SlideShare a Scribd company logo
1 of 6
Download to read offline
Shane Reynolds
Construction Manager
Résumé
shane Reynolds - CV Worley Parsons Corporate Base Page 1
Rev 9 (7-Nov-14)
SUMMARY
Multi Discipline Construction manager
Over 17 years’ working experience as a civil engineering construction manager working on large and small scale projects in
the infrastructure industry. Extensive experience gained in the roads and underground services infrastructure, ranging from
pipe jacking, concrete works, water lines, storm water pipe construction road works, gabion installation, railway formation
construction to bulk earth works. Water and sewer reticulation networks and electrical installations inclusive of water towers
and sewer pump stations.
Currently working as a construction Manager on buildings as well as civil infrastructure work in the Mining environment
Ensure that the work entrusted to the contractors is carried out in strict compliance with the site health,
safety and environmental requirements, the quality, technical, financial and schedule requirements of the
subcontracts and sound engineering practices are carried out. Supervision of construction activities, chair
technical meetings and attend coordination and progress review meetings with construction contractors.
Ensure compliance to works information, drawings, field Engineering Queries and project managers’
instructions. Monitoring of Project cost and schedules.
EXPERIENCE
Current Construction Manager, WorleyParsons RSA, Kathu
Project – Sishen Housing Infrastructure Projects (SHIP) – Anglo American
Duties include but not limited to:
• Representing the client on site
• Managing the principal contractor and sub-contractors on site
• Controlling and monitoring quality of civil and building works
• Checking on progress of construction works
• Checking on quantities
• Checking on all relevant testing of works
• Check on site costing and payment certificates
• Reporting on production
• Problem solving
• Seeing that the contractors adhere to all construction specifications and regulations
• Seeing that contractors on site adhere to all Health and Safety aspects on site
• Good knowledge of SABS and SANS specifications
• Compiling Procurement documentation
Key Performance Areas: optimum safety standards are maintained throughout every phase of the project’s life
cycle. Project is completed in accordance with the current schedule as agreed with the client. Project cost is within
latest approved project budget. Commercial issues are resolved to the optimum benefit of the employer.
Compliance with all technical and quality requirements contained in the contract, or as agreed with client. Project
execution is to the client’s satisfaction and management’s satisfaction. Best possible client relations are
maintained throughout the project lifecycle.
Shane Reynolds
Construction Manager
Résumé
shane Reynolds - CV Worley Parsons Corporate Base Page 2
Rev 9 (7-Nov-14)
Project – Phase 4A,
Construction of 671 houses inclusive of all civil infrastructures
Phase 4B
Construction of Civil services for 245 stands
Phase 4C
Construction of Bulk sewer pump station and infrastructure civil services for 360 housing stands
Artesian Drain
Construction of 400m artesian drain inclusive of pump station
Bulk Sewer servicer
Construction of 2 bulk sewer pump stations inclusive of a 2km sewer rising main
Bulk water Supply
Construction of a 600mega litre water tower inclusive of a chlorination building and 2km water line
Bulk electrical Supply
Construction of a 11kv underground line 4km connected to the power station
476 Family Housing Development
All Civil infrastructure, roads, water sewer and electrical reticulation infrastructure work for 476
housing stands
Boarding Houses
Civil construction works for 140 housing units inclusive of roads, sewer water and sewer pump
station plus sewer rising main
Civil Services for management Housing
Civil infrastructure works (Roads Water and Sewer reticulation)
Civil services for Management Cluster Units
Civil infrastructure works (Roads Water and Sewer reticulation)
Buffer Dam
Construction of a 10 mega litre sewer works buffer dam
Waste Water Treatment Works Pump Station
Refurbishment of an existing sewer pump station
Shane Reynolds
Construction Manager
Résumé
shane Reynolds - CV Worley Parsons Corporate Base Page 3
Rev 9 (7-Nov-14)
2008 - 2012 NEC Construction Supervisor, Mott Macdonald, Port Elizabeth
Project – Ngqura Harbour Construction (Building and Civil works)
