This document provides a summary of Mohammad Saleh Sanoussi Hussain's professional experience and qualifications. He has over 30 years of experience in project management and civil engineering in Saudi Arabia, working on various infrastructure and construction projects for public and private sector clients. His roles have included project manager, technical committee chairman, and construction manager on large projects such as desalination plants, power plants, pipelines, and buildings. He holds a Bachelor's degree in Civil Engineering and professional certifications in project management and value engineering.
1. .
Mohammad Saleh Sanoussi Hussain
Consultant Engineer
Personal Profile:
• Nationality: Saudi Arabia
• Martial Status: Married
• Date of Birth: 13-02-1956
• Place of Birth: Madinah Al-Munawara. (K.S.A)
Contact:
• Saudi Arabia – Jeddah
• Mobile: +966 50 568 4815
• E-mail: alhandra1@live.com
Education:
• Bachelor of Civil Engineering -
King Fahad University of Petroleum & Minerals.
Dhahran, K.S.A- 1979
Membership of Professional Organizational / Society:
• Consultant Engineer Office accredited by the Saudi Council Of Engineers.
• Triangle of Success Registered Consultant Office.
• Associate Value Engineering Specialist –Board of SAVE International Certificate no.
20060111- 24/Jan/2006.
• Certificate of Registration as Consultant Engineer (CE. Sce) Membership no. 10757 Saudi
Council of Engineers-27/Jan/2009.
• International WHO's WHO's of Professionals Organization and Historical Society-/2001
Seminar, Conference & Trainings:
Please see the attachments page no's (6 to 8).
Career Summary:
• More than 30 years experience in private and public sector as Project Manager, and Technical Committee
Chairman, for various projects in the private sector and for the Saline Water Conversion Corporation
(SWCC) and Ministry of Water & Electricity projects, including desalination and power plant associated
marine works, oil un-loading jetty seawater intake and discharge channels. Pump houses, pipeline
construction, housing compounds, schools, concrete re-habilitation works, SWCC clinic, Sewage treatment
plant etc. with broad range of managerial responsibilities Consultancy and supervision, monitoring and
project controls as well as design review, review of shop drawings and process their recommendations and
approval etc.
• Participation and co-ordination with the international consultants like, Durtchhanom ,Khatib Alamy, ILF,
Fitchner, Ewbank Precee Power & Water Ltd, from preliminary study stage and review of technical
specification for Desalination & Power Plants and Water Transmission system , Housing Projects, and
Sanitary Sewage Network Pipes in Jeddah City.
2. .
Page # 01 of 08
Professional Experience:
From Jan 2012 up to date Triangle of Success Consulting Office.
Duties / Responsibilities:
• Study, Design and Management of Public and Private local Projects with International
Consultants
• Supervising Project within Agreed Schedule.
• Forecast Budgeting and Scheduling for Projects.
• Study New Projects Feasibility and give Recommendation BOQ and Pricing0
• Applied Value Engineering Concepts in all Projects done under our Consulting Office.
From February 2009 Up to Dec 2011 Al Fowzani Contracting.
Position: Technical & Management Consultant for Western Province Projects.
Projects:
a) Construction of 50 ( three story) Housing Buildings for Saline Water Conv. Corporation
Plants (Western Region.)
b) Construction of 19 Office Buildings of Border Guard (Jeddah City).
c) Construction of 8 towers in King Abdallah Medical City (Makkah Al-Mukarramah) Under
Awarding.
Project Cost: 700 Million Saudi Riyals.
Duties / Responsibilities:
• Management of all Branch Projects Technically and Financially
• Meeting Project Deadline Efficiently and within Agreed Schedule
• Attending Monthly and Quarterly Meetings with the Clients Representative
• Forecast Budgeting and Scheduling for Projects.
• Study New Projects Feasibility and give Recommendation BOQ and Pricing.
From August 2007 to March 2008- Al-Joudah Construction (Zahran Group).
Projects:
a) Construction of College Buildings in different Cities.
b) Al Baha Medical Tower Center
Project Cost: 800 Million Saudi Riyals
Position: Deputy General Manager
Page # 02 of 08
3. .
Duties / Responsibilities:
• Developed the General Organization Structure of the Company
• Prepared The Salary Scale
• Initiated complete filing system with electronic data management
• Projects Technical and Financial Management.
• Implemented and Conducted Weekly/Monthly and quarterly meetings improving the overall
communication in the Company
From June 2005 to July 2007 – Ministry of Water & Electricity.
Projects:
a). Jeddah City – Sewage Network Project (Main Lines):
• Construction of 200 kilometer long sewage main lines of dia 400mm – 2500mm, including
micro – tunneling / pipe jacking works.
b). Jeddah City – Sewage Network Project (Branch Lines).
