QRS. Role & Responsibilities: - Preparation of site plan and contour map and establishing the chain age board every 100m. - Submit the Existing Conditions survey details and take approval from Client. - Direct participate in surveying to lay out installations and establish reference points, grades, and elevation to guide to construction. - At the road works making level for cutting & filling areas, sub grade, sub base, base course, and wearing course. Making level & alignment for kerb stone & foundations and take approval with consultant - Prior to excavation all safety arrangement submit all certification take approval from client. - Micro tunneling works, setting out for shaft area & monitoring the Excavation. - Setting out the level and guide beam direction, launch seal, back plate - Fixing laser prior to boring & every day monitoring drive follow keeping drive records. - During the boring monitoring every 20 m checking the Direction, Elevation prepare daily status & reporting to concerned engineers. - Resolve any unexpected technical difficulties and other problem that may arise at any time. - Involving daily plans and their implementation on the site and distributing work every day to assistance. - Regularly monitoring the air ventilation system, jack, lesser, Hydraulic, dewatering all site activities. - Conduct regular job site inspections. - Monitor the work environment for hazards - Assist in the quality and safety audit, Identify and highlight possible risk on project. - Taking approval form consultant after completion approval. - Preparing as built when completion of work. • Project: Construction of Five (5) New Schools around Doha and Villages – Package-1(Contract no-C2009/52). At Umm Salal , Al duhail , Al Sailiya. Client: ASHGHAL (Public Works Authority Building Affairs- State of Qatar). Project Value: 229.0 Million Qatar Riyal. Roles and Responsibilities: - Execute all type of civil works (RC foundation, grade beams, columns, water tanks, roof slap, and finishing works.
  • 4. - Inspect all the works and get approval from consultants. - Checking shuttering and layouts &supervising the whole work - Arrange formal checking of setting out and ensure check request form is completed - Preparation of Daily Progress Report in accordance with BOQ. EARLIER EXPERIENCE Combined Group For Trading and Contracting W.L.L (State of Kuwait). Oct 2006 – Oct 2007 Site Engineer Reporting To Deputy Project Manager • Project: Construction completion, Operation and maintenance of the pumping Station at DMC, Kabad and Wafra. (contract No : SE/97a), it includes pumping station, service reservoir, substation, Guard house, over flow lagoon, transformer house, installation of pipe line, lab, administrative, chlorine building & Internal, External road work. Client: Ministry of public work. Site: DMC (Data monitoring center) Project Value: 16 Million KD Ray Construction Ltd Mumbai, India Jan 2003 – Oct 2006 Asst Engineer – Reporting to senior Engineer. • Project: Construction of Power plant & Office Buildings at JSW Steel LTD, Torangal, Bellari, Karnataka, INDIA. Client and Site: Jsw Steel Ltd. Project Value’s 10.0 Million T J Raam Engineering & Builders Tamil Nadu, India. May 1999 – Apr 2002 Site Supervisor Reporting to Site Engineer • Project: RCC Road work Client and Site: E I D (Parris) India Ltd. Project value: 3 million Indian Rupees EDUCATION B Tech Civil Engineer -2012 Civil Engineering (Diploma) -1999. State Board of Chennai, India. Computer Certificates & Knowledge: Auto Cad all Version. MS Office Tools (Word, Excel, Power Point, Outlook Express, Internet. Diploma in E-Commerce. Safety Training Certificates Permit to work system (PTW) at Qatar petroleum. H₂S/BA Course certificate. Suspension Trauma Training Certificate. PERSONAL DETAILS Date of Birth : July 17th 1979 Nationality / Religion : Indian / Islam. Married status : Married Driving Licenses : Holds Indian, and Qatar Driving Licenses Languages : English, Tamil, Hindi and Malayalam. Passport No. : J7410383 Valid up to : 03-08-2021 Please of issue : Abu Dhabi References & Supporting Documents Available upon Request