Construction of a new deep water container port inclusive of all marshalling yard and rail works
Duties include but not limited to:
• Representing the client on site
• Managing the principal contractor and sub-contractors on site
• Controlling and monitoring quality of civil and building works
• Checking on progress of construction works
• Checking on quantities
• Checking on all relevant testing of works
• Check on site costing and payment certificates
• Reporting on production
• Problem solving
• Seeing that the contractors adhere to all construction specifications and regulations
• Seeing that contractors on site adhere to all Health and Safety aspects on site
• Good knowledge of SABS and SANS specifications
• Compiling Procurement documentation
Key Performance Areas: optimum safety standards are maintained throughout every phase of the project’s life
cycle. Project is completed in accordance with the current schedule as agreed with the client. Project cost is within
latest approved project budget. Commercial issues are resolved to the optimum benefit of the employer.
Compliance with all technical and quality requirements contained in the contract, or as agreed with client. Project
execution is to the client’s satisfaction and management’s satisfaction. Best possible client relations are
maintained throughout the project lifecycle.
2007 - 2008 Site Manager, Wascon Civils, Port Elizabeth
Project – Govan Mbeki Township: Roads & underground services phase I & 2
Contract value R17, 000,000.00
2001 - 2007 Site Manager, UniCivils, Port Elizabeth
DELTA MOTORCORPORATION – KEMPSTON ROAD:
1. Contract value of R500,000.00
2. Construction of heavy duty parking space.
3. Size: 2000m2
Shane Reynolds
Construction Manager
Résumé
shane Reynolds - CV Worley Parsons Corporate Base Page 4
Rev 9 (7-Nov-14)
MATTHEW GINIWE HOSTEL:
1. Contract value of R400,000.00
2. Construction of roads & storm water pipes.
BETHELSDORP:
1. Contract value of R1.4 million
2. Construction of 10 000m sewer line – 150 in diameter.
UITENHAGE ROAD WORKS:
1. Construction of roads to the value of R2 million.
KWAZAKHELE ROADWORKS – Part 1 (Ward 16 + 17):
1. Construction of road works to the value of R900,000.00
BAVIAANSKLOOF:
1. Construction of course-way & road maintenance in the Baviaanskloof area.
2. Contract value of R1.4 million.
BULK STORMWATER – KWAZAKHELE:
1. Contract value of R800,000.00
2. Construction 700m of 1.2” diameter storm-water pipe system plus retention dam.
VOLKSWAGEN UITENHAGE:
1. Contract value of R700,000.00
2. Construction of building platforms/storm water drainage/water lines.
MARIO LEVI – UITENHAGE:
1. Contract value of R500,000.00
2. Construction of building platforms/storm water drainage & also including
underground services.
KWAZAKHELE ROADWORKS – Part 2 (Ward 15 + 16):
1. Contract value of R1.4 million
2. Construction of road-works
KWAZAKHELE ROADWORKS – Part 3 (Ward 19):
1. Contract value of R1.4 million
2. Construction of road-works
.
Shane Reynolds
Construction Manager
Résumé
shane Reynolds - CV Worley Parsons Corporate Base Page 5
Rev 9 (7-Nov-14)
2000 - 2001 Site Manager, Fairbrothers Engineering, Cape Town
TABLE MOUNTAIN, CAPE TOWN:
The work consisted of:
1. Strengthening of reticulation dam wall by means of post tension cables.
2. Testing of cable tension and anchor strength.
SEEKOEIVLEI, RETREAT:
The works consisted of 30m pipe jacking (1.1m diameter)
MAPUTO, MOZAMBIQUE:
(Seconded to Messrs. Frankipile (Pty) Ltd.
The work consisted of 30m pipe jacking (1.1m diameter)
EDUCATION
Grade 12, DF Malan High School Cape Town, 1994
ND Civil Engineering, Cape Technicon, 1998 (S2)
• NEC Contract for construction supervisors various workshops
• Legal liability for Construction supervisors, Legricon 2008
• Construction Safety Leadership Programs 2009
• Safety Harness workshop, International Risk Control Academy 2008
• Bulk Earth works for site Forman 2001
• A3 Risk Management Cert.
• Incident investigation cert
• Legal liability mine health and safety act
• Legal liability OHS act
• New Construction Regulations
• Program in Project Management (university of Stellenbosch Business school)
• Program in Project Governance (university of Stellenbosch Business school)
REGISTRATIONS/AFFILIATIONS
PMSA (Project Management of South Africa)
Shane Reynolds
Construction Manager
Résumé
shane Reynolds - CV Worley Parsons Corporate Base Page 6
Rev 9 (7-Nov-14)
SACPCMP Pr.CM (In progress)
PUBLICATIONS/PRESENTATIONS
SPECIFIC TECHNICAL EXPERTISE/SPECIALIST COURSES