• Construction of 2100 kilometer branch sewage network covering entire Central and
Northern districts of Jeddah City, pipeline dia varies from 200mm to 800mm.
• (11) Eleven Contractor (12) Material suppliers are involved in these projects.
Project Cost: 250 Million Saudi Riyals.
Position: Director General Project Execution in Ministry of Water and Electricity – Jeddah.
Consultants: ILF-Austria and Khatib & Alami-Lebanon
Duties / Responsibilities:
• Overall responsible for project monitoring, project controls, re-design and construction
management, quality assurance & quality control and approval of interim & final payment
applications (invoices) for the completed contracts.
• Conducting progress review meetings, co-ordination meetings with Consultants, Contractors
and other Government Departments Managers.
Involved in the following projects from preliminary design stage review till execution, commissioning and
final taking over.
From June 1980 to 2005 – SWCC (Saline Water Conversion Corporation):
Shoiba Infrastructural Projects from 2002 to 2005:
Projects:
2.1 Sewage treatment plant of 1750m3 /day capacity.
2.2 Shoiba beach development works.
2.3 Shoiba Medical Clinic.
2.4 Shoiba fire and safety brigade station.
4. .
Page # 03 of 08
Projects cost: 21 million Saudi riyals.
Position: Technical Committee Chairman.
Consultants: These projects have been executed directly under the supervision of SWCC Technical
Committee Chairman with engineering staff, (No supervision consultants).
Duties / Responsibilities:
Includes complete site inspection and supervision of all construction activities, Monitoring Programs and
Progress of works. Management of supervision team including reviews of all layout drawings, shop
drawings, material submittals / approvals, program and progress, monthly payment certificates, Variation
Orders, conducting meeting and taking appropriate technical decisions and reporting the projects status to
Head office in Riyadh.
Shoiba Housing Projects from 2002 to 2004:
Project: Shaoiba Housing compound Part A & B comprising (3) three story apartment building 30
no's with 3 big schools building with all infrastructure facilities
Project Cost: 210 million Saudi Riyals.
Position: Technical Committee Chairman.
Consultants: This project has been executed directly under the supervision of SWCC Technical Committee
Chairman with engineering staff, (No supervision consultants).
Duties / Responsibilities:
Site inspection and supervision of all construction activities, Monitoring Programs and Progress of works.
Management of supervision team including reviews of all layout drawings, shop drawings, material
submittals / approvals, program and progress, monthly payment certificates, Variation Orders, conducting
meeting and taking appropriate technical decisions and reporting the projects status to Head office in
Riyadh, including supervision of infrastructure works i.e. roads, water supply and sewage network etc.
Concrete Rehabilitation Project from 2000 to 2002:
Project: Power transmission over-head line concrete foundation re-habilitation project. Shoiba to
Makkah 80 kilometers long.
Project Cost: 10 million Saudi Riyals.
Position: Technical Committee Chairman.
Consultants: Saudi Cowi Consult -Denmark.
Duties / Responsibilities:
Monitoring and inspection of works supervised by consultants, conducting progress review meetings with
consultant & contractor.
Review and approval of work procedures / method statements and material submittals.
Note: This project has been executed on energized (live)110kv power transmission line.
Shoiba – Jeddah Water Transmission system from 1995 to 2000:.
Project: 162 kilometer long, Shoiba – Jeddah water transmission system: 60" dia carbon steel
pipeline with 2-valve stations and up-grading of existing pump station from Shoaiba to
Makkah, including construction of main Pump station at Shoaiba.
Page # 04 of 08
5. .
Project Cost: 1.00 billion USD.
Position: Construction Manager.
Consultants: This project has been executed directly under the supervision of SWCC Technical Committee
Chairman with engineering staff, (No supervision consultants).
Duties / Responsibilities:
To assist chairman in all pipeline project construction activities, monitoring programs and progress of
works, management of site supervision team of engineers.
Review and approval of pumping stations layout, construction drawings, material submittals, payment
certificates and variation order.
Conducting progress & technical meetings and taking appropriate technical decision.
Shoiba Desalination and power plant, Phase-II from 1992 to 1995:
Project: 100 MGD / 500 MW Desalination and power plant, including fuel oil un-loading jetty and
other associated heavy marine engineering works.
Project Cost: 3.4 Billion Saudi Riyals.
Position: Head of Civil Engineering Department.
Consultants: EWBANK Price Water & Power Ltd.- U.K.
Duties / Responsibilities:
Involved in all inspection & construction management activities, supervision of all civil works of
Desalination & Power Plant and its associated buildings, structures and marine works. i.e construction of
150 meter high chimneys, massive concreting of turbine foundations, boiler foundations, sea water intake
structures. 6x144,000 cubic meter water storage tanks, multi storied control room building and all
infrastructure works of power & Desalination Plants including oil un-loading jetty of 100,000 DWT.
