1. Pranay Gupta
E-Mail: gupta_pranay@rediffmail.com
Mobile: + 918860002022 / +918750040402/+911122500102
Seeking challenging assignments in Site Administration / Project coordination /Construction
Management with a growth oriented organization preferably in Project management consultancy or
Construction Industry
Professional Profile
⇔ Result oriented construction & development professional with 22 years’ experience in Execution
(including MEPs works), Planning Management of Civil & Construction Projects.
⇔ Currently working with Afon Structure and Infra Pvt.Ltd as Deputy General Manager (Projects).
⇔ Expertise of various latest engineering tools and techniques, cost evaluation techniques and tools
which can be applied to produce cost-effective solutions for the organizations.
⇔ A Project planner with expertise in planning, executing and spearheading construction Projects
involving, Contract Administration in compliance to Quality and Standards,
⇔ Adept in swiftly ramping up Projects in close co-ordination with Contract Cell, Materials
Procurement Cell, Consultants (including MEPs), Architects & Contractors and ensuring on timely
deliverables.
⇔ Deft at establishing and maintaining Project documentation including correspondence, technical
and progress
⇔ Regularly reviewing the Reports and contract / claim documents, including Risk management
⇔ Excellent communication & interpersonal skills with strong analytical, team building, problem
solving and Organizational abilities.
⇔ A strategist with the ability to handle high pressure environments with ease and an open positive
mind.
⇔ Monitoring Zero budget and ‘S’ curve of the Project as per the mile stone and Project value and
duration.
⇔ Preparation of BOQ and rate analysis for extra item.
⇔ Estimation with drawing and coordinating with consultant (Structural and MEPs) for drawing
release.
⇔ Preparing Schedule as per the mile stone and comparing with L1 schedule.
⇔ Finalizing rates with sub-contractors/ Vendors as per the budget.
⇔ Evaluating Project, present cost/ benefits analysis at Project decision points.
Organizational Experience
Tenure Company Name Designation
Aug 2015 to till date Afon Structure and Infra Pvt.Ltd DGM (Projects)
July 2011 to June 2015
November 2007 to July 2011
Shapoorji Pallonji & Co. Limited Project Manager(Projects)
Construction Manager
November 2002
to November 2007
Larsen & Toubro Limited
(ECC Division)
Senior Engineer
February 2002
to November 2002
International Metro Civil
Contractors
Assistant Engineer
May 1994 to February 2002 Jai Prakash Industries Limited Senior Field Engineer
Core Competencies
Project Planning & Management
• Managing overall operations for executing Projects related to construction & MEPs of various
buildings within budget & time parameters.
• Monitoring Projects with respect to budgeted cost, demand forecasts, time over-runs to ensure
timely completion of Projects including Risk assessment & mitigation
• Preparing and monitoring Macro/Micro Level Project Schedules using various software’s
Site & Construction Management
Page 1 of 5
2. • Anchoring on-site construction & all services(MEPs) activities to ensure completion of Project
within the time & cost parameters
• Effective resource utilization to maximize the output.
• Review of engineering drawings (Structural and MEPs), technical specifications, cost estimates for
change orders.
• Scrutinize Suppliers & contractor's change order proposals, submissions and get it approve.
• Inspecting field sites to observe and evaluate condition and operability of facilities and structures.
Materials Management
• Directing the development and implementation of key procurement strategies / contingency plans.
• Ensuring that strategies & plans are aligned with Project requirements.
• Developing long-term partnerships with suppliers; managing day-to-day supplier performance to
ensure meeting of service, cost, delivery and quality norms.
Commercial Operations / Coordination
• Managing the tendering process from floating of tenders/bids to awarding of contracts; coordinating
with Contractors with regard to techno-commercial negotiations.
• Conducting meetings with client & consultant on contractual matters regarding progress of works,
claim situations and other construction issues.
• Liaising with Internal & External Agencies (Structural &MEPs) for obtaining various approvals /
clearances.
• Mobilization and Demobilization of resources, budgeting for the Projects well in time
Employment Scan
Afon Structure and Infra Pvt. Ltd
Projects headed as a DGM (Project coordinator)
⇔ Title: Assembly hanger of overhaul at HAL, SED, Sunabeda, Koraput (Odisha) I/c Civil works,
Water Supply, Sanitary Installation, Drainage Development Works, Internal Electrical
Installations ,EOTs, Mechanical Works, HVAC System, Fire Fighting, Fire Alarms System,
Substation building and Under Ground Sumps
⇔ Client: Central Public works Department INDIA
⇔ Scope: Value of Project is INR54.40 cores (Item rate Contract), The Project is PEB building
including all civil works and services (MEPs) works, covered area 1.26 lac sqf.