More Related Content

What's hot

Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSOHAIL SHAH
 
Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)ahmed elazazy
 
Site engineer zak
Site engineer zakSite engineer zak
Site engineer zakZishan khan
 
CV_CIVIL ENGINEER_JOEMAR
CV_CIVIL ENGINEER_JOEMARCV_CIVIL ENGINEER_JOEMAR
CV_CIVIL ENGINEER_JOEMARJoemar Ramos
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cvwaleed ibrahim
 
C v surveyor( Mumtaz )
C v surveyor( Mumtaz )C v surveyor( Mumtaz )
C v surveyor( Mumtaz )Mumtaz Ahmad
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revisedAdnan Rehmat
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)Mohammad Khan
 
edwin cv for QA-QC Engineer
edwin cv for QA-QC Engineeredwin cv for QA-QC Engineer
edwin cv for QA-QC EngineerEdwin Aguinaldo
 

What's hot (20)

HUM-Surveyor-CV
HUM-Surveyor-CVHUM-Surveyor-CV
HUM-Surveyor-CV
 
QA QC Engineer CV
QA QC Engineer CVQA QC Engineer CV
QA QC Engineer CV
 
Civil engineer
Civil engineerCivil engineer
Civil engineer
 
Sohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site EngineerSohail Afzaal CV for Site Engineer
Sohail Afzaal CV for Site Engineer
 
Civil Site Engineer (2)
Civil Site Engineer (2)Civil Site Engineer (2)
Civil Site Engineer (2)
 
Site engineer zak
Site engineer zakSite engineer zak
Site engineer zak
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
CV Site Engineer Civil
CV Site Engineer CivilCV Site Engineer Civil
CV Site Engineer Civil
 
CV_CIVIL ENGINEER_JOEMAR
CV_CIVIL ENGINEER_JOEMARCV_CIVIL ENGINEER_JOEMAR
CV_CIVIL ENGINEER_JOEMAR
 
Surveyor cv
Surveyor cvSurveyor cv
Surveyor cv
 
Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)Karthikeyan CIVIL Engg Resume (1)
Karthikeyan CIVIL Engg Resume (1)
 
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
En-Waleed Ibrahim Sr. Construction Piping Engineer     cvEn-Waleed Ibrahim Sr. Construction Piping Engineer     cv
En-Waleed Ibrahim Sr. Construction Piping Engineer cv
 
C v surveyor( Mumtaz )
C v surveyor( Mumtaz )C v surveyor( Mumtaz )
C v surveyor( Mumtaz )
 
Adnan Resume revised
Adnan Resume revisedAdnan Resume revised
Adnan Resume revised
 
CV Dodo NEW
CV Dodo NEWCV Dodo NEW
CV Dodo NEW
 
Cv mm
Cv mmCv mm
Cv mm
 
MEP Manager CV)
MEP Manager CV)MEP Manager CV)
MEP Manager CV)
 
00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)00 resume of site supervisor (Pipeline & welding)
00 resume of site supervisor (Pipeline & welding)
 
edwin cv for QA-QC Engineer
edwin cv for QA-QC Engineeredwin cv for QA-QC Engineer
edwin cv for QA-QC Engineer
 
Curriculum Vitae Of Khalid
Curriculum Vitae Of KhalidCurriculum Vitae Of Khalid
Curriculum Vitae Of Khalid
 

Viewers also liked

Worley Parsons Avdhesh Yadav service letter 2016
Worley Parsons  Avdhesh Yadav service letter  2016Worley Parsons  Avdhesh Yadav service letter  2016
Worley Parsons Avdhesh Yadav service letter 2016Avdhesh Yadav
 
Trabajo 28 06-12 carlos anibal guzmán
Trabajo 28 06-12 carlos anibal guzmánTrabajo 28 06-12 carlos anibal guzmán
Trabajo 28 06-12 carlos anibal guzmánCANIGUZU
 
Old issues, new approaches - public private partnerships for effective recove...
Old issues, new approaches - public private partnerships for effective recove...Old issues, new approaches - public private partnerships for effective recove...
Old issues, new approaches - public private partnerships for effective recove...Global Risk Forum GRFDavos
 
06072CaldwellIRSE-final
06072CaldwellIRSE-final06072CaldwellIRSE-final
06072CaldwellIRSE-finalDavid Caldwell
 