Review and approval soil investigation reports, soil improvements methods & its approval.
Note: After completion of major civil works promoted as construction manager for Shoiba-Jeddah Water
Transmission system project.
Madina - Yanbu Desalination and power plants - Phase-II from 1991 to 1992:
Project: 60 million gallon per day / 164 MW desalination and power plant Madina-Yanbu Phase-II.
Project Cost: 700 Million US$.
Position: Head of Civil Engineering Department.
Consultants: The Kuljian Consulting Engineers – U.S.A.
Duties / Responsibilities:
Involved in all inspection & construction management activities, supervision of all civil works of
Desalination & Power Plant and its associated buildings, structures and marine works. i.e construction of
150 meter high chimneys, massive concreting of turbine foundations, boiler foundations, sea water intake
structures. water storage tanks, multi storied control room building and all infrastructure works of power &
Desalination Plants. Review and approval of soil investigation reports, soil improvements procedures etc.
Page # 05 of 08
6. .
Shoiba Desalination and power plants - Phase-I from 1985 to 1991:
Project: 40 million gallon per day / 325 MW desalination and power plant Shaoiba Phase-I.
Project Cost: 2.5 Billion Saudi Riyals.
Position: Head of Civil Engineering Department.
Consultants: Fitchner Consulting Engineers - Germany.
Duties / Responsibilities:
Involved in all inspection & construction management activities, supervision of all civil works of
Desalination & Power Plant and its associated buildings, structures and marine works. i.e construction of
150 meter high chimneys, massive concreting of turbine foundations, boiler foundations, sea water intake
structures. 3x144,000 cubic meter water storage tanks, multi storied control room building and all
infrastructure works of power & Desalination Plants including oil un-loading jetty of 20,000 DWT.
Review and approval of soil investigation reports, soil improvements procedures etc.
Jubail – Riyadh water transmission system from 1980 to 1985:
Project: Construction of 60" dia (carbon steel pipe), two parallel lines of 466 kilometer each and
Riyadh City feeding lines, dia 2000mm of total length 132km to transfer 980,000m3 of water
per day.
Project cost: 1.60 billion USD.
Position: Project Engineer.
Consultants: ILF Consulting Engineers – Austria.
Duties / Responsibilities:
Involved in all site construction, supervision, inspection activities of pipe line project and its appurtenance
including construction of Riyadh city feeding lines.
Review of material submittals, method statements, shop drawings and QA/QC plans.
Attending progress review meetings with consultants & contractors.
Personal References:
1- Dr. Abdullah Al-Shaikh
Deputy of Governor for Training &
Development
Saline Water Conversion Corpn.
Riyadh, Saudi Arabia.
Tel: + 966505408186
2- Dr. Mohammed K. Basalamah
Project Manager.
ILF Consulting Engineers.
Jeddah- Saudi Arabia.
Tel: + 966505603575
3- Eng. Saleh Al-Najdy
Director General in SWCC
Riyadh – K.S.A.
Tel: + 966554365065
Page # 06 of 08
7. .
List of Conference / Seminars / Training Courses Attended.
S.No Title Country Sponsored by Date
1
Project Management Professional (PMP)
الدارةالحترافيةللمشاريع
K.S.A SAC For Training
8th
March 2008
16th
March 2008
2
Associate Value Engineering Specialist
أخصائيمشاركهندسةقيمية
K.S.A SAVE International 24th
Jan 2006
3
Engineering Arbitration Seminar
ندوةالتحكيمالهندسي
K.S.A
G.C.C Commercial
Arbitration Centre
02nd
May–2005
03rd
May-2005
4
Value Engineering Study Workshop for
Ras-Al Zoor Riyadh (SWCC)
ورشةدراسةهندسةقيميةلمشروعرأس
الزوربالتحلية
K.S.A
Al-Yousuf: Value
Engineering
01st
Jan – 2005
20th
Jan - 2005
5
Value Engineering Study Workshop.
ورشةدراسةهندسةقيميةلتطبيقالهندسة
القيميةبالتحلية
K.S.A
Al-Yousuf: Value
Engineering
11th
Oct – 2004
20th
Oct – 2004
6
Advanced Value Engineering Seminar
(MOD.II)
الهندسةالقيمية)ورشة(عمل-موديل2
K.S.A
Al-Yousuf: Value
Engineering
10th
May-2004
12th
May-2004
7
Value Engineering Training Workshop
Mod-I
حلقةتدريبيةتأسيسةورشةعملعنالهندسة
القيمية
K.S.A
Al-Yousuf Value
Engineering
20th
Dec-2003
24th
Dec-2003
8
Training Program on Project
Documentation writing.