⇔ Title: The Palza, DAULTABAD, SEC-106, GURGAON. (Only civil works without finishes)
⇔ Client: M/S VIRIDIAN GF-09, Plaza M6, District Centre, Jasola, New Delhi - 110 025, India
⇔ Scope: Value of Project is INR74.62 cores (cost Plus contract).The Project is high rise
commercial building with 21 stories (G+20) & with two basement and. Covered area 9.57 lac sqf
Role: Being as a Project coordinator on above Projects
Coordinating with consultants (Structural and MEPs) & client for drawing release, approvals front &
payment release.
Controlling the Project as per the schedule.
Executing the Project as per the mile stone and achieving the target.
Tracking & coordinating for Bought out item.
Coordinating with other departments (internal and external) for smooth completion of Projects.
Quantity survey, rate analysis for extra item, planning, MIS to management
Conducting review meeting with site and top management for Project performance and costing.
Controlling the sub-contractor and WO as per the budget & schedule.
Coordinating for material requirement like cement, steel and BOI.
Mobilization and Demobilization of resources, budgeting for the Projects well in time
⇔ Coordination with Internal & External Departments for Structure, MEP, and Utility includes HVAC,
etc. for the Projects.
With Shapoorji Pallonji & Co. Limited
Projects Headed as a Project Manager
⇔ Title: Twin Tower Residential Accommodation for AWHO, Ph.-IV, Greater Noida, UP. (From 14 Apr
2011 TO 30 JUN 2015) Covered area 757504 sqf
Page 2 of 5
3. ⇔ Client: Army Welfare Housing organization
⇔ Scope: Value of Project is INR151.52 cores (Lump sum Contract),The Project is HIGH RISE twin
tower building with 298 dwelling units in 28 story blocks(S+27) & a common basement and all
internal and external services,
⇔ Title: Construction of Residential Accommodation for JP Greens (CSMC), Greater Noida, UP.
(From 23 July 2012 to 13 Apr 2015)
⇔ Client: Jay Pee Green Ltd (Branch of Jai Prakash Industries Ltd.)
⇔ Scope: Value of Project is INR91.21crs (Cost Plus Contract), The Project having five HIGH RISE
towers with 250 units in (S+19) story blocks and one common basement along with complete
structure and finishing works. Covered area 697504 sqf.
⇔ Title: Tata Motors Pantnagar Project (from 27 Nov’2007 to 13 Apr’2011)
⇔ Client: Tata Motors Ltd.
⇔ Scope: Construction of ACE, NANO, VENTURE Project (initial valve was 123crs but As on
31.03.2011 the value was INR214.00 Excluding steel and cement) (Item rate Contract)
⇔ Major quantities executed as a team leader Excavation 3.6lac cum, Backfill 9.68lac cum,
⇔ Concrete 1.56lac cum, Brickwork 0.68lac cum, Plaster(Ext.& Int.) 2.9lac sqm, VDF 0.92lac
Sqm,
⇔ Road work 1.81lac sqm, Pipelines 112886RMT (DWL, IEL, DEL), Strom water line
18800Rmt
Role: Being as a Project Manager on above Projects
⇔ Make construction strategies to control the profit, schedule and maintain the cash flow
⇔ Organize the Manpower, construction equipment & stakeholder management
⇔ Monitoring the master schedule with complete safety and quality
⇔ Maximize the usage Ratio and minimize the wastages
⇔ To mentor and lead a skilled team of engineers & managers & Organize the, specialize Agencies
and vendors to complete the project with in time & cost
⇔ Conducting regularly review meeting with client & consultant (Structural and MEPs) to resolve the
bottle neck of the Project.
⇔ Conducting review meeting with site and top management for Project performance and costing.
⇔ Close monitoring of quantity tracking.
⇔ Controlling the sub-contractor and WO as per the budget & schedule
⇔ Mobilization and Demobilization of resources, budgeting for the Projects well in time
⇔ Coordination with consultants and Government departments for Structure, MEP, and Utility includes
HVAC, etc. for the Projects.
With Larsen & Toubro Limited (ECC Division)
⇔ Title : Subansiri Lower Hydroelectric Project (A.P), India
⇔ Client : National Hydroelectric Power Corporation
⇔ Scope : The Project was executed for constructing 2000 MW Subansiri Lower Hydroelectric Project.