WPI Capability 2014
WPI Capability 2014WPI Capability 2014
WPI Capability 2014Peter Mellor
 
Financing of New Nuclear Capacities
Financing of New Nuclear CapacitiesFinancing of New Nuclear Capacities
Financing of New Nuclear CapacitiesAlexander Wolski
 
Webinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modellingWebinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modellingGlobal CCS Institute
 
IAEA Mak2006: Financial Models & Vendor Agreements
IAEA Mak2006: Financial Models & Vendor AgreementsIAEA Mak2006: Financial Models & Vendor Agreements
IAEA Mak2006: Financial Models & Vendor AgreementsAlexander Wolski
 
Worley Parsons Overview Sept 09
Worley Parsons Overview Sept 09Worley Parsons Overview Sept 09
Worley Parsons Overview Sept 09rosalyndru
 
MIMOSA and IBM IIC - Role of Process, Systems and Tools in Integrated Project...
MIMOSA and IBM IIC - Role of Process, Systems and Tools in Integrated Project...MIMOSA and IBM IIC - Role of Process, Systems and Tools in Integrated Project...
MIMOSA and IBM IIC - Role of Process, Systems and Tools in Integrated Project...Cormac Ryan
 
Advances in Molten Salt Thermal Storage [CSTP 2010]
Advances in Molten Salt Thermal Storage [CSTP 2010]Advances in Molten Salt Thermal Storage [CSTP 2010]
Advances in Molten Salt Thermal Storage [CSTP 2010]Smithers Apex
 
solar power by molten salt technology
solar power by molten salt technologysolar power by molten salt technology
solar power by molten salt technologymadhu124521
 
CV & Construction portfolio
CV & Construction portfolioCV & Construction portfolio
CV & Construction portfolioOmar Rashed
 
Job Experience Letter Format
Job Experience Letter FormatJob Experience Letter Format
Job Experience Letter FormatYour HR World
 
EPC v EPCM Contracting- A Comparison
EPC v EPCM Contracting- A ComparisonEPC v EPCM Contracting- A Comparison
EPC v EPCM Contracting- A Comparisonhelensuni
 
Lesson Plan PowerPoint Presentation
Lesson Plan PowerPoint PresentationLesson Plan PowerPoint Presentation
Lesson Plan PowerPoint Presentationyseauy
 

Viewers also liked (18)

Ma.Aizobel CV Word
Ma.Aizobel CV WordMa.Aizobel CV Word
Ma.Aizobel CV Word
 
Worley Parsons Avdhesh Yadav service letter 2016
Worley Parsons  Avdhesh Yadav service letter  2016Worley Parsons  Avdhesh Yadav service letter  2016
Worley Parsons Avdhesh Yadav service letter 2016
 
Trabajo 28 06-12 carlos anibal guzmán
Trabajo 28 06-12 carlos anibal guzmánTrabajo 28 06-12 carlos anibal guzmán
Trabajo 28 06-12 carlos anibal guzmán
 
Old issues, new approaches - public private partnerships for effective recove...
Old issues, new approaches - public private partnerships for effective recove...Old issues, new approaches - public private partnerships for effective recove...
Old issues, new approaches - public private partnerships for effective recove...
 
06072CaldwellIRSE-final
06072CaldwellIRSE-final06072CaldwellIRSE-final
06072CaldwellIRSE-final
 
WPI Capability 2014
WPI Capability 2014WPI Capability 2014
WPI Capability 2014
 
Financing of New Nuclear Capacities
Financing of New Nuclear CapacitiesFinancing of New Nuclear Capacities
Financing of New Nuclear Capacities
 
Webinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modellingWebinar: Post-combusion carbon capture - Thermodynamic modelling
Webinar: Post-combusion carbon capture - Thermodynamic modelling
 
IAEA Mak2006: Financial Models & Vendor Agreements
IAEA Mak2006: Financial Models & Vendor AgreementsIAEA Mak2006: Financial Models & Vendor Agreements
IAEA Mak2006: Financial Models & Vendor Agreements
 
Worley Parsons Overview Sept 09
Worley Parsons Overview Sept 09Worley Parsons Overview Sept 09
Worley Parsons Overview Sept 09
 
CCS learnings from the LNG sector
CCS learnings from the LNG sectorCCS learnings from the LNG sector
CCS learnings from the LNG sector
 
MIMOSA and IBM IIC - Role of Process, Systems and Tools in Integrated Project...
MIMOSA and IBM IIC - Role of Process, Systems and Tools in Integrated Project...MIMOSA and IBM IIC - Role of Process, Systems and Tools in Integrated Project...
MIMOSA and IBM IIC - Role of Process, Systems and Tools in Integrated Project...
 