البرنامجالتدريبيحولصياغةالعقود
OMAN
Chamber of
Commerce &
Industry – Salalh
Branch.
30th
Aug-2003
03rd
Sep-2003
9
Strategic Planning and Implementation.
التخطيطالستراتجيوتطبيقية
K.S.A
University of
Michigan Business
School
03rd
May-2003
05th
May 2003
10
Value Engineering Workshop (MOD.I)
الهندسةالقيمية)ورشة(عمل-موديل1
K.S.A Humoud Al-Salmi.
CVS-Life
28th
Dec-2002
01st
Jan-2003
11
Latest Developments in International
Construction Law & Practice.
أحدثالتطوراتفيالقانونالدوليوتطبيقاته
فيالنشاءات
Cambridge
U.K
HAWKSMERE
12th
Aug- 2002
16th
Aug-2002
12
Program of Contractual Arbitration
برنامجمناراتالعقودالدارية
K.S.A
Al-Taweel
Consulting Center.
16th
June 2001
20th
June 2001
13
Project Integration and Scope
Management.
نطاقالدارةوتكاملالمشروع
K.S.A
Project Management
institute (P.M.I)
Future Engineering.
26th
Sep-2000
28th
Sep-2000
14 Total Project Management in the 21st
Century.
الدارةالشاملةفيللمشاريعفيالقرن
California
U.S.A
Projacs International 05th
Aug-2000
19th
Aug-2000
8. .
الحاديوالعشرون
Page # 07 of 08
S.No Title Country Sponsored by Date
15
Seventh Arab Structural Engineering
Conference.
فعالياتالمؤتمرالعربيالسابعللهندسة
النشائيةالمنعقدفيدولتالكويت
Kuwait Kuwait University
24th
Nov-1997
26th
Nov-1997
16
Executive Project Management
Conference
مؤتمرإدارةالمشاريعالتنفيذية
London
U.K
Project Management
and Controls Co.
(PROJACS)
25th
Jul-1993
06th
Aug-1993
17
Advanced Project Management by
Computer.
إدارةالمشروعاتباستخدامالحاسباللي
)مستوىمتقدم )
K.S.A
Engineering Committee 11th
Dec-1992
16th
Dec-1992
18
Value Engineering Workshop
الهندسةالقيمية)ورشةعمل )
K.S.A Dar Al-Taqniya.
09th
May-1992
13th
May-1992
19
Deteriorating Concrete Structure and Repair
Strategies
تأكلالمنشاتالخرسانيةوإستراتيجيةالصلح
Bahrain
The Bahrain Society of
Engineers.
16th
Feb-1992
18th
Feb-1992
20
Structural Analysis & Design Using STAAD
III/ISDS Rel 12.1
التحليلوالتصميمالنشائيباستخداماستاد3
K.S.A
Eng. Office Marwan
Ashour
07th
Dec-1991
13th
Dec-1991
21
The Development in Structural Engineering.
التطوراتفيالهندسيةالنشائية
K.S.A King Saud University.
27th
Nov 1991
28th
Nov 1991
22
Basic Corrosion
مبادئالتآكل
K.S.A
National Association of
Corrosion engineers
(NACE)
Nov- 1991
23
Engineering & Research Centre Course in
Concrete Control & Inspection
هندسةوأبحاثضبطجودةالخرسانةوفحصها
U.S.A Bureau of Reclamation 8th
March 1991
24
Structural Analysis & Design by Computer
Application.
استخدامالحاسبالليوتطبيقاتهفيالتحليل
النشائيوالتصميم
K.S.A Engineering Committee.
22nd
May-1990
27th
May-1990
25
Effective Project Management & Leadership
القيادةوالدارةالفعاليةللمشاريع
K.S.A
The George Washington
University.
17th
May-1990
21st
May-1990
26
Structural Analysis and Design
التحليلوالتصميمالنشائي
K.S.A
Eng. Office Marwan
Ashour
12th
May 1990
16th
May 1990
27
First Regional Conference in Civil
Engineering RCCE-98
المؤتمرالقليميالولللهندسةالمدنية
Bahrain
The University of
Bahrain
11th
Mar-1989
13th
Mar-1989
28
Concrete Cracks & Deterioration reasons &
Remedial Measures.
أسباب،التشققات،الشروخوالتأكلفيالمنشآت
الخرسانيةوطرقعلجها
K.S.A Engineering Committee
05th
Dec-1988
08th
Dec-1988
29
Project Engineering and Management
هندسةالمشاريعوالدارة
U.S.A Catalytic - Kuljian
01st
Aug-1983
29th
Feb- 1984
30
Desalination Technology
تقنيةالتحلية
U.K University of Glasgow
28th
Jun-1982
01st
Sep-1982