Role: As Senior Engineer (Civil), involved in:
⇔ Excavation (with Road Header, Rock Cutter & Water Jet) and concerting of Adit & main
Tunnels
⇔ Tunnelling as per approved NATM construction method.
⇔ Planning, monitoring and execution of construction related activities.
⇔ Monitoring the progress & the cycle time for different functions.
⇔ Preparation of theoretical cycle time.
⇔ Preparing actual schedule of resources required based on achieved progress.
⇔ Reconciliation of materials and quantities
⇔ Monthly preparation of subcontractor’s bills & site client bill
⇔ Preparation of rate analysis, analysis of BOQ, rate finalization with contractors and suppliers etc.
⇔ Preparing rolling budget according to the site condition.
⇔ Preparing MIS document to HO.
⇔ Preparing rate analysis for extra item as per the market rate.
Page 3 of 5
4. ⇔ Recipient of incentive and promotion for cost reduction.
⇔ Title : Purulia Pumped Storage Project (900MW), West Bengal
⇔ Client : Taisei Corporation Japan
⇔ Role : As Engineer (Tunnel), involved in:
⇔ Planning, monitoring and execution of construction related activities.
⇔ Excavation and concerting (RCC) of
⇔ Inclined (46 degree) Penstocks (273m x 2 Nos.)
⇔ Inclined Cable (32 degree) Tunnel (284.38m)
⇔ Vertical Shaft (3 m dia x 39 m).
⇔ Diversion Tunnel Inlet Structure (RCC).
⇔ Excavation and invert concrete (RCC) of Upper Penstock Tunnel (450.230m).
⇔ Preparing actual schedule of resources required based on achieved progress.
⇔ Reconciliation of material.
⇔ Monthly preparation of subcontractor’s bills
⇔ Preparation of rate analysis, analysis of BOQ, rate finalization with contractors and
suppliers etc.
⇔ Preparing rolling budget according to the site condition.
⇔ Preparing MIS document for RO/ HO.
⇔ At International Metro Civil Contractors
⇔ Title: Delhi Metro Corridor – 1 B, New Delhi
⇔ Client : Delhi Metro Rail Corporation
⇔ Scope: The Project was executed to make Chawari Bazaar Metro Station (Under Ground, Dee 34
mtr 78 mtr long & 103 mtr wide) for metro train.
Role: As Assistant Engineer (Civil), involved in:
⇔ Planning, monitoring and execution of construction related activities, viz.
⇔ Underpinning, Diaphragm Wall, Utility Diversion & Column Shaft (2.5 m dia. & 32 m deep),
Excavation, Concreting etc.
⇔ Preparing of DPR and productivity report on daily basis
⇔ To ensure the quality standards as per the clients requirement
⇔ Verify PRW bills & ensure bill realization from the client. Checking and processing of bills with
reconciliation statement.
⇔ Documentation of Project data/ records/ Drawings.
⇔ Planning and Follow-up required for manpower, materials and machinery at site as per the
construction schedule for the site.
⇔ At Jai Prakash Industries Limited
⇔ Title : Baglihar Hydro Electric Project (450 MW), Jammu & Kashmir
⇔ Client : Power Development Corporation of J&K
⇔ Role : As Senior Field Engineer (Civil), involved in:
⇔ Planning, monitoring and execution of construction related activities, viz. drilling
Blasting, Heading, Benching, Shot-Crete, Rib Erection, concreting etc.
⇔ Preparing monthly client bill and certifying. Checking and processing of bills with reconciliation
statement.
⇔ Preparing sub-contractor bills,Preparing of DPR on daily basis to submit for HO
⇔ Planning and Follow-up required for manpower, materials and machinery at site as per the
construction schedule for the site
Education
a) 1994 Diploma in Civil Engineering (DCE) with 74.69% from U.P Board of Technical Education,
Lucknow.
b) 1994 Computer Course sponsored by "Ministry of Human Resources and Development", Govt. of
India.
Page 4 of 5
5. PERSONAL DETAILS
a) Date of Birth: 4th September 1971
b) Residential Address: D/74, Preet Vihar, New Delhi-110092.
c) Passport No. : N8720650 (VALID TILL JUNE’2026),issued from DELHI
Page 5 of 5
6. PERSONAL DETAILS
a) Date of Birth: 4th September 1971
b) Residential Address: D/74, Preet Vihar, New Delhi-110092.
c) Passport No. : N8720650 (VALID TILL JUNE’2026),issued from DELHI
Page 5 of 5