Advances in Molten Salt Thermal Storage [CSTP 2010]
Advances in Molten Salt Thermal Storage [CSTP 2010]Advances in Molten Salt Thermal Storage [CSTP 2010]
Advances in Molten Salt Thermal Storage [CSTP 2010]
 
solar power by molten salt technology
solar power by molten salt technologysolar power by molten salt technology
solar power by molten salt technology
 
CV & Construction portfolio
CV & Construction portfolioCV & Construction portfolio
CV & Construction portfolio
 
Job Experience Letter Format
Job Experience Letter FormatJob Experience Letter Format
Job Experience Letter Format
 
EPC v EPCM Contracting- A Comparison
EPC v EPCM Contracting- A ComparisonEPC v EPCM Contracting- A Comparison
EPC v EPCM Contracting- A Comparison
 
Lesson Plan PowerPoint Presentation
Lesson Plan PowerPoint PresentationLesson Plan PowerPoint Presentation
Lesson Plan PowerPoint Presentation
 

Similar to shane Reynolds - CV Worley Parsons

Raymond Guo 2016
Raymond Guo 2016Raymond Guo 2016
Raymond Guo 2016Raymond Guo
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3Moayad Qblawi
 
- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)NABIL NASSAR
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)Sachin Chitnis
 
Chandler Geoff 2016 cv
Chandler Geoff 2016 cvChandler Geoff 2016 cv
Chandler Geoff 2016 cvGeoff Chandler
 
Resume - RAVI PRAKASH
Resume - RAVI PRAKASHResume - RAVI PRAKASH
Resume - RAVI PRAKASHRavi Prakash
 
Mohab Samoil_Resume
Mohab Samoil_ResumeMohab Samoil_Resume
Mohab Samoil_ResumeMohab Samoil
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015Aminul Haque
 
Dnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CVDnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CVNANDLAL PRASAD
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.VAli Fakhir
 

Similar to shane Reynolds - CV Worley Parsons (20)

Raymond Guo 2016
Raymond Guo 2016Raymond Guo 2016
Raymond Guo 2016
 
Moayad c.v version 3
Moayad c.v version 3Moayad c.v version 3
Moayad c.v version 3
 
- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)- Nabil Resume - Civil - Construction-1 (3)( 2)
- Nabil Resume - Civil - Construction-1 (3)( 2)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)CV  -Sachin Madhukar Chitnis  -( Civil Roads, Utility,infra,metro rail ,)
CV -Sachin Madhukar Chitnis -( Civil Roads, Utility,infra,metro rail ,)
 
Hamdi.62016.PDF
Hamdi.62016.PDFHamdi.62016.PDF
Hamdi.62016.PDF
 
S.L Madlala May 2015
S.L Madlala May 2015S.L Madlala May 2015
S.L Madlala May 2015
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
Chandler Geoff 2016 cv
Chandler Geoff 2016 cvChandler Geoff 2016 cv
Chandler Geoff 2016 cv
 
CV1
CV1CV1
CV1
 
Sajeevresume_June-28-2015
Sajeevresume_June-28-2015Sajeevresume_June-28-2015
Sajeevresume_June-28-2015
 
majdi C.V
majdi C.Vmajdi C.V
majdi C.V
 
Poornesha Shetty-QA QC
Poornesha Shetty-QA QCPoornesha Shetty-QA QC
Poornesha Shetty-QA QC
 
Resume - RAVI PRAKASH
Resume - RAVI PRAKASHResume - RAVI PRAKASH
Resume - RAVI PRAKASH
 
Mohab Samoil_Resume
Mohab Samoil_ResumeMohab Samoil_Resume
Mohab Samoil_Resume
 
Bill resume
Bill resumeBill resume
Bill resume
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
 
Naveed Asif C.V Updated
Naveed Asif C.V UpdatedNaveed Asif C.V Updated
Naveed Asif C.V Updated
 
Dnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CVDnyaneshwar_Sonawane CV
Dnyaneshwar_Sonawane CV
 
ALI FAKHIR IBRAHEEM - C.V
ALI FAKHIR IBRAHEEM -  C.VALI FAKHIR IBRAHEEM -  C.V
ALI FAKHIR IBRAHEEM - C.V
 

shane Reynolds - CV Worley Parsons

  • 1. Shane Reynolds Construction Manager Résumé shane Reynolds - CV Worley Parsons Corporate Base Page 1 Rev 9 (7-Nov-14) SUMMARY Multi Discipline Construction manager Over 17 years’ working experience as a civil engineering construction manager working on large and small scale projects in the infrastructure industry. Extensive experience gained in the roads and underground services infrastructure, ranging from pipe jacking, concrete works, water lines, storm water pipe construction road works, gabion installation, railway formation construction to bulk earth works. Water and sewer reticulation networks and electrical installations inclusive of water towers and sewer pump stations. Currently working as a construction Manager on buildings as well as civil infrastructure work in the Mining environment Ensure that the work entrusted to the contractors is carried out in strict compliance with the site health, safety and environmental requirements, the quality, technical, financial and schedule requirements of the subcontracts and sound engineering practices are carried out. Supervision of construction activities, chair technical meetings and attend coordination and progress review meetings with construction contractors. Ensure compliance to works information, drawings, field Engineering Queries and project managers’ instructions. Monitoring of Project cost and schedules. EXPERIENCE Current Construction Manager, WorleyParsons RSA, Kathu Project – Sishen Housing Infrastructure Projects (SHIP) – Anglo American Duties include but not limited to: • Representing the client on site • Managing the principal contractor and sub-contractors on site • Controlling and monitoring quality of civil and building works • Checking on progress of construction works • Checking on quantities • Checking on all relevant testing of works • Check on site costing and payment certificates • Reporting on production • Problem solving • Seeing that the contractors adhere to all construction specifications and regulations • Seeing that contractors on site adhere to all Health and Safety aspects on site • Good knowledge of SABS and SANS specifications • Compiling Procurement documentation Key Performance Areas: optimum safety standards are maintained throughout every phase of the project’s life cycle. Project is completed in accordance with the current schedule as agreed with the client. Project cost is within latest approved project budget. Commercial issues are resolved to the optimum benefit of the employer. Compliance with all technical and quality requirements contained in the contract, or as agreed with client. Project execution is to the client’s satisfaction and management’s satisfaction. Best possible client relations are maintained throughout the project lifecycle.
  • 2. Shane Reynolds Construction Manager Résumé shane Reynolds - CV Worley Parsons Corporate Base Page 2 Rev 9 (7-Nov-14) Project – Phase 4A, Construction of 671 houses inclusive of all civil infrastructures Phase 4B Construction of Civil services for 245 stands Phase 4C Construction of Bulk sewer pump station and infrastructure civil services for 360 housing stands Artesian Drain Construction of 400m artesian drain inclusive of pump station Bulk Sewer servicer Construction of 2 bulk sewer pump stations inclusive of a 2km sewer rising main Bulk water Supply Construction of a 600mega litre water tower inclusive of a chlorination building and 2km water line Bulk electrical Supply Construction of a 11kv underground line 4km connected to the power station 476 Family Housing Development All Civil infrastructure, roads, water sewer and electrical reticulation infrastructure work for 476 housing stands Boarding Houses Civil construction works for 140 housing units inclusive of roads, sewer water and sewer pump station plus sewer rising main Civil Services for management Housing Civil infrastructure works (Roads Water and Sewer reticulation) Civil services for Management Cluster Units Civil infrastructure works (Roads Water and Sewer reticulation) Buffer Dam Construction of a 10 mega litre sewer works buffer dam Waste Water Treatment Works Pump Station Refurbishment of an existing sewer pump station
  • 3. Shane Reynolds Construction Manager Résumé shane Reynolds - CV Worley Parsons Corporate Base Page 3 Rev 9 (7-Nov-14) 2008 - 2012 NEC Construction Supervisor, Mott Macdonald, Port Elizabeth Project – Ngqura Harbour Construction (Building and Civil works) Construction of a new deep water container port inclusive of all marshalling yard and rail works Duties include but not limited to: • Representing the client on site • Managing the principal contractor and sub-contractors on site • Controlling and monitoring quality of civil and building works • Checking on progress of construction works • Checking on quantities • Checking on all relevant testing of works • Check on site costing and payment certificates • Reporting on production • Problem solving • Seeing that the contractors adhere to all construction specifications and regulations • Seeing that contractors on site adhere to all Health and Safety aspects on site • Good knowledge of SABS and SANS specifications • Compiling Procurement documentation Key Performance Areas: optimum safety standards are maintained throughout every phase of the project’s life cycle. Project is completed in accordance with the current schedule as agreed with the client. Project cost is within latest approved project budget. Commercial issues are resolved to the optimum benefit of the employer. Compliance with all technical and quality requirements contained in the contract, or as agreed with client. Project execution is to the client’s satisfaction and management’s satisfaction. Best possible client relations are maintained throughout the project lifecycle. 2007 - 2008 Site Manager, Wascon Civils, Port Elizabeth Project – Govan Mbeki Township: Roads & underground services phase I & 2 Contract value R17, 000,000.00 2001 - 2007 Site Manager, UniCivils, Port Elizabeth DELTA MOTORCORPORATION – KEMPSTON ROAD: 1. Contract value of R500,000.00 2. Construction of heavy duty parking space. 3. Size: 2000m2
  • 4. Shane Reynolds Construction Manager Résumé shane Reynolds - CV Worley Parsons Corporate Base Page 4 Rev 9 (7-Nov-14) MATTHEW GINIWE HOSTEL: 1. Contract value of R400,000.00 2. Construction of roads & storm water pipes. BETHELSDORP: 1. Contract value of R1.4 million 2. Construction of 10 000m sewer line – 150 in diameter. UITENHAGE ROAD WORKS: 1. Construction of roads to the value of R2 million. KWAZAKHELE ROADWORKS – Part 1 (Ward 16 + 17): 1. Construction of road works to the value of R900,000.00 BAVIAANSKLOOF: 1. Construction of course-way & road maintenance in the Baviaanskloof area. 2. Contract value of R1.4 million. BULK STORMWATER – KWAZAKHELE: 1. Contract value of R800,000.00 2. Construction 700m of 1.2” diameter storm-water pipe system plus retention dam. VOLKSWAGEN UITENHAGE: 1. Contract value of R700,000.00 2. Construction of building platforms/storm water drainage/water lines. MARIO LEVI – UITENHAGE: 1. Contract value of R500,000.00 2. Construction of building platforms/storm water drainage & also including underground services. KWAZAKHELE ROADWORKS – Part 2 (Ward 15 + 16): 1. Contract value of R1.4 million 2. Construction of road-works KWAZAKHELE ROADWORKS – Part 3 (Ward 19): 1. Contract value of R1.4 million 2. Construction of road-works .
  • 5. Shane Reynolds Construction Manager Résumé shane Reynolds - CV Worley Parsons Corporate Base Page 5 Rev 9 (7-Nov-14) 2000 - 2001 Site Manager, Fairbrothers Engineering, Cape Town TABLE MOUNTAIN, CAPE TOWN: The work consisted of: 1. Strengthening of reticulation dam wall by means of post tension cables. 2. Testing of cable tension and anchor strength. SEEKOEIVLEI, RETREAT: The works consisted of 30m pipe jacking (1.1m diameter) MAPUTO, MOZAMBIQUE: (Seconded to Messrs. Frankipile (Pty) Ltd. The work consisted of 30m pipe jacking (1.1m diameter) EDUCATION Grade 12, DF Malan High School Cape Town, 1994 ND Civil Engineering, Cape Technicon, 1998 (S2) • NEC Contract for construction supervisors various workshops • Legal liability for Construction supervisors, Legricon 2008 • Construction Safety Leadership Programs 2009 • Safety Harness workshop, International Risk Control Academy 2008 • Bulk Earth works for site Forman 2001 • A3 Risk Management Cert. • Incident investigation cert • Legal liability mine health and safety act • Legal liability OHS act • New Construction Regulations • Program in Project Management (university of Stellenbosch Business school) • Program in Project Governance (university of Stellenbosch Business school) REGISTRATIONS/AFFILIATIONS PMSA (Project Management of South Africa)
  • 6. Shane Reynolds Construction Manager Résumé shane Reynolds - CV Worley Parsons Corporate Base Page 6 Rev 9 (7-Nov-14) SACPCMP Pr.CM (In progress) PUBLICATIONS/PRESENTATIONS SPECIFIC TECHNICAL EXPERTISE/SPECIALIST COURSES